1/1/2014 No manpower 2-ph,3,4- weekly off 5-Jan 1)BC-14 head,tail & counter weight pulleys bearings inspection &

greasing 2)BC-14 gearbox output coupling inspection & greasing 3)RM-2 girth gear grease spray strainers cleanin,spray pattern checking 4)RM-2 both pinions cleaning and inspection(3nos teeth in each pinion) 5)RM-2 area gearboxes oil top up 6)New gears mounting on reconditioned stacker drive bogie wheels 7)Bearing mounting on reconditioned stacker drive bogie wheel 6-Jan 1) Stacker drive boghie wheels set assembling work 2) Rawmill area general checklist work 7-Jan 1) RM-1 Lifting side pinion bearings inspection & greasing 2) RM-1 both maingearbox input couplings inspection & greasing 3) RM-1 high grade & low grade weigh feeders calibration work 8-Jan 1) Rawmill area general checklist work 9-Jan 1) RM-2 O-sepa O/L cyclone,Transition piece wornout area patch work 2) RM-2 high grade & low grade weigh feeders calibration work 10,11 weekly off.12 p.h 13-Jan 1)Rawmill area general checklist work 2)Cement mill-1 Pressing side pinion bearings inspection & greasing 3)Cement mill-1 Lifting side pinion bearings inspection & greasing 4)CM-1 silofed area auto sampler cleaning work 14-Jan 1)RM-1 Pressing side torsion shaft couplings inspection & greasing 2)Rawmill-1 grease barrel top up,oil top up works 15-Jan 1)Rawmill area general checklist & maintenance works 16-Jan 1)RM-2 O-Sepa internals inspection 2)RM-2 O-sepa outer casing wornout area patch work 3)RM-2 Additive weigh feeders calibration work 4)BC-12 worn out impact idlers replacement with normal idlers 17&18- WEEKLY OFF 19-Jan 1)RM-1 Lifting side Torsion shaft couplings inspection & greasing 2)RM-1 LCD wornout scoop pipes repair work 20-Jan 1)Rawmill area general checklist & maintenance works

1F+1W+1R 1R 1F+1W+2R

24.00 Hrs 08.00 Hrs 32.00 Hrs

1F+1W+2R

28.00 Hrs 04.00 Hrs

1F+1W+2R 1F+1W(shift) 2R(shift)

32.00 Hrs 16.00 Hrs 16.00 Hrs

1R

08.00 Hrs

1F+1W+1R 1R

24.00 Hrs 08.00 Hrs

1R 1F+2W+1R

08.00 Hrs 32.00 Hrs

1F+1W+1R(shift)+1R 32.00 Hrs

1F+1W+1R+2R(shift) 40.00 Hrs 1R 08.00 Hrs

1R

08.00 Hrs

1F+1W+1R

24.00 Hrs

2R(1shift+1general) 15.00 Hrs

1F+2W+1R+1R(shift) 40.00 Hrs 1F+1W+1R(shift)21.00 Hrs

1R

08.00 Hrs

21-Jan 1)RM-2 Pressing side main gearbox oil replacement work 1F+1W+2R 2)RM-2 pressing side main gearbox cleaning,internals inspection work 3)RM-2 Pressing side main gearbox lub system filters,oil cooler&suction strainers cleaning 1W+2R work 22-Jan

32.00 Hrs 24.00 Hrs

1)Rawmill ara general checklist work 2)Rawmill ground floor area housekeeping work

1R

08.00 Hrs

23-Jan 1)RM-1 Pressing side main gearbox oil replacement work 2)RM-1 pressing side main gearbox cleaning, internals inspection work 1F+1W+2R 3)RM-1 Pressing side main gearbox lub system filters,oil cooler &suction strainers cleaning 1F+1W+2R work 4) RM-1 Additive weigh feeder calibration work. 1R 5)Mills area check list. 24,25-weekly off. 26th kiln stoppage(no manpower) 27-Jan 1)BC-6 disch. Area bagfilter RAL rotor & DE brg replacement work 2)BC-7 feed chute skirt rubbers adjustment work 3)B'Reclaimer scraper conv. Reconditioned buckets fixing work(5nos) 4)Rawmill area all gearboxes oil level checking & top up work 28-Jan 1)Rawmill-1&2 HLPCs new water line laying work 2)Rawmill area general checklist work 3)Rawmill ground floor & RABH area housekeeping work 29-Jan 1)Rawmill area general checklist work 2)Rawmill ground floor & RABH area housekeeping work 30-Jan 1)Rawmill-1&2 HLPCs new water line laying work 2)Rawmill area general checklist work

