UNIVERSIDAD AUTNOMA DE BAJA CALIFORNIA

FACULTAD DE INGENIERA, ARQUITECTURA Y DIS


ABASTECIMIENTO DE AGUA POTABLE .
M. EN I.C. PABLO ROSSEAU FIGUEROA
P. EN I.C. CRISTINA E. LINDSTROM ALUCANO

NOMA DE BAJA CALIFORNIA

GENIERA, ARQUITECTURA Y DISEO.


IMIENTO DE AGUA POTABLE .
C. PABLO ROSSEAU FIGUEROA
NDSTROM ALUCANO

CLCULO DE LA
GASTO (LTS)

100

POBLACION DE PROYECTO (HAB)

23000

POBLACION FUTURA (HAB)

28755.33753

TASA DE INCREMENTO

1.5

PERIODO DE PROYECTO DE ACUERDO CON


LA POBLACION
POBLACION (HAB)

PERIODO DE PROYECTO

4,000
4,000 - 15,000
15,000 - 70,000
MAYOR A 70,000

5
10
15
20

AOS
AOS
AOS
AOS

DATOS BASICOS DE PROYECTO


EL BARRIL
CONCEPTO

RURAL

CVD

1.2

CVH

1.5

DENSIDAD (HAB/VIV)

DOTACION (LTS/HAB/DIA)

250
GASTOS DE DISEO
GASTO MEDIO DIARIO
Qm =
Qm =

GASTO MAXIMO DIARIO


Qmd = Qm x CVD
Qmd =
100
LTS/SEG

DxP
86400
83

LTS/SEG

GASTO MAXIMO HORARIO


Qmh =
Qmh =

Qm x CVH x CVD
150
LTS/SEG

CLCULO DE LA POBLACION

CONSTRUCCIN DEL PRIMER TRAMO DE LN


TRAMO 1

DATOS
Qmax
Bombeo continuo
Costo po KWH
Velocidad Econmica
Longitud del Tramo
Elevacion de descarga
Elevacion de succin
Carga Esttica
Presin

0.100
24
20
1.2
6750
125
15
110
11

m/s
hrs
MXN
m/s
m
m
m
m
kg/m

Diametro Terico
325.48

POTENCIA REQUERIDA EN
Dimetro nominal interior

rea en m2

Gasto en
m3/seg

Velocidad
m/seg

Long. Lineal
en m

Constante
Hazen-Williams

mm

pulg

(A)

(Q)

(V)

(L)

(C)

323.85

12.75

0.082

0.10

1.21

6750

130

355.60

14.00

0.099

0.10

1.01

6750

130

406.40

16.00

0.130

0.10

0.77

6750

130

GOLPE DE
Presin de
trabajo en
tubera

Dimetro
nominal (d)

Espesor
pared del
tubo

V en

Kg / cm2

cm

(e) cm

m/seg

11.00

32.39

0.79

11.00

35.56

11.00

40.64

145.26 (V)

Es (d)

Et (e)

1.21

176.07

669,397.95

1,658,743.90

0.87

1.01

146.04

735,025.20

1,821,365.85

0.99

0.77

111.81

840,028.80

2,081,560.98

Es = Mdulo de elasticidad el agua (20670 Kg/cm )

Et = Mdulo de elasticidad de las paredes del tubo (Pa


0

COSTO DE INSTALACIN DE TUBERA


Concepto
Excavacin en material tipo A
Excavacin en material tipo B
Excavacin en material tipo C
Plantilla apisonada
Relleno compactado
Relleno a volteo
Atraques de concreto f'c=180 kg/cm2
Suministro, instalacion de junta y prueba de
tubera
Bomba Model 6SAE13MS 6" x 8" ( + 1 )

Dimetro 355mm ( 14" )


Cantidad

Unidad

P. U.

Importe

Suministro total de la conduccin (5)

MER TRAMO DE LNEA DE CONDUCCIN POR BOMBEO


TRAMO 1

metro Terico
mm

POTENCIA REQUERIDA EN EL EQUIPO DE BOMBEO


F

10.679
D

4.87

F
C1.852

Prdidas de friccin

% Otras
prdidas

Carga Esttica

hft = hf + %hf +
C.E.

