Dependence test of selection decisions for research project applications in Slovenia in 2005 on

Method of evaluation of research project applications in Slovenia is defined in: Metodologija ocenjevanja prijav za mentorje mladim razis
Research (alternative) hypothesis: there is positive association between the sums of scores of research team leaders and decisions for p
Null hypothesis H0: there is no positive association (one-sided test).
Level of significance: α=0,05.
Fisher's exact test was calculated with statistical package available on http://www.langsrud.com/fisher.htm .
Note: in case of different value from Fisher and Kullback test, the value of Fisher is taken.
Note: in case of different values for different binning the value in favour for rejection is taken.
Note: Research subfields are defined in http://www.arrs.gov.si/en/gradivo/sifranti/sif-vpp.asp .
Note: Research project applications are arranged in descending order regarding the sum of scores A.
Result of statistical analysis: in 2 subfields (3%) with 27 project applications (8%) null hypothesis of no positive association can be signifi
Mark of Score
research
Score
A1 subfield
Score
A2 A=A1+A2+A3
A3 Selected
Counter
research projects
Natural sciences and mathematics
1.01 1.22 0.73 0.77 2.72 1 Contingency table (c.t.):
1.02 4.66 1.21 5 10.87 1 1 Score category
1.02 5 5 0.49 10.49 1 1 Observed frequencies
0-5,00 5,01-15 Row total Kullback 2Î test:
1.02 3.93 5 0.1 9.03 1 1 Selected projects 2 3 5 S1=
1.02 3.32 3.22 0.15 6.69 1 Nonselected p. 5 1 6 S2=
1.02 1.98 0.57 1.67 4.22 1 Column total 7 4 11 2Î=S1-S2=
1.02 2.88 0.62 3.5 1 Fisher's exact test probability p = Additional Fisher's exact test p
1.02 1.34 1.84 3.18 1 0.2 H0 is not rejected. p=0,061
1.02 1.48 0.89 0.04 2.41 1 Category limit is marked by line i
1.02 0.74 0.73 1.47 1
1.02 0.71 0.42 1.13 1 1
1.02 0.62 0.25 0.08 0.95 1 1
1.03 0.13 0.74 5 5.87 1 Observed frequencies
0-1,30 1,31-15 Kullback 2Î test:
1.03 0.52 0.04 1.97 2.53 1 1 Selected projects 2 4 6 S1=
1.03 0.99 0.43 0.09 1.51 1 1 Nonselected p. 2 2 4 S2=
1.03 1.03 0.42 0.02 1.47 1 1 Column total 4 6 10 2Î=S1-S2=
1.03 0.45 0.87 1.32 1 Fisher's exact test probability p =
1.03 0.17 0.01 1.14 1.32 1 1 0.55 H0 is not rejected. Additional Fisher's exact test p
1.03 1.01 0.28 1.29 1 p=0,45
1.03 0.42 0.6 1.02 1 1
1.03 0.29 0 0.23 0.52 1 1 Natural sciences and mathema
1.03 0.19 0 0.2 0.39 1 Subfield
1.04 2.38 4.34 6.72 1 1 Fisher's exact test probability p = total sum
1.04 2.73 1.82 0.03 4.58 1 1 1 ### 1.01
1.04 1.16 0.29 3.02 4.47 1 4 0 ### 1.02
1.04 3.36 0.79 0.31 4.46 1 p=0,33 H0 is not rejected. 1.03
1.04 2.03 1.21 1.08 4.32 1 1.04
1.04 0.45 0.87 1.32 1 1 Note: 1.05
1.05 1.48 2.44 3.92 1 1.06
1.05 0.82 2.74 3.56 1 rejection is not possible 1.07
1.05 0.3 0.75 1.05 1 1 1.08
1.06 0 0 2.29 2.29 1 1 1.09
1.06 0.25 0.21 0.07 0.53 1 sum of projects,where H0 is reje
1.07 2.93 2.57 0.69 6.19 1 1 sum of projects,where H0 is not
