General Tips and guide For Beginners Planners

Planning Presentation Preview


General Layouts charts for WBS Model . General Sequence flow for Activities (Site Development&super structure). Steps & Rate for General Activities. Construction Flow graph for Finishing Work. Activities Photos.

Eng:Ahmed Abd Elfattah .. 00966581260580, ,eng_ahmedhamoda@hotmail.com

WBS Model

1-Miles Stones 2-Mobilization


3-Design Of Project ( Engineering)

4-Shop Drawings

5-Procurment 6-Precast Production

7-Construction

1-Miles Stones
Start Date Start of N.T.P (Notice To Proceed) Start of Construction or End Date Complete of Material Delivery Complete of Sub Structure

Complete of SuperStructure Take the major Activities from the Contract


5

2-Mobilization

Pre-Construction Survey Report Provision of Layout Area by Royal Commission

3
4

Plan of Laydown Area


Technical Submittal Program

5 6

Contract Schedule
Insurance Certificates List of Plant Equipment
Detailed Quantity Take-off of Issued Const'n.

1-Documents

7 8 9
10
11
12

Fire Prevention Program

Organization Chart
Safety Program As-Built document Program

13 14 15

Procurement Program Including Shipment/Delivery


Quality Control Program Security Program
6

Mobilization

Construction of Project Boundary Fence

2-Site Work

Mobilization of Construction Equipment

6
7

3-Design Of Project ( Engineering)


1-Design&Drawing of Precast ( Panels&Hollowcore)

1-Civil Design

2-Design&Drawing of Foundation
3-Design&Drawing of Sipporix panels

4-Samples for approval


1-Plumbing Design 2-HVAC Design 3-Potable&Fire Fighting Design

2-Mechanical Design

3-Electrical Design

1-All Electrical Work Design


8

4-Shop Drawings 1-Sanitary PipeLine 2-Storm PipeLine 3-Potable&Fire PipeLine 4-Irrigation PipeLine 5-MECH. Co-ordination dwgs 6-Low Current System dwgs 1-Foundation 1-Skilton System 2-Finishes ( Floors , walls , Skirting ) 3-Electrical Work 4-Mechanical Work
9

1-Site Development

2-Housing

5-Procurment

Prepare /Submit FS

Review / Approve

SS

Prepare / Place PO ( Purchase Order)

FS

Production / Delivery Longest Duration


10

1-Architectural

1-Floor and Wall Tiles 2-Single ply roofing & aluminum counter flashing 3-Doors, Windows & Finishes 4-Built-in & modular cabinets

5-Stair handrail, dec. & stainless steel railing


Conduit, Flexible & PVC Associated Electrical item Panel Board & Circuit Breaker LV Cables & grounding Conductor

2-Electrical

Fire alarm system, boxes & LV cables Complete accessories for telecom ''Voice&data'' Complete accessories for telecom ''Video Interco Complete accessories for telecom ''IPTV'' system Lighting Fixture with Lamp
11

3-Mechanical

uPVC Pipe in trench for Sanitary System uPVC Pipe in trench for Potable System Cold & Hot uPVC Pipe with fittings Plumbing System Accessories

HVAC System Accessories


Package Airconditioning Unit ''PACU'' Lavatory Basin & Kitchen Sink

Portable Hand Held Fire Extinguisher

4-Boundary walls

Boundary Wall Precast Elements

Overhead cooling & steel gate door and Steel frame car shade

5-Equipments

Refrigerator, Washing Machine & dry machine Electrical cooking & steel gate hood
12

WBS Model
Shop Drawing

Mile stones

Mobilization

Engineering ( design )

Materials

Site Development Site preparation & earth work Telecommunication Sanitary waste water Storm Drainage system Potable water &fire water supply system Roads Electrical Lighting Irrigation Distribution

Elect ( MV / LV ) Power Distribution

Road Work

Landscape & Hardscape

13

Infrastructure logic steps Site development Activities


9
8 7 6 5

Landscape & Softscape


ROAD WORKS ROAD lighting

) Electrical Cables (MV/LV ( ) Telecommunication Irrigation water Distribution

4
3 2 1 0

Potable & fire water supply Storm Drainage system sanitary waste water Site Preparation
14