Q(hft)

C.E. (m)

(m)

(Q en lps)

hf KL Q1.852

2,589.14

0.314871025

29.80

110.00

140.10

13,987.880

1,641.90

0.199675033

18.90

110.00

129.09

12,888.519

856.89

0.104208461

9.86

110.00

119.96

11,977.444

Sobrepresin
absorbida por
vlvula

Sobrepresin
absorbida por
tubera

GOLPE DE ARIETE
Sobrepresin m

Es(d)
Et(e)
0.404

Es(d)
1
Es(e)
1.404

145.26 V
H
Es(d)
1
Et(e)

Es(d)
1
Es(e)

80%H

20%H

1.185

148.620

118.896

29.724

98.613

24.653

75.500

18.875

0.404

1.404

1.185

123.266

0.404

1.404

1.185

94.375

sticidad de las paredes del tubo (Para Fofo 2'100,000 Kg/cm )


0

NSTALACIN DE TUBERA (MANO DE OBRA Y ADQUISICIN)


Dimetro 406.0 mm ( 16" )
Cantidad

Unidad

P. U.

Dimetro 457.0mm ( 18" )


Importe

Cantidad

Unidad

P. U.

hp

76n

Q(hft )
76n

n = 75 %
57.760

242.172

57.760

223.139

57.760

207.366

Carga
normal de
operacin

Presin total
carga normal
de operacin

20 % H

142.778

172.502

130.786

155.439

120.848

139.723

457.0mm ( 18" )
Importe

CONSTRUCCIN DEL PRIMER TRAMO


TRAMO 2

DATOS
Qmax
Bombeo continuo
Costo po KWH
Velocidad Econmica
Longitud del Tramo
Elevacion de descarga
Elevacion de succin
Carga Esttica
Presin

0.100
24
20
1.2
7300
155
125
30
3

m/s
hrs
MXN
m/s
m
m
m
m
kg/m

Diametro Terico
325.48

POTENCIA REQ
Dimetro nominal interior

rea en m2

Gasto en
m3/seg

Velocidad
m/seg

Long. Lineal
en m

mm

pulg

(A)

(Q)

(V)

(L)

323.85

12.75

0.082

0.10

1.21

7300

355.60

14.00

0.099

0.10

1.01

7300

406.40

16.00

0.130

0.10

0.77

7300

Presin de
trabajo en
tubera

Dimetro
nominal (d)

Espesor pared
del tubo

V en

145.26 (V)

Es (d)

Kg / cm2

cm

(e) cm

m/seg

3.00

32.39

0.79

1.21

176.07

669,397.95

3.00

35.56

0.87

1.01

146.04

735,025.20

3.00

40.64

0.99

0.77

111.81

840,028.80

Es = Mdulo de elasticidad el agua (20670 Kg/cm )

Et = Mdulo de elasticidad de las paredes d

DEL PRIMER TRAMO DE LNEA DE CONDUCCIN POR BOMBEO


TRAMO 2

Diametro Terico
325.48
mm
POTENCIA REQUERIDA EN EL EQUIPO DE BOMBEO
Constante HazenWilliams

10.679
D

4.87

F
1.852

Prdidas de friccin

% Otras prdidas

Carga Esttica

hf KL Q1.852

(C)

C.E. (m)

130

2,589.14

0.314871025

32.23

30.00

130

1,641.90

0.199675033

20.44

30.00

130

856.89

0.104208461

10.67

30.00

GOLPE DE ARIETE
Sobrepresin m
Et (e)

Es(d)
Et(e)

Es(d)
1
Es(e)

Es(d)
1
Es(e)

145.26 V
Es( d)
1
Et( e )

1,658,743.90

0.404

1.404

1.185

148.620

1,821,365.85

0.404

1.404

1.185

123.266

2,081,560.98

0.404

1.404

1.185

94.375

= Mdulo de elasticidad de las paredes del tubo (Para Fofo 2'100,000 Kg/cm )

OMBEO

Q(hft )
76n

hft = hf + %hf +
C.E.

