Production Planning and Control - 5

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question
When shop floor scheduling problem larger than 3 machines arise the
analytical solution procedures leading to optimality are complex and
difficult.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer


Question
Total lead time is the summation of following factors :-
Correct Answer
Queue and transit time , Manufacturing time , Order preparation time
Your Answer
Manufacturing time , Delay time , Queue and transit time

Select The Blank


Question
Labour efficiency depends upon ________
Correct Answer
Training and experience
Your Answer
Training and experience

Select The Blank


Question
The LOB technique is made more accurate and fast by using ________.
Correct Answer
Computers
Your Answer
Log-tables

Select The Blank


Question
Process plan is the process of establishing the ________ and most
economical path that each part is to follow from raw material stage to
finished product stage.
Correct Answer
Shortest
Your Answer
Optimum
Select The Blank
Question
________reflects impact of money tied up in inventory.
Correct Answer
Inventory turnover
Your Answer
Inventory turnover

Multiple Choice Multiple Answer


Question
The check list approach comprises of following parameters :-
Correct Answer
Each department head concerned with efficiency of PPC function is given a
set of questions to be answered. , The department head has to answer in
"Yes/no" format only , Each "Yes" answer gives one negative score
Your Answer
Each department head concerned with efficiency of PPC function is given a
set of questions to be answered. , The department head has to answer in
"Yes/no" format only , Each "Yes" answer gives one negative score

Multiple Choice Single Answer


Question
In ABC analysis, the classification is based on :-
Correct Answer
Cumulative cost
Your Answer
Carrying cost

Multiple Choice Single Answer


Question
Find EOQ in Rs from the following data :-Annual consumption = 20, 000
units, Ordering and receiving cost of material = Rs 20 per order, Annual
carrying cost or storage cost = 10% of unit cost of material, Cost of
material = Rs 50.
Correct Answer
20000
Your Answer
10000

Multiple Choice Single Answer


Question
Spares without which the system will not work are categorized as :-
Correct Answer
Vital
Your Answer
Vital
Match The Following
Question
Correct Answer
Your Answer
Order quantity
Factor influencing process planning
Factor influencing process planning
Machine capacity chart
Dimensional accuracy
Special purpose machines
Mass production
Special purpose machines
General purpose machines with special toolings
Standard elemental time data
Compare alternative processes
Break even analysis

True/False
Question
C type items would never be vital under VED analysis.
Correct Answer
False
Your Answer
False

True/False
Question
In replenishment system, the type of ordering is either according to
"stock level" or "pre-fixed time scale".
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer


Question
At company's subsidiary stores /tool crib following tools are stored :-
Correct Answer
Consumable tools , Inspection fixtures , Instruments and gauges
Your Answer
Consumable tools , Inspection fixtures , Instruments and gauges

True/False
Question
Exponential smoothening is weighted average method.
Correct Answer
True
Your Answer
True

Select The Blank


Question
The administrative lead time e.g. time involved in processing the order,
which may be in periodical review system including the period until next
review is called ________ lead time.
Correct Answer
Internal
Your Answer
Cumulative

Select The Blank


Question
Heuristics methods involve drawing procedure diagram which indicates
the ________ available for transferring tasks laterally from one column to
another to arrive at most promising balance.
Correct Answer
Flexibility
Your Answer
Flexibility

Multiple Choice Single Answer


Question
The light engineering company has one special purpose facing & centering
machine And one copying lathe. The foreman has five work orders for
processing . The operation Sequence is fixed [ each job is first faced and
centered and then copy turned ] . The standard Hours required for each
machine to process each work order are shown in the following Table :-
Work Order Processing Time [Hours ] Facing & centering machine Copying
Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to
minimize requirements of machine hours.
Correct Answer
IV-I-II-V-III
Your Answer
II-III-IV-I-V

True/False
Question
In PERT, use of dummy activities is not much essential.
Correct Answer
False
Your Answer
True
True/False
Question
The make-or-buy decision is not taken only at starting of a factory but
has to be reviewed continuously.
Correct Answer
True
Your Answer
True

