Schedule 1

S.No. 1 Description of Item Supply & Erection of Horizontal Cross arm with MS angle 50x50x6 mm of 1.5 mts. length and Back clamp with 50x6 mm MS flat of 0.45 mts. including Bolts & Nuts with washers etc. Supply and erection of Top cleat with 65x65x6 mm MS angle of length 0.5 mts. and 2 Nos. back clamps with 50x6 mm MS flat of length 0.45 mts. including GI bolts and nuts with washers etc. Supply and erection of 11 kv Pin Insulators with 11 kv pins of weight 760 Gms. Supply and fixing of 11 kv C&T polymer Disc Insulators (45 KN) with hardware complete. Supply and erection of 11 kv Tapping channel of size 75x40 mm of length 1.5 mts. with clamp of size 50x6 mm MS flat of length 0.45 mts. Including GI bolts and nuts with washers etc. Shifting of existing conductor of LT line from LT Pin Insulators duly removing pin binding on the existing 3-phase LT line, rebinding the conductor to the 11 kv Pin Insulators and stringing the line complete maintaining proper ground clearances. Unit Each Qty. 4

2 3 4 5

Each Each Each Each

19 57 12 4

6a

Route Kms.

6b

10

Dismantling of LT Pin Insulators with pins and shackles etc., and handing over Route to concerned District stores. Kms. Supply and erection of MS Stay set complete as per drawing where ever necessary including excavation of stay pit of size 0.45x0.45x1.34 mts. in all soils (except which require blasting) including dewatering, shoring and Each Set shuttering whereever necessary and erection of anchor rod and anchor plate in the pit concreting the stay pit with 1:4:8 cement concrete using 40 mm HBG metal including supply of all materials and levelling the site after concreting and Each Set connecting the stay to the pole as per departmental standards. Supply and erection of 8 M 140 Kg WL PSCC Pole as intermediate poles in the existing LT line where ever necessary (to maintain standard ground clearances and to be erected if the existing span is about 100 mts. and depending on sag of the line) including the excavation of pole pit of size Each 0.6x0.6x1.5 mts. in all soils, (except which require blasting) and back filling the pits after erection of pole with the excavated earth/extra earth and levelling the site and ramming without any lead including transporting and all incidental charges. Number of poles with AC Black paint as back ground and White paint for Each numbering complete as per specification Total :

Schedule 2
Sl.No 1 Description of Item Unit Qty. Supply and erection of 9.1 mts. PSCC pole in a pit of size 0.76x0.76 x1.82m for 9.1 mts. PSCC poles including dewatering, shoring and shuttering wherever necessary and back filling the pits with excavated earth after erection including cost of Bolts, Nuts & Washers etc. Each All soils excepting hard gravel, hard morum, disintegrated rock and hard 1 pole rock requiring blasting etc. Concreting of Pole location for single pole structure on which DTR erected upto ground level of size 0.6x0.6x1.82 Mtrs with 1:4:8 cement concret mix Each 1 using 40mm HBG metal including cost of all materials i.e. cement, sand, HBG Location metl etc., dewatering, curing the pits before and after concreting. Supply and erection of 50 mm dia 2.0 mts. long CI earth pipe including excavation of pit, earthing with No.8 GI wire, supply and refiling the pit with bentonite powder and soil with ratio 1:4 and giving connections etc. as per departmental standards as per drawing enclosed, the neutral earthing is to be done with 7/12 stay wire connected with heavy duty lugs to CI earth pipe and the balance earthing with 4mm GI wire should be done. The two electrodes should be inter connected with 4mm GI wire with heavy duly lugs. Double earthing is to be done for all the equipments as well as structure.

1.1

1.2

Each

3 4 5 6

8.1

Supply and erection of 11 kV HG Fuse set complete (Solid core type). Each Supply and erection of mounting arrangements as per the drawing with MS Each Channel, Angle and Flat of size 75x40x6mm, 50x50x6mm, 50x6mm Supply, erection and commissioning of 3-phase 25/16 kva 3-star Aluminum wound DTR as per the specification of total losses not exceeding 695 Watts. Each Base date 01.10.2011 with ex-works price ` 45117 Supply and fixing of LT HG Fuse set complete (Solid core type). Each Supply erection and commissioning of LT Single Core 50 Sq.mm. PVC Cable including clamping, cleating,iron supports etc., complete connecting to LT supports with LT HG fuse set neatly and securely and supply and erection of SMC box (where a single phase electronic energy meter to be fixed in the box) 30 with a provision for fixing with 1 No. ring type 50/5 LT CT to record the Meters energy and the box and LT CT are to be placed in between one phase of the transformer from LV side to the LT HG fuse set as per drawing and the box to be mounted on the existing pole.. Supply and erection of MS Stay set complete as per drawing where ever necessary including excavation of stay pit of size 0.45x0.45x1.34 Mtrs in all soils (except which require blasting) including dewatering, shoring and Each shuttering whereever necessary and erection of anchor rod and anchor plate in the pit.