1.07 1.1 0.01 1.11 1 1
1.08 1.93 3.71 5.64 1 1 Observed frequencies
0-1,10 1,11-15 Kullback 2Î test:
1.08 0.09 0 2.29 2.38 1 1 Selected projects 2 3 5 S1=
1.08 1.12 0.13 1.25 1 Nonselected p. 2 1 3 S2=
1.08 0.31 0.88 1.19 1 1 Column total 4 4 8 2Î=S1-S2=
1.08 0.43 0.05 0.59 1.07 1 1 Fisher's exact test probability p =
1.08 0.71 0.11 0.82 1 1 0.5 H0 is not rejected. Additional Fisher's exact test p
1.08 0.29 0.21 0.5 1 p=0,36
1.08 0.1 0.04 0.14 1
1.09 2.23 2.29 3.78 8.3 1 1
1.09 2.61 1.48 0.14 4.23 1 1
1.09 0.73 1.48 0.62 2.83 1
Engineering sciences and technologies
2.01 4.16 3.81 2.9 10.87 1 1
2.01 1.1 1.53 1.91 4.54 1
2.01 0.72 0.25 0.73 1.7 1
2.01 0.39 1.16 1.55 1
2.01 0.71 0 0.71 1 1
2.02 4.5 1.61 1.36 7.47 1 1
2.02 1.77 0.21 0.34 2.32 1
2.02 0.36 0.88 1.24 1
2.02 0.36 0.88 1.24 1
2.02.06 0.54 0.13 0.67 1 1
2.03 2.73 0.26 5 7.99 1 Observed frequencies
0-5,00 5,01-15 Kullback 2Î test:
2.03 0.81 0.17 5 5.98 1 Selected projects 2 2 4 S1=
2.03 0.69 0 5 5.69 1 Nonselected p. 5 3 8 S2=
2.03 0.61 0.08 5 5.69 1 1 Column total 7 5 12 2Î=S1-S2=
2.03 5 0.14 5.14 1 1 Fisher's exact test probability p =
2.03 1.19 0.07 2.84 4.1 1 0.58 H0 is not rejected.
2.03 1.19 0.07 2.84 4.1 1
2.03 0.29 0.1 1.39 1.78 1
2.03 0.13 0.02 1.51 1.66 1
2.03 1.01 0.37 1.38 1 1
2.03 1.02 0.32 1.34 1 1
2.03 0.29 0.18 0.73 1.2 1
2.04 4.53 5 5 14.53 1 Observed frequencies
0-5,00 5,01-15 Kullback 2Î test:
2.04 2.78 1.86 3.51 8.15 1 1 Selected projects 3 6 9 S1=
2.04 1.64 1.4 5 8.04 1 1 Nonselected p. 10 2 12 S2=
2.04 5 1.88 0.52 7.4 1 1 Column total 13 8 21 2Î=S1-S2=
2.04.03 1.96 0.05 5 7.01 1 1
2.04 0.49 0.25 5 5.74 1 1 Fisher's exact test probability p =
2.04 5 0.63 5.63 1 1 0.03 H0 is rejected.
2.04 1.48 0.01 4.09 5.58 1
2.04 2.3 2.6 0.04 4.94 1 1
2.04 2.8 1.88 0.07 4.75 1 1
2.04.03 1.63 1.5 0.03 3.16 1
2.04 1.3 0.21 0.89 2.4 1 1
2.04 1.45 0.49 1.94 1
2.04 1.45 0.49 1.94 1
2.04 1.35 0.52 0.06 1.93 1
2.04 1.56 0.05 1.61 1
2.04 0.9 0.18 1.08 1
2.04 0.84 0.03 0.87 1
2.04 0.45 0.12 0.57 1
2.04 0.3 0.14 0.44 1
2.04 0.25 0 0.25 1
2.05 1.04 0.13 2.16 3.33 1
2.05 0.14 0.11 0.25 1 1
2.06 5 1.51 5 11.51 1 1 Fisher's exact test probability p =
2.06 2.08 0.88 5 7.96 1 1 0 3
2.06 2.14 0.69 1.87 4.7 1 1 3 0
2.06 2.11 0.23 1.17 3.51 1 p=0,050 H0 is rejected.
2.06 0.82 1.07 1.11 3 1
2.06 0.72 0.11 0.05 0.88 1
2.07 4.27 1.01 0.71 5.99 1 1
2.07 1.94 0.02 1.96 1
2.07 0.73 0 0.05 0.78 1
2.07 0.73 0 0.05 0.78 1
2.07 0.42 0 0.42 1
2.07 0.37 0.01 0.38 1
2.07 0.28 0.09 0.37 1
2.07 0.23 0 0.23 1
2.07 0.18 0 0.18 1
2.08 2.17 0 4.8 6.97 1 1 Fisher's exact test probability p =
2.08 1.58 0.07 5 6.65 1 1 1
2.08 1.58 0.07 5 6.65 1 1 3 0
2.08 1.26 0.04 5 6.3 1 p=0,40 H0 is not rejected.
2.08 0.46 0.13 0.01 0.6 1
2.09 5 0.56 5 10.56 1 1 Observed frequencies
0-4,00 4,01-15 Kullback 2Î test:
2.09 3.66 0.03 5 8.69 1 1 Selected projects 2 3 5 S1=
2.09 2.27 1.78 0.25 4.3 1 1 Nonselected p. 2 0 2 S2=
2.09 2.41 0.25 1.14 3.8 1 1 Column total 4 3 7 2Î=S1-S2=