Select The Blank


Question
Only satisfied customers get in ________ from new customers.
Correct Answer
Business
Your Answer
Business

Multiple Choice Multiple Answer


Question
The following are salient features of the fixed order quantity system :-
Correct Answer
Reorder quantity is always the same which is usually economic order
quantity , The time interval between deliveries varies. , Replenishment
action is initiated when the stock on hand is just sufficient to meet
demand during the lead time.
Your Answer
Reorder quantity is always the same which is usually economic order
quantity , Replenishment action is initiated when the stock on hand is just
sufficient to meet demand during the lead time. , Percent cumulative cost
of item is taken into consideration.

Match The Following


Question
Correct Answer
Your Answer
Tool order
To instruct tool crib to keep tools ready
Instruct to issue tools
Move order
Movement of material from stores to first machine
Movement of material from stores to first machine
Stores issue order
Instruction to stores to issue material
Instruction to stores to issue material
Inspection order
Report inspection results
Report inspection results
Multiple Choice Single Answer
Question
Responsibility of smooth flow of work through different work centers or
departments of company rests with :-
Correct Answer
Production control department
Your Answer
Production control department

Select The Blank


Question
________ is the sum of set up time and run time.
Correct Answer
Manufacturing time
Your Answer
Manufacturing time

Multiple Choice Single Answer


Question
Detachable ticket, after filling in required information is :-
Correct Answer
Placed in a tray/box
Your Answer
Given to progress section

Multiple Choice Multiple Answer


Question
Subsidiary orders include :-
Correct Answer
Material Order , Shop order , Inspection order
Your Answer
Material Order , Shop order , Inspection order

Multiple Choice Single Answer


Question
Long termed forecasts are for the period of :-
Correct Answer
5 to 10 years
Your Answer
One year

Multiple Choice Multiple Answer


Question
If actual demand far exceeds forecast, it will result into :-
Correct Answer
Better utilization of equipment , Project margin , Higher material purchase
Your Answer
Better utilization of equipment , Higher material purchase , Increase in
labour productivity

Select The Blank


Question
Classification of items on basis of their capital lock up is called ________
analysis.
Correct Answer
XYZ
Your Answer
VED

Multiple Choice Single Answer


Question
Physical Count method of collecting information from manufacturing
shops is applicable in following situation :-
Correct Answer
Workshops employing few machines
Your Answer
Workshops producing small parts in huge quantities

Multiple Choice Multiple Answer


Question
The expected time can be minimised by minimising following parameters
:-
Correct Answer
Optimistic time , Pessimistic time , Most likely time
Your Answer
Pessimistic time , Lead time

Multiple Choice Single Answer


Question
In order to maintain precedence relationships, the most common
approach is to make use of :-
Correct Answer
Precedence diagrams
Your Answer
Precedence diagrams

True/False
Question
There are five manufacturing systems. However, many manufacturers
combines two or more systems to produce a final product.
Correct Answer
True
Your Answer
True

Multiple Choice Multiple Answer


Question
HML Analysis helps to :-
Correct Answer
Access storage & security requirements , Keep control over departmental
head level , Determine frequency of stock verification
Your Answer
Access storage & security requirements , Determine frequency of stock
verification , Controls carrying cost

Multiple Choice Single Answer


Question
The sourcing of vendors in case of 'B' type of items is :-
Correct Answer
Medium
Your Answer
Minimum

Select The Blank


Question
Production Planning and Control department acts as a link between
company's sales and ________ department.
Correct Answer
Manufacturing
Your Answer
Manufacturing

Multiple Choice Multiple Answer


Question
Move orders, released for material movement from stores to first work
center are used for following types of organizations :-
Correct Answer
Big steel plants , Power plants , Heavy machinery manufacturers
Your Answer
Big steel plants , Heavy machinery manufacturers , High volume white
goods manufacturers