Q(hft)

76n

(m)

(Q en lps)

n = 75 %

62.55

6,245.133

57.760

108.122

50.64

5,056.194

57.760

87.538

40.77

4,070.884

57.760

70.479

Sobrepresin
absorbida por
vlvula

Sobrepresin
absorbida por
tubera

Carga normal
de operacin

Presin total
carga normal
de operacin

80%H

20%H

hp

20 % H

118.896

29.724

65.449

95.173

98.613

24.653

52.480

77.133

75.500

18.875

41.732

60.607

ATRAQUES
DIA.
COMERC.
COEF. DE
FRICCION

in

12.750

CARGA
ESTATICA

130.000

30

VELOCIDAD

m/seg

1.01

kg/m

22,010.165

kg

54,886.569

kg

65,863.883

LPS

100.000

PRESION EN
TUBERIA

DIA.
COMER.

in

12.750

REACCION

AREA DEL
CODO

3.243

m/seg

0.100

1.2 x
REACCION
PESO VOL.
DE
CONCRETO

7.990

VOLUMEN
DE
CONCRETO

GASTO

GASTO

PERDIDAS hf

kg/m 114,079.591

47.533

TABLA DE CALCULO DEL DIMENSIONAMIENTO DEL TANQUE DE REGULACIO


SUMINISTRO
BOMBEO
DEMANDA
TIEMPO HRS
100%
HORARIA%

DIFERENCIA DIFERENCIA
ENTRADA- ACUMULAD
SALIDA
A

0-1
1-2
2-3
3-4

100
100
100
100

45
45
45
45

55
55
55
55

55
110
165
220

4-5

100

45

55

275

5-6
6-7

100
100

60
90

40
10

315
325

7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100

135
150
150
150
140
120
140
140
130
130
120
100
100
90
90
80
60

-35
-50
-50
-50
-40
-20
-40
-40
-30
-30
-20
0
0
10
10
20
40

290
240
190
140
100
80
40
0
-30
-60
-80
-80
-80
-70
-60
-40
0

2400

2400 MAXIMO =
MINIMO =

De acuerdo a los porcentajes proporcionados por la ley


de demandas horarias en las variaciones del consumo,
espresadas como porcentajes horarios del gasto
maximo diario en algunas poblaciones.

325
-80

MIENTO DEL TANQUE DE REGULACION

VOLUMEN
AJUSTADO

380
435
490
545

VOLUMEN
c=

405

C=

14.58

V=

1213.115802

600
640
650
615
565
515
465
425
405
365
325
295
265
245
245
245
255
265
285
325
-

METODO DE LA C.N.A.
Qmd =

83.2041 LPS

Capacidad= Qmd x 86400


CAP =

2396.278128 m

Q=
CVH=
CVD=
C=

150 L/H/D
1.5
1.2
130

Tramo

1-2
2-3
2-4
4-5
4-9
5-7
5-6
9-8
7-12
9-10
10-11

Longitud
Long.
Habitantes
Propios
Crucero Real (m) Virtual (m)

2
3
4
5
9
7
6
8
12
10
11

546
357
376
225
452
505
505
703
505
703
703

546
357
752
225
452
505
505
1249
505
703
703

2275
857
2469
540
1883
2083
2083
6358
2083
4083
4083
28797

Habitantes
Tributarios

28797
857
25665
6789
16407
4166
2083
6358
2083
8166
4083

Cotas

Diametro (in)
Habitantes
Totales

31072
1714
28134
7329
18290
6249
4166
12716
4166
12249
8166

Gasto (lps) Teo.

