Professional Documents
Culture Documents
[Period]
Name of the Company
Re&ie-ed )y:[Name]
Re&ie-ed )y:[Name]
Appro&a$ ,ate:
P$ea+e in+ert the addre++ and contact detai$+ of the $oca$ (.I, office #Nepa$ !hutan%
Contents
,ocumentation of chan*e+ compared to the initia$ a++e++ment report2222222222222222222222222222222222222222222223 (tatu+ of imp$ementation2222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222224 Indicator+222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222 5 Ne- o)+er&ation+ and +ummary of ne- recommendation+ for continuou+ impro&ement222222222222222226 Anne' /:.'ecuti&e +ummary of ne- recommendation+22222222222222222222222222222222222222222222222222222222222222222//
/0
/0
Status of implementation
1.1 Overview
Name of company: Addre++: (.I, counterpart: ,ate of &i+it )y (.I, team: ,ate of Imp$ementation Report #IR%: Ne't &i+it +chedu$e:
/0
(tatu+ of
Simple pa$bac %
months#
Investment cost
Rs.#
Resource benefit
41,250 48,055 1
Ongoing/delay/dat e of implementation
Freezers
&eplace damaged refrigerator door seals +dd grate! feed secondary air through side door
7,226
5,000
'
"() $*h of electricity / yr and ( $g of food waste eliminated )!( $g of fire wood saved / yr! lower smo$e in factory
56,300
8,500
(r.
Option
Remar%s
/0
/ 3 4 8 9 : 5
&otal amount
/0
1./ Documentation
Please copy according to your needs
&able 10 Detailed description of insert the title of theoption &itle of recommendation
/0
,e+cription of e'i+tin* +y+tem and it+ operation
Please describe briefly the implement measure! the steps have to been ta$en! difficulty-s! etc.
Indicators
Please document the indicators in comparison to the basic situation and the I+&. Please provide a short statement whether the target value was achieved or not. &emar$: ./ample for indicators
Relevant basic value1 O&erni*ht +tay+ Produced paper '' 'y Amount' 1nit Num)er of +tay+ m; or 7*
/0
Amount 7<h m;
1nit
Reference: ?uantity of product or +er&ice: e2*2 produced paper@ o&erni*ht +tay+@ etc2 ,ata per month Con+umption you -ant to contro$: e2*2 -ater@ e$ectricity@ -a+te@ etc2 (pecific con+umption: e2*2 -ater produced paper@ e$ectricity o&erni*ht +tay@ etc2 Numerica$ &a$ue Numerica$ *oa$
/0
5 6
Red mean+: hi*h priority a fo$$o- up ha+ to )e done immediate$y@ ye$$o- mean+: medium priority a fo$$o- up ha+ to )e done in the fo$$o-in* 8 month+ "echnica$ option+@ or*ani+ationa$ #re+pon+i)i$ity@ documentation@ procedure@ mea+urement@ etc2% option+ A Materia$+@ ener*y@ time@ co+t+ minu+ additiona$ co+t+ #ener*y for the ne- e?uipment@ maintenance@ etc2% /0 .?uipment@ pipin*@ in+u$ation@ preparation of the area@ contro$ e?uipment@ etc2 // In&e+tment +a&in*+ /3 (pecific con+umption -hich i+ impro&ed )y the mea+ure
(.I, 1 Imp$ementation Report: P$ea+e in+ert the company name &emar$: the columns mar$ed in grey will be discussed and completed during the ne/t company visit and from that moment this table will be used as the wor$plan. If necessary please use 0able 1 1see chapter 1 .12 for a detailed description of the recommendation
/0
/0
,e+cription of e'i+tin* +y+tem and it+ operation
/0
Savings potential
No2 of option+ identified in IAR: "ota$ annua$ +a&in*+ potentia$ #R+ Nu%: Bi*he+t potentia$ area+: [Pro&ide a &ery )rief de+cription of hi*he+t potentia$ area+ e2*2 ,ie+e$ +a&in*+ potentia$ of *rid po-er +a&in*+ potentia$ or -ater +a&in*+ potentia$ etc2]
Resource benefit
Simple pa$bac%
months#
-stimated Investment
Rs.#
48,055
41,250
7,226
5,000
'
"() $*h of electricity / yr and ( $g of food waste eliminated )!( $g of fire wood saved / yr! lower smo$e in factory
56,300
8,500
(.I, 1 Imp$ementation Report: P$ea+e in+ert the company name Cost benefit Area Recommendation Action plan
Potential saving
Rs.!"ear#
Resource benefit
Simple pa$bac%
months#
-stimated Investment
Rs.#
Sum
<
nnnnnn
/0