2.09 1.74 0.5 2.24 1 Fisher's exact test probability p =
2.09 1.56 0.1 0.49 2.15 1 1 0.29 H0 is not rejected.
2.09 0.37 0.08 0.45 1
2.10 3.12 0.6 2.93 6.65 1 Observed frequencies
0-2,00 2,01-15 Kullback 2Î test:
2.10 2.48 0.18 2.05 4.71 1 Selected projects 2 1 3 S1=
2.10 0.68 0.39 1.74 2.81 1 1 Nonselected p. 6 4 10 S2=
2.10 0.68 0.39 1.74 2.81 1 Column total 8 5 13 2Î=S1-S2=
2.10 0.28 0.03 2.12 2.43 1
2.10 1.45 0.49 1.94 1 Fisher's exact test probability p =
2.10 1.45 0.49 1.94 1 1 0.8 H0 is not rejected.
2.10 1.35 0.29 1.64 1
2.10 0.96 0.06 0.54 1.56 1 1
2.10 0.69 0.02 0.71 1
2.10 0.49 0 0.15 0.64 1
2.10 0.56 0 0.56 1
2.10 0.28 0.13 0.41 1 Engineering sciences and tech
2.11 0.22 0.02 2.57 2.81 1 Subfield
2.11 0.66 0.16 1.7 2.52 1 total sum
2.11 1.17 0.08 0.78 2.03 1 2.01
2.11 1.05 0.43 1.48 1 1 2.02
2.11.03 0.53 0.11 0.13 0.77 1 2.03
2.11 0.55 0.14 0.69 1 2.04
2.12 2.01 0.19 1.52 3.72 1 1 2.05
2.12 0.69 0 2.52 3.21 1 2.06
2.12 1.88 0.26 0.1 2.24 1 2.07
2.12 0.8 0.1 0.5 1.4 1 1 2.08
2.12 0.88 0.21 1.09 1 1 2.09
2.13 2.77 1.09 5 8.86 1 1 2.10
2.13 1.64 0.44 3.8 5.88 1 1 2.11
2.13 0.7 0.73 1.94 3.37 1 2.12
2.13 1.03 0 0.35 1.38 1 2.13
2.14 0.91 0.15 1.32 2.38 1 2.14
2.14 1.42 0.11 0.41 1.94 1 1 2.15
2.15 4.66 0.44 5 10.1 1 2.16
2.15 1.7 0.03 5 6.73 1 2.17
2.15 0.3 0.15 0.05 0.5 1 2.18
2.16 1.07 0.06 1.76 2.89 1 1 2.19
2.16 1.17 0.6 0.5 2.27 1 2.20
2.16 0.36 0 0.36 1 1 sum of projects,where H0 is reje
2.19 1.49 0.14 0.07 1.7 1 sum of projects,where H0 is not
2.19 0.91 0 0.91 1
2.19 0 0 0 1
2.20 0.21 0.04 5 5.25 1
2.20 0.36 0.26 2.09 2.71 1
2.20 0.11 0 0.81 0.92 1
Medical sciences
3.01 0.81 2.73 3.54 1 Observed frequencies
0-1,34 1,35-15 Kullback 2Î test:
3.01 1.88 1.57 3.45 1 Selected projects 0 1 1 S1=
3.01 1.04 0.38 1.42 1 1 Nonselected p. 4 3 7 S2=
3.01 0.48 0.87 1.35 1 Column total 4 4 8 2Î=S1-S2=
3.01 0.25 1.09 1.34 1
3.01 0.75 0.48 1.23 1 Fisher's exact test probability p =
3.01 0.66 0.06 0.72 1 0.5 H0 is not rejected.
3.01 0.26 0.4 0.66 1
3.02 2.46 2.39 4.85 1
3.02 0.48 0.49 0.97 1 1
3.03 0.43 2.5 4.34 7.27 1 1 Observed frequencies
0-1,00 1,01-15 Kullback 2Î test:
3.03 2.73 0.45 0.38 3.56 1 Selected projects 2 1 3 S1=
3.03 0.4 2.52 2.92 1 Nonselected p. 4 7 11 S2=
3.03 2.36 0.2 2.56 1 Column total 6 8 14 2Î=S1-S2=
3.03 1.34 0.29 1.63 1
3.03 0.67 0.82 1.49 1 Fisher's exact test probability p =
3.03 0.52 0.43 0.51 1.46 1 0.94 H0 is not rejected.
3.03 1.11 0.08 1.19 1
3.03 0.52 0.16 0.32 1 1 Medical sciences
3.03 0.4 0.36 0.76 1 1 Subfield
3.03 0.57 0.19 0.76 1 1 total sum
3.03 0.3 0.13 0.01 0.44 1 3.01
3.03 0.29 0.11 0.4 1 3.02
3.03 0.37 0.02 0.39 1 3.03
3.04 2.67 2.17 4.84 1 1 3.04
3.04 0.85 1.48 0.62 2.95 1 1 Fisher's exact test probability p = 3.05
3.04 1.03 0.12 1.15 1 1 0 4 3.06
3.04 0.32 0.06 0.38 1 1 2 0 3.07
3.04 0.35 0.02 0.37 1 p=0,070 H0 is not rejected. 3.08
3.04 0.04 0.16 0.2 1 3.09
3.05 4.98 1.62 1.8 8.4 1 1 sum of projects,where H0 is reje