Multiple Choice Multiple Answer


Question
Smoothing performs following activities:-
Correct Answer
Reallocation of resources , Improving utilization of resources , Conducting
Heuristic approach
Your Answer
Improving utilization of resources , Conducting Heuristic approach ,
Conducting Load flow analysis

Select The Blank


Question
________ phase of PPC makes sure that the programmed production is
constantly maintained.
Correct Answer
Control
Your Answer
Control

Multiple Choice Multiple Answer


Question
Process Sheet contains following information :-
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Order Quantity

True/False
Question
The make-or-buy decision becomes necessary when the current source of
supply is not able to supply the material in accordance with buyer's
quality requirements.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer


Question
Negative value of critical ratio :-
Correct Answer
Is meaningless
Your Answer
Indicates shortfall in scheduled delivery period

Multiple Choice Multiple Answer


Question
In linear programming method of line balancing, there are three types of
constraints namely :-
Correct Answer
Cycle time constraint , Step or task constraint , Precedence constraints
Your Answer
Cycle time constraint , Step or task constraint , Precedence constraints

Multiple Choice Single Answer


Question
Let us suppose that activity M & N can not start until activity K & L are
completed. Activities K &L are therefore :-
Correct Answer
Preceding
Your Answer
Preceding

True/False
Question
XYZ analysis helps to identify few items which account for large amount
of money locked up in the stock and take steps for liquidation / reduction.
Correct Answer
True
Your Answer
False

True/False
Question
Overlapping of operations helps in compressing manufacturing time.
Correct Answer
True
Your Answer
False

at 4:57 AM 0 comments Links to this post

Labels: Production Planning and Control (Set-2)

Production Planning and Control - 4

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer


Question
Purchase cost include :-
Correct Answer
Excise , Packing and forwarding , Octroi
Your Answer
Excise , Octroi

True/False
Question
Inspection operations is a part of process plan for a part.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer


Question
Why customer is called the king?
Correct Answer
Customer's orders gives us work
Your Answer
Customer's orders gives us work

True/False
Question
To solve "n jobs - 3 machines" sequencing problem, the largest of time of
any job on the second machine must be smaller than or equal to the
smallest time of any job on first machine or third machine.
Correct Answer
True
Your Answer
True

True/False
Question
Line staff can assist PPC by manufacturing some of their needs in their
own shops rather than making PPC to tool room or purchase.
Correct Answer
True
Your Answer
False

Multiple Choice Single Answer


Question
Ordering of raw material is based on :-
Correct Answer
Sales forecast
Your Answer
Material availability

Multiple Choice Multiple Answer


Question
The queue time is intended to compensate for the time for which the job
has to :-
Correct Answer
Wait near the machines for its turn until other jobs ahead of it are
completed. , Lie after its completion till is picked up and moved to next
machine/work center. , Spend extra time due to emergent situations
Your Answer
Wait near the machines for its turn until other jobs ahead of it are
completed. , Lie after its completion till is picked up and moved to next
machine/work center. , Wait until inspection and storage is completed.

Multiple Choice Multiple Answer


Question
In an organization, poor material handling system may result in the
following :-
Correct Answer
Damage to material/product , Delays in supply of material , Accidents
while handling
Your Answer
Damage to material/product , Delays in supply of material , Accidents
while handling

True/False
Question
LOB is a manual planning and scheduling technique similar in nature to
MRP [Material Resource Planning].
Correct Answer
True
Your Answer
False

Multiple Choice Multiple Answer


Question
Standard time accounts for :-
Correct Answer
Contingency allowance , Operator's rating/efficiency , Tool change time
Your Answer
Contingency allowance , Tool change time , Job splitting time

True/False
Question
As per a study on materials management practices, a typical firm spends
almost half of its rupee sales on goods purchased from vendors.
Correct Answer
True
Your Answer
False

Select The Blank


Question
________ analysis mainly helps to identify non-existing items for which
store keeps bin cards, wastes computer memory or wastes computer
stationary while preparing stores ledger.
Correct Answer
MNG Analysis
Your Answer
SOS Analysis

