Supplier: Address:
Place of Delivery: VSU, Baybay, Date of Delivery: 30 calendar days upon receipt of
No.
Leyte
PO
I
otv
1.255
Unit
DESCRIPTION
For the Construction of STAFF Dormitoru Phase baqs Cement. Portland. REPUBLIC
224.75
282.061.25
1,380
pcs
224.75
3't0,'t55.00
lntended
for:
GSD
GRAND
rerformance Bond
(5olo of
TOTAL
of
592,216.25
n case of failure to make the full delivery within the time specified above, a penalty of one-tenth (1/10)
Sonforme:
Rer
rdsliad
Office/Ddofl'{'
Cetdfled
Correct:
R( Authorized Official)
Leyte
DESCRIPTION
DeliverylgInl
For tlrc Construction af STAFF Dormitoru Phase Steel Bars, deformed, 1Omm dia x 6 M, 3-5
tlrc Construclion of SruDENT Dormitory Phase Steel Bars, deformed, 20mm dia x 6 M, std size Steel Bars, deformed, 1Omm dia x 6 M, 3.5
GRAND
of the total PO) either in Cash or
TOTAL
589,{60.00
in ease of failure to make the fuli delivery within the time specified above, a penalg of onetenth (1/10) of one percentfor every day of delay shall be imposed. 5$r.'ffi5t*-" l.t
Very
truly-yout(',*;-.*
+i!d*i;
-
JOSE L. BACUSMO
;{.
,-'. ;.r:
-r:L
Place of Delivery: VSU, Baybay, Leyte Date of Delivery: 30 calendar days upon receipt of PO
DESCRIPTION
For the Construction of STAFF Dormitol Phase Steel Bars, deformed, 16mm dia x 6 M, 9 Tie Wire # 16 Marine, 112" x4'x8'
GW
7
Nails,
1-112"
1
GRAND
of the total PO) either in Cash or
TOTAL
521.1
Check = P
ln case of failure to make the tull delivery within the time specified above, a penalty of one-tenth (1/10) of . one percent for every day of delay shall be
imposed.
Conforme:
raLE
l.ww*
Amount: ALOBS No.