3.05 2.34 1.06 3.4 1 sum of projects,where H0 is not
3.05 0.53 0.54 1.07 1 1
3.05 0.58 0.19 0.77 1 1
3.05 0.36 0.09 0.13 0.58 1 1
3.05 0.16 0.14 0.3 1 1
3.06 2.57 1.83 4.4 1 1 Observed frequencies
0-1,25 1,25-15 Kullback 2Î test:
3.06 3.16 0.48 3.64 1 Selected projects 0 2 2 S1=
3.06 1.88 0.39 2.27 1 Nonselected p. 6 5 11 S2=
3.06 0.48 0.87 1.35 1 Column total 6 7 13 2Î=S1-S2=
3.06 0.48 0.87 1.35 1
3.06 0.58 0.1 0.61 1.29 1 Fisher's exact test probability p =
3.06 1.25 0.04 1.29 1 1 0.27 H0 is not rejected.
3.06 0.75 0.48 1.23 1
3.06 0.82 0.23 1.05 1
3.06 0.66 0.18 0.84 1
3.06 0.5 0.18 0.68 1
3.06 0.28 0.14 0.42 1
3.06 0.28 0.14 0.42 1
3.07 5 0.47 4.7 10.17 1
3.07 1.6 5 6.6 1
3.08 5 0.47 4.7 10.17 1 1 Observed frequencies
0-1,50 1,51-15 Kullback 2Î test:
3.08 4.04 2.77 6.81 1 Selected projects 0 2 2 S1=
3.08 1.22 0.3 2.76 4.28 1 Nonselected p. 5 4 9 S2=
3.08 0.72 1.8 0.33 2.85 1 Column total 5 6 11 2Î=S1-S2=
3.08 1.45 1.36 2.81 1 1
3.08 0.33 1.18 1.51 1 Fisher's exact test probability p =
3.08 0.81 0 0.81 1 0.27 H0 is not rejected.
3.08 0.62 0.09 0.71 1
3.08 0.58 0 0.58 1
3.08 0 0.49 0.06 0.55 1
3.08 0.1 0.04 0.14 1
3.09 0.89 0.38 1.27 1
3.09 0.23 0.02 0.25 1
Biotechnical sciences
4.01 2.16 0.59 0.81 3.56 1 Observed frequencies
0-1,00 1,01-15 Kullback 2Î test:
4.01 1.8 0.21 0.27 2.28 1 1 Selected projects 1 1 2 S1=
4.01 1.07 0.15 1.01 2.23 1 Nonselected p. 3 3 6 S2=
4.01 0.82 0.12 0.58 1.52 1 Column total 4 4 8 2Î=S1-S2=
4.01 0.44 0.05 0.23 0.72 1
4.01 0.24 0 0.34 0.58 1 Fisher's exact test probability p =
4.01 0.13 0.01 0.27 0.41 1 1 0.79 H0 is not rejected.
4.01 0.15 0 0.06 0.21 1
4.02 1.08 0.82 2.31 4.21 1
4.02 0.07 2.61 0.72 3.4 1
4.02 0 0.08 0.35 0.43 1
4.02 0.07 0 0.07 1
4.02 0 0 0 1
4.03 1 1.72 5 7.72 1 1 Observed frequencies
0-1,25 1,26-15 Kullback 2Î test:
4.03 3.29 2.54 1.1 6.93 1 Selected projects 1 5 6 S1=
4.03 3.51 0.68 0.98 5.17 1 Nonselected p. 11 6 17 S2=
4.03 2.11 1.55 0.42 4.08 1 1 Column total 12 11 23 2Î=S1-S2=
4.03 0.34 0 2.74 3.08 1
4.03 1.94 0.61 0.06 2.61 1 1 Fisher's exact test probability p =
4.03 1.03 0.32 1.35 1 0.06 H0 is not rejected.
4.03 1.05 0.27 1.32 1 1 Additional Fisher's exact test p =
4.03 0.45 0 0.82 1.27 1 3 3
4.03 0.45 0 0.82 1.27 1 14 3
4.03 1.13 0.13 1.26 1 1 p=0,16 H0 is not rejected.
4.03 0.36 0.39 0.44 1.19 1
4.03 1.06 0.1 1.16 1
4.03 0.81 0.18 0.09 1.08 1 1
4.03 0.81 0.18 0.09 1.08 1
4.03 0.42 0.6 1.02 1
4.03 0.4 0.48 0.12 1 1 Biotechnical sciences 2005
4.03 0.37 0.34 0.22 0.93 1 Subfield
4.03 0.34 0 0.56 0.9 1 total sum
4.03 0.69 0.1 0.79 1 4.01
4.03 0.15 0.19 0.07 0.41 1 4.02
4.03 0 0 0.37 0.37 1 4.03
4.03 0 0 0 1 4.04
4.04 1.35 0.96 1.25 3.56 1 1 4.05
4.06 3.64 5 1.78 10.42 1 1 4.06
4.06 0.84 0.21 2.9 3.95 1 1 sum of projects,where H0 is reje
4.06 2.05 0.34 1.3 3.69 1 sum of projects,where H0 is not
4.06 0.19 0 0.19 1 1
Social sciences 2005
5.01.01 3.2 0 5 8.2 1 1
5.01 1.51 1.3 0.41 3.22 1 1
5.01 0.48 0 0.12 0.6 1
5.02 5 0.29 5 10.29 1 Observed frequencies