Multiple Choice Single Answer


Question
If more variety is to be manufactured, the manufacturing facilities would
have to be :-
Correct Answer
Commonised
Your Answer
Expanded

True/False
Question
Work measurement is not useful for choosing between two alternate
methods of production.
Correct Answer
False
Your Answer
False

True/False
Question
On completion of work the job card is returned to production planning and
control department for reference and record.
Correct Answer
False
Your Answer
True

True/False
Question
Curve fitting method of statistical forecasting uses curve line approach.
Correct Answer
False
Your Answer
True

Select The Blank


Question
________ is a production line made up of operations that form or change
the physical or sometimes chemical characteristics of a product.
Correct Answer
Fabrication line
Your Answer
Assembly line
Multiple Choice Single Answer
Question
Keeping procurement cost and carrying cost constant, if annual usage of
certain product becomes 4 times, the EOQ would be :-
Correct Answer
Doubled
Your Answer
Halved

Multiple Choice Single Answer


Question
LOB technique was devised by US army in the year :-
Correct Answer
1952
Your Answer
1955

True/False
Question
Transit time for manufactured items should be considered only when it is
insignificant.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer


Question
5 jobs are to be processed on machines M1 and M2 , first on M1 and then
on M2. The processing times in hours are as follows.Find the sequence for
5 jobs that will minimize total elapsed time .also find idle time & total
elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5 2
2 1 6 8 9 7 6 3 8 5 10 4
Correct Answer
2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2
respectively.
Your Answer
2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2
respectively.

Multiple Choice Multiple Answer


Question
SDE analysis is based on problems of procurement namely :-
Correct Answer
Non-availability , Scarcity , Longer lead time
Your Answer
Non-availability , Scarcity , Longer lead time
Multiple Choice Multiple Answer
Question
In a mass production assembly shop following work measurement
techniques are used :-
Correct Answer
Time study , Work sampling , Production study
Your Answer
Time study , Production study , Analytical estimating

Multiple Choice Multiple Answer


Question
Due to the following emergent events, the queue time has to compensate
for the time for which the job has to undergo an extra time :-
Correct Answer
Tool breakage , Job split up , Change in priorities
Your Answer
Tool breakage , Job split up , Store inventory

Select The Blank


Question
Given the following data :- procurement cost per order = Rs 30 ;
frequency of ordering per year =4 ; number of suppliers = 3 . Form the
above data, total procurement cost would be Rs ________.
Correct Answer
360
Your Answer
40

Multiple Choice Multiple Answer


Question
In replenishment system, the fixed order quantity system is also called by
following names :-
Correct Answer
Fixed order system , Min-max system , Re-order point system
Your Answer
Fixed order system , Min-max system , Re-order point system

Multiple Choice Single Answer


Question
Given a decision for designing a line layout, major problem is subdividing
a work so that smooth flow can result. The subdivision process is called :-
Correct Answer
Line balancing
Your Answer
Line balancing
True/False
Question
In CPM, use of dummy activities is much essential .
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer


Question
The commonly used network techniques other than PERT and CPM are as
follows :-
Correct Answer
MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control
System ] , GERT [ Graphical Evaluation Review Techniques ]
Your Answer
MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control
System ] , GERT [ Graphical Evaluation Review Techniques ]

Match The Following


Question
Correct Answer
Your Answer
Work element
Smallest portion of work identified during the breakdown analysis of the
job.
Smallest portion of work identified during the breakdown analysis of the
job.
Production line
Arrangement of workstations where each workman performs a pre-
determined task on an incomplete unit which passes down the line of
subsequent unit until it is finished.
Arrangement of workstations where each workman performs a pre-
determined task on an incomplete unit which passes down the line of
subsequent unit until it is finished.
Work Station
Assigned location, zone, place or stage in assembly where designated
work is performed on part component of product.
Assigned location, zone, place or stage in assembly where designated
work is performed on part component of product.
Station work content
Time required to perform the designated amount of work at a given work
station and is obtained by adding up time of work elements allotted to the
work station.
Time after which a finished product comes off the production line.