32.00 Hrs 32.00 Hrs 08.00 Hrs

1F+1W+2R 1R

32.00 Hrs 08.00 Hrs

1F+1W+1R 2R

24.00 Hrs 16.00 Hrs

2R

16.00 Hrs

1F+1W+2R 1R

24.00 Hrs 08.00 Hrs

Sandeep,Firoz,Jalal Anil Rajesh gang

Sandeep,Firoz,Jalal,Anil

Sandeep,Firoz,Jalal,Anil Rajeevan,Sundar rao Babu baby,Ansari

Anil

Sandeep,Firoz,Jalal Anil

Anil Sandeep,Firoz,Jalal,Gupta Muali,vallabha rao,prasannan,naresh rawat

Sandeep,Firoz,Jalal,Ansari,Babu baby Anil

Anil

Sandeep,Firoz,Jalal Anil,Sasidharan

Sandeep,Firoz,Jalal,Gupta,Munna Murali gang

Anil

Sandeep,Firoz,Jalal,Anil Sundar rao,Ansari,Babu baby

Anil

Sandeep,Firoz,Jalal, bhanu Shift gang Anil

Sandeep,Firoz,Jalal, bhanu Hanumamtha reddy

Sandeep,Firoz,Jalal Hanumantha reddy,Ansari(shift)

Hanumantha reddy,Sasidharan(shift)

Sandeep,Jose,Jalal,Bhanu Hanumamtha reddy

Works to be done by shift gang in Rawmill section


Sl.No Work Description Remarks 1 Dump hopper area bagfilters FRL units replacement 2 Air receivers fixing at Rawmill hoppers & BC-2 area 3 BC-1 tail pulley area belt sway switches shifting work 4 BC-5 discharge area scraper arrangement work,chute extension work 5 BC-6 discharge area scraper arrangement work,chute extension work 6 Spare gearbox shifting to BC-9 drive area from BC-8 drive area 7 BC-7 discharge chute patch work 8 Spare guides preparation for replacement at Bridge Reclaimer curvature area 9 Bridge Reclaimer damaged buckets repair work 10 Airslide cloth fixing for spare 580mm wide air chambers 11 RABH enmass conveyor-1,2,3 tail sprocket glands replacement work 12 Dust silo bottom RAL glands replacement work 13 RABH RAL-7 glands replacement 14 RABH RALs area leakages arresting work 15 Bearings fixing to reconditioned stacker single boghie wheels Rajesh

Rawmill area works & spare parts Planning Sl.No Work Description 1 RM-1 1st chamber liners replacement work 2 RM-1 Vent bagfilter bags cleaning,inspection& damaged bags replacement work 3

s & spare parts Planning Expected start date

Spares required

Remarks

Rawmill area Rain affected areas


Sl.No 1 2 3 Location Dump hopper tunnel(towards Admin office side) BC-6 tail pulley area Rawmill weigh feeders area(BC-12& BC-11) Remarks 1. Protection wall to be provided 1. Shed extension to be done 1. Sheet openings at vent line area & Cable tray area to be covered. 2. Roof beams covering to be done 1. Top beams to be covered. 2. 1feet height wall to be provided around the pit top wall 1.Floor openings to be closed 1. Sheeting to be done to avoid rain during winds 1. Bottom boot shed top openings to be covered 1. Side sheeting to be extended up to ground

4 Rawmill-1&2 RCBE pits 5 6 7 8 Rawmill 1st & 3rd floors RM-2 Inlet slide ring guard area Blending silo feed Bucket elevators BC-13 & 14 tunnels

Sl. No 1

Item Main Po Text Only 40 Characters

Item full Description No Limit Characters

Sl. No 1

Item Main Po Text

Item full Description

UOM Make/Brand As u mention we will allotted, No change if ones item code allotted If any specific

UOM

Make/Brand

Asset Like computer, Printer, Furnitures etc.,

Equipment Section are Equipment

Remarks

Asset

Equipment

Remarks