97.10
5.36
87.92
22.90
57.16
19.53
13.02
39.74
13.02
38.28
25.52

12.61
2.96
12.00
6.13
9.68
5.66
4.62
8.07
4.62
7.92
6.47

Com.

14
4
12
8
10
6
6
10
6
8
8

Perdida de
Carga
Piezometrica Terreno

1.462
1.995
1.775
0.634
2.335
4.298
2.029
1.853
2.029
5.126
2.419

36.894
34.899
35.120
34.486
37.455
38.784
32.457
39.308
36.756
42.581
45

9
7
6
8
8
12
6
30
1
22
30

Carga
Disponible

27.894
27.899
29.120
26.486
29.455
26.784
26.457
9.308
35.756
20.581
15.000

RED CERRADA
C=

150

CIRCUITO
PROPIO COMUN

I
I

CRUCERO

LONG. M

GASTO LPS DIA. TEOR IN

DIAM.
COMER IN

1-2
1-5
2-6
5-6

500
500
500
500

7.000
-7.000
7.000
-7.000

3.39
3.39
3.39
3.39

4
4
4
4
=

II
II
II
II

2-3
6-7
3-7
2-6

1151
1151
500
500

14.000
-14.000
7.000
-7.000

4.79
4.79
3.39
3.39

6
6
4
4
=

3-4
3-7
4-8
7-8

650
500
500
650

8.000
-7.000
7.000
-8.000

3.62
3.39
3.39
3.62

4
4
4
4
=

II

III
III
III
III

II

CIRCUITO
PROPIO COMUN

I
I
II
I

CRUCERO

1-2
1-5
2-6
5-6

LONG. M

500
500
500
500

GASTO LPS DIA. TEOR IN

7.0000
-7.0000
7.0000
-7.0000

3.39
3.39
3.39
3.39

DIAM. COM
IN

4
4
4
4
=

II
II
II
II

2-3
6-7
3-7
2-6

1151
1151
500
500

14.0000
-14.0000
7.0000
-7.0000

4.79
4.79
3.39
3.39

6
6
4
4
=

III
III
III
III

II

3-4
3-7
4-8
7-8

650
500
500
650

8.0000
-7.0000
7.0000
-8.0000

3.62
3.39
3.39
3.62

4
4
4
4
=

CIRCUITO
CRUCERO

LONG. M

GASTO LPS DIA. TEOR IN

DIAM. COM
IN

PROPIO

COMUN

I
I
II
I

CRUCERO

1-2
1-5
2-6
5-6

LONG. M

500
500
500
500

GASTO LPS DIA. TEOR IN

7.000
-7.000
7.000
-7.000

3.39
3.39
3.39
3.39

DIAM. COM
IN

4
4
4
4
=

II
II
II
II

2-3
6-7
3-7
2-6

1151
1151
500
500

14.000
-14.000
7.000
-7.000

4.79
4.79
3.39
3.39

6
6
4
4
=

III
III
III
III

II

3-4
3-7
4-8
7-8

650
500
500
650

8.000
-7.000
7.000
-8

3.62
3.39
3.39
3.62

4
4
4
4
=

CIRCUITO
PROPIO COMUN

I
I
II
I

CRUCERO

1-2
1-5
2-6
5-6

LONG. M

500
500
500
500

DIAM. COM
IN
GASTO LPS DIA. TEOR IN

7.000
-7.000
7.000
-7.000

3.39
3.39
3.39
3.39

4
4
4
4
=

II
II
II
II

2-3
6-7
3-7
2-6

1151
1151
500
500

14.000
-14.000
7.000
-7.000

4.79
4.79
3.39
3.39

6
6
4
4
=

III
III
III
III

II

3-4
3-7
4-8
7-8

650
500
500
650

8.000
-7.000
7.000
-8.000

3.62
3.39
3.39
3.62

4
4
4
4
=

CIRCUITO
PROPIO COMUN

I
I
II
I

CRUCERO

1-2
1-5
2-6
5-6

LONG. M

500
500
500
500

GASTO LPS DIA. TEOR IN

7.000
