You are on page 1of 2

`

Improving Your Bottom-Line


Waste (MT) 50 Client to pay KA (RM) 41,660
Transport/pallet (RM) 50 Client to pay GES (RM) 63,340
Toll/trip (KA) 15 Total (RM) 105,000
Total trip (18pallet/trip) (KA) 4
Treatment by KA (RM) 590 Incineration + Transport 124,310
and toll(KA)
GES cost for treatment (RM)** 2100
Chemicals (30% of waste) (MT) 15 19,310
Savings (RM)
No of pallet 65 (18%)
**GES cost for treatment varies based on type of sludge, quantity
and client’s location
• GES undertakes to ensure that all wastes are disposed in accordance
with EQ (Scheduled Waste) Regulations 2005.
• Your responsibility ends at waste storage – We manage it until
disposal and the receipt of relevant legal documentation.

For any Inquiries, Please Contact Approximately


15% Savings
minimum

Incineration route does no good for the environment


(It’s completely destructive – A ZERO sum game)

Did the planet betray us or did we betray the planet?


- An inconvenient truth
….. We help minimizing the Global Warming Potential
What we do Our Proven Solutions

We are in the business of working with our clients to identify all waste Sludge
streams emanating from their industrial process – provide waste
management strategy from generation, storage, minimization and
packaging in accordance with environmental legislation.
On-Site Treatment

Who need our services?


Any industry that generates waste classified as “industrial waste” and Packaging
cannot be disposed in any municipal land-fills and normally waste contains
of Oil & Grease (O&G), Total Organic Compound (TOC) and/or heavy metals
that exceed the permissible limits. Disposal
(Kualiti Alam)
How does this benefit the waste generator?
We are able to chemically treat the waste using our proprietary chemicals
to reduce the Oil and grease (O&G), Total Organic Compound (TOC) and/or
Heavy Metal content. This allows the waste to be disposed in manners other Landfill Solidification
than incineration i.e. solidification/secured land-fill etc. The price
differential (savings) is shared with the generators.

We Preserve the Environment


The ‘GE Solution’ Landfill route is a natural
waste treatment process that will allow for Invoice and Payment Options
landfill rehabilitation and render the land
useable over time.
1. Client to pay Kualiti Alam (KA) and balance pay to General
Among Clients Benefited From Our Services Environmental Solution (GES)
= Treatment cost by GES – Client pays KA [Treatment Cost by KA (after on-site
treatment) + Transport + Toll]

2. Client to pay General Environment Solution (GES) and GES pay to


Kualiti Alam for total cost of treatment

You might also like