APAC Procurement Business Module

Time-Phased Planning Procedure Training Document Local Group Companies

Submit Date, 15-Jun-04 <Confidential>

<Other Clause> Copyright @ 2003 Holcim Services (Asia) Ltd.

APBM

Document Control
Document Name Author File Name & Path Created Last Edited Printed on Version V 1.0 Time-Phased Planning Procedure Training Document Ha Tran 15-Jun-04

Revision Date 15-Jun-04

Revision Description

Author Ha Tran

Sign-off

Document Approval
Role Name Signature Date

Distribution List
Role Name Signature Date

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

2/21

APBM

Table of Contents
TIME-PHASED PLANNING ................................................................................................................. 4 BUSINESS PROCESS PROCEDURE................................................................................................. 6 1. CREATION OF PLANNING CALENDAR (PLANNING CYCLE) ................................................................... 6 2. ASSIGNMENT OF PLANNING CALENDAR TO THE MATERIAL IN MASTER RECORDS VIA TRANSACTION MM02 .............................................................................................................................................. 11 3. RUN MATERIAL REQUIREMENTS PLANNING TO GENERATE THE PROCUREMENT PROPOSAL ................ 16 CHECK STOCK/REQUIREMENTS LIST FOR THE RELATED MATERIAL ....................................................... 16 4. RUNNING OF MATERIAL REQUIREMENTS PLANNING (MRP) ............................................................. 19

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

3/21

APBM

Time-Phased Planning
Time-phased planning is a MRP procedure where the materials are planned in a particular time interval. If, for example, a vendor always delivers a material on a certain weekday, then it makes sense to plan this material according to the same cycle, adjusted to the delivery date. To plan a material with time-phased planning, it is a must that the MRP Type shall be entered in the material master record for time-phased planning and the planning cycle. The latter is defined in the form of a planning calendar in the Planning Cycle field. For time-phased planning materials, the planning file entries NETCH and NETPL in the planning file are not important, so are not set for MRP changes. Materials that are planned according to a timephase are provided with an MRP date in the planning file. This date is reset on the creation of a new material master data, and then after every planning run. This date corresponds to the day that the material will next be planned; it is calculated on the basis of the planning cycle specified in the material master. The material will only be planned on the days that have been specified by the planning cycle. Noted that to have control of this procedure and plan a material before the intended MRP date, it is possible to specify a MRP date in the planning run. For example, if the MRP run is planned for Monday, it is probable to execute the run for Monday on Saturday. The lot-sizing procedure for a time-phased planning material is the exact lot size, so optimizing lotsizing procedures can also be applicable for time-phased planning.

When the planning run is triggered, the system uses the MRP date in the planning file to check whether the materials are to be planned. The MRP date is calculated from the planning cycle. The system calculates the requirement. It also determines a time interval according to the following algorithm: MRP date + planning cycle + purchasing processing time + planned delivery time + goods receipt processing time.

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

4/21

APBM

The system compares the forecast requirement in this time interval with the stock and both the fixed and firm receipts in this time interval. It then calculates the quantity to be ordered. During calculation, the system assumes that the fixed receipts lie at certain intervals. It does not matter whether the fixed receipts are available at the start or at the end of the interval. This means that there may be a temporary shortage. Noted that Time-phased planning can be combined with a reorder point. The material is not only planned on the MRP date in the planning file, but also when the reorder point is fallen short of due to a good issue. If the reorder point has shortage, the material is flagged for planning, as is the planning cycle. During requirements calculation, the system creates a time interval that spans from the time of the reorder point shortage to the availability date of the next regular MRP date. For this time interval, the ordered quantity must suffice. On the next MRP date, the material is again planned at regular intervals.

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

5/21

APBM

Business Process Procedure


1. Creation of Planning Calendar (Planning Cycle)
1.1. Access transaction by Via Menu Via Transaction Code Logistics Materials Management Material Requirements Planning (MRP) MRP Master Data Planning Calendar Create Periods MD25

Key T-Code: MD25

Fig-01

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

6/21

APBM

1.2. On Create Planning Calendar screen, fill in the data as below:

Fig-02 Field Name Plant Planning calendar Description Key uniquely identifying a plant Three character number that specifically identifies a PPS-planning calendar R/O/C/D R R User Action and Values Enter the plant number Enter the planning calendar (S38, for instance) Press ENTER Legend: R = Required, O = Optional, C = Conditional, D = Display

