You are on page 1of 4

Saudi Aramco 2616-ENG (3/99)

OPERNS.


SAUDI ARAMCO OIL COMPANY
SECTION 15930 Variable Air Volume Terminals
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

SUBSECTION INDEX Part 1 - General


DESCRIPTION

1.01 1.02 1.03 1.04

Description Quality Assurance Submittals Product Delivery, Storage and Handling

Part 2 - Products
DATE JOB/EWO

2.01 2.02 2.03 2.04 2.05 2.06

General Unit Cabinet Damper Assembly Controls Electric Heating Coil Space Temperature Sensors

REV. NO.

DISCIPLINE ENGINEER

Part 3 - Execution 3.01 Installation

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

PART 1 - GENERAL 1.01 Description A. This Section covers providing variable air volume terminals of the shutoff type as herein specified and shown on the Drawings, including accessories required to complete the Work acceptable to Saudi Aramco Representative.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

1.02

Quality Assurance A. Reference Codes and Standards: Comply with applicable Saudi Aramco Standards, Codes and Standards as specified herein and listed in Section 15001. Insulation shall meet NFPA-90A requirements for flame spread and smoke generation and UL-181 requirements for antierosion, corrosion and fungus properties. Electric heating coils, when specified shall be UL or ETL listed and designed to comply with UL Standard 1096.
SECTION 15930
DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

Date:

B.

C.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

1 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

ENGG

CERT

D.

Sound power levels shall be ARI certified in accordance with the requirements of ARI-880.

1.03

Submittals A. Submit three (3) copies of the following to Saudi Aramco Representative for approval, manufacturers literature and certified prints in accordance with these Specifications. Required data shall include, but shall not be limited to: 1. 2. Physical Dimensions of each Specialty. Materials of Construction. Weights.

DESCRIPTION

B.

DATE JOB/EWO

3. 1.04

Product Delivery, Storage and Handling A. Refer to Section 15050 Basic Mechanical Material and Methods.

REV. NO.

DISCIPLINE ENGINEER

PART 2 PRODUCTS 2.01 General A. Factory-assembled, pressure independent type externally powered, variable air volume control terminal. Unit shall be complete with a damper assembly, flow sensor, collars for duct connection and all required features. Control box shall be clearly marked with an identification label that lists such information as nominal cfm, maximum and minimum factoryset airflow limits, coil type and coil hand, where applicable.

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

2.02

Unit Cabinet A. Constructed of 22-gage (20-gage optional) galvanized steel with round or rectangular inlet collar and rectangular discharge with slip and drive connection. Insulated with 1-in. thick, 3-lb equivalent density mat-faced insulation that meets the requirements of UL-181 and NFPA90A. A non-perforated internal sheet metal cover. CAV boxes used in Clinic Building shall be provided with external insulation and shall be approved for health care application. Extending over the fiberglass insulation and covering the liner cut edges shall be provided.
DWG. TYPE PLANT NO. INDEX DRAWING NO.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

B.
Date:

C.

SECTION 15930
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

2 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

CERT

2.03

Damper Assembly A. The control air damper assembly shall be constructed of heavy gage steel with solid shaft rotating in bearings. Damper shaft shall be marked on the end to indicate damper position. Damper blade shall incorporate a flexible gasket for tight air-flow shutoff and operate over a full 90 degrees.

ENGG

B.
DESCRIPTION

2.04

Controls A. Units shall have pressure-independent controls. Capable of maintaining required airflow set points 5% of the unit's capacity at any inlet pressure up to6-in. wg. The unit inlet shallbe provided with multiple averaging velocity sensor probes. VAV terminals controls shall be coordinate with the Building automation system.

DATE JOB/EWO

B.

C.

REV. NO.

2.05
DISCIPLINE ENGINEER

Electric Heating Coil A. Electric coils shall be mounted in a minimum 20 gage zinc coated steel casing and shall be UL listed. Elements shall be nickel chrome and sup-ported by ceramic isolators. The integral control panel shall be housed in a NEMA 1 enclosure, with hinged access door for access to all controls and safety devices. Electric coils shall contain a primary automatic reset thermal cutout and differential pressure airflow switch for proof of airflow Electric coils shall include fused door interlocking disconnect switch, mercury contactors, fuse block, dust tight enclosure construction, all mounted and/or wired within the control enclosure. Heaters shall be designed for the capacity, electrical characteristics and steps of control as shown on the equipment schedule. Coils shall be factory wired and shall include all limit switches.

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

B. C.

CERTIFIED _ __________
DATE: ________

D.

CONSTRUCTION AGENCY
________________ DATE:

E.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

F.

Date:

G.

SECTION 15930

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

3 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

2.06

Space Temperature Sensors A. Refer to Section 15985 Building Automation System.

ENGG

CERT

PART 3 - EXECUTION 3.01 Installation A. All VAV shall be installed where shown on the Drawings in accordance with the manufacturers instructions. Do not support VAV terminals with perforated metals straps. Do not support VAV terminals from ducts or pipes. Hang VAV terminals independently from the ceiling construction.

DESCRIPTION

B. B. C.

DATE JOB/EWO

- END OF SECTION -

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 15930

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

4 OF 4

00