You are on page 1of 7

YANB U

Aramco Sinopec Refining Company Limited


BRIDGE CRANE & ELECTRIC HOIST INSTALLATION PROCEDURE

CONTRACT NO: YOE-YASREF-6600024370(IK) Job No: 090559

Doc No.

GENERAL CONFIDENTIAL This document contains confidential information that is only to be used for the Yanbu Export Refinery Project (YERP) and it is not intended for any other use or any disclosure to third parties or publication without the express written permission of the YERP Project Management Team (PMT). Any reproduction is restricted to those portions and copies strictly necessary in order for recipients to make the intended and permitted use and all such copies shall be returned to YERP PMT for appropriate disposal after completion of such use.

REV

DATE

ISSUED FOR

PREPARED BY D. C. CASACOP

REVIEWED BY (QCM)

REVIEWED BY (CM)

APPROVED BY (SD)

APPROVED BY (CLIENT)

OCT 2011

Issued For Client Acceptance (ICA)

J.J.PARK

J.H.KIM

H.J.YIM

Page 1 of 7

Yanbu Export Refinery Project


WELDERS PERFORMANCE QUALIFICATIONPROCEDURE Document No.: 111-IK3-QA-Q59-0003 Revision No.: A Issue Date : 28 SEP 2011

TABLE OF CONTENTS
1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 SCOPE ....................................................................................................................... 2 PURPOSE .................................................................................................................. 3 SAFETY...................................................................................................................... 3 DEFINITIONS ............................................................................................................. 3 REFERENCES ........................................................................................................... 4 RESPONSIBILITIES ................................................................................................... 4 INSTALLATION ......................................................................................................... 5 PRECOMMISIONING ................................................................................................. 6 ATTACHMENT .................................................................................................... 6 & 7

Page 2 of 7

Yanbu Export Refinery Project


WELDERS PERFORMANCE QUALIFICATIONPROCEDURE Document No.: 111-IK3-QA-Q59-0003 Revision No.: A Issue Date : 28 SEP 2011

1.0

SCOPE

The scope of this procedure is to describe the system and practice established for the Bridge Crane & Electric Hoist - Monorail inspection and installation procedure. Inspectors maintaining their qualification to meet the project specification, code and standard (API 650) for the construction of EPC 3,YERP Gasoline Project at Yanbu, K.S.A.

2.0

PURPOSE The purpose is intended to assist the Plant and Equipment (P&E) Inspector of Plant Inspection Units in their selection by providing Typical Plans and inspection checklist for Bridge Crane & Electric Hoist-Monorail on stream evaluation and tracking of existing equipment condition.

3.0

SAFETY

3.1

Use of approved and inspected lifting equipment, tools and qualified workers such as rigger, flag man ,crane operator ,erection supervisor and superintendent. Ensure personal safety of any person involved during inspection of equipment are provides permit, lights, scaffolding and job Safety Analysis shall be prepared before start of activities. Use of personnel protection equipment and safety requirements for inspection is the responsibility of the inspector / inspection Engineer.

3.2

3.3

4.0

DEFINITIONS YERP PMT Contractor QA : : : : Yanbu Export Refinery Project Project Management Team Daelim Saudi Arabia Co. Ltd. Quality Assurance; Part of Quality Management focused on providing confidence that quality requirements will be fulfilled.

Page 3 of 7

Yanbu Export Refinery Project


WELDERS PERFORMANCE QUALIFICATIONPROCEDURE Document No.: 111-IK3-QA-Q59-0003 Revision No.: A Issue Date : 28 SEP 2011

QC PMI PWHT WPQT WPQR NDT RFI QCP SATIP YERP SAEP YERP SAES

: : : : : : : : : : :

Quality Control; Part of Quality Management focused on fulfilling quality requirements. Positive Material Identification Post Weld Heat Treatment Welders Performance Qualification Test Welding Procedure Qualification Record Non Destructive Testing Request for Inspection Quality Control Procedure Saudi Aramco Typical Inspection Plan YERP Saudi Aramco Engineering Procedure YERP Saudi Aramco Engineering Standard

5.0

REFERENCES SAES-M-001 SAES-M-008 GI-0007.028 GI-0007.029 GI-0007.030 : : : : : Structural Design Criteria for Non-Building Structure Design Criteria for Lifting Equipment Crane Lifts : Types & Procedure Inspections : Use & Maintenance of Below-the-Hook Lifting Equipment for Cranes Inspection & Testing Requirements for Lifting Equipment and Elevator . Hoist or Overhead Cranes: Lifting Capacity Over 5000 kgs. Base Mounted Drum Hoist Slings Hooks Overhead Hoist Overhead and Gantry Cranes (Top Running Bridge Single Girder, Underhung Hoist)

Form 175-313100 :

ASME B30.7 ASME B30.9 ASME B30.10 ASME B30.16 ASME B30.17

: : : : :

Page 4 of 7

Yanbu Export Refinery Project


WELDERS PERFORMANCE QUALIFICATIONPROCEDURE Document No.: 111-IK3-QA-Q59-0003 Revision No.: A Issue Date : 28 SEP 2011

6.0

RESPONSIBILITIES

6.1

MECHANICAL SUPERINTENDENT Shall have the responsibility and authority for direction and control of the Bridge Crane and Hoist installation work including all necessary provisions to perform the activities.

