Structure: 3-Nov-06
Checked By:
Design Criteria: 1. Slab Thickness (Case 1) 2. Beam Section b x d (Case 1) 200 x 310 650 mm mm
Pg 1
3. Using Timber Keruing or equivalent group B timber Allowable flexure stress: 12.41 N/mm2 Allowable shear stress: 1.17 N/mm2 Modulus of elasticity: 11700.00 N/mm2 4. Plywood: Allowable bending stress: Modulus,E : 5. Design of scaffold in accordance with CP 23 6. Designed live loadings: a. Live load(during concreting) = b. Self weight of formwork = 10.00 N/mm2 7000.00 N/mm2
DESIGN CALCULATION
Project: Compute. By
SLAB DESIGN
Pg 2
Spacing of runners, s = Design loads: Concrete (wet) = Design load, F = Assume continuous span, with Modulus,Z = 24000.00 Mmax = 0.10 Max. shear force = 1.74 Check Bending: fbc = 4.12 Check Deflection: d= 0.83 i.e. Plywood is adequate
285 mm 7.75 kN/m2 9.75 kN/m2 12 mm thick plywood mm3 kNm kN N/mm2 mm < Limit: < Limit: 10.00 3.00 ok! ok!
Runners:(Section) 50 wide Span = 1.20 m Load/runner = 2.78 kN/m Modulus,Z = 83333.33 mm3 Mmax = 0.50 kNm Max. shear force = 2.08 kN Check Bending: fbc = 6.00 N/mm2 Check Shear: Shear Stress = 0.42 N/mm2 Check Deflection: d= 1.54 mm Check for the cantilever: Max. cantilever L = Load/runner = Mmax = Max. shear force = Check Bending: fbc = Check Shear: Shear Stress = Check Deflection: d= 0.50 2.78 0.35 1.39 m kN/m kNm kN
100 deep
Beams:(Section) 100 wide Span = 0.85 m Load/runner = 4.17 kN Modulus,Z = 166666.67 mm3 Mmax = 1.67 kNm Max. shear force = 4.17 kN Reaction = 8.34 kN
DESIGN CALCULATION
Project: Compute. By Date:
Pg 3 10.00 N/mm2 0.42 N/mm2 2.62 mm 12.41 1.17 3.15 ok! ok! ok!
BEAM DESIGN Beam width = 200 Spacing of runners, s = Design loads: Concrete (wet) = Design load, F = Assume continuous span, with Modulus,Z = 24000.00 Mmax = 0.09 Max. shear force = 2.28 Check Bending: fbc = 3.80 Check Deflection: d= 0.4 i.e. Plywood is adequate
Depth =
650 200 mm
16.25 kN/m2 18.25 kN/m2 12 mm plywood mm3 kNm kN N/mm2 mm < Limit: < Limit: 10.00 3.0 ok! ok!
Runners:(Section) 50 wide Span = 1.20 m Load/runner = 3.65 kN/m Modulus,Z = 83333.33 mm3 Mmax = 0.66 kNm Max. shear force = 2.74 kN Check Bending: fbc = 7.88 N/mm2 Check Shear: Shear Stress = 0.55 N/mm2 Check Deflection: d= 2.02 mm Check for the cantilever: Max. cantilever L = Load/runner = Mmax = Max. shear force = Check Bending: fbc = Check Shear: Shear Stress = Check Deflection: d= 0.50 3.65 0.46 1.83 m kN/m kNm kN
100 deep
DESIGN CALCULATION
Project: Compute. By Date:
Beams:(Section) 150 Span = 1.20 Load/runner = 5.48 Modulus,Z = 250000.00 Mmax = 2.70 Max. shear force = 10.81 Check Bending: fbc = 10.79 Check Shear: Shear Stress = 0.72 Check Deflection: d= 1.34 Check Load to Scaffold Leg Maximum load per leg, F =
Pg 4
16.29 kN
Allowable load per frame = 5 tonnes or 50 kN Allowable load per leg = 25 kN Therefore the scaffold is adequate provided the critical effective length of 1.8m is maintained by providing adequate ties/braces Use 50 x 100 timber at 1200 c/c to prop the formwork Allowable compression parallel to the grain : Timber Prop 50 Span L= 0.34 Load/prop = 2nd moment of Area Iy= 1041666.7 Radius of gyration ry = 14.4 Effective span Le = 0.3 Le / ry = 23.6 wide m mm3 mm3 m
1.2m
As per CP23, table 3.7 For short term loads Limiting values of Le/r = 8.62E/ Cgpar = 108.2 > Modification factor K5= Check compression: fc = 1.46
23.56
ok!
0.83 N/mm2
< Limit:
12.62
ok!