COMBINED PERFORATED PIPE & SOAK AWAY DRAINAGE SYSTEM DESIGN DATA: Intensity of Rainfall Area of the plot Duration of Rainfall Time Available to Drain Run Off co efficient Flow Rate Calculation: Volume collected in 1.5 hrs Volume flow rate Soak Pit Sizing : Permeability Rate in m/s Flow area Required v = Af = 0.0003333 m/s 41.66 m2 0.00 m 0.00 m 0.00 m 0.00 m2 As Apn>Af ,Soakaway pit is required. Soak away Size of L*W = Flow area of the Soapit No.of Soak pits Flow area required each Soakpit (Aesa) Volume of the Soak pit (V) Depth of the Soak pit (h) Diameter of Soak pit (D) Permeability Calculation Percolation Time , T - sec/mm Percolation Time , T - sec/cm Coefficient of Permeability, v - cm/sec 3 sec/mm 30 sec/cm 0.03333333 cm/sec 0.0003333 m/s
P.O.Box: 125786 Dubai- U.A.E
REFERENCE Refer Annexure -1 (DM - TABLE 4.1.3) Architectural Drawings Refer Annexure -1 (DM - TABLE 4.1.3) Refer Annexure -3 (DM - TABLE 4.3.1) Refer Annexure -2 (DM - TABLE 4.2.1)
V= Vf =
Length of the single pipe from perforation point to soak pit Lp = Diameter of Pipe Thickness of gravel D= tgravel =
E-mail: consist@eim.ae