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

7/21

APBM

1.3. On Create Planning Calendar screen, fill in the data as below:

Fig-03 Field Name Planning calendar: short description Minimum period Description A short description of the planning calendar A period that you require to reprocess the planning calendar The indicator instructs the system to select the next working day instead R/O/C/D R R R User Action and Values Enter the short description Enter the minimum period Select the indicator

Click on Legend: R = Required, O = Optional, C = Conditional, D = Display

icon

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

8/21

APBM

1.4. On the pop up screen, select Months (week days) alternative option and click on icon:

Fig-04 1.5. Supposing it is agreed between purchasing and vendor that all shipments will be delivered to the warehouse on every Monday of each week, on Create Planning Calendar screen, make the setting and press ENTER:

Fig-05

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

9/21

APBM

1.6. On the pop up screen, maintain the appropriate validity period (normally 12 month period) and then click on icon:

Fig-06 1.7. On Create Planning Calendar: Periods screen, click on defined planning calendar: icon to save this newly-

Fig-07

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

10/21

APBM

2. Assignment of Planning Calendar to the material in master records via Transaction MM02
2.1. Access transaction by Via Menu Via Transaction Code Logistics Materials Management Material Master Material Change Immediately MM02

Key T-Code: MM02

Fig-08

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

11/21

APBM

2.2. On Change Material (Initial Screen) screen, fill in the data as below:

Fig-09 Field Name Material Description Alphanumeric key uniquely identifying the material R/O/C/D R User Action and Values Enter the material number Click on Legend: R = Required, O = Optional, C = Conditional, D = Display icon

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

12/21

APBM

2.3. On the pop up screen, select appropriate User views (MRP Views) and click on

icon:

Fig-10 2.4. On the pop up screen, fill in the data as below:

Fig-11 Field Name Plant Stor. location Description Key uniquely identifying a plant Number of the storage location at which the material is stored R/O/C/D R R User Action and Values Enter the plant Enter the storage location number

icon. Press ENTER or click on The next screen will pop up where the planning calendar can be filled in the Planning Cycle field of the MRP View 1 Legend: R = Required, O = Optional, C = Conditional, D = Display

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

13/21

APBM

2.5. On Change Material XXXXXXXXXXXX (TH Spare Parts1) screen, fill in the data as below:

Fig-12

Fig-13

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

14/21

APBM

User Action and Values Click on Ctrl+S icon to save this material master record. Legend: R = Required, O = Optional, C = Conditional, D = Display

Field Name

Description

R/O/C/D

Fig-14

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

15/21

APBM

3. Run Material Requirements Planning to generate the procurement proposal Check Stock/Requirements List for the related material
3.1. Access transaction by Via Menu Via Transaction Code Logistics Materials Management Inventory Management Environment Stock Stock/Requirements List MD04

Key T-Code: MD04

Key T-Code: MD04

Fig-15

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

16/21

APBM

3.2. On Stock/Requirements List: Initial Screen screen, fill in the data as below:

Fig-16 Field Name Material MRP area Description Alphanumeric key uniquely identifying the material Number of the MRP area for which material requirements planning should be carried out separately Key uniquely identifying a plant R/O/C/D R R User Action and Values Enter the material number Enter the MRP area number

Plant

Enter the plant

Press ENTER to see the details of the stock/requirements list for the related material Legend: R = Required, O = Optional, C = Conditional, D = Display

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

17/21

APBM

Fig-17

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

18/21

APBM

4. Running of Material Requirements Planning (MRP)


4.1. Access transaction by Via Menu Via Transaction Code Logistics Materials Management Material Requirements Planning (MRP) MRP Planning Single-Item, Single-Level MD03

Key T-Code: MD03

Fig-18

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

19/21

APBM

4.2. On Single-Item, Single-Level screen, fill in the data as below:

Fig-19 Field Name Material MRP area Description Alphanumeric key uniquely identifying the material Number of the MRP area for which material requirements planning should be carried out separately Key uniquely identifying a plant R/O/C/D R R User Action and Values Enter the material Enter the MRP area number

Plant

Enter the plant number

Press Enter twice (skipping the warning message) which leads you to the result of MRP run for this related material Legend: R = Required, O = Optional, C = Conditional, D = Display

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

20/21

APBM

4.3. On Planning Result: Individual Lines screen, click on run for this material:

icon to save the result of MRP

Fig-20

Time-Phased Planning Procedure Training Document This document is for Super Users Training on 17 21 January, 04

21/21