0-2,00 2,01-15 Kullback 2Î test:
5.02 1.32 0.02 1.8 3.14 1 Selected projects 1 2 3 S1=
5.02 1.32 0.02 1.8 3.14 1 1 Nonselected p. 3 4 7 S2=
5.02 2.21 0.03 2.24 1 Column total 4 6 10 2Î=S1-S2=
5.02.01 2.21 0.03 2.24 1 1
5.02.01 2.21 0.03 2.24 1 Fisher's exact test probability p =
5.02.02 1.54 0.01 1.55 1 0.67 H0 is not rejected.
5.02.01 1.08 0 1.08 1 1
5.02 0.7 0.04 0.13 0.87 1
5.02.02 0.64 0 0.64 1
5.03 1.82 0.53 5 7.35 1 1 Fisher's exact test probability p =
5.03 1.96 0.06 2.91 4.93 1 1 1 2
5.03 1.65 0 1.69 3.34 1 3 0
5.03 1.15 0 1.21 2.36 1 1 p=0,20 H0 is not rejected.
5.03 2.19 0 2.19 1
5.03 1.9 0 0.08 1.98 1
5.04.01 1.46 0.01 3.42 4.89 1
5.04.01 1.46 0.01 3.42 4.89 1
5.04 1.22 0.03 2.71 3.96 1 Social sciences 2005
5.04 2.5 0.51 3.01 1 Subfield
5.04.01 1.22 0 0.37 1.59 1 total sum
5.04 1.1 0 0.37 1.47 1 5.01
5.04.03 0.38 0 0.14 0.52 1 5.02
5.05 3.22 0.01 3.23 1 5.03
5.05 0.73 0 0.73 1 5.04
5.05 0.73 0 0.73 1 5.05
5.06.03 0.56 0 0.56 1 5.06
5.07 1.56 0.18 0.6 2.34 1 5.07
5.08 0 0 0 1 5.08
5.10 1.13 0 2.87 4 1 5.09
5.10 0.79 0.94 0.54 2.27 1 1 5.10
5.10.01 0.58 0.51 1.09 1 5.11
5.10.02 0.53 0 0.53 1 5.12
5.11.01 2.5 0 0.84 3.34 1 1 5.13
5.11 1.98 0 0.2 2.18 1 sum of projects,where H0 is reje
5.11 1.4 0 0.15 1.55 1 sum of projects,where H0 is not
5.11 1.5 0 1.5 1
5.12.01 2 0 0.06 2.06 1
5.12 0.89 0.12 0.01 1.02 1
5.13 0.75 0 0.75 1
Humanities 2005
6.01 5 0 5 1 1 Observed frequencies
0-2,00 2,01-15 Kullback 2Î test:
6.01 5 0 5 1 Selected projects 0 1 1 S1=
6.01 5 0 5 1 Nonselected p. 3 3 6 S2=
6.01 2.81 0 0.26 3.07 1 Column total 3 4 7 2Î=S1-S2=
6.01 1.8 0 1.8 1
6.01 1.8 0 1.8 1 Fisher's exact test probability p =
6.01 0.81 0 0.09 0.9 1 0.57 H0 is not rejected.
6.02 0.65 0.01 0.05 0.71 1
6.03.02 2 0 0.58 2.58 1
6.03 1.97 0.02 1.99 1
6.03.02 1.36 0 0.09 1.45 1
6.03 0.86 0 0.86 1 1
6.03 0.52 0.02 0.54 1
6.04 5 0 5 1 1 Humanities 2005
6.04 3.82 0 0.65 4.47 1 1 Subfield
6.04 3.65 0 3.65 1 total sum
6.04 1.31 0 0.06 1.37 1 1 6.01
6.05 3.38 0 1.11 4.49 1 1 6.02
6.05 3.26 0 3.26 1 6.03
6.05 2.47 0 0.5 2.97 1 1 6.04
6.05 1.41 0 1.41 1 6.05
6.06 2.43 0 2.43 1 6.06
6.06 2.01 0 2.01 1 6.07
6.06 1.25 0 0.06 1.31 1 6.08
6.07 0.56 0.03 0.59 1 6.09
6.08 3.28 0 0.01 3.29 1 6.10
6.09 3.17 0 0.16 3.33 1 1 6.11
6.09 2.77 0 0.28 3.05 1 6.12
6.10 4.5 0 0.25 4.75 1 1 sum of projects,where H0 is reje
6.10 0.26 0.01 0.27 1 sum of projects,where H0 is not
6.11 3.76 0 3.76 1
6.11 1.19 0 1.19 1
6.12 1.8 0.04 0.03 1.87 1 1
6.12 1 0 0.75 1.75 1 1
Interdisciplinary studies
7.02 5 0.91 1.09 7 1 Observed frequencies
0-3,00 3,01-15 Kullback 2Î test:
7.02 1.88 0.03 3.44 5.35 1 Selected projects 4 3 7 S1=
7.02 2.1 0.21 2.78 5.09 1 1 Nonselected p. 1 2 3 S2=
7.02 2.08 0.8 0.77 3.65 1 1 Column total 5 5 10 2Î=S1-S2=
7.02 2.52 0.82 0.21 3.55 1 1
7.02 1.12 1.2 2.32 1 1 Fisher's exact test probability p =
7.02 1.01 0.46 0.25 1.72 1 1 0.92 H0 is not rejected.
7.02 0.94 0 0.94 1
7.02 0.51 0.15 0.66 1 1
7.02 0.39 0.18 0.57 1 1

