greasing 2)BC-14 gearbox output coupling inspection & greasing 3)RM-2 girth gear grease spray strainers cleanin,spray pattern checking 4)RM-2 both pinions cleaning and inspection(3nos teeth in each pinion) 5)RM-2 area gearboxes oil top up 6)New gears mounting on reconditioned stacker drive bogie wheels 7)Bearing mounting on reconditioned stacker drive bogie wheel 6-Jan 1) Stacker drive boghie wheels set assembling work 2) Rawmill area general checklist work 7-Jan 1) RM-1 Lifting side pinion bearings inspection & greasing 2) RM-1 both maingearbox input couplings inspection & greasing 3) RM-1 high grade & low grade weigh feeders calibration work 8-Jan 1) Rawmill area general checklist work 9-Jan 1) RM-2 O-sepa O/L cyclone,Transition piece wornout area patch work 2) RM-2 high grade & low grade weigh feeders calibration work 10,11 weekly off.12 p.h 13-Jan 1)Rawmill area general checklist work 2)Cement mill-1 Pressing side pinion bearings inspection & greasing 3)Cement mill-1 Lifting side pinion bearings inspection & greasing 4)CM-1 silofed area auto sampler cleaning work 14-Jan 1)RM-1 Pressing side torsion shaft couplings inspection & greasing 2)Rawmill-1 grease barrel top up,oil top up works 15-Jan 1)Rawmill area general checklist & maintenance works 16-Jan 1)RM-2 O-Sepa internals inspection 2)RM-2 O-sepa outer casing wornout area patch work 3)RM-2 Additive weigh feeders calibration work 4)BC-12 worn out impact idlers replacement with normal idlers 17&18- WEEKLY OFF 19-Jan 1)RM-1 Lifting side Torsion shaft couplings inspection & greasing 2)RM-1 LCD wornout scoop pipes repair work 20-Jan 1)Rawmill area general checklist & maintenance works
1F+1W+1R 1R 1F+1W+2R
1F+1W+2R
1R
08.00 Hrs
1F+1W+1R 1R
1R 1F+2W+1R
1R
08.00 Hrs
1F+1W+1R
24.00 Hrs
1R
08.00 Hrs
21-Jan 1)RM-2 Pressing side main gearbox oil replacement work 1F+1W+2R 2)RM-2 pressing side main gearbox cleaning,internals inspection work 3)RM-2 Pressing side main gearbox lub system filters,oil cooler&suction strainers cleaning 1W+2R work 22-Jan
1)Rawmill ara general checklist work 2)Rawmill ground floor area housekeeping work
1R
08.00 Hrs
23-Jan 1)RM-1 Pressing side main gearbox oil replacement work 2)RM-1 pressing side main gearbox cleaning, internals inspection work 1F+1W+2R 3)RM-1 Pressing side main gearbox lub system filters,oil cooler &suction strainers cleaning 1F+1W+2R work 4) RM-1 Additive weigh feeder calibration work. 1R 5)Mills area check list. 24,25-weekly off. 26th kiln stoppage(no manpower) 27-Jan 1)BC-6 disch. Area bagfilter RAL rotor & DE brg replacement work 2)BC-7 feed chute skirt rubbers adjustment work 3)B'Reclaimer scraper conv. Reconditioned buckets fixing work(5nos) 4)Rawmill area all gearboxes oil level checking & top up work 28-Jan 1)Rawmill-1&2 HLPCs new water line laying work 2)Rawmill area general checklist work 3)Rawmill ground floor & RABH area housekeeping work 29-Jan 1)Rawmill area general checklist work 2)Rawmill ground floor & RABH area housekeeping work 30-Jan 1)Rawmill-1&2 HLPCs new water line laying work 2)Rawmill area general checklist work
1F+1W+2R 1R
1F+1W+1R 2R
2R
16.00 Hrs
1F+1W+2R 1R
Sandeep,Firoz,Jalal,Anil
Anil
Sandeep,Firoz,Jalal Anil
Anil
Sandeep,Firoz,Jalal Anil,Sasidharan
Anil
Anil
Hanumantha reddy,Sasidharan(shift)
Rawmill area works & spare parts Planning Sl.No Work Description 1 RM-1 1st chamber liners replacement work 2 RM-1 Vent bagfilter bags cleaning,inspection& damaged bags replacement work 3
Spares required
Remarks
4 Rawmill-1&2 RCBE pits 5 6 7 8 Rawmill 1st & 3rd floors RM-2 Inlet slide ring guard area Blending silo feed Bucket elevators BC-13 & 14 tunnels
Sl. No 1
Sl. No 1
UOM Make/Brand As u mention we will allotted, No change if ones item code allotted If any specific
UOM
Make/Brand
Remarks
Asset
Equipment
Remarks