East Rochelle Oil and Gas Field, Block 15/27, North Sea, United Kingdo

Share on facebook Share on twitter Share on email Share on print More Sharing Services 14

Ke! "ata

East Rochelle oil and gas field is located in Block 15/2 of the !reater Rochelle area "prod#ction licence $22%& in the '( section of the )orth Sea* +t lies abo#t 2 miles awa, from the '( coastline in the central )orth Sea* -he field is sit#ated appro.imatel, 115 miles north/east of 0berdeen1 Scotland1 in a water depth of abo#t 4%2ft* -he field achieved first prod#ction from the 3est Rochelle prod#ction well in 4ctober 2215* -he development has an e.pected field life of si. ,ears1 with prod#ction anticipated to contin#e #ntil 221 *

Endea#o$r Energ!, Ne%en and &re ier Oil 'artnershi'

6-he field is sit#ated appro.imatel, 115 miles north/east of 0berdeen1 Scotland1 in a water depth of abo#t 4%2ft*6 -he !reater Rochelle area is a combination of two #ndeveloped oil and gas fields1 namel, 3est Rochelle "blocks 15/2%b and 15/2%c& and East Rochelle "block 15/2 &* -he 3est Rochelle became operational in 4ctober 2215 and the East Rochelle is e.pected to be operational b, the end of 2215* -he area is 7ointl, owned b, Endeavo#r Energ,1 a s#bsidiar, of -e.as/based Endeavo#r +nternational 8orporation1 )e.en $etrole#m '(1 a s#bsidiar, of oil and gas compan, )e.en1 and $remier 4il1 an independent #pstream oil and gas compan,* Endeavo#r has a 449 working interest1 while )e.en and $remier 4il have 419 and 159 working interests in the field1 respectivel,* )e.en is the operator of the field*

(!drocar)on #ol$ es and reser#es at East Rochelle


!as in place for the East Rochelle field for low1 base and high cases is estimated to be 11: billion c#bic feet "bcf&1 15 bcf and 1:5bcf respectivel,* -he planned recover, of gas from the field is estimated to be %;bcf for low case1 11;bcf for base case and 15 bcf for high case* 8ondensate recover, rates are estimated to be abo#t 2*5 million barrels "mmbbl& for low case1 4*4mmbbl for base case and 4*:mmbbl for high case*

Greater Rochelle*)ased oil and gas +ield disco#er!


East Rochelle field was originall, discovered and drilled b, the <ess 8orporation "formerl, 0merada <ess& in 2222 as the Rochelle field "discover, well 15/2 /:&* 6-he 3est Rochelle became operational in 4ctober 2215 and the East Rochelle is e.pected to be operational b, the end of 2215*6 -he original Rochelle field was renamed as East Rochelle after the discover, of 3est Rochelle acc#m#lation in 2212 b, the 15/2%b/12 discover, well* Endeavo#r ac=#ired the field>s licence in 222% and drilled the appraisal well 15/2 /11 in late 222; and tested it in earl, 222:* -he appraisal well was drilled to a total depth of 511%2m b, the Sedco 24 semis#b* Endeavo#r s#bmitted an environmental impact statement "E+S& for East Rochelle to the '( ?epartment of Energ, and 8limate 8hange "?E88& in March 2212* -he statement was approved in late 2212*

-he field development plan "@?$& for Rochelle was approved b, the ?E88 in @ebr#ar, 2211*

East Rochelle and Scott 'lat+or in+rastr$ct$re

tie*)ack

6Endeavo#r ac=#ired the field>s licence in 222% and drilled the appraisal well 15/2 /11 in late 222; and tested it in earl, 222:*6 East Rochelle oil and gas field is being developed as a s#bsea tie/back to the Scott platform located in Block 15/22* -he platform is operated b, )e.en $etrole#m with a 41*:9 working interest and has been in operation since 1::5* @ield development incl#des constr#ction of #p to two prod#ction wells1 installation of a new prod#ction pipeline #p to the )e.en>s platform and tie/back of the wells to the platform* 0 separate 1:/mile control #mbilical will also be installed from the platform to the prod#ction wells to provide h,dra#lic / electrical control1 chemicals and pipeline treatments to the wellhead locations* East Rochelle h,drocarbons will be carried to the Scott platform via a 1:/mile1 12in diameter prod#ction pipeline* @rom there1 oil will be transported to the !rangemo#th Refiner, b, the @orties $ipeline S,stem and gas will be transmitted to the St* @erg#s !as -erminal via the Scottish 0rea !as Evac#ation "S0!E& s,stem* 0s of 0pril 22121 f#ll pipeline fabrication has commenced after the completion of the assembl, of pipeline section* ?rilling on the first prod#ction well and s#bsea installation were commenced d#ring the second =#arter of 2212* 3ork on the pipe was commenced in the third =#arter of 2212*

,ontractors in#ol#ed -ith the UK North Sea +ield


+n A#ne 22111 -echnip was awarded an engineering1 proc#rement1 constr#ction and installation "E$8+& contract worth B;;m for the East Rochelle development* -he scope of contract incl#des complete pro7ect management and detailed design1 assembl,1 installation and pre/commissioning of 1: miles of pipe/in/pipe1 fle.ible riser1 s#bsea isolation valves1 manifolds and free iss#e #mbilicals to control s#bsea str#ct#res* 4ther works incl#de tie/in spools1 trenching1 backfill and s#bsea rock d#mping* -he first of the two development wells was drilled b, ?iamond 4ffshore>s 4cean )omad rig* S#bsea #mbilicals and associated e=#ipment will be s#pplied b, 0ker Sol#tions* -he contract1 signed in A#l, 22111 is worth B15m and incl#des s#ppl, of one one/mile long infield control #mbilical and one 21155ft riser #mbilical*