Natural sciences and mathema


Results of Fisher's exact test Subfield
Projects 2007
No. of subfields
No. Projects % total sum
Natural sciences and mathematics 2005 1.01
sum of projects,where H0 is0rejected0 1.02
sum of projects,where H0 is
46not rejected
100 1.03
total sum on field 9 46 100 1.04
Engineering sciences and technologies 1.05
sum of projects,where H0 is
27rejected
24 1.06
sum of projects,where H0 is
87not rejected
76 1.07
total sum on field 20 114 100 1.08
Medical sciences 2005 1.09
sum of projects,where H0 is0rejected0 sum of projects,where H0 is reje
sum of projects,where H0 is
64not rejected
100 sum of projects,where H0 is not
total sum on field 9 64 100 Engineering sciences and tech
Biotechnical sciences 2005 Subfield
sum of projects,where H0 is0rejected0 total sum
sum of projects,where H0 is
41not rejected
100 2.01
total sum on field 6 41 100 2.02
Social sciences 2005 2.03
sum of projects,where H0 is0rejected0 2.04
sum of projects,where H0 is
43not rejected
100 2.05
total sum on field 13 43 100 2.06
Humanities 2005 2.07
sum of projects,where H0 is0rejected0 2.08
sum of projects,where H0 is
34not rejected
100 2.09
total sum on field 12 34 100 2.10
Interdisciplinary studies 2005 2.11
sum of projects,where H0 is0rejected0 2.12
sum of projects,where H0 is
10not rejected
100 2.13
total sum on field 1 10 100 2.14
ALL FIELDS 2.15
sum of projects,where H0 is
27rejected8 2.16
sum of projects,where H0325
is not rejected
92 2.17
total sum on field 70 352 100 2.18
2.19
total sum of projects
53 on 53
160
(76%) subfields,
45 where
2.20significant rejection is not exp
sum of projects,where H0 is reje
sum of projects,where H0 is not
Medical sciences
Subfield
total sum
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
sum of projects,where H0 is reje
sum of projects,where H0 is not
Biotechnical sciences 2005
Subfield
total sum
4.01
4.02
4.03
4.04
4.05
4.06
sum of projects,where H0 is reje
sum of projects,where H0 is not
Social sciences 2005
Subfield
total sum
5.01
5.02
5.03
5.04
5.05
5.06
5.07
5.08
5.09
5.10
5.11
5.12
5.13
sum of projects,where H0 is reje
sum of projects,where H0 is not
Humanities 2005
Subfield
total sum
6.01
6.02
6.03
6.04
6.05
6.06
6.07
6.08
6.09
6.10
6.11
6.12
sum of projects,where H0 is reje
sum of projects,where H0 is not
Interdisciplinary studies
Subfield
total sum
7.02
sum of projects,where H0 is reje
sum of projects,where H0 is not
ions in Slovenia in 2005 on bibliometric and scientometrics scores
evanja prijav za mentorje mladim raziskovalcem za leto 2008 in za (so)financiranje raziskovalnih projektov v letu 2008, http://www.arrs.gov.si/sl/progpro
earch team leaders and decisions for project selection.