Multiple Choice Multiple Answer


Question
Steps involved in process planning include the following :-
Correct Answer
Enlist feature influencing selection of manufacturing process , Prepare
sequence of basic operation , Write down route sheet
Your Answer
Prepare sequence of basic operation , Write down route sheet , Indent
requirement of tooling and fixtures

Multiple Choice Single Answer


Question
Effective capacity per period is calculated as :-
Correct Answer
Multiplication of net capacity with labour efficiency
Your Answer
Multiplication of net capacity by utilization index

Select The Blank


Question
Orders with ________ slack time remaining per operation are run first.
Correct Answer
Shortest
Your Answer
Longest

Match The Following


Question
Correct Answer
Your Answer
Time taken by each job at each machine
Processing time
Job time
Time between starting of first job and completion of last job
Elapsed time
Processing time
Number of stages the job has to pass
Number of machines
Number of machines
Time during which the machine is standstill
Idle time
Job priority

Select The Blank


Question
LOB has advantage that it is more ________ oriented than MRP.
Correct Answer
Customer
Your Answer
Practical

Multiple Choice Single Answer


Question
A company has 10 machines, working in two shifts. Utilization index is
0.75 and shop efficiency is 80%. Effective capacity hours for loading and
scheduling are :-
Correct Answer
576
Your Answer
576

Multiple Choice Single Answer


Question
The cost involved in subcontracting some of the operations of item outside
the home plant is called :-
Correct Answer
Outside operations cost
Your Answer
Outdoor cost

Multiple Choice Multiple Answer


Question
LOB deals with :-
Correct Answer
Identification of crucial operations in a job , Establishment of schedules of
crucial operations , Attraction of attention of those who do not conform to
the schedule.
Your Answer
Identification of crucial operations in a job , Establishment of schedules of
crucial operations , Attraction of attention of those who do not conform to
the schedule.

Select The Blank


Question
________items should be excluded from ABC Analysis.
Correct Answer
Non-moving
Your Answer
Seasonal

Multiple Choice Single Answer


Question
To keep facilities busy, waiting time due to non-availability of work should
be kept at :-
Correct Answer
Minimum .
Your Answer
Minimum .

Multiple Choice Single Answer


Question
Installed capacity :-
Correct Answer
Can be equal to or less than licensed capacity
Your Answer
Can be equal to or less than licensed capacity

Multiple Choice Single Answer


Question
Scheduling can be considered as a process of :-
Correct Answer
Fitting shop order into uncommitted time available for a machine
Your Answer
Determining time required for each operation

Select The Blank


Question
Short term forecasts are for ________.
Correct Answer
Material Planning
Your Answer
Material Planning

Select The Blank


Question
The ________ makes scheduling process simpler but does not provide
economy in manufacture.
Correct Answer
First-come-first scheduled
Your Answer
First-come-first scheduled

Select The Blank


Question
Good quality and ________are the two main requirements to secure
maximum business from a customer.
Correct Answer
Competitive rates
Your Answer
Competitive rates

Select The Blank


Question
Generally for ________ flow system, Heuristic method is preferred.
Correct Answer
Intermittent
Your Answer
Continuous

Multiple Choice Single Answer


Question
Sequencing helps management to determine the most economical job
sequence the one that consumes minimum :-
Correct Answer
Elapsed time
Your Answer
Lead time

at 4:55 AM 0 comments Links to this post

Labels: Production Planning and Control (Set-2)

Production Planning and Control - 3

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question
Purchase department must keep PPC informed regarding lead time of
different items specially where lead times are extended.
Correct Answer
True
Your Answer
True

True/False
Question
In order to complete a project on time, each critical activity need not be
completed in time.
Correct Answer
False
Your Answer
False

Select The Blank


Question
Because of uncertainty of activity timings, PERT acquired a shape of
________ model.
Correct Answer
Probabilistic
Your Answer
Probabilistic

