Professional Documents
Culture Documents
A-02
A-03
A-04
URAIAN
HARGA
(Rp)
35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,315.90
269,316.00
35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,235.90
355,236.00
28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,842.90
222,843.00
22,446.00
468.00
14,501.90
4,200.00
6,500.00
750.00
400.00
49,265.90
49,266.00
No.
URAIAN
HARGA
(Rp)
35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,135,065.75
1,135,066.00
47,600.00
554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
927,350.00
927,350.00
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
861,935.00
861,935.00
No.
A-08
A-09
A-10
A-11
A-12
A-13
URAIAN
HARGA
(Rp)
4,200.00
4,000.00
8,200.00
8,200.00
30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00
280,014.00
26,640.00
306,654.00
306,654.00
280,014.00
2,640.00
282,654.00
282,654.00
196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00
900.00
1,520.00
474,296.40
474,296.00
6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00
8,125.00
900.00
1,520.00
166,813.22
166,813.00
No.
URAIAN
HARGA
(Rp)
74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00
900.00
1,520.00
265,378.10
265,378.00
25,000.00
5,850.00
10,500.00
1,105.00
150.00
1,040.00
43,645.00
43,645.00
31,250.00
21,000.00
2,000.00
54,250.00
54,250.00
B-02
B-03
B-04
B-05
B-06
B-07
B-08
B-09
B-10
URAIAN
HARGA
(Rp)
16,800.00
3,200.00
20,000.00
20,000.00
22,092.00
4,160.00
26,252.00
26,252.00
30,870.00
5,840.00
36,710.00
36,710.00
26,250.00
4,960.00
31,210.00
31,210.00
34,566.00
6,640.00
41,206.00
41,206.00
2,100.00
400.00
2,500.00
2,500.00
21,672.00
4,000.00
25,672.00
25,672.00
8,064.00
1,520.00
9,584.00
9,584.00
21,000.00
4,000.00
25,000.00
25,000.00
210,360.00
12,600.00
800.00
223,760.00
223,760.00
No.
B-11
B-12
B-13
B-14
URAIAN
HARGA
(Rp)
26,400.00
6,300.00
1,200.00
33,900.00
33,900.00
244,200.00
10,500.00
2,000.00
256,700.00
256,700.00
107,040.00
10,500.00
2,000.00
119,540.00
119,540.00
56,512.50
5,178.00
8,765.00
42,000.00
8,000.00
120,455.50
120,456.00
C-02
C-03
C-04
C-05
URAIAN
HARGA
(Rp)
226,050.00
284,012.00
113,199.00
63,000.00
39,000.00
4,500.00
6,000.00
735,761.00
735,761.00
226,050.00
229,178.00
121,368.00
63,000.00
39,000.00
4,500.00
6,000.00
689,096.00
689,096.00
226,050.00
191,216.00
126,969.60
63,000.00
39,000.00
4,500.00
6,000.00
656,735.60
656,736.00
246,600.00
52,590.00
32,760.00
25,350.00
2,925.00
3,120.00
363,345.00
363,345.00
1,237,500.00
284,012.00
81,728.00
103,439.00
22,160.00
92,475.00
126,000.00
55,250.00
6,375.00
12,000.00
2,020,939.00
2,020,939.00
No.
C-06
C-07
C-08
C-09
URAIAN
HARGA
(Rp)
92,475.00
393,680.00
114,930.00
141,437.00
99,960.00
19,500.00
2,250.00
6,400.00
870,632.00
870,632.00
92,475.00
284,012.00
81,728.00
103,439.00
126,000.00
55,250.00
6,375.00
12,000.00
761,279.00
761,279.00
3,330.70
24,007.60
31,665.00
85,063.00
742,500.00
24,930.00
84,480.00
2,808.00
4,950.00
6,000.00
42,000.00
43,550.00
5,025.00
4,000.00
1,104,309.30
1,104,309.00
2,804.80
20,432.00
26,387.50
68,894.00
569,250.00
19,390.00
71,280.00
2,808.00
4,950.00
5,000.00
33,600.00
32,500.00
3,750.00
3,200.00
864,246.30
864,246.00
No.
URAIAN
HARGA
(Rp)
2,614.60
18,845.97
24,857.03
66,774.46
742,500.00
24,930.00
84,480.00
2,808.00
4,950.00
6,000.00
42,000.00
43,550.00
5,025.00
4,000.00
1,073,335.05
1,073,335.00
126,216.56
1,680.00
160.00
128,056.56
128,057.00
139,440.00
5,250.00
16,000.00
56,241.50
216,931.50
216,932.00
259,017.00
99,990.00
51,920.00
65,000.00
84,000.00
16,000.00
52,650.00
628,577.00
628,577.00
D-02
D-03
D-04
D-05
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
306,508.00
132,808.00
183,657.00
69,300.00
16,250.00
1,875.00
6,400.00
716,798.00
716,798.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
276,982.00
120,038.00
198,434.00
69,300.00
16,250.00
1,875.00
6,400.00
689,279.00
689,279.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
472,416.00
137,916.00
170,991.00
84,000.00
22,750.00
2,625.00
80,000.00
970,698.00
970,698.00
1,406.00
255,400.00
211,100.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
618,640.00
127,700.00
168,880.00
38,622.00
69,300.00
16,250.00
1,875.00
6,400.00
1,047,667.00
1,047,667.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
409,146.00
120,038.00
196,323.00
84,000.00
22,750.00
2,625.00
80,000.00
914,882.00
914,882.00
No.
D-06
D-07
D-08
D-09
D-10
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
1.0500
0.0500
0.0350
0.0035
0.0020
57,900.00
42,000.00
65,000.00
75,000.00
80,000.00
60,795.00
2,100.00
2,275.00
262.50
160.00
65,592.50
65,593.00
1.0500
0.0150
0.0070
0.0070
0.0007
0.0003
16,500.00
27,700.00
42,000.00
65,000.00
75,000.00
80,000.00
17,325.00
415.50
294.00
455.00
52.50
24.00
18,566.00
18,566.00
0.0400
0.3000
2,850,000.00
23,400.00
55,000.00
42,000.00
65,000.00
75,000.00
80,000.00
114,000.00
7,020.00
12,600.00
16,900.00
1,950.00
400.00
152,870.00
152,870.00
2,850,000.00
23,400.00
55,000.00
42,000.00
65,000.00
75,000.00
80,000.00
128,250.00
7,020.00
12,600.00
16,900.00
1,950.00
400.00
167,120.00
167,120.00
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
114,000.00
9,360.00
39,600.00
52,885.00
56,000.00
12,600.00
21,450.00
2,475.00
480.00
308,850.00
308,850.00
0.3000
0.2600
0.0260
0.0050
0.0450
0.3000
0.3000
0.2600
0.0260
0.0050
0.0400
0.4000
0.0150
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060
No.
D-11
D-12
D-13
D-14
URAIAN
SATUAN VOLUME
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0400
0.4000
HARGA SATUAN
(Rp)
HARGA
(Rp)
0.0180
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
114,000.00
9,360.00
47,520.00
52,885.00
56,000.00
12,600.00
21,450.00
2,475.00
480.00
316,770.00
316,770.00
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.3000
0.3300
0.0330
0.0060
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
114,000.00
9,360.00
11,000.00
39,600.00
52,885.00
168,000.00
12,600.00
21,450.00
2,475.00
480.00
431,850.00
431,850.00
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
0.3200
0.3300
0.0330
0.0060
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
85,500.00
9,360.00
8,250.00
39,600.00
52,885.00
56,000.00
13,440.00
21,450.00
2,475.00
480.00
289,440.00
289,440.00
Kg
m3
M3
ltr
Oh
Oh
Oh
Oh
388.0000
0.6500
0.6500
215.0000
6.0000
1.0000
0.1000
0.3000
1,406.00
255,400.00
211,100.00
3.00
42,000.00
65,000.00
75,000.00
80,000.00
545,528.00
166,010.00
137,215.00
645.00
252,000.00
65,000.00
7,500.00
24,000.00
1,197,898.00
1,197,898.00
No.
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
D-15
562,400.00
102,160.00
173,102.00
645.00
252,000.00
65,000.00
7,500.00
24,000.00
1,186,807.00
1,186,807.00
570,000.00
35,100.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
163,800.00
22,750.00
67,600.00
68,250.00
18,375.00
13,200.00
4,248,004.00
4,248,004.00
769,500.00
46,800.00
33,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,441,279.00
5,441,279.00
769,500.00
46,800.00
33,000.00
2,475,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
4,616,279.00
4,616,279.00
769,500.00
46,800.00
2,970,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
No.
D-18
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
65,000.00
75,000.00
80,000.00
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.3310
- Mandor
Oh
0.1700
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
150.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
0.6000
55,000.00
- Besi Beton
Kg
240.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
2.0000
55,000.00
- Besi Beton
Kg
120.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
HARGA
(Rp)
91,000.00
24,825.00
13,600.00
5,078,279.00
5,078,279.00
769,500.00
46,800.00
2,475,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
4,583,279.00
4,583,279.00
769,500.00
46,800.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,408,279.00
5,408,279.00
769,500.00
46,800.00
33,000.00
3,960,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
6,101,279.00
6,101,279.00
1,140,000.00
93,600.00
110,000.00
1,980,000.00
49,860.00
No.
URAIAN
-
D-18r
SATUAN VOLUME
HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
2,640,000.00
235,000.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Semen Portland
Kg
323.0000
Pasir Beton
M3
0.5200
Koral Beton 2/3
M3
0.7800
Kayu Balok Terentang
M3
0.1500
Plywood Tebal 9 mm
Lbr
3.5000
Dolken -8-10/4m
Btg
20.0000
Pekerja
Oh
7.3000
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
140.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
180.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
175.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)
454,138.00
132,808.00
164,658.00
396,000.00
822,500.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,646,664.00
6,646,664.00
1,140,000.00
93,600.00
2,310,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,573,014.00
6,573,014.00
1,140,000.00
93,600.00
2,970,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,233,014.00
7,233,014.00
1,140,000.00
93,600.00
2,887,500.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,225,664.00
6,225,664.00
No.
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
1 M3 Kolom Beton Tulang Praktis 12/12 (210 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (260 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
260.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)
1 M3 Kolom Beton Tulang 20/20 (210 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/30 (230 kg besi + bekisting) Struktur bertingkat 6dia.16 +2dia.12,
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
230.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,803,164.00
6,803,164.00
1,140,000.00
93,600.00
4,290,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,628,164.00
7,628,164.00
1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,728,014.00
7,728,014.00
8-15
1,140,000.00
93,600.00
3,795,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
No.
URAIAN
-
SATUAN VOLUME
HARGA SATUAN
(Rp)
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,058,014.00
8,058,014.00
1,140,000.00
93,600.00
110,000.00
4,125,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,498,014.00
8,498,014.00
1,140,000.00
93,600.00
2,887,500.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,150,514.00
7,150,514.00
1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,728,014.00
7,728,014.00
1,140,000.00
No.
URAIAN
-
D-19
D-20
SATUAN VOLUME
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
4.0000
2.0000
200.0000
1.8000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
HARGA SATUAN
(Rp)
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
93,600.00
110,000.00
3,300,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,673,014.00
7,673,014.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
1,140,000.00
93,600.00
110,000.00
2,310,000.00
58,170.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,691,324.00
6,691,324.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
1,140,000.00
93,600.00
110,000.00
2,475,000.00
66,480.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,864,634.00
6,864,634.00
No.
D-21
D-22
D-23
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
1,140,000.00
93,600.00
110,000.00
2,970,000.00
74,790.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,367,944.00
7,367,944.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
1,140,000.00
93,600.00
110,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,706,254.00
7,706,254.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
1,140,000.00
93,600.00
110,000.00
4,125,000.00
103,875.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
No.
URAIAN
-
D-24
D-25
SATUAN VOLUME
Pekerja
Oh
7.3000
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (300 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
300.0000
- Kawat Beton
Kg
4.5000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
1.6000
- Besi Beton
Kg
120.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1400
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
- Dolken -8-10/4m
Btg
16.0000
- Pekerja
Oh
5.9600
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
2.8000
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.4550
- Mandor
Oh
0.2080
Jumlah
Dibulatkan
HARGA SATUAN
(Rp)
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,552,029.00
8,552,029.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
1,140,000.00
93,600.00
110,000.00
4,950,000.00
124,650.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
9,397,804.00
9,397,804.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
912,000.00
74,880.00
88,000.00
1,980,000.00
49,860.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,693,859.00
5,693,859.00
No.
D-26
D-26
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
1 M3 Balok Beton Tulang 15/30 (190 kg besi + bekisting) Struktur bertingkat 4dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
190.0000
16,500.00
- Kawat Beton
Kg
2.2500
27,700.00
912,000.00
74,880.00
3,135,000.00
62,325.00
No.
