The purpose of this report is to present to the Board of Directors (1) the first-year budget, (2) the detailed fee schedule, (3) two key sponsorships, and (4) recommendations. Budget The Sports Connection budget for July 1, 20-- through June 30, 20-- is printed in full in Appendix A. The ten budget categories, with amounts designated for each category, are itemized. The $2 million budget includes a high of 40 percent being designated for building renovations with the next highest amount at 12.5 percent designated for playing field area upgrades and equipment and furniture purchases. Each budget category is explained thoroughly in the text that follows. Justifications are presented where appropriate with references to the specifications of the grant.
Bianca Wright
September 23,2013
3-1
Building Renovations
Figure 2 lists the individual items for the building renovation category. The largest portion of the entire budget$800,000 or 40 percent of the budgetis devoted to the building renovations required at Sports Connection. It is important to remember that the New Orleans Park and Recreation Center was using space released from the local schools after consolidation. This space included a gymnasium, cafeteria, office suite, several large classrooms, and restrooms.
Building Renovations Painting, repairs, interior construction work Reconfigure to have 2 basketball courts, 1 volleyball court Convert 2 classrooms to aerobic center Convert 2 classrooms and 2 rest rooms to locker rooms Convert 1 classroom to a seminar/conference room Convert section of cafeteria to staff lounge and user lounge Improve handicap access Reconfigure office area Convert remaining cafeteria section to fitness center Reserve for contingencies Subtotal
$ 250,000 150,000 25,000 150,000 25,000 50,000 50,000 10,000 50,000 40,000 800,000
The largest item in this category is $250,000 designated for painting, repairs, and some interior construction. Also, adding two basketball courts and one volleyball court; converting existing classrooms to an aerobic center; and adding locker rooms, a lounge for fitness staff and patrons, and a seminar/conference room are major renovations needed. The addition of the seminar/conference room will open up a wide variety of opportunities for educational programming that will address the needs of varying audiences. The budget also shows a $50,000 expenditure to improve handicap access. Having access for handicapped individuals and other special groups who otherwise might not take advantage of this facility was an important specification made by the anonymous donor.
Bianca Wright
September 23,2013
3-1
General Park Upgrade Add walking, jogging, and bike trails Upgrade playground area Improve lighting and landscaping Add picnic and shelter areas Subtotal
The interest in fitness for all ages justifies adding walking, jogging, and bike trails. Citizens will now have access to excellent trails for making fitness a lifetime commitment. Also, special programs will be planned using these areas of the park.
Playing Field Area Upgrade Improve lighing Add bleacher sections Improve drainage and hydro-seed to improve turf Add fencing behind batting area and in needed areas Lay out soccer, baseball, and softball fields Subtotal
Bianca Wright
September 23,2013
3-1
Swimming Pool and Tennis Court Upgrades Resurface tennis courts Repair fence and upgrade area surrounding tennis courts Improve lighting Resurface pool deck Repair fence and upgrade area surrounding pool Subtotal
Driving Range and Practice Putting Green Construction Driving Range Practice putting green Subtotal
Equipment and Furniture Fitness equipment Sports equipment Office furniture and equipment Seminar room furniture and equipment Furniture for staff/volunteer and user lounges Subtotal
Bianca Wright
September 23,2013
3-1
Grand Opening
A well-planned and publicized grand opening was set forth in the specifications of the donor. For this reason, a comprehensive grand opening has been planned and justifies the total expenditure of $40,000. (See Figure 8.) This amount is a low 2 percent of the budget as a result of services donated by a public relations professor at Central University who is very interested in the success of this grant. With our well-trained office staff and computer hardware and software, the center will be able to do the publicity pieces and mass mailings in-house, thus resulting in substantial savings.
Architect and Professional Fees Operation Budget for First Year (= to 5% of endowment) Reserve for Contingencies Total Budget