-7.000
7.000
-7.000

3.39
3.39
3.39
3.39

DIAM. COM
IN

4
4
4
4

=
II
II
II
II

2-3
6-7
3-7
2-6

1151
1151
500
500

14.000
-14.000
7.000
-7.000

4.79
4.79
3.39
3.39

6
6
4
4
=

III
III
III
III

3-4
3-7
4-8
7-8

II

650
500
500
650

8.000
-7.000
7.000
-8.000

3.62
3.39
3.39
3.62

4
4
4
4
=

CIRCUITO
PROPIO COMUN

CRUCERO

LONG. M

1-2
1-5
2-6
5-6

500
500
500
500

I
I
II
I

GASTO LPS DIA. TEOR IN

7.000
-7.000
7.000
-7.000

3.39
3.39
3.39
3.39

DIAM. COM
IN

4
4
4
4
=

II
II
II
II

2-3
6-7
3-7
2-6

1151
1151
500
500

14.000
-14.000
7.000
-7.000

4.79
4.79
3.39
3.39

6
6
4
4
=

III
III
III
III

3-4
3-7
4-8
7-8

II

650
500
500
650

8.000
-7.000
7.000
-8.000

3.62
3.39
3.39
3.62

4
4
4
4
=
11

ELEVANDO EL TANQUE
CIRCUITO
PROPIO COMUN

I
I

CRUCERO

LONG. M

H COMP

CARGA
DISPON

COTA
TERRENO

1-2
1-5
2-6
5-6

500
500
500
500

3.519
-3.519
3.519
-3.519

20.00
37.85
22.88
30.36

25
21
16
17

II
II
II
II

2-3
6-7
3-7
2-6

1151
1151
500
500

4.058
-4.058
3.519
-3.519

15.94
23.42

20
30

II

III
III
III
III

II

3-4
3-7
4-8
7-8

650
500
500
650

5.858
-3.519
3.519
-5.858

20.00

41

16.48
14.14

33

H/Q

CORRECCION 1

3.518897
-3.518897
3.518897
-3.518897
0

0.503
0.503
0.503
0.503
2.011

0.0000
0.0000
0.0000
0.0000

4.05830963
-4.05830963
3.518897
-3.518897
0

0.290
0.290
0.503
0.503
1.585

0.0000
0.0000
0.0000
0.0000

5.85790605
-3.518897
3.518897
-5.85790605
0

0.732
0.503
0.503
0.732
2.470

0.0000
0.0000
0.0000
0.0000

H/Q

0.503
0.503
0.503
0.503
2.011

0
0
0
0

4.05830963
-4.05830963
3.518897
-3.518897
0

0.290
0.290
0.503
0.503
1.585

0
0
0
0

5.85790605
-3.518897
3.518897
-5.85790605
0

0.732
0.503
0.503
0.732
2.470

0
0
0
0

H/Q

0.0000

0.0000

CORRECCION 2

3.518897
-3.518897
3.518897
-3.518897
0

Q LPS

CORRECCION 3

7.00
-7.00
7.0000
-7.0000

14.0000
-14.0000
7.0000
-7.0000

8.0000
-7.0000
7.0000
-8.0000

Q LPS

7
-7
7
-7

14
-14
7
-7

8.0000
-7
7
-8

Q LPS

H/Q

CORRECCION 3

3.518897
-3.518897
3.518897
-3.518897
0

0.503
0.503
0.503
0.503
2.011

0
0
0
0

4.05830963
-4.05830963
3.518897
-3.518897
0

0.290
0.290
0.503
0.503
1.585

0
0
0
0

5.85790605
-3.518897
3.518897
-5.85790605
0

0.732
0.503
0.503
0.732
2.470

0
0
0
0

H/Q

0.503
0.503
0.503
0.503
2.011

0
0
0
0

4.05830963
-4.05830963
3.518897
-3.518897
0

0.290
0.290
0.503
0.503
1.585

0