URAIAN
-
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
MultiPlek 9 mm 120 x 240
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
D-27
SATUAN VOLUME
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,773,324.00
6,773,324.00
1 M3 Balok Beton Tulang 20/40 (200 kg besi + bekisting) Struktur bertingkat 7dia.16+2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
912,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
74,880.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
3,300,000.00
- Kawat Beton
Kg
3.0000
27,700.00
83,100.00
- Semen Portland
Kg
323.0000
1,406.00
454,138.00
- Pasir Beton
M3
0.5200
255,400.00
132,808.00
- Koral Beton 2/3
M3
0.7800
211,100.00
164,658.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
369,600.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
423,080.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
448,000.00
- Pekerja
Oh
5.9600
42,000.00
250,320.00
- Tukang Batu
Oh
0.3500
65,000.00
22,750.00
- Tukang Kayu
Oh
2.8000
65,000.00
182,000.00
- Tukang Besi
Oh
1.4000
65,000.00
91,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
34,125.00
- Mandor
Oh
0.2080
80,000.00
16,640.00
Jumlah
6,959,099.00
Dibulatkan
6,959,099.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
912,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
74,880.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
3,300,000.00
- Kawat Beton
Kg
3.0000
27,700.00
83,100.00
- Semen Portland
Kg
323.0000
1,406.00
454,138.00
- Pasir Beton
M3
0.5200
255,400.00
132,808.00
- Koral Beton 2/3
M3
0.7800
211,100.00
164,658.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
369,600.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
423,080.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
448,000.00
- Pekerja
Oh
5.9600
42,000.00
250,320.00
- Tukang Batu
Oh
0.3500
65,000.00
22,750.00
- Tukang Kayu
Oh
2.8000
65,000.00
182,000.00
- Tukang Besi
Oh
1.4000
65,000.00
91,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
34,125.00
- Mandor
Oh
0.2080
80,000.00
16,640.00
Jumlah
6,959,099.00
Dibulatkan
6,959,099.00
1 M3 Balok Beton Tulang 20/30 (175 kg besi + bekisting) Struktur bertingkat 5dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
912,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
74,880.00
- Minyak Bekisting
Ltr
55,000.00
Besi Beton
Kg
175.0000
16,500.00
2,887,500.00
- Kawat Beton
Kg
3.0000
55,000.00
165,000.00
- Semen Portland
Kg
323.0000
1,406.00
454,138.00
- Pasir Beton
M3
0.5200
255,400.00
132,808.00
- Koral Beton 2/3
M3
0.7800
211,100.00
164,658.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
369,600.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
423,080.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
448,000.00
- Pekerja
Oh
5.9600
42,000.00
250,320.00
- Tukang Batu
Oh
0.3500
65,000.00
22,750.00
- Tukang Kayu
Oh
2.8000
65,000.00
182,000.00
- Tukang Besi
Oh
1.4000
65,000.00
91,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
34,125.00
- Mandor
Oh
0.2080
80,000.00
16,640.00
No.
URAIAN
Jumlah
Dibulatkan
SATUAN VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
6,628,499.00
6,628,499.00
1 M3 Balok Beton Tulang 25/55 (140 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
912,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
74,880.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
140.0000
16,500.00
2,310,000.00
- Kawat Beton
Kg
3.0000
27,700.00
83,100.00
- Semen Portland
Kg
323.0000
1,406.00
454,138.00
- Pasir Beton
M3
0.5200
255,400.00
132,808.00
- Koral Beton 2/3
M3
0.7800
211,100.00
164,658.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
369,600.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
423,080.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
448,000.00
- Pekerja
Oh
5.9600
42,000.00
250,320.00
- Tukang Batu
Oh
0.3500
65,000.00
22,750.00
- Tukang Kayu
Oh
2.8000
65,000.00
182,000.00
- Tukang Besi
Oh
1.4000
65,000.00
91,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
34,125.00
- Mandor
Oh
0.2080
80,000.00
16,640.00
Jumlah
5,969,099.00
Dibulatkan
5,969,099.00
1 M3 Balok Beton Tulang 30/60 (110 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
912,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
74,880.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
110.0000
16,500.00
1,815,000.00
- Kawat Beton
Kg
3.0000
27,700.00
83,100.00
- Semen Portland
Kg
323.0000
1,406.00
454,138.00
- Pasir Beton
M3
0.5200
255,400.00
132,808.00
- Koral Beton 2/3
M3
0.7800
211,100.00
164,658.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
369,600.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
423,080.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
448,000.00
- Pekerja
Oh
5.9600
42,000.00
250,320.00
- Tukang Batu
Oh
0.3500
65,000.00
22,750.00
- Tukang Kayu
Oh
2.8000
65,000.00
182,000.00
- Tukang Besi
Oh
1.4000
65,000.00
91,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
34,125.00
- Mandor
Oh
0.2080
80,000.00
16,640.00
Jumlah
5,474,099.00
Dibulatkan
5,474,099.00
1 M3 Balok Beton Lintel 11/11 (300 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
1,140,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
93,600.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
300.0000
16,500.00
4,950,000.00
- Kawat Beton
Kg
1.8000
27,700.00
49,860.00
- Semen Portland
Kg
323.0000
1,406.00
454,138.00
- Pasir Beton
M3
0.5200
255,400.00
132,808.00
- Koral Beton 2/3
M3
0.7800
211,100.00
164,658.00
- Kayu Balok Terentang
M3
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
560,000.00
- Pekerja
Oh
7.3000
42,000.00
306,600.00
- Tukang Batu
Oh
0.3500
65,000.00
22,750.00
- Tukang Kayu
Oh
3.3000
65,000.00
214,500.00
- Tukang Besi
Oh
2.1000
65,000.00
136,500.00
- Kepala Tukang
Oh
0.5700
75,000.00
42,750.00
- Mandor
Oh
0.2500
80,000.00
20,000.00
Jumlah
8,288,164.00
Dibulatkan
8,288,164.00
1 M3 Balok Beton Lintel 11/15 (234 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
1,140,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
93,600.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
234.0000
16,500.00
3,861,000.00
No.
URAIAN
-
D-28
SATUAN VOLUME
Kawat Beton
Kg
1.8000
Semen Portland
Kg
323.0000
Pasir Beton
M3
0.5200
Koral Beton 2/3
M3
0.7800
Kayu Balok Terentang
M3
MultiPlek 9 mm 120 x 240
Lbr
Dolken -8-10/4m
Btg
20.0000
Pekerja
Oh
7.3000
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang (230 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
1.6000
- Besi Beton
Kg
230.0000
- Kawat Beton
Kg
3.4500
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1400
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
- Dolken -8-10/4m
Btg
16.0000
- Pekerja
Oh
5.9600
HARGA SATUAN
(Rp)
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,199,164.00
7,199,164.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
912,000.00
74,880.00
88,000.00
3,795,000.00
95,565.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
No.
URAIAN
-
D-29
D-30
D-31
D-32
D-33
SATUAN VOLUME
HARGA SATUAN
(Rp)
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
7,554,564.00
7,554,564.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
712,500.00
70,200.00
66,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
277,200.00
377,750.00
392,000.00
235,200.00
22,750.00
149,500.00
91,000.00
30,375.00
16,160.00
6,575,339.00
6,575,339.00
914,882.00
431,850.00
18,566.00
914,882.00
4,318,500.00
1,670,940.00
6,904,322.00
6,904,322.00
914,882.00
431,850.00
18,566.00
914,882.00
4,318,500.00
1,438,865.00
6,672,247.00
6,672,247.00
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
2.8000
Tukang Besi
Oh
1.4000
Kepala Tukang
Oh
0.4550
Mandor
Oh
0.2080
Jumlah
Dibulatkan
1 M3 Tangga Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.2500
- Paku Biasa 2" - 5"
Kg
3.0000
- Minyak Bekisting
Ltr
1.2000
- Besi Beton
Kg
200.0000
- Kawat Beton
Kg
3.0000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1050
- Plywood Tebal 9 mm
Lbr
2.5000
- Dolken -8-10/4m
Btg
14.0000
- Pekerja
Oh
5.6000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
2.3000
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.4050
- Mandor
Oh
0.2020
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
10.0000
- Besi Beton Polos
Kg
90.0000
Jumlah
Dibulatkan
1 M3 Lisplang Beton Tulang T= 8 cm (77,5 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
10.0000
- Besi Beton Polos
Kg
77.5000
Jumlah
Dibulatkan
914,882.00
3,597,310.50
2,042,260.00
6,554,452.50
6,554,453.00
914,882.00
3,597,310.50
2,413,580.00
6,925,772.50
6,925,773.00
914,882.00
431,850.00
18,566.00
914,882.00
3,597,310.50
2,413,580.00
6,925,772.50
6,925,773.00
914,882.00
431,850.00
18,566.00
914,882.00
2,880,439.50
1,670,940.00
5,466,261.50
5,466,262.00
No.
D-34
D-35
D-36
D-37
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
1 M3 Pelat Lantai Beton Tulang T= 15 cm (115 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
914,882.00
- Pasang Bekisting untuk lantai
M2
6.6700
431,850.00
- Besi Beton Polos
Kg
115.0000
18,566.00
Jumlah
Dibulatkan
1 M' Kolom Praktis Beton Tulang (11x11) cm
- Kayu papan terentang
M3
0.0020
2,850,000.00
- Paku Biasa 2" - 5"
Kg
0.0100
23,400.00
- Besi Beton Polos
Kg
3.0000
16,500.00
- Kawat Beton
Kg
0.0450
27,700.00
- Semen Portland
Kg
4.0000
1,406.00
- Pasir Beton
M3
0.0060
255,400.00
- Koral Beton
M3
0.0090
211,100.00
- Pekerja
Oh
0.0600
42,000.00
- Tukang Batu
Oh
0.0200
65,000.00
- Tukang Kayu
Oh
0.0200
65,000.00
- Tukang Besi
Oh
0.0200
65,000.00
- Kepala Tukang
Oh
0.0060
75,000.00
- Mandor
Oh
0.0030
80,000.00
Jumlah
Dibulatkan
1 M' Ring Balok Beton Tulang (10x15) cm
- Kayu papan terentang
M3
0.0030
2,850,000.00
- Paku Biasa 2" - 5"
Kg
0.0200
23,400.00
- Besi Beton Polos
Kg
3.6000
16,500.00
- Kawat Beton
Kg
0.0500
27,700.00
- Semen Portland
Kg
5.5000
1,406.00
- Pasir Beton
M3
0.0090
255,400.00
- Koral Beton
M3
0.0150
211,100.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang Batu
Oh
0.0330
65,000.00
- Tukang Kayu
Oh
0.0330
65,000.00
- Tukang Besi
Oh
0.0330
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Dinding
- Kayu papan terentang
M3
0.0300
2,850,000.00
- Paku Biasa 2" - 5"
Kg
0.4000
1,406.00
- Minyak Bekisting
Ltr
0.2000
55,000.00
- Kayu balok terentang
M3
0.0200
2,640,000.00
- Plywood Tebal 9 mm
Lbr
0.3500
151,100.00
- Dolken -8-10/4m
Btg
3.0000
28,000.00
- Formite/spacer
Buah
4.0000
2,500.00
- Pekerja
Oh
0.3200
42,000.00
- Tukang Kayu
Oh
0.0330
65,000.00
- Kepala Tukang
Oh
0.0330
75,000.00
- Mandor
Oh
0.0060
80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)
914,882.00
2,880,439.50
2,135,090.00
5,930,411.50
5,930,412.00
5,700.00
234.00
49,500.00
1,246.50
5,624.00
1,532.40
1,899.90
2,520.00
1,300.00
1,300.00
1,300.00
450.00
240.00
72,846.80
72,847.00
8,550.00
468.00
59,400.00
1,385.00
7,733.00
2,298.60
3,166.50
4,200.00
2,145.00
2,145.00
2,145.00
750.00
400.00
94,786.10
94,786.00
85,500.00
562.40
11,000.00
52,800.00
52,885.00
84,000.00
10,000.00
13,440.00
2,145.00
2,475.00
480.00
315,287.40
315,287.00
No.
D-38
D-39
D-40
URAIAN
SATUAN VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
912,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
316,800.00
423,080.00
896,000.00
222,600.00
22,750.00
84,500.00
68,250.00
19,875.00
21,200.00
6,438,864.00
6,438,864.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
684,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
422,400.00
423,080.00
672,000.00
235,200.00
22,750.00
171,600.00
68,250.00
30,000.00
15,440.00
6,196,529.00
6,196,529.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
712,500.00
70,200.00
66,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
No.
URAIAN
-
D-41
D-42
D-43
SATUAN VOLUME
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.1050
2.8000
14.0000
5.6500
0.3500
1.5600
1.4000
0.3230
0.2830
HARGA SATUAN
(Rp)
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
277,200.00
423,080.00
392,000.00
237,300.00
22,750.00
101,400.00
91,000.00
24,225.00
22,640.00
6,574,999.00
6,574,999.00
Kg
M3
M3
Oh
Oh
Oh
Oh
413.0000
0.4256
0.6807
1.6500
0.2750
0.0280
0.0830
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
580,678.00
108,704.63
143,688.73
69,300.00
17,875.00
2,100.00
6,640.00
928,986.36
928,986.00
Kg
M3
M3
Oh
Oh
Oh
Oh
352.0000
0.4569
0.6873
1.6500
0.2750
0.0280
0.0830
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
494,912.00
116,685.88
145,096.07
69,300.00
17,875.00
2,100.00
6,640.00
852,608.94
852,609.00
Kg
M3
M3
Oh
Oh
Oh
Oh
384.0000
0.4325
0.6927
1.6500
0.2750
0.0280
0.0830
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
539,904.00
110,460.50
146,221.93
69,300.00
17,875.00
2,100.00
6,640.00
892,501.43
892,501.00
E-02
E-03
E-04
E-05
URAIAN
HARGA
(Rp)
108,500.00
46,327.70
21,239.40
27,300.00
13,000.00
1,500.00
2,400.00
220,267.10
220,267.00
108,500.00
37,329.30
21,706.20
27,300.00
13,000.00
1,500.00
2,400.00
211,735.50
211,736.00
108,500.00
31,213.20
23,806.80
27,300.00
13,000.00
1,500.00
2,400.00
207,720.00
207,720.00
54,250.00
20,204.22
9,336.00
13,440.00
6,500.00
750.00
1,200.00
105,680.22
105,680.00
54,250.00
16,169.00
10,036.20
13,440.00
6,500.00
750.00
1,200.00
102,345.20
102,345.00
No.
