You are on page 1of 13

RESUME

Jordan Hamid
Block A13-1-10, Vista apartment seri alam jalan

Persiaran seri alam, bdr seri alam masai 81750 Johor Bahru Malaysia

H/P NO. 016-7803996 / 07-3885982

E-mail : jordan_hamid@hotmail.com
jhpowers88@gmail.com

Piping Supervisor, QA/QC- Inspector


● Field and Office Management – Team Leadership - Project Management Team – Quality Control ●

A thorough and professional piping supervisor / piping inspector with a total of


sixteen(16) years comprehensive training and experience while working for dominant
companies involved in major projects of Oil & Gas Refineries, Petrochemical Plant
Industries / Offshore and FPSO Conversion project, topside platform, shipyard in
malaysia. Offers an outstanding performance and safety records combined with
reliability and dependability. Successfully supervised and inspection and brings
notable ethics and pride to every job. Having served as piping supervisor,
welding/piping inspector, test packages supervisor, piping foreman.(craft).The field
Acquired skills such as project management team, planning, supervising, quality
control, implementing various task assigned. Knowledgeable in pre-commissioning
and commissioning, document control and test package preparation, punch listing.

Supplemental Information

Computer literate, MS Word, MS Excel, Basic AutoCad. Proficient in written and


oral

communication both in Malay, English,

Objective
JORDAN Cv Page 1/7
Challenging and rewarding upper-level position in a growth-oriented organization,
which offers diverse job responsibility in Construction Piping Supervisor and QA/QC-
Inspector and will fully, utilize both my technical and managerial abilities.

Experience Classification

Job Function Years Experience

Piping Supervisor 14
QA/QC-Piping Inspector 11
QA/QC- hull 2
Line Checker 11
Commissioning 2
Piping Foreman 2

Industry Years Experience

Oil and Gas 13


Shipbuilding / shipyard 6
Power Station 2
Petrochemical - Refinery 10

Total experience 16+

Employment History

QA/QC-Piping Inspector, Mar. 2007 -


May. 2009

Talisman Energy (M) Limited

Germanischer Lloyd/STR

Ramunia/ Pasir gudang, Johor bahru, malaysia

Project: Bunga Orkid-WHRPs, Bunga Raya A- AFGC & BOA-CPP

Duties & Responsibilities

Respect and apply HSE rules,

○ To assist the Certifiying Authority/ QA/QC Engineer responsible for the piping
inspection, erection and installation of piping system.

JORDAN Cv Page 2/7


○ Assign ensure all fabrication spool (pipe’s),correctly as per iso, drawing and
welding activities are strictly comply with code and standards specification.

○ To check welding activities before welding, during welding, after welding.

○ To check the welding document suck as approved Welding Procedure


Specification, Procedure Qualification Record and check all information for all
variable and range of approval for that procedure.

○ To check the variable for Welder Qualification certificate and position limits and
the history of employment to avoid time laps.

○ To check and monitor the joint preparation suck as per requirement of WPS and
also the jig and fixtures for distortion control.

○ To check the condition of welding machine and condition of welding cables,


electrode holder, welder tools and ensure all connection is correct.

○ To check the material size, dimension, pipes rout as per isometric drawing,
collect the data and result and submit to higher authorities.

○ Do a line Checker engage in punch killing.

○ Involve in supervision of hydro testing and pneumatic testing and flushing


activities.

○ Check and approve test package and document.

QA/QC- Inspector ( Piping & Structural) Sept. 2006 –


Mar. 2007

Malaysian Marine Heavy and Engineering ( MMHE )

Pasir Gudang, Johor Bahru,Malaysia

Duties & Responsibilities

Respect and apply HSE rules, to assist the lead QA/QC head. Marine Conversion
Depatment, responsible for the erection structural block and installation of piping
system for T-10 drilling tender bardge, assign.

○ Ensure all Fabrication spool (pipe’s), structure block correctly as per drawing
and welding activities are strictly comply with code, standards and client
specification.

○ To check before welding, during welding, after welding.

○ To check the welding document suck as approved Welding Procedure


Specification, Procedure Qualification Record and check all information for all
variable and range of approval for that procedure.

○ To check the variable for Welder Qualification certificate and position limits and
the history of employment to avoid time laps.

JORDAN Cv Page 3/7


○ To check and monitor the joint preparation suck as per requirement of WPS and
also the jig and fixtures for distortion control.

○ To check the condition of welding machine and condition of welding calbes,


electrode holder, welder tools and ensure all connection is correct.

○ To check the material size, dimension, pipes rout as per isometric drawing,
collect the data and result and submit to higher authorities.