0
0
0

5.85790605
-3.518897
3.518897
-5.85790605
0

0.732
0.503
0.503
0.732
2.470

0
0
0
0

3.518897
-3.518897
3.518897
-3.518897

H/Q

0.503
0.503
0.503
0.503

14
-14
7
-7

8
-7
7
-8

Q LPS

7
-7
7
-7

14
-14
7
-7

8
-7
7
-8

CORRECCION 5

0
0
0
0

7
-7
7
-7

CORRECCION 4

3.518897
-3.518897
3.518897
-3.518897
0

Q LPS

Q LPS

7
-7
7
-7

2.011

4.05830963
-4.05830963
3.518897
-3.518897
0

0.290
0.290
0.503
0.503
1.585

0
0
0
0

5.85790605
-3.518897
3.518897
-5.85790605
0

0.732
0.503
0.503
0.732
2.470

0
0
0
0

H/Q

0.503
0.503
0.503
0.503
2.011

0
0
0
0

4.05830963
-4.05830963
3.518897
-3.518897
0

0.290
0.290
0.503
0.503
1.585

0
0
0
0

5.85790605
-3.518897
3.518897
-5.85790605
0
mts.

0.732
0.503
0.503
0.732
2.470

0
0
0
0

8
-7
7
-8

CORRECCION 6

3.518897
-3.518897
3.518897
-3.518897
0

14
-14
7
-7

Q LPS

7
-7
7
-7

14
-14
7
-7

8
-7
7
-8

Profundidad (m)
Cota del Fondo (m)
Cota Superior en la envoltura de la grava (m)
Desnivel entre el ro y la envoltura (m)
Gradiente hidrulco (m)
Gasto por metro lineal de galera (m)
Longitud (m)

10
106.1
107
9.6
0.192
2.592
38.6

n Grava=
Pendiente=
Q(cft)=

0.02
0.0357
3.53

ITERACION 1
AR^2/3=
0.251
Suponiendo b (ft)=
6.000
Suponiendo m=
2.000
y (ft)=
0.097
area (ft)=
perimetro (ft)=
radio hidraulico=
velocidad=
B.L. (ft)=

0.601
8.687
0.069
5.875
0.0291

0.1
ITERACION 2
AR^2/3=
Suponiendo b (ft)=
Suponiendo m=
y (ft)=
area (ft)=
perimetro (ft)=
radio hidraulico=
velocidad=
B.L. (ft)=

ERACION 2
0.250775
3
2
0.146

ITERACION 3
AR^2/3=
Suponiendo b (ft)=
Suponiendo m=
y (ft)=

0.250775
2.5
2
0.16

AR^2/3=
Suponiendo b (ft)=
Suponiendo m=
y (ft)=

0.480632
5.1494516
0.0933365
7.3444964
0.0438

area (ft)=
perimetro (ft)=
radio hidraulico=
velocidad=
B.L. (ft)=

0.4512
4.5178277
0.099871
7.8235816
0.048

area (ft)=
perimetro (ft)=
radio hidraulico=
velocidad=
B.L. (ft)=

ITERACION 3
AR^2/3=
Suponiendo b (ft)=
Suponiendo m=
y (ft)=

0.250775
0.98
2
0.26

area (ft)=
perimetro (ft)=
radio hidraulico=
velocidad=
B.L. (ft)=

0.39
2.724133
0.1431648
0
0.078

CURVA DEL SISTEMA


TRAMO I
Hs=24.5+6750 Q^1.852

7 en serie

172/3
24.5

Q (lps)=
Dif Alt (m)=

100
24.5
3600

Q (m/s)
0
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1

H (m)
24.50
25.83
29.32
34.71
41.89
50.79
61.35
73.53
87.28
102.58
119.41

172 m