ud.com/fisher.htm .

of no positive association can be significantly rejected at α=0,05. In 15 (21%) subfields with 165 project applications (47%) null hypothesis can not be re

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


78.21
75.93
2.28 <Cr. χ2 H0 is not rejected.
Additional Fisher's exact test p = 2 3
H0 is not rejected. 6 0
Category limit is marked by line in column F.

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


65.46
65.18
0.28 <Cr. χ2 H0 is not rejected.

Additional Fisher's exact test p = 3 3


H0 is not rejected. 3 1

Natural sciences and mathematics 2005


H0: there is no positive association
No. of projekts
46 Fisher's Kullback
exact test2Î test
H
1 0 is not rejected.
11 H0 is not Hrejected.
0
is not rejected.
10 H0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
3 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
8 H0 is not Hrejected.
0
is not rejected.
3 H0 is not rejected.
0
46

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


45.41
44.87
0.54 <Cr. χ2 H0 is not rejected.

Additional Fisher's exact test p = 3 2


H0 is not rejected. 3 0

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


87.87
87.7
0.17 <Cr. χ2 H0 is not rejected.

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


204.79
199.15
5.64 >Cr. χ2 H0 is rejected.
Alternative:
Kullback 2Î test: Observed 0-2,50
frequencies
2,51-15
39.38 Selected projects
1 4 5
36.55 Nonselected p.2 0 2
2.83 Correction for one null frequency in c.t.: 2Î= 3 4 7
1.83 <Cr. χ2 H0 is not rejected. Fisher's exact test probability p =
p=0,14 H0 is not rejected.

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


102.05
102.01
0.04 <Cr. χ2 H0 is not rejected.

Engineering sciences and technologies 2005


H0: there is no positive association
No. of projekts
114 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
H
5 0 is not H
rejected.
0
is not rejected.
5 H0 is not Hrejected.
0
is not rejected.
12 H0 is not Hrejected.
0
is not rejected.
21 H0 is rejected.
H0 is rejected.
2 H0 is not rejected.
6 H0 is rejected.
9 H0 is not rejected.
5 H0 is not rejected.
7 H0 is not Hrejected.
0
is not rejected.
13 H0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
5 H0 is not rejected.
4 H0 is not rejected.
2 H0 is not rejected.
3 H0 is not rejected.
3 H0 is not rejected.
0 H0 is not rejected.
0 H0 is not rejected.
3 H0 is not rejected.
3 H0 is not rejected.
27
87

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


50.95
49.42
1.53 Correction for one null frequency in c.t.: 2Î=
0.53 <Cr. χ2 H0 is not rejected.

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


115
114.12
0.88 <Cr. χ2 H0 is not rejected.

Medical sciences
H0: there is no positive association
No. of projekts
64 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
H
8 0 is not H
rejected.
0
is not rejected.
2 H0 is not rejected.
14 H0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
6 H0 is not rejected.
13 H0 is not Hrejected.
0
is not rejected.
2 H0 is not rejected.
11 H0 is not Hrejected.
0
is not rejected.
2 H0 is not rejected.
0
64
Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84
107.06
104.27
2.79 <Cr. χ2 H0 is not rejected.

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


82.71
79.92
2.79 <Cr. χ2 H0 is not rejected.

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


46.45
46.45
0 <Cr. χ2 H0 is not rejected.

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


234.58
230.22
4.36 >Cr. χ2 H0 is rejected.
Biotechnical sciences 2005
H0: there is no positive association
No. of projekts
41 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
8 H0 is not Hrejected.
0
is not rejected.
5 H0 is not rejected.
23 H0 is not Hrejected.
0
is rejected.
1 H0 is not rejected.
0 H0 is not rejected.
4 H0 is not rejected.
0
41

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


66.51
66.43
0.08 <Cr. χ2 H0 is not rejected.