Piping Supervisor @ Piping Inspector Mar. 2005


– Aug. 2006

Saibos Akogep SNC – AMP-2 Topside Project –

Pasir gudang Johor Bahru Malaysia

TOTAL ELF Petroleum Nigeria Ltd. - AMENAM/KPNO Oil and

Gas Export Project Phase 2-

Duties & Responsibilities

Respect and apply HSE rules,

○ Reporting to construstion manager/ Piping Manager in all respective works at


site with more detail work.

○ Primarily responsible for all construction activities at site and to ensure that the
contractors executes the daily activities as planned and completed on desired
date.

○ To ensure the contractor carries out the works safely and apply safety
conditions and practices prevail at work site.

○ To advice suprintendant / engineer of any required acceleration plan in order to


maintain project schedule.

○ To resolve any relevant technical querries and liase with client senior inspector.
If not direct to superintendent or discipline engineer.

○ To verify progress at site and submit the report to planning coordinator.

○ Responsible for site housekeeping and liase with subcontractor in


manufactuiring site.

○ Checking of allignment, measuring and levelling of fabricated and erected


pipeline.

JORDAN Cv Page 4/7


○ Do line check created punch list A,B,C, submit the report to planning
coordinator and contractor for killing( Clearing).

Piping Supervisor Mar. 2003


– Mar. 2005

Malaysia Shipyard and Engineering ( MSE )

Pasir Gudang, Johor Bahru,Malaysia

Duties & Responsibilities

Respect and apply HSE rules, responsible for the fabrication and installation of piping
system for N’KOSSA-1 FSO-YOHO. Conversion project / MISC- Bunga Kertas, FPSO-
Conversion project ( Onshore/ Offshore).MOAB Talisman Energy Project(Dynac Eng.).
On shipbuilding and operation department, assign to

○ Check for correctness and completeness followed by approval of documents


prepared by Owner

○ Field control

○ Responsible for reviewing the entire piping system to make sure that it meets all
required codes and its safe and adequate facilities are provided.

○ Handle special tools and equipment for maintenance, inspection, and repair.

○ Participate in all implementation discussion concerning the mechanical / piping


question to be clarified.

○ Witnessing of hydro testing.

○ Perform punch listing and coordinate punch list work items in preparation for
handover of test packages.

○ Closing out / repair of punch list work items.

○ Scheduling and planning with 3 weeks look ahead

Piping Supervisor, Design Line Checker Feb 2002 -


Nov,2002

Ikatan innovasi Sdn. Bhd. (Kverner Jv Dialog) BASF-

Petronas Chemical Sdn. Bhd.Gebing, Kuantan Pahang.Malaysia.

Duties & Responsibilities

Respect and apply HSE rules, assign for

○ checking of designer’s PDS produced isometric for various project.

JORDAN Cv Page 5/7


○ Responsible for the quality of the produced isometric to be issue for
construction, using sophisticated DRV (design review) or SPR (smart plant
review) tools,

○ coordinated with design managers,supervisors and designer regarding project


specifications and requirements as mandated by client and international
standard,

○ conduct roll out meeting and clinics to designer to minimize and control error
and promote lesson learnt on previous project.

○ Assign for the revision and modification of P&ID as required by process and
clients comments using intelligent PDS-2D intergraph system.

○ Conduct line check create punch list A,B,C, submit the report to planning
coordinator and contractor for killing( Clearing).

Piping Test Pakages Supervisor –(Line Checker) Jan.2001 -


July 2001

Toyo/Projass Consutium Sdn. Bhd. Optimal (MEOG)

Kertih, Terengganu

Duties and Responsibilities:

Respect and apply HSE rules,

○ Check isometric base on P&ID, project specification, equipment report and plot
plan.

○ Check pipe system design and operating condition on project data sheet.

○ Assign to supervise, check and monitor all testing activities.

○ Check and approve test package and document.

○ Check conduct inspection and monitor test preparation prior testing activities,

○ Prepare test schedule base on contruction schedule.

○ Coordinate to project-sub contractor with regards on specification,calculation


and design of piping components subject for testing.

○ Conduct line check and create punlist submit the report to planning coordinator

Piping Supervisor / Piping Inspector Sept. 2000 -


Jan. 2001

Sukwon Idche Engineering (M) Sdn. Bhd.