E-06
E-07
E-08
E-09
E-10
URAIAN
HARGA
(Rp)
54,250.00
13,610.08
10,503.00
13,440.00
6,500.00
750.00
1,200.00
100,253.08
100,253.00
532,800.00
17,996.80
8,169.00
12,600.00
6,500.00
750.00
1,200.00
580,015.80
580,016.00
532,800.00
15,466.00
8,169.00
12,600.00
6,500.00
750.00
1,200.00
577,485.00
577,485.00
532,800.00
17,996.80
8,169.00
12,600.00
6,500.00
750.00
1,200.00
580,015.80
580,016.00
31,200.00
16,872.00
8,869.20
12,600.00
6,500.00
750.00
1,200.00
46,791.20
46,791.00
No.
E-11
E-12
E-13
E-14
URAIAN
HARGA
(Rp)
62,500.00
18,981.00
11,203.20
32,175.00
14,700.00
9,750.00
1,125.00
1,360.00
151,794.20
151,794.00
50,000.00
14,692.70
8,869.20
32,175.00
13,440.00
7,800.00
900.00
1,200.00
129,076.90
129,077.00
37,500.00
10,545.00
6,301.80
32,175.00
13,440.00
7,800.00
900.00
1,200.00
109,861.80
109,862.00
62,500.00
19,754.30
1,021.60
9,802.80
63,855.00
140.40
2,850.00
831.00
1,055.50
15,540.00
10,205.00
525.00
1,230.00
1,480.00
190,790.60
190,791.00
No.
E-15
E-16
E-17
E-18
URAIAN
HARGA
(Rp)
50,000.00
14,706.76
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
14,280.00
8,450.00
525.00
1,027.50
1,360.00
117,281.26
117,281.00
37,500.00
14,706.76
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
14,280.00
8,450.00
525.00
1,027.50
1,360.00
104,781.26
104,781.00
56,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
108,782.30
108,782.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
No.
E-19
E-20
E-21
E-22
E-23
URAIAN
HARGA
(Rp)
62,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
115,282.30
115,282.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
62,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
115,282.30
115,282.00
53,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
105,782.30
105,782.00
No.
E-24
E-25
E-26
E-27
E-28
URAIAN
HARGA
(Rp)
58,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
110,782.30
110,782.00
56,800.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
109,582.30
109,582.00
65,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
118,282.30
118,282.00
72,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
124,982.30
124,982.00
64,400.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
117,182.30
117,182.00
No.
E-29
E-30
E-31
E-32
E-33
URAIAN
HARGA
(Rp)
75,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
127,982.30
127,982.00
64,400.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
117,182.30
117,182.00
72,900.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
125,682.30
125,682.00
75,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
127,982.30
127,982.00
68,900.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
121,682.30
121,682.00
No.
E-34
E-35
E-36
E-37
E-38
URAIAN
HARGA
(Rp)
76,600.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
129,382.30
129,382.00
72,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
125,282.30
125,282.00
77,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
129,782.30
129,782.00
561,000.00
1,800.00
17,490.64
5,835.00
23,550.00
30,240.00
42,250.00
4,875.00
2,800.00
689,840.64
689,841.00
101,430.00
16,520.50
8,169.00
26,040.00
22,750.00
2,625.00
2,400.00
179,934.50
179,935.00
No.
E-39
E-40
E-41
E-42
E-43
URAIAN
HARGA
(Rp)
63,300.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
116,082.30
116,082.00
58,485.00
8,925.00
14,700.00
11,375.00
1,275.00
160.00
94,920.00
94,920.00
159,392.80
3,570.00
13,384.00
113,262.00
6,300.00
29,250.00
3,375.00
640.00
329,173.80
329,174.00
159,392.80
3,570.00
13,384.00
202,100.00
8,400.00
39,000.00
4,500.00
800.00
431,146.80
431,147.00
159,392.80
3,570.00
13,384.00
55,384.00
8,400.00
39,000.00
4,500.00
800.00
284,430.80
284,431.00
No.
E-44
E-44
E-45
E-46
URAIAN
HARGA
(Rp)
12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,720.80
9,375.00
4,200.00
3,250.00
375.00
400.00
92,048.80
92,049.00
12,118.00
3,390.00
29,047.20
3,850.00
28,800.00
1,720.80
9,375.00
4,200.00
3,250.00
375.00
400.00
96,526.00
96,526.00
12,118.00
3,390.00
85,540.00
2,618.00
28,800.00
4,200.00
3,250.00
375.00
400.00
140,691.00
140,691.00
12,118.00
3,390.00
47,938.80
2,618.00
28,800.00
4,200.00
3,250.00
375.00
400.00
103,089.80
103,090.00
No.
URAIAN
HARGA
(Rp)
792,000.00
15,466.00
8,169.00
12,600.00
6,500.00
750.00
1,200.00
836,685.00
836,685.00
34,050.00
46,995.20
266.56
15,840.00
4,200.00
3,250.00
375.00
160.00
105,136.76
105,137.00
F-02
F-03
F-04
F-05
F-06
URAIAN
HARGA
(Rp)
11,979.12
3,967.80
8,400.00
9,750.00
1,125.00
800.00
36,021.92
36,022.00
9,110.88
4,434.60
8,400.00
9,750.00
1,125.00
800.00
33,620.48
33,620.00
7,311.20
4,668.00
8,400.00
9,750.00
1,125.00
800.00
32,054.20
32,054.00
15,184.80
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
47,253.20
47,253.00
12,204.08
6,535.20
10,500.00
13,000.00
1,500.00
1,000.00
44,739.28
44,739.00
10,249.74
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
42,318.14
42,318.00
6,073.92
- Pasir Pasang
M3
0.0220
233,400.00
5,134.80
- Pekerja
Oh
0.2000
42,000.00
8,400.00
- Tukang Batu
Oh
0.1500
65,000.00
9,750.00
- Kepala Tukang
Oh
0.0150
75,000.00
1,125.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
800.00
31,283.72
31,284.00
No.
F-07
F-08
F-09
F-10
F-11
F-12
URAIAN
HARGA
(Rp)
7,972.02
5,368.20
6,300.00
4,550.00
525.00
640.00
25,355.22
25,355.00
13,075.80
4,201.20
10,920.00
13,000.00
1,500.00
1,040.00
43,737.00
43,737.00
9,940.42
4,901.40
10,920.00
13,000.00
1,500.00
1,040.00
41,301.82
41,302.00
703.00
3,034.20
3,360.00
26,000.00
3,000.00
320.00
36,417.20
36,417.00
5,624.00
6,006.00
6,955.00
787.50
840.00
20,212.50
20,213.00
8,914.04
2,800.80
12,600.00
9,750.00
1,125.00
1,200.00
36,389.84
36,390.00
No.
URAIAN
HARGA
(Rp)
6,073.92
3,734.40
6,300.00
4,550.00
525.00
640.00
21,823.32
21,823.00
URAIAN
HARGA
(Rp)
1,900.00
42,000.00
65,000.00
75,000.00
80,000.00
47,500.00
6,300.00
4,875.00
600.00
640.00
59,915.00
59,915.00
6,000.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
30,000.00
11,248.00
7,468.80
16,800.00
13,000.00
1,500.00
160.00
80,176.80
80,177.00
100,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
60,000.00
1,190.00
5,880.00
4,355.00
525.00
560.00
72,510.00
72,510.00
80,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
28,000.00
2,856.00
5,880.00
4,550.00
525.00
560.00
42,371.00
42,371.00
73,300.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
30,786.00
2,856.00
5,880.00
4,550.00
525.00
560.00
45,157.00
45,157.00
65,900.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
28,996.00
2,856.00
5,880.00
4,355.00
525.00
560.00
43,172.00
43,172.00
No.
G-07
G-08
G-09
G-10
G-11
G-12
URAIAN
HARGA
(Rp)
29,835.00
2,856.00
5,880.00
4,355.00
525.00
560.00
44,011.00
44,011.00
33,840.00
2,856.00
5,880.00
4,355.00
525.00
560.00
48,016.00
48,016.00
80,010.00
4,800.00
3,528.00
8,125.00
975.00
320.00
97,758.00
97,758.00
93,500.00
702.00
8,400.00
6,500.00
750.00
800.00
110,652.00
110,652.00
48,600.00
6,300.00
4,875.00
600.00
640.00
61,015.00
61,015.00
72,000.00
6,300.00
4,875.00
600.00
640.00
84,415.00
84,415.00
No.
URAIAN
HARGA
(Rp)
1.0200
0.2000
0.2000
0.1000
0.0100
0.0010
203,100.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00
207,162.00
4,680.00
8,400.00
6,500.00
750.00
80.00
227,572.00
227,572.00
3.5000
0.0500
10.8000
0.0320
1.0000
0.4000
0.2000
0.0200
0.0200
10,500.00
23,400.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
36,750.00
1,170.00
15,184.80
7,468.80
15,700.00
16,800.00
13,000.00
1,500.00
1,600.00
109,173.60
109,174.00
1.1000
0.0500
0.2500
0.1500
0.0150
0.0130
138,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
152,350.00
1,190.00
10,500.00
9,750.00
1,125.00
1,040.00
175,955.00
175,955.00
0.7000
0.0200
0.1200
0.0600
0.0060
0.0060
83,100.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
58,170.00
476.00
5,040.00
3,900.00
450.00
480.00
68,516.00
68,516.00
0.3000
0.0400
0.1500
0.0700
0.0080
0.0060
37,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
11,250.00
952.00
6,300.00
4,550.00
600.00
480.00
24,132.00
24,132.00
1.0500
0.1500
0.0500
0.0050
0.0080
19,600.00
42,000.00
65,000.00
75,000.00
80,000.00
20,580.00
6,300.00
3,250.00
375.00
640.00
31,145.00
31,145.00
No.
G-19
G-20
G-21
G-22
G-21
URAIAN
HARGA
(Rp)
147,630.00
400.00
6,300.00
48,750.00
600.00
480.00
204,160.00
204,160.00
172,935.00
400.00
6,300.00
48,750.00
600.00
480.00
229,465.00
229,465.00
90,000.00
800.00
4,200.00
65,000.00
750.00
800.00
161,550.00
161,550.00
22,275.00
1,750.00
4,200.00
13,000.00
1,500.00
400.00
43,125.00
43,125.00
16,000.00
1,052.00
3,528.00
8,125.00
975.00
320.00
30,000.00
30,000.00
H-02
H-03
H-04
H-05
URAIAN
HARGA
(Rp)
24,750.00
238.00
1,260.00
4,550.00
525.00
120.00
31,443.00
31,443.00
21,450.00
238.00
1,260.00
4,550.00
525.00
120.00
28,143.00
28,143.00
199,200.00
1,190.00
2,520.00
6,500.00
750.00
240.00
210,400.00
210,400.00
43,920.00
4,230.00
7,560.00
199,200.00
6,300.00
32,500.00
3,750.00
600.00
298,060.00
298,060.00
60,720.00
1,404.00
51,363.00
11,340.00
26,000.00
3,000.00
1,080.00
154,907.00
154,907.00
No.
H-06
H-07
H-08
H-09
URAIAN
HARGA
(Rp)
60,720.00
1,404.00
50,349.00
11,340.00
26,000.00
3,000.00
1,080.00
153,893.00
153,893.00
60,720.00
1,428.00
25,116.00
11,340.00
26,000.00
3,000.00
1,080.00
128,684.00
128,684.00
12,118.00
3,390.00
29,047.20
1,925.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375.00
400.00
93,960.20
93,960.00
12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375.00
400.00
91,408.00
91,408.00
No.
H-10
H-11
H-12
H-13
H-12
URAIAN
HARGA
(Rp)
60,720.00
1,428.00
31,122.00
1,925.00
11,340.00
26,000.00
3,000.00
1,080.00
136,615.00
136,615.00
60,720.00
1,428.00
26,325.00
3,850.00
11,340.00
26,000.00
3,000.00
1,080.00
133,743.00
133,743.00
30,870.00
238.00
2,100.00
3,250.00
375.00
240.00
37,073.00
37,073.00
8,925.00
1,875.00
2,100.00
3,250.00
375.00
240.00
16,765.00
16,765.00
1,575.00
238.00
1,822.80
3,250.00
375.00
240.00
7,500.80
7,500.00
I-02
I-03
I-04
I-05
URAIAN
HARGA
(Rp)
362,250.00
13,778.80
5,018.10
20,410.00
10,500.00
7,800.00
900.00
1,000.00
421,656.90
421,657.00
338,940.00
14,060.00
5,018.10
23,550.00
10,920.00
8,125.00
937.50
1,040.00
402,590.60
402,591.00
73,140.00
1,687.20
700.20
1,570.00
2,520.00
1,950.00
225.00
240.00
82,032.40
82,032.00
86,247.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675.00
360.00
101,548.78
101,549.00
56,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
92,670.20
92,670.00
No.