6.2

QUALITY CONTROL MANAGER Shall responsible for ensuring adequate implementation and application of this inspection procedure in accordance with applicable codes, standard, specification and verify the application of the requirements .

6.3

QC INSPECTOR Shall perform the inspection activities of equipment (ITP) verification of RFI that used for inspection such as visual inspection, preservation, elevation, orientation, location, alignment, punch clear, vessel enclosure and final inspection as per specification approved by company.

7.0

INSPECTION AND INSTALLATION PROCEDURE 7.1 REVIEW BRIDGE CRANE / HOIST DOCUMENTS QC shall review the document as per standard outline the procedure to be followed in preparation of Safety Inspection Sheet (SIS),material system specification, standard drawing and procedure of Bridge Crane & Hoist installation , Handling , storage and preservation documents.

7.2

MATERIAL RECEIVING / INSPECTION OF BRIDGE CRANE / HOIST QC shall verify Test Certificates in accordance with SA Form 175-313100, showing conformance of all materials and assembly specified code and standards. Clearly marked Rated Capacity, nameplate , dimension check Painting, hoist shall be cleaning and greasing, gear box greasing and then cover with tarpaulin .Ensure that crane are free from dirt , sufficient support from the ground to avoid contact .

Page 5 of 7

Yanbu Export Refinery Project


WELDERS PERFORMANCE QUALIFICATIONPROCEDURE Document No.: 111-IK3-QA-Q59-0003 Revision No.: A Issue Date : 28 SEP 2011

7.3

INSTALLATION OF BRIDGE CRANE / HOIST

a. Shall verify structural released for bridge crane railing as per SATIP-M-001-01. Check relevant drawing vendor and structural drawing prior to equipment installation . b. Installation of railing bolt ,nuts and clips with torque tightening . Inspection of spans , levelling and elevation were tolerances shall be in accordance with vendor or manufacturer requirements. c. Before installation works , bridge crane dimension compared to railing distance dimension shall be verified to avoid delay in erection activities. d. Crane platform, ladder and handrail are installed with gratings and clips are clearly completed conformance to relevant vendor drawing. stopper installed . working SWL are marked in beam. Hook, block and ropes are visually approved inspection. e. Preservation shall be implement, movable parts shall be cleaned and apply oil/ grease, winch wire rope greasing, gear box oil filling, bearing greasing touchup painting . d. Electrical check for travelling crane emergency stop switch shall be installed and function satisfactory, light flushing , alarm system and other safety devices checks. Electrical released report shall be required prior to load test. e. Inspection of maximum and minimum operating speed, overload limit alarm functioning , alarm while crane travelling checked ,pendant required distance above the ground . All are ready prior to load test .

8.0

PRECOMMISSIONING BRIDGE CRANE / HOIST FINAL INSPECTION a. Load test at 125% rated load capacity and measured the deflection as a requirement are completed and approved inspection. b. Instrument , electrical ,insulation pre-commissioning .Refer to the respective SATIPs for electrical & instrument. c. Final inspection shall be carry-out with punch listing for reinstatement by contractor .

Page 6 of 7

Yanbu Export Refinery Project


WELDERS PERFORMANCE QUALIFICATIONPROCEDURE Document No.: 111-IK3-QA-Q59-0003 Revision No.: A Issue Date : 28 SEP 2011

9.0

ATTACHMENT

YERP-SAIC-D-2014 YERP-SAIC-D-2023 YERP-SAIC-D-2005 YERP-SAIC-D-2024 YERP-SAIC-D-2025 YERP-SAIC-L-2014 YERP-SATR-L-2001 YERP-SATR-D-2005 YERP-SAIC-D-2021 YERP-SATR-A-2011 YERP-SA-6133

: : : : : : : : : : :

Alignment Inspection Record-Horizontal Vessel Alignment Inspection Record-Vertical Vessel Vessel Closure Inspection Certificate Tray Test Report Final Inspection / Re-Instatement Punch List Review Vessel SIS, Procedure for Vessel Internal Component Installation Verification of NMRs for Vessel & Trays Vessel Internal Receiving Inspection Vessel Fabricated Structural Attachment to Equipment (Access and supports) Equipment Inspection Schedule Storage, Handling & Preservations

Page 7 of 7