Super Structure Logic Relation

Concrete Work

Civil Finishing Work

Mechanical Work

Electrical Work

15

Precast- panels & Stairs Precast- Hollow core

Roofing isolating System

Doors & Windows


Surface Preparation putty WaterProofing Sanitary Fixtures

Plastering
Electrical Roughin Work

Floor tiles Electrical Wiring Marble for Stairs

Block Work

Electrical Lighting Fixtures&Switches

Concrete Screed

Painting

Skirting for Stairs


Mechanical-1st Fix piping ( Sanitary , hot & Cold , Ac pipes
Marble Floors Metal work ( Handrail) Gypsum Board ( Steel system , cladding , painting ) Furnishing 16 Kitchens& Rooms

MechanicalFirefighting pipes
MechanicalDucting&AC pipes

Activities/Steps & Rates Pre-cast & Finishing


PRECAST: Panels&Stairs Hollow Core Alignment(Finishing)With MANLIFT crane. ( From 4 to 7 days ) to Finish (Panels or Hc) 1 level for Apartment containing ( 4 flats ) = 1 Complete floor ( 860m2) in 14 days. Roofing system: Roughin Work Screed WaterProofing Foamsheets Whitesheets(Cover) Back Fill ( Gravel ) Roof Tiles ( Terrazo ). Fire Alarm System: piping (with roughin work) Pulling Cables ( With wiring work ) Fire Alarm Panels (After putty on walls ) Termination (With Lighting Fixtures)

17

Activities/Steps & Rates (Site development)


Curbstones:
Surveyer Backfill&Compaction (Min 10 m to 25m) /day Lean Concrete Curbstones installation .

Potable&Firewater system:
Excavation Installing pipes thurst Block Testing Warning tape Backfill. (From 80 to 100 m (Excavation+Installing pipes UPVC)/ 3 days ) IF WORK IS OPENED

Electrical Work :
_Wiring LVC into buildings&link it to the Electrical Room ( Black & Blue cables) _Electrical Room Duct Banks Excavation transh For MVC installing Cables(loops) between stations and the main line which feeding the project . _Lighting Poles : Lean Conc. Precast Foundation Piping Work Pulling cables Installing Light Poles Fixing Accessories

18

Construction flow for finishing Work

19

Notes : LOGICAL REALATIONS


Site Development:
_Dont start CURBSTONES untill you finish ( house Connection for sanitary and protable&firewater). _Meduim voltage cables( run under roads) take from main cable out site to Electrical rooms inside project then low voltage cables from Elec.rooms to Buildings .

Finishing :
Windows&doors take 25%. Doors & Windows. Work Start Once Marble for stairs & SP finished

_Once Sp Finished _Painting 1st Coat _HandRail Metal

Electrical :

_Once Roughin start Fire alarm system&IPTV SYSTEM TAKE (HALF)OF ITS %. _Lighting Fixtures cant start untile Gypsum board & Painting ceiling Finished

Mechanical:
Start on firefighting Pipes & Mechanical 1st fix .

_Once precast finish

20

Activities Photos

21

Precast Erection&Alignment:

22

23

24

Potable&Firewater Pipes

25

26

Mechanical Work

27

28

29

Electrical ( Roughin )&SCREED

30

31

Block Work:

32

Light poles Foundation

33

Curbstones

34

Electrical Room &Duct bank


Elec. Room

Duct banks

35

Wiring Low Voltage Cables to Buildings


Duct banks

Cables DRUM

L.C.V Pulling

ELEC. Room

36

Shuttering &Steel Work

Pouring& Curing

Installing Pipes

37

Roofing System:
Roughin Electrical Work Foam Concrete with Slopes Concrete pads For HVAC units

Isolating

Isolating & Testing

38

White Sheets

Blue Foam Boards

39

Backfilling with AGG.

Roof tiles (Terrazzo)

HVAC outdoor Units

40

Telecom Duct Banks

41

42

Irrigation System

43

Flooring ( Out Doors ) (After , LV , Irrigation , House Connection Sewer)

44

Gypsum Board
Cladding &Painting

Metal Suspended Frames

45

Meduim Voltage Cables

46

General Items
Water Meters Box

47