I-06
I-07
I-08
I-09
I-10
URAIAN
HARGA
(Rp)
62,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
99,170.20
99,170.00
53,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
89,670.20
89,670.00
58,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
94,670.20
94,670.00
56,800.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
93,470.20
93,470.00
65,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
102,170.20
102,170.00
No.
I-11
I-12
I-13
I-14
I-15
URAIAN
HARGA
(Rp)
72,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
108,870.20
108,870.00
75,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
111,870.20
111,870.00
68,900.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
105,570.20
105,570.00
76,600.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,270.20
113,270.00
72,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
109,170.20
109,170.00
No.
I-16
I-17
I-18
I-19
I-20
URAIAN
HARGA
(Rp)
77,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,670.20
113,670.00
583,000.00
11,515.14
10,503.00
10,205.00
29,400.00
22,750.00
2,625.00
2,800.00
672,798.14
672,798.00
394,170.00
26,400.00
27,300.00
22,750.00
2,625.00
2,600.00
475,845.00
475,845.00
10,600.00
1,687.20
700.20
1,570.00
2,520.00
1,950.00
225.00
240.00
19,492.40
19,492.00
12,250.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675.00
360.00
27,551.78
27,552.00
No.
I-21
I-22
I-23
I-24
I-25
I-26
URAIAN
HARGA
(Rp)
20,938.32
1,190.00
5,040.00
7,800.00
900.00
480.00
36,348.32
36,348.00
15,900.00
1,602.84
700.20
392.50
3,780.00
5,850.00
675.00
400.00
29,300.54
29,301.00
371,175.00
12,495.00
7,140.00
11,050.00
1,275.00
680.00
403,815.00
403,815.00
85,155.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
153,570.00
153,570.00
114,030.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
182,445.00
182,445.00
79,800.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
148,215.00
148,215.00
No.
URAIAN
HARGA
(Rp)
M2
Kg
Oh
Oh
Oh
Oh
1.050
0.100
0.2500
0.5000
0.0250
0.00250
86,000.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
90,300.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
158,715.00
158,715.00
Bh
Kg
Oh
Oh
Oh
Oh
26.250
0.100
0.2500
0.5000
0.0250
0.00250
9,700.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
254,625.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
323,040.00
323,040.00
Bh
Kg
Oh
Oh
Oh
Oh
11.670
0.100
0.2500
0.5000
0.0250
0.00250
22,500.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
262,575.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
330,990.00
330,990.00
J-02
J-03
J-04
J-05
J-06
URAIAN
HARGA
(Rp)
10,360,440.00
252,000.00
1,170,000.00
150,000.00
24,000.00
11,956,440.00
11,956,440.00
6,831,120.00
252,000.00
1,170,000.00
150,000.00
24,000.00
8,427,120.00
8,427,120.00
6,336,000.00
252,000.00
1,170,000.00
150,000.00
24,000.00
7,932,000.00
7,932,000.00
345,348.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
573,768.00
573,768.00
227,704.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
456,124.00
456,124.00
199,241.00
33,600.00
130,000.00
15,000.00
3,200.00
381,041.00
381,041.00
No.
J-07
J-08
J-09
J-10
J-11
J-12
URAIAN
HARGA
(Rp)
195,853.00
33,600.00
130,000.00
15,000.00
3,200.00
377,653.00
377,653.00
364,326.40
42,000.00
195,000.00
22,500.00
40,000.00
663,826.40
663,826.00
111,574.96
714.00
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
356,458.96
356,459.00
341,556.00
3,570.00
21,000.00
130,000.00
15,000.00
2,000.00
513,126.00
513,126.00
109,677.68
714.00
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
354,561.68
354,562.00
111,574.96
7,140.00
7,170.00
131,700.00
25,200.00
130,000.00
15,000.00
2,400.00
430,184.96
430,185.00
No.
J-13
J-14
J-15
J-16
J-17
URAIAN
HARGA
(Rp)
111,574.96
7,140.00
19,120.00
64,400.00
66,450.00
33,600.00
162,500.00
18,750.00
3,200.00
486,734.96
486,735.00
111,574.96
7,140.00
19,120.00
131,700.00
119,050.00
33,600.00
162,500.00
18,750.00
3,200.00
606,634.96
606,635.00
6,261,860.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,736,900.00
7,736,900.00
5,808,000.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,283,040.00
7,283,040.00
63,360.00
3,570.00
4,200.00
6,500.00
750.00
400.00
78,780.00
78,780.00
No.
J-18
J-19
J-20
J-21
J-22
J-23
URAIAN
HARGA
(Rp)
73,920.00
3,570.00
4,200.00
6,500.00
750.00
400.00
89,340.00
89,340.00
41,928.48
1,190.00
4,200.00
13,000.00
1,500.00
400.00
62,218.48
62,218.00
62,618.60
1,190.00
4,620.00
14,300.00
1,650.00
400.00
84,778.60
84,779.00
30,870.00
882.00
1,365.00
150.00
80.00
33,347.00
33,347.00
554,400.00
322,000.00
47,600.00
10,000.00
84,000.00
126,000.00
12,600.00
84,500.00
9,750.00
1,040.00
1,251,890.00
172,436.64
172,437.00
31,680.00
2,380.00
6,300.00
16,250.00
1,875.00
6,000.00
64,485.00
64,485.00
No.
J-24
J-25
J-26
J-27
URAIAN
HARGA
(Rp)
40,656.00
4,760.00
6,300.00
19,500.00
2,250.00
6,000.00
79,466.00
79,466.00
10,560.00
4,200.00
13,000.00
1,500.00
400.00
29,660.00
29,660.00
6,261,860.00
402,000.00
71,400.00
100,800.00
468,000.00
54,000.00
9,600.00
7,367,660.00
7,367,660.00
24,970.00
36,960.00
285.60
30.00
4,200.00
3,250.00
375.00
400.00
70,470.60
70,471.00
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
Kg
Kg
Oh
Oh
Oh
Oh
1.1000
0.0800
0.0600
0.0060
0.0060
0.0003
24,000.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
26,400.00
2,432.00
2,520.00
390.00
450.00
24.00
32,216.00
32,216.00
m'
m'
jam
Oh
Oh
Oh
Oh
0.0100
0.0010
0.0080
0.0010
0.00001
0.00001
0.00005
7,150.0000
55,000.0000
100,000.0000
42,000.0000
65,000.0000
75,000.0000
80,000.0000
71.50
55.00
800.00
42.00
0.65
0.75
4.00
973.90
974.00
kg
ltr
ltr
jam
org
org
org
org
0.0400
0.0300
0.0040
0.0170
0.0040
0.0020
0.0002
0.0002
23,600.00
7,150.00
55,000.00
100,000.00
42,000.00
65,000.00
75,000.00
80,000.00
944.00
214.50
220.00
1,700.00
168.00
130.00
15.00
16.00
2,463.50
2,464.00
M2
Oh
Oh
Oh
Oh
1.0000
1.0500
1.5000
0.1050
0.0052
306,600.00
42,000.00
65,000.00
75,000.00
80,000.00
306,600.00
44,100.00
97,500.00
7,875.00
416.00
456,491.00
456,491.00
m2
Oh
Oh
Oh
Oh
1.0000
1.0500
1.0500
0.1050
0.0052
211,800.00
42,000.00
65,000.00
75,000.00
80,000.00
211,800.00
44,100.00
68,250.00
7,875.00
416.00
332,441.00
332,441.00
Page 61
HARGA
(Rp)
No.
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
Page 62
HARGA
(Rp)
5,500.00
42,000.00
65,000.00
75,000.00
80,000.00
63,250.00
50,400.00
78,000.00
900.00
48.00
192,598.00
192,598.00
35,900.00
23,800.00
5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00
39,490.00
476.00
10,246.68
4,200.00
6,500.00
750.00
400.00
62,062.68
62,063.00
20,801.00
23,800.00
5,595,800.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
21,841.05
357.00
53,719.68
7,600.00
6,300.00
26,000.00
1,875.00
104.00
117,796.73
117,797.00
20,801.00
23,800.00
5,595,800.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
21,841.05
357.00
106,320.20
9,120.00
8,400.00
26,000.00
1,875.00
100.00
174,013.25
174,013.00
20,801.00
23,800.00
5,595,800.00
26,800.00
42,000.00
65,000.00
75,000.00
80,000.00
21,841.05
2,380.00
106,320.20
13,400.00
6,300.00
19,500.00
2,250.00
640.00
172,631.25
172,631.00
No.
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
151,100.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
166,210.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
179,301.50
179,302.00
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
163,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
179,300.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
192,391.50
192,392.00
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
81,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
89,100.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
102,191.50
102,192.00
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
102,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
112,200.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
125,291.50
125,292.00
4.4000
1.0500
0.0850
0.0850
0.0085
0.0042
151,100.00
171,800.00
42,000.00
65,000.00
75,000.00
80,000.00
664,840.00
180,390.00
3,570.00
5,525.00
637.50
336.00
855,298.50
855,299.00
Page 63
No.
URAIAN
SAT
VOLUME
M
Kg
Cm
Oh
Oh
Oh
Oh
4.7600
4.5220
20.0000
0.6500
0.6500
0.0650
0.0320
Page 64
HARGA SAT
(Rp)
HARGA
(Rp)
151,100.00
12,200.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
664,840.00
54,900.00
2,025.00
3,570.00
5,525.00
637.50
400.00
731,897.50
731,898.00
163,000.00
12,200.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
717,200.00
54,900.00
2,025.00
3,570.00
5,525.00
637.50
400.00
784,257.50
784,258.00
300,000.00
250.00
5,500.00
42,000.00
65,000.00
75,000.00
80,000.00
330,000.00
2,500.00
38,500.00
8,400.00
13,000.00
1,500.00
80.00
393,980.00
393,980.00
24,000.00
24,000.00
23,600.00
42,000.00
65,000.00
75,000.00
80,000.00
360,000.00
787,200.00
1,180.00
8,400.00
13,000.00
1,500.00
80.00
1,171,360.00
1,171,360.00
7,300.00
24,000.00
2,464.00
42,000.00
65,000.00
75,000.00
80,000.00
34,748.00
108,528.00
49,280.00
27,300.00
42,250.00
4,875.00
2,560.00
269,541.00
269,541.00
No.