True/False
Question
Flexibility and product variety are not inter-related with each other.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer


Question
The 'G' group of GOLF analysis covers items procurement from
Government suppliers such as :-
Correct Answer
STC , MMTC , Public Sector Undertaking
Your Answer
STC , MMTC , Public Sector Undertaking

Select The Blank


Question
Buying for C quantities should be made in ________ quantities .
Correct Answer
Large
Your Answer
Small

Select The Blank


Question
Of all the work measurement techniques the most widely used techniques
is________.
Correct Answer
Time study
Your Answer
Time study

Multiple Choice Single Answer


Question
Keeping available time per day constant, if the desired production rate per
day is to be doubled ,cycle time will be reduced by :-
Correct Answer
0.5
Your Answer
0.5
Select The Blank
Question
In alternate routing, the delayed job may be routed to a ________
machine where rate of production is faster.
Correct Answer
Costlier
Your Answer
New

Multiple Choice Single Answer


Question
Mass & flow production and process production are categorized under :-
Correct Answer
Continuous production
Your Answer
Continuous production

Multiple Choice Single Answer


Question
The earliest start time of an activity equals to earliest event time of :-
Correct Answer
Tail event
Your Answer
Head event

Multiple Choice Single Answer


Question
If efficiency is more, the manufacturing time required for completion of
job would be generally :-
Correct Answer
Less
Your Answer
Less

Match The Following


Question
Correct Answer
Your Answer
Move order
Transport material from and to required work centers
Transport material from and to required work centers
Materials Order
Allocation of material required in connection with shop order
Allocation of material required in connection with shop order
Work Order
Bird's eye view of production programme
Order from contractor to execute job
Production Order
Reserve material required in connection with sales order
Reserve material required in connection with sales order

Multiple Choice Single Answer


Question
Development of additional vendors/suppliers depends upon :-
Correct Answer
Sales forecast
Your Answer
Sales forecast

Multiple Choice Single Answer


Question
The assignment method is also called as :-
Correct Answer
Hungarian Method
Your Answer
Hungarian Method

Multiple Choice Multiple Answer


Question
Material control function embraces a following techniques :-
Correct Answer
Make -or -buy decision , Pareto's analysis , Replenishment system
Your Answer
Make -or -buy decision , Replenishment system

Multiple Choice Multiple Answer


Question
Overtime can be avoided in many ways and they are :-
Correct Answer
Unrealistic delivery date , Acceptance of too many rush order , Excessive
machine breakdown
Your Answer
Acceptance of too many rush order , Excessive machine breakdown ,
Insufficient manpower or machines

Select The Blank


Question
Lead time is ________ for different items.
Correct Answer
Different
Your Answer
Different

Multiple Choice Multiple Answer


Question
The tooling data is prepared in respect of following measuring instruments
:-
Correct Answer
Vernier caliper , Micrometer screw gauge , Strain gauge
Your Answer
Vernier caliper , Micrometer screw gauge , Strain gauge

True/False
Question
The LOB technique is most appropriate for assembly operations involving
number of distinct components.
Correct Answer
True
Your Answer
True

Select The Blank


Question
If number of work stations is 8 and work content of all stations is 32 , the
cycle time would be ________.
Correct Answer
4
Your Answer
4

Multiple Choice Multiple Answer


Question
The minimum requirements for application software for line balancing are
as follows :-
Correct Answer
1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent
operating system.
Your Answer
1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent
operating system.

