You are on page 1of 5

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS

SANTOS (SAMPANG ) PTY LTD

MULTI CABLE TRANSIT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (Sampang) Pty. Ltd. : : : E/I Building System / Sub No. System Desc. Sub System Desc. : 9820-U-009 : Control Room Building System : 9820-U-009-1 Tag No. E03MC

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check frame material have correct specifiction and size Check frame design accordance with design drawing Check frame have correct dimension accordance to design drawing Check that frame have completed fabrication work Check that MCT frame location refer to layout Check that support have completed finishing work Check MCT specification refer to MTO and company specification Check that MCT installed at correct location refer to layout Check that MCT installation arrangement refer to installation detail Check that MCT accessories are installed correctly

Notes :

Description Company

Performed by

Witnessed / Approved by

Witnessed / Approved by

Signature

Print Name Date

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

MULTI CABLE TRANSIT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (Sampang) Pty. Ltd. : 9820-64-352-2 : : E/I Building System / Sub No. System Desc. Sub System Desc. : 9820-U-009 : Control Room Building System : 9820-U-009-1 Tag No.
9820-MCT-E01 INDOKOMAS

E03MC

No.

Inspection Check List

SANTOS

PAL

1 2 3 4 5 6 7 8 9 10

Check frame material have correct specifiction and size Check frame design accordance with design drawing Check frame have correct dimension accordance to design drawing Check that frame have completed fabrication work Check that MCT frame location refer to layout Check that support have completed finishing work Check MCT specification refer to MTO and company specification Check that MCT installed at correct location refer to layout Check that MCT installation arrangement refer to installation detail Check that MCT accessories are installed correctly

Notes :

Description Company

Performed by

Witnessed / Approved by

Witnessed / Approved by

Signature

Print Name Date

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

MULTI CABLE TRANSIT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (Sampang) Pty. Ltd. : 9820-64-352-2 : : E/I Building System / Sub No. System Desc. Sub System Desc. : 9820-U-009 : Control Room Building System : 9820-U-009-1 Tag No.
9820-MCT-E02

E03MC

No.

Inspection Check List

SANTOS

1 2 3 4 5 6 7 8 9 10

Check frame material have correct specifiction and size Check frame design accordance with design drawing Check frame have correct dimension accordance to design drawing Check that frame have completed fabrication work Check that MCT frame location refer to layout Check that support have completed finishing work Check MCT specification refer to MTO and company specification Check that MCT installed at correct location refer to layout Check that MCT installation arrangement refer to installation detail Check that MCT accessories are installed correctly

Notes :

Description Company

Performed by

Witnessed / Approved by

Witnessed / Approved by

Signature

Print Name Date

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

MULTI CABLE TRANSIT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (Sampang) Pty. Ltd. : : : System / Sub No. System Desc. Sub System Desc. : : : Tag No.
9820-MCT-E03 INDOKOMAS

E03MC

No.

Inspection Check List

SANTOS

PAL

1 2 3 4 5 6 7 8 9 10

Check frame material have correct specifiction and size Check frame design accordance with design drawing Check frame have correct dimension accordance to design drawing Check that frame have completed fabrication work Check that MCT frame location refer to layout Check that support have completed finishing work Check MCT specification refer to MTO and company specification Check that MCT installed at correct location refer to layout Check that MCT installation arrangement refer to installation detail Check that MCT accessories are installed correctly

Notes :

Description Company

Performed by

Witnessed / Approved by

Witnessed / Approved by

Signature

Print Name Date

ELECTRICAL MECHANICAL COMPLETION CHECK SHEETS


SANTOS (SAMPANG ) PTY LTD

MULTI CABLE TRANSIT

Project Name Customer Drawing Reff. / Rev Single Line No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (Sampang) Pty. Ltd. : : : E/I Building System / Sub No. System Desc. Sub System Desc. : 9820-U-009 : Control Room Building System : 9820-U-009-1 Tag No.
9820-MCT-E06 9820-MCT-101 9820-MCT-102 9820-MCT-103

E03MC

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check frame material have correct specification and size Check frame design accordance with design drawing Check frame have correct dimension accordance to design drawing Check that frame have completed fabrication work Check that MCT frame location refer to layout Check that support have completed finishing work Check MCT specification refer to MTO and company specification Check that MCT installed at correct location refer to layout Check that MCT installation arrangement refer to installation detail Check that MCT accessories are installed correctly

Notes :

Description Company

Performed by

Witnessed / Approved by

Witnessed / Approved by

Signature

Print Name Date