URAIAN
SAT
M2
Oh
Oh
Oh
Oh
VOLUME
HARGA SAT
(Rp)
1.0000
1.0500
1.0500
0.1050
0.0052
501,700.00
42,000.00
65,000.00
75,000.00
80,000.00
501,700.00
44,100.00
68,250.00
7,875.00
416.00
622,341.00
622,341.00
1.0000
0.3500
0.3500
0.0350
0.0018
537,300.00
42,000.00
65,000.00
75,000.00
80,000.00
537,300.00
14,700.00
22,750.00
2,625.00
144.00
577,519.00
577,519.00
Page 65
HARGA
(Rp)
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
Bahan
7.6200
m' Kusen Alumunium Natural Uk 4" + upah 20%
181,320.00
1.3500
lbr Multiplek 9 mm
151,100.00
0.0300 m3 Kayu papan kamper medan
5,823,400.00
11.7000
m' List kayu profil 1 cm
8,900.00
0.1000
kg Paku biasa " - 1"
23,800.00
0.2500
kg Lem putih FOX
23,900.00
4.0000
bh Grendel jendela 2"
5,500.00
2.0000
bh Handle partisi
33,000.00
1.5400 m2 Cat kayu
39,790.00
4.8600 m2 Cat tembok
17,608.00
Jumlah I
Tenaga
0.3000
1.3000
0.1300
0.0130
Oh
Oh
Oh
Oh
Pekerja Terampil
Tukang kayu Terampil
Kepla Tukang Kayu
Mandor
42,000.00
65,000.00
75,000.00
80,000.00
Jumlah II
Jumlah I + II
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Bahan
12.0000
m' Profil aluminium 4" natural + upah 20%
181,320.00
5.4000
m' Profil daun jendela alm. + upah 20%
118,560.00
1.8100 m2 Kaca polos 5 mm
111,000.00
2.0000
ps
Engsel jendela 3"
15,000.00
2.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
0.0000
ls
Acesories ( 5 % )
150,848.70
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Bahan
14.1000
m' Profil aluminium 4" natural + upah 20%
181,320.00
2.7000
m' Profil daun jendela alm. + upah 20%
118,560.00
1.6500 m2 Kaca polos 5 mm
111,000.00
1.6800 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.0000
ps
Engsel jendela 3"
15,000.00
1.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
bh Grendel pintu 2"
5,500.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
152,993.70
12,600.00
84,500.00
9,750.00
1,040.00
107,890.00
2,215,571.88
2,175,840.00
640,224.00
200,910.00
30,000.00
66,000.00
14,200.00
150,848.70
3,278,022.700
2,556,612.00
320,112.00
183,150.00
598,851.12
15,000.00
33,000.00
14,200.00
31,500.00
5,500.00
126,500.00
152,993.70
4,037,418.820
181,320.00
111,000.00
356,459.00
1,269,240.00
41,070.00
598,851.12
21,000.00
5,500.00
126,500.00
95,458.06
31,500.00
5,500.00
126,500.00
95,458.06
2,168,119.176
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
Bahan
15.4500
m' Profil aluminium 4" natural + upah 20%
181,320.00
5.4000
m' Profil daun jendela alm. + upah 20%
118,560.00
2.5500 m2 Kaca polos 5 mm
111,000.00
2.0000
ps
Engsel jendela 3"
15,000.00
2.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
0.0000
ls
Acesories ( 5 % )
186,233.40
Page 66
1,381,658.40
203,985.00
174,702.00
104,130.00
2,380.00
5,975.00
22,000.00
66,000.00
61,276.60
85,574.88
2,107,681.88
2,801,394.00
640,224.00
283,050.00
30,000.00
66,000.00
14,200.00
186,233.40
4,021,101.400
K (2)
10
11
12
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
Bahan
17.5500
m' Profil aluminium 4" natural + upah 20%
181,320.00
5.4000
m' Profil daun jendela alm. + upah 20%
118,560.00
2.4000 m2 Kaca polos 5 mm
111,000.00
1.6800 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
2.0000
ps
Engsel jendela 3"
15,000.00
2.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
bh Grendel pintu 2"
5,500.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
204,439.50
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
Bahan
8.9000
m' Profil aluminium 4" natural + upah 20%
181,320.00
0.6500 m2 Kaca polos 5 mm
111,000.00
2.7300 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
ps
spagnolet tanam
51,600.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
132,951.55
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Bahan
8.8000
m' Profil aluminium 4" natural + upah 20%
181,320.00
0.7000 m2 Kaca polos 5 mm
111,000.00
2.9400 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
ps
spagnolet tanam
51,600.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
136,065.27
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
Bahan
10.7500
m' Profil aluminium 4" natural + upah 20%
181,320.00
1.0700 m2 Kaca polos 5 mm
111,000.00
1.6800 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
ps
spagnolet tanam
51,600.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
133,340.56
3,182,166.00
640,224.00
266,400.00
598,851.12
30,000.00
66,000.00
14,200.00
31,500.00
5,500.00
126,500.00
204,439.50
5,165,780.620
1,613,748.00
72,150.00
973,133.07
31,500.00
51,600.00
126,500.00
132,951.55
3,001,582.624
1,595,616.00
77,700.00
1,047,989.46
31,500.00
51,600.00
126,500.00
136,065.27
3,066,970.733
1,949,190.00
118,770.00
598,851.12
31,500.00
51,600.00
126,500.00
133,340.56
3,009,751.676
181,320.00
35,000.00
60,236.60
924,732.00
280,000.00
60,236.60
1,264,968.600
181,320.00
111,000.00
37,596.00
725,280.00
26,640.00
37,596.00
789,516.000
181,320.00
111,000.00
43,461.00
815,940.00
53,280.00
43,461.00
912,681.000
Page 67
K (2)
13
14
181,320.00
111,000.00
62,018.40
1,160,448.00
79,920.00
62,018.40
1,302,386.400
181,320.00
111,000.00
80,575.80
1,504,956.00
106,560.00
80,575.80
1,692,091.800
Page 68
K (2)
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
335,900.00
42,000.00
65,000.00
75,000.00
80,000.00
335,900.00
2,520.00
39,000.00
4,500.00
240.00
382,160.00
382,160.00
165,300.00
42,000.00
65,000.00
75,000.00
80,000.00
165,300.00
420.00
32,500.00
750.00
400.00
199,370.00
199,370.00
94,500.00
42,000.00
65,000.00
75,000.00
80,000.00
94,500.00
210.00
32,500.00
375.00
200.00
127,785.00
127,785.00
21,000.00
42,000.00
65,000.00
75,000.00
80,000.00
21,000.00
630.00
9,750.00
1,125.00
64.00
32,569.00
32,569.00
15,000.00
42,000.00
65,000.00
75,000.00
80,000.00
15,000.00
420.00
6,500.00
750.00
40.00
22,710.00
22,710.00
3,550.00
42,000.00
65,000.00
75,000.00
80,000.00
3,550.00
630.00
9,750.00
1,125.00
64.00
15,119.00
15,119.00
No.
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
420,000.00
42,000.00
65,000.00
75,000.00
80,000.00
420,000.00
2,100.00
32,500.00
3,750.00
200.00
458,550.00
458,550.00
205,400.00
42,000.00
65,000.00
75,000.00
80,000.00
205,400.00
2,100.00
32,500.00
3,750.00
200.00
243,950.00
243,950.00
87,400.00
42,000.00
65,000.00
75,000.00
80,000.00
96,140.00
630.00
9,750.00
1,125.00
60.00
107,705.00
107,705.00
111,000.00
42,000.00
65,000.00
75,000.00
80,000.00
122,100.00
630.00
9,750.00
1,125.00
64.00
133,669.00
133,669.00
M. PEKERJAAN SANITASI
No.
M-01
M-02
M-03
M-04
M-05
URAIAN
SAT VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
188,200.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00
1,773,400.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,773,400.00
1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80.00
532,020.00
2,430,770.00
2,430,770.00
1,012,700.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,773,400.00
1,012,700.00
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
212,808.00
1,400,178.00
1,400,178.00
255,300.00
42,000.00
65,000.00
75,000.00
80,000.00
255,300.00
255,300.00
75,600.00
175,500.00
40,500.00
8,800.00
45,954.00
601,654.00
601,654.00
61,700.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00
67,870.00
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
159,314.90
159,315.00
No.
M-06
M-07
M-08
M-09
M-10
URAIAN
SAT VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
775.00
1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00
42,000.00
144,150.00
160,284.00
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
620,778.90
620,779.00
775.00
1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00
41,075.00
61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
134,400.00
65,975.00
112.50
1,280.00
377,545.50
377,546.00
10,025.00
42,000.00
65,000.00
75,000.00
80,000.00
12,030.00
12,030.00
1,512.00
3,900.00
450.00
144.00
4,210.50
22,246.50
22,247.00
15,800.00
42,000.00
65,000.00
75,000.00
80,000.00
18,960.00
18,960.00
1,512.00
3,900.00
450.00
144.00
6,636.00
31,602.00
31,602.00
26,475.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00
31,770.00
1,512.00
3,900.00
450.00
144.00
11,119.50
48,895.50
48,896.00
No.
URAIAN
M-11
M-12
M-13
M-14
M-15
M-16
SAT VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
m'
org
org
org
org
lot
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
27,675.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00
33,210.00
1,512.00
3,900.00
450.00
144.00
11,119.50
50,335.50
50,336.00
m'
org
org
org
org
lot
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
86,975.00
42,000.00
65,000.00
75,000.00
80,000.00
104,370.00
104,370.00
3,402.00
8,775.00
1,012.50
328.00
36,529.50
154,417.00
154,417.00
m'
org
org
org
org
lot
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
13,050.00
42,000.00
65,000.00
75,000.00
80,000.00
15,660.00
15,660.00
3,402.00
8,775.00
1,012.50
328.00
5,481.00
34,658.50
34,659.00
bh
org
org
org
org
1.0000
0.0300
0.3000
0.0300
0.0015
397,800.00
42,000.00
65,000.00
75,000.00
80,000.00
397,800.00
1,260.00
19,500.00
2,250.00
120.00
420,930.00
420,930.00
bh
bh
org
org
org
org
1.0000
0.0250
0.0100
0.1000
0.0100
0.0050
40,900.00
4,200.00
42,000.00
65,000.00
75,000.00
80,000.00
40,900.00
105.00
420.00
6,500.00
750.00
400.00
49,075.00
49,075.00
bh
org
org
org
org
1.0000
0.0100
0.1000
0.0100
0.0050
66,600.00
42,000.00
65,000.00
75,000.00
80,000.00
66,600.00
420.00
6,500.00
750.00
400.00
74,670.00
74,670.00
No.
M-17
M-18
M-19
M-20
M-21
URAIAN
SAT VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
1.1000
12.0000
0.1030
0.0305
0.0345
0.0100
0.1000
0.0100
0.0050
44,300.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00
48,730.00
9,300.00
144.82
7,118.70
6,047.85
420.00
6,500.00
750.00
400.00
79,411.37
79,411.00
1.05000
0.3500
0.1500
0.4000
0.0250
0.0013
60,000.00
63,000.00
42,000.00
65,000.00
75,000.00
80,000.00
63,000.00
22,050.00
6,300.00
26,000.00
1,875.00
100.00
119,325.00
119,325.00
1.10
25.00
0.206
0.061
0.069
0.3800
0.1900
0.0190
0.0190
130,900.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00
143,990.00
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
221,242.74
221,243.00
0.50000
0.01500
0.00960
0.2500
0.1500
0.4000
0.0250
0.0013
20,801.00
23,400.00
2,850,000.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
10,400.50
351.00
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100.00
79,986.50
79,987.00
1.00
3.3000
1.1000
0.0010
0.1600
0.0600
1,724,700.00
42,000.00
65,000.00
75,000.00
80,000.00
1,724,700.00
1,724,700.00
138,600.00
71,500.00
75.00
12,800.00
103,482.00
2,051,157.00
2,051,157.00
No.
M-22
M-23
M-24
URAIAN
SAT VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
1.00
3.3000
1.1000
0.0010
0.1600
0.0600
1,316,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,316,400.00
1,316,400.00
138,600.00
71,500.00
75.00
12,800.00
78,984.00
1,618,359.00
1,618,359.00
4.500
0.214
2.250
15.000
0.300
15.000
5.400
5.000
3.375
5.400
1.050
9.000
1.125
26,252.00
175,300.00
716,798.00
220,267.10
6,438,864.00
41,301.82
256,800.00
46,750.00
20,000.00
23,400.00
205,000.00
36,700.00
34,584.00
118,134.00
37,514.20
1,612,795.50
3,304,006.50
1,931,659.20
619,527.30
1,386,720.00
233,750.00
67,500.00
126,360.00
215,250.00
330,300.00
38,907.00
10,022,423.70
10,022,424.00
2.250
0.107
1.125
7.500
0.150
7.500
9.000
2.500
1.688
2.700
0.525
9.000
0.563
20,000.00
175,300.00
716,798.00
220,267.10
6,438,864.00
41,301.82
256,800.00
46,750.00
20,000.00
23,400.00
205,000.00
36,700.00
34,584.00
45,000.00
18,757.10
806,397.75
1,652,003.25
965,829.60
309,763.65
2,311,200.00
116,875.00
33,760.00
63,180.00
107,625.00
330,300.00
19,470.79
6,780,162.14
6,780,162.00
URAIAN
SAT
VOLUME
HARGA SAT
HARGA
35,600.00
42,000.00
80,000.00
1,780.00
6,300.00
200.00
8,280.00
8,280.00
35,800.00
38,400.00
29,600.00
42,000.00
65,000.00
75,000.00
80,000.00
2,864.00
768.00
296.00
1,680.00
2,600.00
300.00
200.00
8,708.00
8,708.00
25,000.00
30,000.00
41,700.00
42,000.00
65,000.00
75,000.00
80,000.00
3,750.00
5,100.00
7,089.00
2,940.00
4,875.00
562.50
200.00
24,516.50
24,517.00
30,400.00
25,000.00
30,000.00
41,700.00
42,000.00
65,000.00
75,000.00
80,000.00
6,080.00
3,750.00
5,100.00
14,595.00
2,940.00
6,825.00
300.00
200.00
39,790.00
39,790.00
48,000.00
112,700.00
5,000.00
65,000.00
75,000.00
80,000.00
7,200.00
41,924.40
10,000.00
3,900.00
1,200.00
200.00
64,424.40
64,424.00
8,100.00
42,000.00
80,000.00
2,835.00
4,200.00
480.00
7,515.00
7,515.00
No.
URAIAN
SAT
VOLUME
HARGA SAT
HARGA
0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025
25,000.00
30,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
2,500.00
3,000.00
19,500.00
840.00
4,095.00
472.50
200.00
30,607.50
30,608.00
0.1200
0.1800
0.0280
0.0420
0.0042
0.0025
30,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
3,600.00
13,500.00
1,176.00
2,730.00
315.00
200.00
21,521.00
21,521.00
0.2000
0.1600
0.0100
1.0000
0.5000
0.2000
0.3000
0.0300
0.0100
75,000.00
25,000.00
32,500.00
1,000.00
5,000.00
42,000.00
65,000.00
75,000.00
80,000.00
15,000.00
4,000.00
325.00
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800.00
53,775.00
53,775.00
0.2000
25,000.00
5,000.00
- Plamir tembok
Kg
0.1600
25,000.00
4,000.00
- Rol cat
Bh
0.0100
32,500.00
325.00
- Steger werk
Ls
1.0000
1,000.00
1,000.00
- Ampelas
Lbr
0.5000
5,000.00
2,500.00
- Pekerja
Oh
0.2000
42,000.00
8,400.00
- Tukang cat
- Kepala tukang
Oh
Oh
0.3000
0.0300
65,000.00
75,000.00
19,500.00
2,250.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
N-10-r' 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
- Cat tembok setara Vinilex
Kg
- Plamir tembok
Kg
- Rol cat
Bh
- Steger werk
Ls
- Ampelas
Lbr
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
m2
Kg
Oh
Oh
Oh
Oh
800.00
43,775.00
43,775.00
0.1300
0.1100
0.1000
0.6700
0.3300
0.1300
0.2000
0.0200
0.0100
25,000.00
25,000.00
32,500.00
1,000.00
5,000.00
42,000.00
65,000.00
75,000.00
80,000.00
3,250.00
2,750.00
3,250.00
670.00
1,650.00
5,460.00
13,000.00
1,500.00
800.00
32,330.00
32,330.00
1.2000
0.2500
0.3500
0.1750
0.0170
0.0017
55,700.00
35,700.00
42,000.00
65,000.00
75,000.00
80,000.00
66,840.00
8,925.00
14,700.00
11,375.00
1,275.00
136.00
103,251.00
103,251.00
No.