JORDAN Cv Page 6/7
Project : Olefin Project (MOP) Kertih Terengganu. Malaysia

Duties and Responsibilities

○ Direct reports to the Lead Construction Engineer and performs the following
functions:
○ Interprets piping drawings and specifications for contractor use.
○ Verifies correct installation of piping with all components (supports, hangers,
valves, etc.).
○ Monitors physical installations to ensure that work is installed in accordance
with drawings, specifications, and applicable codes.
○ Assign to supervised at workshop fabrication,fabricated pipes spool and pipes
support
○ Coordinates his discipline(s) with others, when conflicts arise, to resolve
problems and prevent delays.
○ Assists contractor in planning and scheduling work to obtain maximum
efficiency.
○ Check ,conduct inspection and monitor test preparation prior testing activities,
prepare test schedule base on contruction schedule
○ Witnesses all piping construction verifications, including P&ID checks and
hydrostatic testing.

Test Packages Supervisor / Piping Inspector Aug.1999


- Jan. 2000

Toyo Corporation / Tapat Tiknik (kuj) Sdn. Bhd.

Project : Aromatic Project KR-2 Kertih Terengganu. Malaysia

Duties and Responsibilities

○ Collect revision of project isometric drawingas per field change, site instruction
and as-builts.

○ Compilation of completed check sheets, test sheets in a book called Dossier and
check it’s completion prior to hand-over to Commissioning group or Client.

○ Prepare Pre-commissioning progress reports. Prepare procedures required for


Pre-commissioning the system as per project specification or Vendor
requirement.

○ Supervise and Line check the Piping and Mechanical installation and make sure
if conforms to P&ID and prepare as-built drawing if necessary. Preserve &
Maintain all Equipment once received in Fabrication yard, Compile all Punch-list
generated by all Departments, Client, and Vendor & Commissioning and prepare
consolidated Punch-list and monitor status.

○ Line checking of piping system fabricated and installed.

○ Provide calculation and detailed drawing for revised piping routes and design.
Engage in punch killing supervision prior testing.

JORDAN Cv Page 7/7


○ Involve in supervision of hydro and pneumatic testing activities.

Piping Supervisor Jan.


1997 to July. 1999

Dealim (M) Engineering Sdn. Bhd. GPP – 5/6

Petronas Project. Km 8 tok Arun Off Santong, 23100 terengganu. Malaysia

Duties and Responsibilities

○ Reports to the Lead Construction Engineer and performs the following functions

○ Monitors physical installations to ensure that work is installed in accordance


with drawings, specifications, and applicable codes.

○ Interprets piping drawings and specifications for contractor use.

○ Assists contractor in planning and scheduling work to obtain maximum


efficiency.

○ Coordinates his discipline(s) with others, when conflicts arise, to resolve


problems and prevent delays.

○ Witnesses all piping construction verifications, including P&ID checks and


hydrostatic testing.

○ Verifies correct installation of piping with all components (supports, hangers,


valves, etc.).

Piping Supervisor / Piping inspector Sept.1996


- Dec.1996

JGC Jv HYUNDAI DOZ (M) SDN. BHD. LPG Project,

Sarawak, Bintulu, Malaysia

Duties and Responsibilities

JORDAN Cv Page 8/7


Respect and apply HSE rules, check isometric base on P&ID, project specification,
equipment report and plot plan, check pipe system design and operating condition on
project data sheet.

Assign to

○ supervise, check and monitor all piping activities collect data testing activities.

○ Check and approve test

○ package and document. Check ,conduct inspection and monitor test preparation
prior

testing activities.

○ Coordinate to project-sub contractor with regards on specification,

Q/C. Piping Inspector Oct. 1995


to Jun. 1996

Applied Engineering (S’kan) Sdn. Bhd.

Melawa Power Station 50 MW. Kota kinabalu,

Sabah, East Malaysia

Duties and Responsibilities

○ Fit up Inspection of pipe joints.

○ Witnessing of Hardness checking

○ Witnessing of Hydro Testing.

○ Inspection of incoming materials.

○ Inspection of Pipe Supports.

○ Visual Inspection of welding.

○ Witnessing of Magnetic Particle Testing.

○ Witnessing of Liquid Penetrate Testing.

○ Preparation of each disciplines status index; (list of all Piping, Mechanical


Materials per sub system) to produce a check sheets, test sheets necessary for
the completion of each subsystem. Compilation of completed check sheets, test
sheets in a book called Dossier and check it’s completion prior to hand-over to
Commissioning group or Client. Prepare Pre-commissioning progress reports.
Prepare procedures required for Pre-commissioning the system as per Project
specification or Vendor requirement. Supervise and Line check the Piping and
Mechanical installation and make sure if conforms to P&ID and prepare as-built
drawing if necessary. Preserve & Maintain all Equipment once received in
Fabrication yard, Compile all Punch-list generated by all Departments, Client,

JORDAN Cv Page 9/7


and Vendor & Commissioning and prepare consolidated Punch-list and monitor
status.