Multiple Choice Multiple Answer


Question
Detachable Card contain following information :-
Correct Answer
Quantity produced , Operation , Date of completion
Your Answer
Quantity produced , Operation , Sequence of operation

Multiple Choice Single Answer


Question
The assembly work content [ Wi ] of the i'th station having n work
stations is given by :-
Correct Answer
å Wi from i=1 to n
Your Answer
Wi / n

True/False
Question
Production Planning and Control makes the supervisor ineffective.
Correct Answer
True
Your Answer
False

Select The Blank


Question
________ are grouped so that their total time is preferably equal to or
little lesser than the time available each work station.
Correct Answer
Tasks
Your Answer
Assembly lines

Multiple Choice Single Answer


Question
The work measurement and time study belong to the following school of
management :-
Correct Answer
Scientific School of management
Your Answer
Scientific School of management

Multiple Choice Multiple Answer


Question
Economic indicator for forecasting fertilizer requirements are :-
Correct Answer
Land under cultivation , Trends of rainfall , Credit offered by banks
Your Answer
Land under cultivation , Trends of rainfall , Credit offered by banks

Multiple Choice Single Answer


Question
As the quantity increases, the procurement cost :-
Correct Answer
Reduces
Your Answer
Also increases

Multiple Choice Multiple Answer


Question
To minimize total throughout time we are required to minimize :-
Correct Answer
Queuing , Idle time , Inventory
Your Answer
Queuing , Idle time

Multiple Choice Multiple Answer


Question
Following are the factors which influence tool life :-
Correct Answer
Type of tool , Material it is required to operate upon , Operators efficiency
Your Answer
Type of tool , Material it is required to operate upon , Operators efficiency

Multiple Choice Single Answer


Question
What are the customer's expectation from the supplier?
Correct Answer
Consistent good quality of products
Your Answer
Consistent good quality of products

Multiple Choice Multiple Answer


Question
While communicating to customer on delays in delivery following
information should be given :-
Correct Answer
Information on identification of job , Reasons for delays , Revised date of
delivery
Your Answer
Reasons for delays , Revised date of delivery , Derailed production records

Select The Blank


Question
Job production requires ________ capital investment.
Correct Answer
Lowest
Your Answer
High

Multiple Choice Multiple Answer


Question
To operate fixed order quantity system, following parameters are required
to be fixed:-
Correct Answer
Minimum stock , Re-order point , Standard reorder quantity
Your Answer
Minimum stock , Re-order point , Breakeven point

Match The Following


Question
Correct Answer
Your Answer
End piece allowance
Material insufficient to produce one piece
Material insufficient to produce one piece
Stock allowance
Quantity to meet requirement of spares
Quantity to meet requirement of spares
Machining allowance
Extra material requirement
Extra material requirement
Spoilage allowance
Process rejection
Process rejection

Select The Blank


Question
Work sampling is ________
Correct Answer
Done at random interval
Your Answer
Done continuously without interval

Select The Blank


Question
The information on the nature of tooling required for an item can be
obtained from its ________.
Correct Answer
Route sheet
Your Answer
Route sheet

Multiple Choice Multiple Answer


Question
The main characteristics of jobbing production are :-
Correct Answer
Small production runs , Discontinuous flow of materials , Disproportionate
manufacturing cycle time
Your Answer
Small production runs , Discontinuous flow of materials , Disproportionate
manufacturing cycle time

Multiple Choice Single Answer


Question
Let us suppose that activity P & Q can not start until activity R& S are
completed. Activities P &Q are therefore :-
Correct Answer
Succeeding
Your Answer
Succeeding

Multiple Choice Single Answer


Question
Critical ratio equals to one indicates that :-
Correct Answer
Job is just on schedule and requires to be watched closely.
Your Answer
Job is just on schedule and requires to be watched closely.

True/False
Question
Random fluctuation is addition of cyclical fluctuation and seasonal
fluctuation.
Correct Answer
False
Your Answer
True

True/False
Question
Labour efficiency factor is applied after capacity requirement of equipment
is calculated.
Correct Answer
False
Your Answer
True

Select The Blank


Question
________ is the specific instant of time that marks start and end of
activity.
Correct Answer
Event
Your Answer
Event
True/False
Question
Increase in inventory carrying cost increases EOQ.
Correct Answer
False
Your Answer
True

True/False
Question
A company where different personnel give conflicting delivery promises
need to improve its scheduling and processing function.
Correct Answer
True
Your Answer
True

True/False
Question
A type items are always vital under VED analysis.
Correct Answer
False
Your Answer
True