URAIAN
SAT
VOLUME
HARGA SAT
HARGA
0.1200
0.1800
0.0280
0.0420
0.0042
0.0025
30,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00
3,040.00
160.00
840.00
13,000.00
1,500.00
800.00
19,340.00
19,340.00
3,040.00
160.00
4,139.60
10,500.00
14,625.00
1,687.50
600.00
34,752.10
34,752.00
20,310.00
252.00
3,900.00
900.00
480.00
25,842.00
25,842.00
2,500.00
3,000.00
6,500.00
840.00
4,095.00
472.50
200.00
17,607.50
17,608.00
2,500.00
3,000.00
9,750.00
1,260.00
6,142.50
712.50
304.00
23,669.00
23,669.00
3,600.00
4,500.00
1,176.00
2,730.00
315.00
200.00
12,521.00
12,521.00
HARGA (Rp)
25,000.00
24,000.00
25,000.00
42,000.00
80,000.00
2,000.00
24.00
25,000.00
1,050.00
200.00
28,274.00
28,274.00
25,000.00
24,000.00
50,000.00
42,000.00
80,000.00
2,000.00
24.00
50,000.00
1,050.00
200.00
53,274.00
53,274.00
25,000.00
24,000.00
10,000.00
42,000.00
80,000.00
1,000.00
24.00
10,000.00
840.00
160.00
12,024.00
12,024.00
25,000.00
15,000.00
42,000.00
80,000.00
1,000.00
7,500.00
1,680.00
320.00
10,500.00
10,500.00
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
URAIAN
Mandor
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Plitur
Tukang Taman
Tukang
Pembantu Tukang
Pekerja Biasa
Penjaga Malam
Sopir
Operator
Mekanik
Pembantu Sopir
Pembantu Operator
Pembantu Mekanik
SATUAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
UPAH (Rp.)
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
80,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
42,000.00
42,000.00
42,000.00
65,000.00
75,000.00
65,000.00
42,000.00
50,000.00
42,000.00
KETERANGAN
NO
A.
MATERIAL
SAT
HARGA (Rp)
Pasir Urug
Tanah Urug Pilihan
Sirtu
Pasir Teras
Pasir Pasang Kali
Pasir Beton
Abu Batu
Batu Gosok ( Apung )
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Bronjol ( Untuk Bronjong )
Batu Koral Beton Kali
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K-225 )
Batu Telor
Batako Kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Blok 8 x 20 x 40
Bata Merah Bakar kelas I
Bata Merah Bakar kelas II
Bata Merah Oven ( Klingker )
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20
Grass Blok 30 x 30
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
Paving Blok Natural 6 cm
Paving Blok Warna 6 cm
Canstin Paving Blok
Semen PC /50 kg
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
zak
36
37
38
39
40
41
42
43
44
45
46
47
48
Semen Putih
Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm
Readymix Beton K500, Tanpa Pompa ( Selang )
Readymix Beton K400, Tanpa Pompa ( Selang )
Readymix Beton K350, Tanpa Pompa ( Selang )
Readymix Beton K300, Tanpa Pompa ( Selang )
Readymix Beton K225, Tanpa Pompa ( Selang )
Readymix Beton K175, Tanpa Pompa ( Selang )
Kapur Pasang / Kapur Tembok
Kapur Sirih
Semen Warna
Tanah liat
Air
zak
bh
m3
m3
m3
m3
m3
m3
m3
kg
kg
m3
ltr
Page 81
175,300.00
89,200.00
203,500.00
174,200.00
233,400.00
255,400.00
259,000.00
29,600.00
223,600.00
211,100.00
205,000.00
196,000.00
205,500.00
180,800.00
172,600.00
96,600.00
14,100.00
73,700.00
97,800.00
2,000.00
2,400.00
5,400.00
775.00
675.00
1,800.00
14,800.00
15,500.00
9,700.00
22,500.00
81,100.00
108,600.00
76,000.00
86,000.00
34,900.00
70,300.00
1,406.00
92,700.00
58,900.00
1,105,000.00
903,500.00
877,500.00
925,000.00
850,000.00
825,000.00
353,300.00
18,300.00
15,700.00
31,300.00
3.00
BHN
NO
49
50
51
52
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
MATERIAL
SAT
HARGA (Rp)
Formite/spacer
Hollow/Con Blok 8 x 20 x 40
Hollow/Con Blok 8 x 15 x 40
Hollow/Con Blok 8 x 10 x 40
bh
bh
bh
bh
2,500.00
5,000.00
4,000.00
3,000.00
kg
lt
lt
kg
lt
kg
kg
lt
kg
kg
ml
bh
bh
bh
5 lt
kg
m3
m3
bh
bh
bks
bks
lt
kg
kg
kg
kg
lt
kg
lt
lt
kg
kg
kg
lbr
kg
kg
kg
lbr
kg
kg
kg
lt
lt
bh
25,000.00
120,000.00
75,000.00
25,000.00
75,000.00
20,000.00
30,000.00
40,000.00
90,000.00
185,000.00
70,000.00
62,500.00
32,500.00
8,500.00
10,000.00
25,000.00
29,000.00
382,600.00
370,000.00
16,000.00
22,000.00
5,200.00
5,500.00
15,000.00
110,000.00
34,200.00
37,700.00
37,700.00
35,800.00
48,000.00
112,700.00
19,500.00
23,900.00
21,400.00
30,800.00
52,500.00
39,200.00
35,800.00
5,000.00
24,400.00
30,400.00
40,900.00
41,700.00
44,000.00
76,300.00
Page 82
BHN
NO
MATERIAL
SAT
HARGA (Rp)
46
47
48
49
50
Cat Bron
Karet lis
Minyak cat
Glass beet
Residu
kg
bh
kg
kg
lt
67,700.00
3,300.00
38,400.00
50,100.00
8,100.00
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
bt
bt
bt
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
m1
m1
m1
m1
m1
m1
m1
m3
m3
m1
m1
m3
m3
m3
bt
kg
m2
m2
m2
17,700.00
25,000.00
37,200.00
7,094,450.00
5,280,000.00
5,595,800.00
5,692,600.00
5,823,400.00
6,363,600.00
6,645,300.00
8,633,700.00
8,724,300.00
2,658,000.00
20,772,000.00
22,188,400.00
13,625,400.00
12,736,100.00
2,069,800.00
1,870,500.00
2,071,700.00
22,600.00
28,000.00
8,900.00
10,000.00
14,300.00
17,200.00
29,400.00
160,100.00
122,500.00
2,772,000.00
3,356,800.00
2,500.00
3,300.00
4,000.00
2,850,000.00
2,640,000.00
139,500.00
23,400.00
22,000.00
537,300.00
351,200.00
D
1
2
m2
lbr
17,400.00
62,400.00
Page 83
BHN
NO
MATERIAL
SAT
HARGA (Rp)
3
4
5
6
7
8
9
10
11
12
m2
m2
lbr
lbr
kg
lbr
bh
lbr
zak
m'
22,500.00
19,500.00
79,800.00
83,800.00
12,500.00
132,800.00
15,000.00
67,500.00
75,000.00
8,500.00
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
61,700.00
64,400.00
56,200.00
92,000.00
166,600.00
119,000.00
19,800.00
22,700.00
34,200.00
55,700.00
151,100.00
195,000.00
255,400.00
323,900.00
235,000.00
140,000.00
129,100.00
131,700.00
127,200.00
114,700.00
128,200.00
57,900.00
89,200.00
133,400.00
170,000.00
132,900.00
238,100.00
F
1
2
3
4
5
6
7
8
9
10
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
3,400.00
2,400.00
3,400.00
2,800.00
3,600.00
3,400.00
5,700.00
6,300.00
3,200.00
2,500.00
Page 84
BHN
NO
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
MATERIAL
SAT
Tegel Badak PC 30 x 30
Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia
Keramik 20 x 25 Dinding KM KW I DN Corak Mulia
Keramik 30 x 30 KWI DN Putih Polos Mulia
Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 40 x 40 KWI DN Putih Polos Mulia
Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Putih Polos Roman
Keramik 20 x 25 Dinding KM KW I DN Corak Roman
Keramik 20 x 25 KW I DN Putih Polos Roman
Keramik 30 x 30 KW I DN Polos Roman
Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman
Keramik 40 x 40 KW I DN Polos Roman
Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman
Vinyl Lantai Standar
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Parquet Jati
Stairnosing Keramik 10/20
Stairnosing Fiber
Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granito Tile Essenza Ukuran 40 x 40 Polis
Granito Tile Essenza Ukuran 30 x 30
Granito Tile Essenza Ukuran 40 x 40 UnPolis
Marmer
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis
Granito Tile Essenza 60 x 60 Polis
Granito Tile Essenza 60 x 60 UnPolis
Batu Tempel Hitam
Bata Karawang
Campuran untuk Kedap Air ( AM )
Plint keramik 10 x 20
Plint keramik 10 x 25
Page 85
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m
m2
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
ltr
bh
bh
HARGA (Rp)
4,100.00
63,300.00
67,300.00
54,500.00
56,000.00
62,500.00
54,500.00
62,500.00
53,000.00
58,000.00
56,800.00
65,500.00
64,400.00
72,200.00
75,200.00
72,900.00
75,200.00
72,900.00
68,900.00
76,600.00
72,500.00
77,000.00
56,000.00
1,025,500.00
353,500.00
375,400.00
13,700.00
25,000.00
31,800.00
13,500.00
1,848,400.00
1,612,900.00
1,331,100.00
1,299,400.00
345,000.00
322,800.00
204,900.00
550,000.00
550,200.00
345,700.00
340,800.00
237,600.00
157,900.00
358,100.00
231,800.00
96,500.00
600.00
37,600.00
3,000.00
3,250.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
61
62
63
64
65
66
67
68
Plint keramik 10 x 30
Plint keramik 10 x 40
Plint keramik 15 x 30
Plint keramik 15 x 40
Plint granito 10 x 30
Plint granito 10 x 40
Plint granito 15 x 30
Plint granito 15 x 40
bh
bh
bh
bh
bh
bh
bh
bh
3,500.00
4,000.00
4,500.00
5,250.00
25,900.00
27,600.00
31,100.00
41,300.00
G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
m1
m1
m1
m1
m1
m1
stk
stk
stk
stk
stk
stk
stk
stk
kg
44,300.00
56,400.00
74,200.00
49,200.00
61,700.00
80,900.00
94,300.00
130,900.00
299,800.00
298,500.00
9,600.00
12,700.00
16,800.00
22,800.00
17,400.00
H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
kg
kg
m2
m2
kg
kg
kg
kg
kg
kg
kg
kg
m1
kg
kg
m2
m2
m2
m2
m2
m2
kg
m2
m2
16,500.00
20,700.00
171,300.00
185,000.00
24,000.00
23,900.00
18,300.00
21,600.00
19,200.00
10,600.00
27,700.00
63,500.00
1,000.00
28,200.00
41,400.00
13,400.00
15,300.00
14,900.00
32,100.00
35,900.00
28,600.00
23,600.00
51,900.00
38,700.00
Page 86
BHN
NO
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
MATERIAL
SAT
Timah
Timah Hitam
Ram nyamuk Alumunium
Plat Srip 2 x 30 mm ( 6 m1 )
Plat Srip 3 x 30 mm ( 6 m1 )
Plat Strip
Besi Strip
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Alumunium 0.1 mm
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " )
Daun Jendela Alumunium Natural ( tanpa kaca dan accessories )
Daun Jendela Alumunium Warna ( tanpa kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )
Handle Alumunium ( Tarikan Pintu Alumunium )
Kait Angin Alumunium
Karet Asisoris Kusen / Pintu Alumunium
Jalusi Alluminium
Sunscreen Almunium
Seng Plat BJLS 30 60 cm ( 100 m1 )
Seng Plat BJLS 30 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mms/d 10 mm
Plat Besi 10 mm keatas
Kabel presstressed polos
Jaring Kawat Baja
Lem Kuning ( Aibond )
Lem Fox
Lem Vinyl
Besi Strip Kaca Nako
Profil alumunium "T"
Besi Hallow ( 2 x 4 x 4) cm (400cm)
Besi Hallow ( 4 x 4) cm (400 cm)
Besi Rail Pengamanan
Jendela Besi
Jendela Besi tahan api
Pintu gulung besi
Pintu Roliing Door
Jendela nako kaca ryben + tralis 6 klips
Jendela nako kaca ryben + tralis 7 klips
Jendela nako kaca ryben + tralis 8 klips
Jendela nako kaca ryben + tralis 10 klips
Page 87
kg
kg
m2
bt
bt
bt
kg
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m2
m2
m2
m2
bh
ps
m1
m'
m2
roll
roll
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m1
btg
btg
kg
m2
m2
m2
m2
set
set
set
set
HARGA (Rp)
46,300.00
43,300.00
32,400.00
33,000.00
33,100.00
18,200.00
26,800.00
89,800.00
110,500.00
141,400.00
143,100.00
171,800.00
56,300.00
151,100.00
163,000.00
81,000.00
102,000.00
98,800.00
148,800.00
211,800.00
207,500.00
345,200.00
104,500.00
7,500.00
35,000.00
380,200.00
1,581,500.00
2,080,100.00
16,800.00
17,700.00
14,100.00
14,100.00
14,700.00
26,700.00
28,900.00
35,700.00
23,900.00
44,000.00
11,000.00
12,200.00
22,600.00
29,200.00
459,300.00
390,200.00
501,700.00
501,700.00
306,600.00
170,000.00
200,000.00
230,000.00
290,000.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
76
77
78
79
80
81
set
set
set
set
set
set
120,000.00
140,000.00
170,000.00
210,000.00
230,000.00
300,000.00
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BAHAN KACA
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Polos 8 mm ( ASAHI )
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca cermin 8 mm
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Patri Ex Luar Negeri Terpasang
Kaca 6 mm Gravver
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Sealant
Jendela Nako
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
kg
bh
69,000.00
87,400.00
111,000.00
183,100.00
148,700.00
323,400.00
627,000.00
150,500.00
186,400.00
234,300.00
1,621,100.00
3,425,700.00
1,263,900.00
22,000.00
125,700.00
211,800.00
109,200.00
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
kg
kg
kg
bh
bh
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
