Medium Voltage switchgear

Withdrawable SF6 circuit breaker

MCset 4 - 24 kV

Installation instruction

Contents

Glossary Symbols Recommendations Standard tightening torques List of bags and accessories

General

4
4 4 5 6 6

Gas exhaust version 7 Gas exhaust version with IPX1 protection unit 8 Internal arc version with protection on 3 sides 9 Internal arc version with protection on 4 sides 10 Internal arc version with protection on 4 sides with IPX1 protection unit 11 Cubicle AD4 (for unit entry from above) 12 Cubicles CL4-GL4 (for unit entry from above) 12

Approximate dimensions and weights

Handling instructions

Packaging 13 Handling 14 Storing 15

13

Installation and operation recommendations

The switchgears resistance to ageing in an MV substation 16 Operation and maintenance 16

16

Unpacking

Unpacking 17 Tools 17

17

Floor finishingand cubicle fastening

Surface condition 18 Floor quality 18 Description of the fixing rails and accessories 18 Placing and adjusting on standard civil engineering works 18 Placing and adjusting on earthquake resistant civil engineering works 20

18

Mobile part extraction


Safety rules for use Extraction and lowering tool Without lowering (extraction table) Mobile part extraction Procedure to draw-out the mobile part Procedure to draw-in the mobile part Procedure to extract the VTs Procedure to insert the VTs and to close the MV cable compartment

22
22 22 22 23 23 26 29 31

Schneider Electric

07897542EN indice: D0 - 1

Contents

Access to the interior of the cubicle


AD4 - RD4 cubicle CL4 cubicle (bus-section) CL4 cubicle (bus-section) with upstream CTs GL4 cubicle (bus-riser) TT4 cubicle DI4 cubicle AD4 cubicle incoming from the top (RHC)

33 34 35 36 37 38 39 40 41 41 42 42 43 47 54 55 60 61 62 63 65 66 67

33

Installation instructions

Preparation of the cubicle to the positioning Adjusting cubicles on standard civil engineering works Fastening to the floor on standard civil engineering works Fastening to the floor on earthquake resistant civil engineering works Verify correct positioning Assembly tunnel Cubicle coupling Connection of earthing busbar End panels assembling Fitting the main busbars 1250A main busbars 2000 / 2500A main busbars Fitting joint covers Positioning the joint covers

40

Connection of the LV cables

LV cable connections Closing the top entry LV cable steel sheet.

66

Earthing circuit equipotential connection and MV cable earthing


Starting conditions Equipotential connection of the switchboards earth to the substation earth Connection of MV cables One single core or three-core cable per phase 1 to 4 single core cables per phase Three-core cable per phase Anchoring supports for MV cables Earthing of MV cable shields Earthing of MV cable shields (DI4) Final operations

68 68 69 69 70 70 71 72 72 73

68

Fitting fuses in DI4 cubicle

74

 - 07897542EN indice: D0

Schneider Electric

Contents

Checking and cocking the internal arcing detector Voltage test on the main circuits How to prepare the units Operations to be carried out on the unit to be connected to the testing equipment Withdraw the VT fuses Close the earthing switch Prevent the insertion of the circuit-breaker Open the earthing switch Restore the possibility of circuit-breaker insertion After performing the test

Tests on site

75 76 76 77 77 78 79 80 81 81

75

Schneider Electric

07897542EN indice: D0 - 

General

Glossary

UF
gas exhaust AD4

Functionnal Unit (cubicle + mobile part + Sepam)


basic version, without internal arc withstand incomming / outgoing cubicle incomming / outgoing cubicle (without circuit-breaker) withdrawable line coupling cubicle mesurement and busbar earthing cubicle bus riser cubicle trough the top fuse switch outgoing cubicle voltage transformer current transformer or current sensor Voltage Presence Indicating System low voltage voltage class 24 kV earthing switch busbar

Nota: this document is available for all the units ordered from the 1st of March 2008.

RD4 CL4 - GL4 TT4 AD4 RHB - RHC DI4 TT TC VPIS LV MV SMALT BB

mobile part
SF ERT extraction table withdrawable circuit-breaker with SF6 breaking which is used in AD4 and CL4 cubicles rack-in or rack-out and removal tool of the mobile parts on the ground extraction or insertion table without the removal tool of the mobile parts on the ground

Symbols
SMALT operation

Operation position.

Open earthing switch mechanical indicator.

Close earthing switch mechanical.

 - 07897542EN indice: D0

Schneider Electric

General

Mobile part operation

Operating position.

Plug-in position.

Withdrawn position. Insertion / extraction position.

Recommendations

Height (H) of ceiling for tunnel installationI It is necessary to have a height

of ceiling H u 2.80m to install a tunnel (even 2.90m for internal arc performance 31.5kA - 0.15s).

Installation above the switchboard

All type of equipment installation such as lamp or light are forbidden.

Marking

It is compulsory forbidden to walk on the parts bearing this marking.

It is compulsory forbidden to remove the parts bearing this marking when the equipment is energised.