Social sciences 2005


H0: there is no positive association
No. of projekts
43 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
3 H0 is not rejected.
10 H0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
7 H0 is not rejected.
3 H0 is not rejected.
1 H0 is not rejected.
1 H0 is not rejected.
1 H0 is not rejected.
0 H0 is not rejected.
4 H0 is not rejected.
4 H0 is not rejected.
2 H0 is not rejected.
1 H0 is not rejected.
0
43

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


40.43
39.18
1.24 <Cr. χ2 H0 is not rejected.

Humanities 2005
H0: there is no positive association
No. of projekts
34 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
H
7 0 is not H
rejected.
0
is not rejected.
1 H0 is not rejected.
5 H0 is not rejected.
4 H0 is not rejected.
4 H0 is not rejected.
3 H0 is not rejected.
1 H0 is not rejected.
1 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
0
34

Kullback 2Î test: Critical value χ2 (α=0,05;df=1) = 3.84


66.51
66.02
0.48 <Cr. χ2 H0 is not rejected.

Natural sciences and mathematics 2005


H0: there is no positive association
No. of projekts
46 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
1 H0 is not rejected.
11 H0 is not Hrejected.
0
is not rejected.
H
10 0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
3 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
8 H0 is not Hrejected.
0
is not rejected.
3 H0 is not rejected.
0
46
Engineering sciences and technologies 2005
H0: there is no positive association
No. of projekts
114 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
H
5 0 is not Hrejected.
0
is not rejected.
5 H0 is not Hrejected.
0
is not rejected.
12 H0 is not Hrejected.
0
is not rejected.
21 H0 is rejected.
H0 is rejected.
2 H0 is not rejected.
6 H0 is rejected.
9 H0 is not rejected.
5 H0 obdržimo
7 H0 is not Hrejected.
0
is not rejected.
13 H0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
5 H0 is not rejected.
4 H0 is not rejected.
2 H0 is not rejected.
3 H0 is not rejected.
3 H0 is not rejected.
0 H0 is not rejected.
0 H0 is not rejected.
3 H0 is not rejected.
3 H0 is not rejected.
27
87
Medical sciences
H0: there is no positive association
No. of projekts
64 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
8 H0 is not Hrejected.
0
is not rejected.
2 H0 is not rejected.
14 H0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
6 H0 is not rejected.
13 H0 is not Hrejected.
0
is not rejected.
2 H0 is not rejected.
11 H0 is not Hrejected.
0
is not rejected.
2 H0 is not rejected.
0
64
Biotechnical sciences 2005
H0: there is no positive association
No. of projekts
41 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
8 H0 is not Hrejected.
0
is not rejected.
5 H0 is not rejected.
23 H0 is not Hrejected.
0
is rejected.
1 H0 is not rejected.
0 H0 is not rejected.
4 H0 is not rejected.
0
41
Social sciences 2005
H0: there is no positive association
No. of projekts
43 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
H
3 0 is not rejected.
10 H0 is not Hrejected.
0
is not rejected.
6 H0 is not rejected.
7 H0 is not rejected.
3 H0 is not rejected.
1 H0 is not rejected.
1 H0 is not rejected.
1 H0 is not rejected.
0 H0 is not rejected.
4 H0 is not rejected.
4 H0 is not rejected.
2 H0 is not rejected.
1 H0 is not rejected.
0
43
Humanities 2005
H0: there is no positive association
No. of projekts
34 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
7 H0 is not Hrejected.
0
is not rejected.
1 H0 is not rejected.
5 H0 is not rejected.
4 H0 is not rejected.
4 H0 is not rejected.
3 H0 is not rejected.
1 H0 is not rejected.
1 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
2 H0 is not rejected.
0
34
Interdisciplinary studies
H0: there is no positive association
No. of projekts
10 Fisher's Kullback
exact test2Î(α=0,05)
test (α=0,05)
10 H0 is not Hrejected.
0
is not rejected.
0
10
08, http://www.arrs.gov.si/sl/progproj/rproj/akti/metod-tapl-mr-130707.asp .

(47%) null hypothesis can not be rejected. In 53 subfields (76%) with 160 (45%) project applications no significant statistical estimation can be made b
S1= 41.11 Critical value χ2 (α=0,05;df=1) = 3.84
S2= 36.55
2Î=S1-S2= 4.56 Correction for one null frequency in c.t.: 2Î=
3.56 <Cr. χ2 H0 is not rejected.