kg
bh
23,800.00
23,400.00
20,000.00
1,600.00
900.00
57,100.00
21,700.00
7,500.00
71,800.00
15,900.00
9,300.00
5,300.00
800.00
7,200.00
600.00
300.00
35,000.00
17,500.00
250.00
K
1
2
3
BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant BSP 1"
Besi Pipa Untuk Hydrant BSP 1.25"
Besi Pipa Untuk Hydrant BSP 1.5"
bt
bt
bt
166,700.00
210,200.00
298,000.00
Page 88
BHN
NO
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
MATERIAL
SAT
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
Page 89
HARGA (Rp)
351,800.00
439,300.00
595,000.00
869,600.00
1,423,400.00
172,300.00
227,900.00
365,800.00
573,100.00
772,400.00
109,100.00
159,400.00
181,500.00
259,300.00
280,500.00
326,400.00
467,400.00
672,100.00
849,900.00
920,300.00
6,300.00
8,600.00
16,700.00
19,800.00
20,700.00
22,700.00
51,200.00
60,400.00
75,900.00
118,600.00
40,100.00
52,200.00
63,200.00
79,900.00
105,900.00
110,700.00
167,100.00
205,100.00
347,900.00
640,000.00
818,300.00
22,500.00
27,800.00
40,500.00
58,500.00
60,200.00
75,800.00
126,300.00
145,700.00
256,800.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
tb
gl
m1
m1
m1
m1
m1
m1
m1
4,400.00
4,700.00
4,900.00
7,200.00
9,500.00
13,500.00
15,800.00
26,400.00
29,700.00
34,000.00
89,900.00
10,100.00
4,200.00
36,700.00
53,500.00
57,900.00
65,700.00
74,700.00
83,600.00
92,500.00
L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
BAHAN SANITAIR
Stop Kran 3/4" KIT
Stop Kran 1" KIT
Stop Kran 1 1/2" KIT
Stop Kran 2" KIT
Stop Kran 2 1/2" KIT
Stop Kran 3" KIT
Check Valve 1/2"
Double Neple 1/2"
Water Mur 1/2"
Gate walve 1/2"
Saringan Air Lt. KM Stainless Steel
Apooer Bath Tube
Kran Stainless Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2"
Kran Tembok ITAP dia. 1/2"
Kran Bebek Sun Eui 1/2"
Kran Bebek ITAP 1/2"
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin Warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
unit
unit
unit
unit
unit
103,900.00
124,200.00
208,000.00
267,900.00
713,200.00
830,300.00
86,400.00
32,400.00
40,200.00
55,500.00
66,600.00
267,800.00
46,100.00
221,000.00
134,800.00
86,900.00
40,900.00
144,600.00
51,500.00
228,400.00
2,098,700.00
46,300.00
1,012,700.00
699,900.00
205,600.00
188,200.00
2,032,900.00
Page 90
BHN
NO
MATERIAL
SAT
HARGA (Rp)
28
29
30
31
32
33
34
35
36
unit
unit
bh
unit
lbr
bh
bh
bh
btng
1,724,700.00
910,800.00
1,272,100.00
1,773,400.00
495,900.00
397,800.00
1,272,300.00
1,650,200.00
60,000.00
M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
m2
bh
m2
m2
m2
m2
m2
33,100.00
47,100.00
100,000.00
140,600.00
164,700.00
77,200.00
111,100.00
62,900.00
83,100.00
73,300.00
65,900.00
58,500.00
42,300.00
78,500.00
97,200.00
80,000.00
487,100.00
283,600.00
19,600.00
1,900.00
2,700.00
2,300.00
7,500.00
4,800.00
10,500.00
203,100.00
172,700.00
138,500.00
80,900.00
105,300.00
100,800.00
83,900.00
88,700.00
96,700.00
8,500.00
26,400.00
112,400.00
142,200.00
139,300.00
145,100.00
Page 91
BHN
NO
MATERIAL
SAT
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
m2
lbr
lbr
m1
m1
m1
m1
bh
m1
bh
HARGA (Rp)
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
N
1
2
3
4
5
6
7
8
9
10
11
12
13
BAHAN MEKANIKAL
Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW )
Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW )
Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW )
Presure Tank kap. 500 liter lengkap
Hydran Box dlm Gedung ( Lengkap )
Fire House 1.5 x 30 m + nose
Exhose Fan H 360 W 60 x 60 cm
Exhose Fan H 380 W CFM 55 x 55 cm
Exhose Fan H 100 W 40 x 40 cm
AC Split 3 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 1 PK Setara TOSHIBA
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU
71,396,400.00
O
1
2
3
4
5
6
7
8
9
10
11
12
BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' )
ROLL
ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
102,700.00
151,700.00
6,600.00
7,600.00
4,900.00
10,900.00
7,600.00
6,300.00
15,400.00
20,700.00
11,800.00
13,700.00
Page 92
2,700.00
4,000.00
7,500.00
10,700.00
10,000.00
3,000.00
4,500.00
6,000.00
7,500.00
38,100.00
37,500.00
75,000.00
21,000.00
16,400.00
34,500.00
22,000.00
11,000.00
7,200.00
2,200.00
1,700.00
7,200.00
216,358,900.00
591,647,100.00
36,997,300.00
6,854,400.00
4,866,100.00
6,862,900.00
5,491,100.00
1,092,600.00
30,791,800.00
21,926,500.00
5,174,100.00
4,200,000.00
BHN
NO
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
MATERIAL
SAT
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk
Page 93
HARGA (Rp)
18,600.00
17,600.00
119,700.00
26,500.00
29,700.00
12,000.00
19,300.00
23,800.00
14,500.00
19,200.00
18,500.00
20,400.00
25,800.00
35,500.00
41,900.00
841,900.00
2,182,600.00
153,500.00
204,800.00
222,600.00
468,800.00
55,100.00
106,000.00
521,100.00
23,800.00
26,300.00
23,800.00
87,700.00
144,900.00
87,800.00
179,600.00
61,200.00
29,700.00
35,200.00
41,800.00
37,900.00
40,600.00
41,300.00
8,300.00
6,500.00
144,000.00
306,900.00
306,900.00
67,900.00
147,400.00
307,600.00
221,700.00
738,000.00
101,500.00
65,100.00
423,700.00
296,100.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
P
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
bh
bh
bh
bh
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
bh
bh
bh
ps
ps
ps
m1
unt
unt
unt
unt
unt
bh
m1
m1
lbr
lbr
m1
410,900.00
408,600.00
126,500.00
864,300.00
193,100.00
335,900.00
165,300.00
207,300.00
54,400.00
102,700.00
586,600.00
85,200.00
94,500.00
46,800.00
51,600.00
49,800.00
5,500.00
7,100.00
29,000.00
32,200.00
31,500.00
33,000.00
21,000.00
15,000.00
13,700.00
9,100.00
420,000.00
597,500.00
200,000.00
205,400.00
255,500.00
19,500.00
43,500.00
53,500.00
86,900.00
50,100.00
57,900.00
Q
1
2
3
4
5
6
kg
kg
kg
ton
ton
ton
12,459.00
12,459.00
10,890.00
1,348,300.00
1,200,200.00
1,666,900.00
R
1
2
unit
unit
172,600.00
243,800.00
Page 94
BHN
NO
MATERIAL
SAT
HARGA (Rp)
3
4
5
6
7
8
9
10
11
unit
unit
unit
unit
unit
unit
unit
unit
unit
718,500.00
1,100,200.00
1,890,700.00
4,961,500.00
7,878,000.00
27,151,200.00
15,702,700.00
172,052,500.00
5,195,300.00
S
1
2
3
4
5
6
bh
bh
bh
bh
bh
bh
1,172,500.00
1,316,400.00
1,954,200.00
255,300.00
118,500.00
161,100.00
T
1
2
3
4
5
6
7
8
9
10
ALAT TUKANG
Palu 0.5 kg
Cangkul
Singkup
Sekrop
Pengki
Linggis
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Selang Plastik untuk Water Pas dia. 0.5 cm
Water Pas Alumunium 60 cm
bh
bh
bh
bh
bh
bh
bh
bh
m
bh
39,300.00
24,500.00
41,400.00
50,100.00
12,300.00
41,700.00
101,000.00
37,800.00
1,600.00
88,200.00
U
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
lt
m3
lt
lt
lt
lt
lt
15 kg
15.1 kg btl
btl
kg
ltr
Gln
kg
kg
kg
bh
18,000.00
151,100.00
28,435.00
7,150.00
7,800.00
3,300.00
55,000.00
104,600.00
88,900.00
66,400.00
19,400.00
40,500.00
15,700.00
35,600.00
2,400.00
11,100.00
1,400.00
V
1
2
BAHAN PAGAR
Panel Beton Pracetak
Kolom Beton Pracetak
lbr
btg
199,200.00
264,000.00
Page 95
BHN
NO
B.
1
2
3
4
5
6
7
8
9
10
MATERIAL
SAT
BIDANG PERTAMANAN
Aglonema
Bambu krisik/jepang
Furadan
Kompos/pupuk kandang
M atoa (2 m)
Palm (botol, ekor tupai, putri, dll) tinggi 2 m
Philo
Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m
Pohon perdu (kaca piring, puring, mawar, melati, dll)
Rumput gajah mini
batang
batang
kg
karung
batang
batang
batang
batang
batang
m2
HARGA (Rp)
50,000.00
50,000.00
24,000.00
25,000.00
40,000.00
100,000.00
75,000.00
25,000.00
10,000.00
15,000.00
Page 96
BHN
NO
A.
PEKERJAAN PERSIAPAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
PEKERJAAN TANAH
1 M3 Galian Tanah Biasa sedalam 1 m
1 M3 Galian Tanah Biasa Sedalam 2 m
1 M3 Galian Tanah Biasa Sedalam 3 m
1 M3 Galian Tanah Keras Sedalam 1 m
1 M3 Galian Tanah Lumpur Sedalam 1 m
1 M2 Pekerjaan Stripping Setinggi 10 cm
1 M3 Pembuangan Tanah sejauh 150 m
1 M3 Urugan Kembali
1 M3 Pemadatan Tanah
1 M3 Urugaan Pasir
1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm
1 M3 Urugan Sirtu
1 M3 Urugan Tanah Pilihan
1 M2 Pembuatan jalan sementara, tebal 25 cm
B.
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
D.
1
2
3
4
5
PEKERJAAN PONDASI
1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
1 M' Pembuatan Tiang Pancang f 40 cm, Beton Tulang
1 M' Memancang Tiang Pancang Beton Tulang
1 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang
1 M' Menyambung Tiang Pancang Beton Bertulang
PEKERJAAN BETON
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
1 M3 Membuat Tiang Pancang Beton Prestressed
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr
Page 97
HRGST
NO
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
1 M Memasang PVC Waterstop Lebar 200 mm
1 Kg Pembesian Dengan Besi Polos/ulir
1 M2 Pasang Bekesting Untuk Pondasi
1 M2 Pasang Bekisting Untuk Sloof
1 M2 Pasang Bekesting Untuk Kolom
1 M2 Pasang Bekesting Untuk Balok
1 M2 Pasang Bekesting Untuk Lantai
1 M2 Pasang Bekesting Untuk Tangga
1 M3 Membuat Beton Cor Mutu K-225
1 M3 Membuat Beton Cor Mutu K-275
1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
1 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)
1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
1 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
1 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15
1 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat
19
20
21
22
23
24
25
26
Page 98
HRGST
NO
E.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
URAIAN PEKERJAAN
Page 99
HRGST
NO
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
F.
17
18
19
20
21
22
23
24
25
26
27
28
29
G.
1
2
3
4
5
6
7
8
9
10
11
URAIAN PEKERJAAN
1 M2 Dinding Keramik corak 20 x 20 cm setara Mulia
1 M2 Dinding Keramik polos 20 x 20 cm Setara Mulia
1 M2 Dinding Keramik polos 20 x 25 cm Setara Mulia
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Mulia
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Mulia
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Mulia
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Mulia
1 M2 Dinding Keramik Corak 10 x 20 cm Setara Roman
1 M2 Dinding Keramik polos 10 x 20 cm Setara Roman
1 M2 Dinding Keramik corak 20 x 20 cm setara Roman
1 M2 Dinding Keramik polos 20 x 20 cm Setara Roman
1 M2 Dinding Keramik polos 20 x 25 cm Setara Roman
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Roman
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Roman
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Roman
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Roman
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Roman
1 M2 Dinding Marmer
1 M2 Dinding Batu Tempel Hitam
1 M2 Dinding Porselen (11 x 11) cm
1 M2 Wall paper
1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
1 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps
1 M2 Pasang Dinding anyaman bambu, rangka kayu
PEKERJAAN PLESTERAN DAN SIARAN
1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
1 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian
1 M2 Berapen adk. 1pc : 5ps Tebal 15 mm
1 M2 Plesteran Beton adk. 1pc : 2ps Tebal 15 mm
1 M2 Plesteran Beton adk. 1pc : 3ps Tebal 15 mm
1 M2 Plesteran Skoning adk. 1pc : 2ps, tebal 10mm
1 M2 Acian Plesteran
1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
1 M2 Plesteran Siar adk. 1pc : 2ps dinding bata merah
PEKERJAAN ATAP
1 M2 Pasang Atap Genteng Palentong
1 M2 Pasang Genteng Bubung Palentong
1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm
1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm
1 M Pasang Nok Stel Gelombang 1,05 m
1 M2 Pasang Atap Genteng Beton
1 M2 Pasang Atap Genteng Murando Natural
Page 100
HRGST
NO
12
13
14
15
16
17
18
19
20
21
22
H.