Schneider Electric

07897542EN indice: D0 - 

General

Standard tightening torques


(non greased screws and bolts)
screw 6 8 10 12 14 torque in Nm 13 28 50 75 120 Application methods: The elastic washers placed on the external sides of the pads and busbars ensure better distribution of stress regarding bolts tightened to the recommended torques.

List of bags and accessories

package
switchboard end and fixing parts

content
- switchboard end sheets - tunnels - cubicle fixing rails (lengh: 2m) - bag of screws and expansion pins - busbar - bag of screws - operating crank - identification front plates - civil engineering guide - installation instruction - using instruction - ERT or extraction table

cubicle component* (bag located inside of each cubicle) standards accessories (bag located inside of the 1st cubicle of the switchboard)

mobile part tools

package (may be supplied)


spare parts (bag located inside of the 1st cubicle of the switchboard) optional accessories

content
- fuses, cranks, etc.

- earthing truck (independant box) - phase balance testing device - mobile part tools: ERT or extraction table (independant box)

* the VTs fuses are already fitted inside their compartment in the cubicle.

 - 07897542EN indice: D0

Schneider Electric

Approximate dimensions and weights


Gas exhaust version

Dimensions
AD4 width (mm) height (mm) depth (mm) internal arc withstand 25kA - 1s internal arc withstand 31.5kA - 0.15s 900 2325 2377 1750 + 40 2377 CL4 + GL4 900 + 900 TT4 900 RD4 DI4

Approximate weights (without LV cables or accessories)


AD4* weight (kg) 1300 CL4 + GL4 900 + 500 TT4 650 RD4 750 DI4 550

* with 2 CTs per phase, circuit breaker and withdrawable VT compartment.

Schneider Electric

07897542EN indice: D0 - 

Approximate dimensions and weights


Gas exhaust version with IPX1 protection unit

Dimensions
AD4 width (mm) height (mm) depth (mm) internal arc withstand 25kA - 1s internal arc withstand 31.5kA - 0.15s 900 2732 2784 1841 2784 CL4 + GL4 900 + 900 TT4 900 RD4 DI4

Approximate weights (without LV cables or accessories)


AD4* weight (kg) 1350 CL4 + GL4 950 + 550 TT4 700 RD4 800 DI4 600

* with 2 CTs per phase, circuit breaker and withdrawable VT compartment.

 - 07897542EN indice: D0

Schneider Electric

Approximate dimensions and weights


Internal arc version with protection on 3 sides (wall installation)

Dimensions
AD4 width (mm) height (mm) depth (mm) internal arc withstand 25kA - 1s internal arc withstand 31.5kA - 0.15s 900 2325 2377 1900 + 40 2377 CL4 + GL4 900 + 900 TT4 900 RD4 DI4

Approximate weights (without LV cables or accessories)


AD4* weight (kg) 1300 CL4 + GL4 900 + 500 TT4 650 RD4 750 DI4 550

* with 2 CTs per phase, circuit breaker and withdrawable VT compartment.

Schneider Electric

07897542EN indice: D0 - 

Approximate dimensions and weights


Internal arc version with protection on 4 sides, in substations with a ceiling height between 2.8** and 4m

Dimensions
AD4 width (mm) height (mm) depth (mm) internal arc withstand 25kA - 1s internal arc withstand 31.5kA - 0.15s 900 2732 2784** 1900 + 40 2784** CL4 + GL4 900 + 900 TT4 900 RD4 DI4

Approximate weights (without LV cables or accessories)


AD4* weight (kg) 1350 CL4 + GL4 1025 + 625 TT4 800 RD4 950 DI4 700

* with 2 CTs per phase, circuit breaker and withdrawable VT compartment. ** for internal arc performance 31.5kA 0.15s, the minimum ceiling height will be 2.9m.

10 - 07897542EN indice: D0

Schneider Electric

Approximate dimensions and weights


Internal arc version with protection on 4 sides in a substation with a ceiling height of 2.8** to 4m with IPX1 protection unit

Dimensions
AD4 width (mm) height (mm) depth (mm) internal arc withstand 25kA - 1s internal arc withstand 31.5kA - 0.15s 900 2732 2784** 1991 2784** CL4 + GL4 900 + 900 TT4 900 RD4 DI4

Approximate weights (without LV cables or accessories)


AD4* weight (kg) 1350 CL4 + GL4 1025 + 625 TT4 800 RD4 950 DI4 700

* with 2 CTs per phase, circuit breaker and withdrawable VT compartment. ** for internal arc performance 31.5kA 0.15s, the minimum ceiling height will be 2.9m.

Schneider Electric

07897542EN indice: D0 - 11

Approximate dimensions and weights


Cubicle AD4 (for unit entry from above)

Cubicles CL4-GL4 (for unit entry from above)

Dimensions
AD4 width (mm) height (mm) depth (mm) internal arc withstand 25kA - 1s internal arc withstand 31.5kA - 0.15s 900 2325 2377 2250 + 40 CL4-GL4 900 + 900 2325 2377 2250 + 40

Approximate weights (without LV cables or accessories)


AD4* weight (kg) 1400 CL4-GL4 1100 + 500

* with 2 CTs per phase, circuit breaker and withdrawable VT compartment.

