PURCHASE ORDER VISAYAS STATE UNIVERSITY

Supplier: Address:

BRODETH Marketing saibai city, ie-vte

PO No STF-13-07-2-Dorm Date: July 19,2013 _ PR No 2013-04-0698/0699


Mode of Procuremnt: Bidding

Place of Delivery: VSU, Baybay, Date of Delivery: 30 calendar days upon receipt of
No.

Leyte

PO
I

Delivery Termj FOB Site Payment Term: Unit Cost Amount

otv
1.255

Unit

DESCRIPTION

For the Construction of STAFF Dormitoru Phase baqs Cement. Portland. REPUBLIC

224.75

282.061.25

Forthe Construction of STUDENT Dormitoru Phase


5

1,380

pcs

Cement, Portland, REPUBLIC

224.75

3't0,'t55.00

lntended

for:

GSD

GRAND
rerformance Bond
(5olo of

TOTAL
of

592,216.25

the total PO) either in Cash or ManageCs Check = P

n case of failure to make the full delivery within the time specified above, a penalty of one-tenth (1/10)

one percent for every day of delay shall be imposed.

Sonforme:

Rer

rdsliad

Office/Ddofl'{'

Cetdfled

Correct:

Amount: ALOBS No.

R( Authorized Official)

Head. lA*to. Div

VISAYAS STATE UNIVERSITY


PO No STF-13-07-3-Dorm

Date: July 19,2013 PR No 2013-04-0698/0699


rof Delivery:VSU, Baybay,
of Delivery: 30

Leyte
DESCRIPTION

DeliverylgInl

For tlrc Construction af STAFF Dormitoru Phase Steel Bars, deformed, 1Omm dia x 6 M, 3-5

tlrc Construclion of SruDENT Dormitory Phase Steel Bars, deformed, 20mm dia x 6 M, std size Steel Bars, deformed, 1Omm dia x 6 M, 3.5

GRAND
of the total PO) either in Cash or

TOTAL

589,{60.00

in ease of failure to make the fuli delivery within the time specified above, a penalg of onetenth (1/10) of one percentfor every day of delay shall be imposed. 5$r.'ffi5t*-" l.t

Very

truly-yout(',*;-.*
+i!d*i;
-

JOSE L. BACUSMO

;{.

,-'. ;.r:

-r:L

Amount: ALOBS No.

PURCHASE ORDER VISAYAS STATE UNIVERSITY


Ormoc MAC MERCURY Hardware No STF-13-07-1-Dorm Datg; July 19,2013 PR No 2013-04-0698/0699
PO

Place of Delivery: VSU, Baybay, Leyte Date of Delivery: 30 calendar days upon receipt of PO

Delivery Term: FOB Site

DESCRIPTION
For the Construction of STAFF Dormitol Phase Steel Bars, deformed, 16mm dia x 6 M, 9 Tie Wire # 16 Marine, 112" x4'x8'
GW
7

Nails,

1-112"
1

Forthe Construction of STUDENT Dormitoru Phase


Steel Bars, deformed, 16mm dia x 6 M, 9 Tie Wire # 16 Marine, 112" x4'x8' CW Nails, 4" CW Nails, 1-112"

GRAND
of the total PO) either in Cash or

TOTAL

521.1

Check = P

ln case of failure to make the tull delivery within the time specified above, a penalty of one-tenth (1/10) of . one percent for every day of delay shall be

imposed.

Conforme:

raLE

l.ww*