1
2
3
4
5
6
7
8
9
10
11
12
13
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
URAIAN PEKERJAAN
1 M2 Pasang Atap Genteng Murando Glazur
1 M2 Pasang Atap Genteng Metal
1 M Pasang Nok Genteng Beton
1 M Pasang Nok Genteng Metal
1 M2 Pasang Atap Seng Gelombang
1 M2 Pasang Atap Nok Seng
1 M2 Pasang Alluminium Foil / Sisalation
1 M2 Pasang Atap Alluminium Natural
1 M2 Pasang Atap Alluminium warna
1 M2 Pasang Nok Alluminium
1 M' Pasang Lisplank GRC ukuran 30 cm
1 M' Pasang Nok Pinggir
PEKERJAAN LANGIT-LANGIT
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
1 M List Langit-langit Kayu Profil 10 cm
1 M List Langit-langit Gypsum 10 cm
1 M List Langit-langit Kayu 1/4 cm
PEKERJAAN LANTAI
1 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza
1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza
1 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza
1 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza
1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman
1 M2 Lantai Marmer
1 M2 Lantai Parquet Jati
1 M Plint Keramik ukuran (10 x 40) cm
1 M Plint Keramik ukuran (10 x 30) cm
1 M' Plint kayu kamper Samarinda (2 x 10) cm
1 M' Plint keramik ukuran (10 x 20) cm
1 M2 Lantai karpet
1 M2 Paving block natural 8 cm
1 M2 Paving block warna 8 cm
1 M2 Paving block natural 6 cm
1 M2 Paving block warna 6 cm
1 M2 Grass Block 20 x 20
1 M2 Grass Block 30 x 30
Page 101
HRGST
NO
J.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
K.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
URAIAN PEKERJAAN
PEKERJAAN KAYU
1 M3 Kusen Pintu & jendela kayu Kamper Samarinda
1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
1 M3 Kusen Pintu & jendela kayu Borneo Super
1 M2 Pintu Panel Kayu Kamper Samarinda
1 M2 Pintu Panel Kayu Kamper Medan/Kruing
1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
1 M2 Pintu & Jendela Kaca Kayu Borneo
1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
1 M2 Jalusi Mati Kusen Kayu kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
1 M3 Kuda-kuda Kayu Kamper Medan
1 M3 Kuda-kuda Kayu Borneo Super
1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super
1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan
1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
1 M List Plafond + kayu Profil 10 cm
1 M2 Pekerjaan partisi
1 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super
1 M2 Rangka langit-langit ( 0,50 x 1,00 ) m, Kayu Borneo Super
1 M' Reuter Kayu kamper Medan
1 M3 Gording kayu kelas II
1 M2 Dinding bilik, rangka kayu borneo
PEKERJAAN BESI DAN ALLUMINIUM
1 Kg Besi profil
1 Kg Perakitan baja
1 Cm Pengelasan dengan las listrik
1 m2 Pintu Rolling Door
1 m2 Pintu Alluminium Natural
1 m2 Terali Besi
1 m2 Kawat Harmonika 4 cm
1 m' Talang Datar, Seng BJLS 28 lebar 90 cm
1 m' Talang Miring, Seng BJLS 28 lebar 90 cm
1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
1 m' Pasang kusen pintu/jendela alluminium natural 4"
1 m' Pasang kusen pintu/jendela alluminium warna 4"
1 m' Pasang kusen pintu/jendela alluminium natural 3"
1 m' Pasang kusen pintu/jendela alluminium warna 3"
1 m2 Pintu alluminium strip lebar 8 cm
1 m2 Pintu/jendela kaca rangka alluminium natural 4"
1 m2 Pintu/jendela kaca rangka alluminium warna 4"
1 m2 Jendela nako & teralis (10 klips)
1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
1 m2 Rangka jendela besi square tube (5 x 5) cm
1 m2 Pintu lipat (folding door)bahan besi
1 m2 Tirai (venetions blinds and vertical blinds)
1 m2 Rangka atap baja ringan
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
Page 102
HRGST
NO
URAIAN PEKERJAAN
28
29
30
31
32
33
34
35
36
37
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m
1
2
3
4
5
6
7
8
9
10
L.
M.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
PEKERJAAN SANITASI
1 Buah Closet jongkok Porselen Standar
1 Buah Urinoir
1 Buah Wastafel
1 Buah bak Mandi Fibreglass Volume 0,30 m3
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
1 M' Pipa PVC 1/2" (AW)
1 M' Pipa PVC 1" (AW)
1 M' Pipa PVC 11/2" (AW)
1 M' Pipa PVC 2" (AW)
1 M' Pipa PVC 4" (AW)
1 M' Pipa PVC 3/4" (AW)
1 Buah Bak Cuci piring Stainless steel
1 Buah Kran 1/2" - 3/4"
1 Buah Floor Drain
1 M' Grafel beton U 20 cm -60 cm
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
1 M' Saluran Air Limbah Buis Beton 60 cm
1 M' Pasang Talang Seng Datar
1 Buah Closet Duduk
1 Buah Tangki Air fibreglass Volume 1 m3
1 Unit Septictank 2x1,50x1,50 m + Rembesan
1 Unit Septictank 1x1,50x1,50 m + Rembesan
Page 103
HRGST
NO
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
O.
1
2
3
4
URAIAN PEKERJAAN
PEKERJAAN PENGECATAN
1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
1 M2 Mendempul Dan Menggosok Kayu
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
1 M2 Pelaburan Bidang Kayu dengan Politur
1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
1 M2 Pengecatan Tembok Baru Setara ICI
1 M2 Pengecatan Tembok Lama Setara ICI
1 M2 Pengecatan Plafond ( 3x ) Setara ICI
1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
1 M2 Memasang Wallpaper
1 M2 Pengecatan Permukaan Baja dengan Meni Besi
1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
1 M2 Pengecatan Tembok Lama Setara Vinilex
PEKERJAAN PERTAMANAN
1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
1 M2 Tanam rumput gajah (silang papan catur)
Page 104
HRGST
NO
URAIAN PEKERJAAN
K(2)
1
2
2
3
3
4
4
5
5
6
6
PEKERJAAN KUSEN SD
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
7 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
7 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m
Page 105
HRGST
HARGA
(Rp)
269,316.00
355,236.00
222,843.00
49,266.00
1,135,066.00
927,350.00
861,935.00
8,200.00
96,799.00
306,654.00
282,654.00
474,296.00
166,813.00
265,378.00
43,645.00
54,250.00
20,000.00
26,252.00
36,710.00
31,210.00
41,206.00
2,500.00
25,672.00
9,584.00
25,000.00
223,760.00
33,900.00
256,700.00
119,540.00
120,456.00
735,761.00
689,096.00
656,736.00
363,345.00
2,020,939.00
870,632.00
761,279.00
1,104,309.00
864,246.00
1,073,335.00
128,057.00
216,932.00
628,577.00
716,798.00
689,279.00
970,698.00
1,047,667.00
914,882.00
Page 106
HRGST
HARGA
(Rp)
65,593.00
18,566.00
152,870.00
167,120.00
308,850.00
316,770.00
431,850.00
289,440.00
1,197,898.00
1,186,807.00
4,248,004.00
5,441,279.00
4,616,279.00
5,078,279.00
4,583,279.00
5,408,279.00
6,101,279.00
6,646,664.00
6,573,014.00
7,233,014.00
6,225,664.00
6,803,164.00
7,728,014.00
8,058,014.00
8,498,014.00
7,150,514.00
7,673,014.00
6,691,324.00
6,864,634.00
7,367,944.00
7,706,254.00
8,552,029.00
9,397,804.00
5,693,859.00
6,201,324.00
8,288,164.00
7,199,164.00
6,608,324.00
6,773,324.00
6,959,099.00
6,959,099.00
6,628,499.00
5,969,099.00
7,554,564.00
6,575,339.00
6,904,322.00
6,672,247.00
6,554,453.00
6,925,773.00
5,466,262.00
5,930,412.00
72,847.00
94,786.00
315,287.00
6,438,864.00
6,196,529.00
6,574,999.00
928,986.00
852,609.00
892,501.00
Page 107
HRGST
HARGA
(Rp)
220,267.00
211,736.00
207,720.00
105,680.00
102,345.00
100,253.00
580,016.00
577,485.00
580,016.00
46,791.00
151,794.00
129,077.00
109,862.00
190,791.00
117,281.00
104,781.00
108,782.00
107,282.00
Page 108
HRGST
HARGA
(Rp)
115,282.00
107,282.00
107,282.00
115,282.00
105,782.00
110,782.00
109,582.00
118,282.00
124,982.00
117,182.00
127,982.00
117,182.00
125,682.00
127,982.00
121,682.00
129,382.00
125,282.00
129,782.00
689,841.00
179,935.00
116,082.00
94,920.00
329,174.00
431,147.00
284,431.00
92,049.00
140,691.00
103,090.00
836,685.00
105,137.00
36,022.00
33,620.00
32,054.00
47,253.00
44,739.00
42,318.00
31,284.00
25,355.00
43,737.00
41,302.00
36,417.00
20,213.00
36,390.00
21,823.00
59,915.00
80,177.00
72,510.00
42,371.00
45,157.00
43,172.00
44,011.00
48,016.00
97,758.00
110,652.00
61,015.00
Page 109
HRGST
HARGA
(Rp)
84,415.00
227,572.00
109,174.00
175,955.00
68,516.00
24,132.00
31,145.00
204,160.00
229,465.00
161,550.00
43,125.00
30,000.00
31,443.00
28,143.00
210,400.00
298,060.00
154,907.00
153,893.00
128,684.00
93,960.00
91,408.00
136,615.00
133,743.00
37,073.00
16,765.00
7,500.00
421,657.00
402,591.00
82,032.00
101,549.00
92,670.00
99,170.00
89,670.00
94,670.00
93,470.00
102,170.00
108,870.00
111,870.00
105,570.00
113,270.00
109,170.00
113,670.00
672,798.00
475,845.00
19,492.00
27,552.00
36,348.00
29,301.00
403,815.00
153,570.00
182,445.00
148,215.00
158,715.00
323,040.00
330,990.00
Page 110
HRGST
HARGA
(Rp)
11,956,440.00
8,427,120.00
7,932,000.00
573,768.00
456,124.00
381,041.00
377,653.00
663,826.00
356,459.00
513,126.00
354,562.00
430,185.00
486,735.00
606,635.00
7,736,900.00
7,283,040.00
78,780.00
89,340.00
62,218.00
84,779.00
33,347.00
172,437.00
64,485.00
79,466.00
29,660.00
7,367,660.00
70,471.00
32,216.00
974.00
2,464.00
456,491.00
332,441.00
192,598.00
62,063.00
117,797.00
174,013.00
172,631.00
179,302.00
192,392.00
102,192.00
125,292.00
855,299.00
731,898.00
784,258.00
393,980.00
1,171,360.00
269,541.00
622,341.00
577,519.00
196,000.00
2,215,571.88
3,278,022.70
4,037,418.82
2,168,119.18
Page 111
HRGST
HARGA
(Rp)
4,021,101.40
5,165,780.62
3,001,582.62
3,066,970.73
3,009,751.68
1,264,968.60
789,516.00
912,681.00
1,302,386.40
1,692,091.80
382,160.00
199,370.00
127,785.00
32,569.00
22,710.00
15,119.00
458,550.00
243,950.00
107,705.00
133,669.00
463,770.00
2,430,770.00
1,400,178.00
601,654.00
159,315.00
620,779.00
377,546.00
22,247.00
31,602.00
48,896.00
50,336.00
154,417.00
34,659.00
420,930.00
49,075.00
74,670.00
79,411.00
119,325.00
221,243.00
79,987.00
2,051,157.00
1,618,359.00
10,022,424.00
6,780,162.00
Page 112
HRGST
HARGA
(Rp)
8,280.00
8,708.00
24,517.00
39,790.00
64,424.00
7,515.00
30,608.00
21,521.00
53,775.00
43,775.00
32,330.00
103,251.00
19,340.00
34,752.00
25,842.00
17,608.00
23,669.00
12,521.00
28,274.00
53,274.00
12,024.00
10,500.00
Page 113
HRGST
HARGA
(Rp)
2,215,572
3,278,023
4,037,419
2,168,119
4,021,101
5,165,781
3,001,583
3,066,971
3,009,752
1,264,969
789,516
912,681
1,302,386
1,692,092
Page 114
HRGST
K O T A B OK G
OO
TR
A BOGOR
KOTA BOGOR
TAHUN ANGGARAN 2011