1 1 1 1

8.2

concreting the stay pit with 1:4:8 cement concrete using 40mm HBG metal including supply of all materials and levelling the site after concreting and connecting the stay to the pole as per departmental standards. Number of DTR structure code, details of services (Service Number & Connected load) of that DTR on poles with AC Black paint as back ground and White paint for numbering complete as per specification Total :

Each

Each

Schedule 3
Sl.No 1 Description of Item Supply erection and commissioning of LT AB Cable 3x16+25 sq.mm as per the specification for connecting LT services from DTR neatly and securely on the existing supports. Supply and erection of S-ph 2 W/L cross arm made up of 50x50x6 mm angle with back clamp made of 50x6 mm MS Flat including bolts & nuts with washers. Total : Unit Kms. Qty. 1

Each

18

Schedule 4
Sl.No Description of Item Supply & erection of 11 kb 200 Amp AB switch (tilting type) on existing support for controlling group of 16/25 kva DTRs, Supply and erection of 11 kv Tapping channel of size 75x40 mm of length 1.5 mts. with clamp of size 50x6 mm MS flat of length 0.4 mts. including supply and erection of 5 KA, Line type metal oxide 11 kv lightning arrestor. Total : Unit Qty.

Each

Schedule 5
S.No. 1 Description of Item Supply & erection of 11 kv 200 Amp AB switch (horizontal) for line DPs with pole earthing Total : Unit Each Qty. 1

Schedule -6
Sl.No Description of Item Supply and erection of 8 Mtr. PSCC pole in a pit of size 0.6x0.6x1.5m for 8mtr PSCC poles including dewatering, shoring and shuttering wherever necessary and back filling the pits with excavated earth after erection and painting of location numbers on the poles with Black paint on white back ground with durable paint. Supply and fixing of 1.07 Mts 65x65x6 mm MS angle/ 75x40x6 mm MS channel 11 kv V x-arm with suitable back clamp and bolts, nuts & washers on to the already erected poles. Unit Qty.

Nos.

18

Each

14

4 5

7 8

10 11 a)

12

Supply and fixing of 1.5 Mts 75x40x6 mm channel 11 kv horizental channel Each x-arm with suitable back clamp and bolts, nuts & washers on to the already erected poles. Supply and fixing of Top cleat with 65x65x6mm MS angle of length 0.5 Mtrs Each and 2 Nos back clamps with 50x6mm MS flat of length 0.45 Mtrs including GI bolts and nuts with washers etc. Supply and fixing of 11 kv pin insulators with pins on already fixed 11 kv xEach arms. Supply and fixing of 11 kv stain insulator set with clamps to the x-arms already fixed wherever necessary, the set should consists of 1 tension 11 kv Each C&T polymer Disc Insulators (45 KN) and suitable metal part and clamp with bolts nuts and washers for holding the conductor. Supply and fixing of standard bracing set with double x-arm of standard channels and angle for the DPs where ever necessary including pipe earthing Each set of the DP using No.8 GI wire, bentonite powder, GI pipe of 40 mm dia 2.5 m long, suitable bolts and nuts. Each Supply and fixing of danger boards where ever necessary route km 3 Supply, paving and stringing of 55 sqmm AAA conductor on the already Nos. erected pole and insulators, with suitable sag and tension with necessary condcut jumpers where ever required. ors Supply and erection of suitable cradle type guarding of standard size per span wherever necessary using channels of size 50x50x6 mm, no.8 GI wire etc Span (As per sketch). Concreting of pits with CC Mix (1:4:8) using 40 mm HBG metal including cost of all materials, curing etc., as per the clause Pole concreting for DP cut point poles, vertical formation poles of size Nos. 0.6x0.6x1.52m Supply and erection of MS Stay set complete as per drawing where ever necessary including excavation of stay pit of size 0.45x0.45x1.34 Mtrs in all Each set soils (except which require blasting) including dewatering, shoring and shuttering whereever necessary and erection of anchor rod and anchor plate in the pit Concreting of pits with CC Mix (1:4:8) using 40 mm HBG metal of pit size Each set 0.45x0.45x1.34 Mt including cost of all materials, curing etc. Total :

15 48

12

1 1

10

10

erection Amount cost

3428

3428

250

1000

300

1200

500

2000

7628

Rate

Amount

750

750

750

750

3000

3000

250

500

300

600

5600

Rate 1900

Amount 1900

1900

Rate

Amount

650

650

650

Rate 750

Total 750 750

Rate

Amount

500

9000

3500

3500

650

3900

250

2500

300

3000 21900