Supervisor Jan.
1995 - Sept. 1995

Sabah Shipyard Sdn. Bhd. Labuan F.T. Malaysia.

Project : Lawit-A Shell Project / Ship repair.

Duties and Resonsibilities

○ In platform, safety consciousness, fitting of pipes from joint grade coordinate


and in good clearance as specification for welding.

○ Checking all the existing pipe line for lay out in good alignments and in proper
elevation as per isometric is concerned.

○ Check &fit-up of spools along pipe rack, furnace, different kinds of materials
steel, carbon steel, alloy.

○ Supervised and monitor of fabrication of pipe spool on site & fabrication shop
and non-destructive test qualification results
○ Checking of line schedule for testing and installation of manifold and vent valve.

○ Check the entire installed pipeline according to the given code name and
number for priority for hydro testing schedule.

○ Check all weld joint and inspection of all valves are installed correctly and tightly
closed

Piping foreman July.


1994 - Dec. 1994

Shore Service Sdn. Bhd. Labuan F.T. East Malaysia

Project : 1. Semarang Offshore (1994)

2. St. Maria ( Semarang Offshore)

Duties and Responsibilities

JORDAN Cv Page 10/7


○ Respect and apply HSE rules, prepared PTW (Permit to Work) responsible for
take off material and request to ware house, labor loading, erection spool &
valves and supervision for dismantling,

○ Fabrication and installation of process piping as per requirement on scope of


work.

○ Provide detail drawing, and technical information base on project scope and
standards.

Piping Supervisor / Pre-comm. team May.


1993 – May.1994

Krisi Macdow Sdn. Bhd

Project : PSR-1 Petronas Project. Melaka Malaysia

Duties and Responsibilities

○ Monitor some maintenance activities related to new installation works. Provide


detail drawing, and technical information base on project scope and standards.
○ Perform checkout, cleaning and commissioning tasks on various equipments.
○ Ensure that adequate care and maintenance of Equipment / Preservation of
Equipments.
○ Undertake mechanical run tests of all Rotating Equipments and their trouble
shooting.
○ Maintain commissioning and start-up records.
○ Preparation of preventive maintenance & lubrication schedules.
○ Utilize the safety tagging and lockout procedure/process.

Education

BsME.-Diploma-WMSU- 1993

Jacinto Cuevas Nat’l High School. 1988

PMR. Completed. SRK Pulau Gaya Kota Kinabalu Sabah. 1978

Harcourt derict learning Mech. Engineering. 2000

JORDAN Cv Page 11/7


Seminal attended

Safety Induction And Health for construction Conducted by: NIOSH / CIDB

Basic First Aid Training. ORGANIZED BY: HSE –KDA DEPARTMENT

Confined Space Aweareness: MSTS ASEA SDN. BHD. Pasir Gudang J.B.

Responsoled by: Saibos Akogep

ISO 9001:2000, Conducted by MMHE : QA/QC Manager.

API 570 Pressure Piping Inspector: Inspection, Repair, Rerating & Alteration, API
RP 571,

API RP 574, API RP 578, ASME B31.3 Piping Design, ASME B16.5 Flanges, ASME
Section IX Welding ASME Section V NDE. ( Jan 2008)

Safety Training Courses: Offshore Passport Certification For 3 Year - Until 2012
Basic Offshore Safety Induction & Emergency Training With HUET EBS (Including
Additional OLP Modules)

MY 037421 OPITO Approved.

Award

Improbing Safety Award: SBM / Exxon Mobil, FSO YOHO Project 2004

JORDAN Cv Page 12/7


Excellenent HSE Contribution Award: Talisman Energy, Mobile Offshore
Application

Barge Project 2003

References Salary

Available upon request Negotiable

Personal Information

NRIC NO. : 661004-12-5467 MARITAL STATUS :


Married 3 children

PLACE OF BIRTH : Sabah, Malaysia DATE OF BIRTH : 04-


Otober 1966

NATIONALITY : Malaysian RACE : Malay

RELIGION : Muslim HEALTH :


Excellent

HEIGHT/WEIGHT : 1.70m/68kg PREFFERED WORK LOC. : Any where

LANGUAGE SPOKEN : English / Malay LANGUAGE WRITTEN : English /


Malay

EPF NO. : : 15527972 INCOME TAX NO. : : SG-


04507476-03

I hereby certify that the above information is true and correct to the best of my
knowledge.

…Jordan Bin Hamid………………

JORDAN Cv Page 13/7

You might also like