12 - 07897542EN indice: D0

Schneider Electric

Handling instructions
Packaging
Standard packaging
- The units are shipped simply placed on a pallet and wrapped in a polyethylene bag. - the units may include or not their circuit-breaker.

Marine packaging
- The units are shipped on a pallet, in a closed crate.

- The units may include or not the circuit-breaker.

Warning
Do not walk on the top of packaged units.

Schneider Electric

07897542EN indice: D0 - 13

Handling instructions
Handling
Handling using a sling
Use a 900mm minimum width crosspiece between rings. - Attach the four slings to the relevant lifting devices. - As soon as the unit is lifted, the pallet can be removed.

Cubicle AD4 (for unit entry from above) Cubicle CL4 with upstream CTs

14 - 07897542EN indice: D0

Schneider Electric

Handling instructions
Handling on rollers

Warning
Before putting the unit on the rollers, remove the pallet.

Storing
Store the devices in their original packaging, placed on dry ground or on a material insulating it from moisture.

Prolonged storage

After prolonged storage, thoroughly clean insulating parts before operation.

Schneider Electric

07897542EN indice: D0 - 15

Installation and operation recommendations


The switchgears resistance to ageing in an MV substation depends on 3 main factors
The necessity of correct implementation of connections New cold retractable or slip-on technology offers ease of installation that favours resistance over time. Their design allows them to used in polluted environments with harsh climatic conditions. Impact of the relative humidity factor Installing a heating device is essential in climates with high relative humidity levels and major temperature differences. Ensure that draughts and / or thermal shocks are avoided in all cubicle compartments in order to avoid the creation of dew points (sources of partial discharges). The equipment must be installed in conformity with the relevant IEC standard. Outside of these normal usage conditions, we recommend contacting Schneider Electric to determine the operations to be carried out as well as their frequency according to the actual service conditions. Ventilation control: Grid size must be suited to the power dissipated in the substation. These grids must be placed exclusively in the vicinity of the transformer, in order to avoid air circulation on the MV switchboard.

Operation and maintenance

After 6 to 12 month operations, we recommend you to check the busbars and MV cable connection tightening. It should be done with a calibrated torque spanner, adjust to lower torque compare to values indicated in page 6. If no problems are detected and if the busbars and cable connections havent been modified, it will not necessary to do again this check. In case of dismantling, the elastic washers must be change and replace by new ones supplied by Schneider Electric. It is strongly advised to periodically carry out (minimum every 2 years approximately) a few operation cycles on operating devices. Outside normal conditions of use (between -5C and 40C , absence of dust, corrosive gas, etc.), it is recommended to examine with our Schneider Electric services centre the steps to be taken, in order to ensure correct functioning of the installation. Our service centre is at your disposal at any time: - to undergo an installation diagnostic, - to offer you, if need be, suitable maintenance operations, - to offer you maintenance contracts, - to offer you adaptations.

16 - 07897542EN indice: D0

Schneider Electric

Unpacking
Unpacking
Standard cubicle

Tools
- Fork or ring spanner n.19 (A1 ou A2).

Units shall be unpacked in close proximity to the erection site. AD4, RHC RHB cubicles, CL4 cubicle with upstream CTs
- Remove the plastic wrapping and lifting the unit by the four anchoring devices (for handling

see pages 7 and 8). - Remove the pallet and lay the unit on the floor. - Then remove the four anchoring devices and the relevant cage nuts. - In the case of units provided with end panels, after having removed the anchoring devices, put back the bolts on the end panels. The circuit breakers are delivered in cubicles in a withdrawn position.

Warning

Dont dismantle any parts from the unit.

Schneider Electric

07897542EN indice: D0 - 17

Floor finishing and cubicle fastening


Surface condition
The floor surface must be level (no bumps) and such that a 2 meters rule placed on all surfaces and in every direction shows a clearance of no more than 5mm.

Floor quality Description of the fixing rails and accessories


Cubicle fixing
Take the equipment from the civil engineering package of the switchboard packaging.

For the rolling of mobile part extraction tools without degrading the floor, it must have a compression withstand u 33 Mpa.

Standard civil engineering: - 1 fixing rail A (length 2 m), - 4 expansion pins B, - 2 fastening shims C.

Earthquake resistant civil engineering: - 2 fixing rails A (length 2 m), - 8 expansion pins B, - 4 fastening shims C.

Placing and adjusting on standard civil engineering works


Preparation
Drill holes in the floor and the fixing rails.

Tools

Drill.

Socket spanner n.13.

Placing the fixing rails

Place and fix the rails to the floor using

the supplied expansion pins, screws and washers. Cut the last rail to the required length.

18 - 07897542EN indice: D0

Schneider Electric

Floor finishing and cubicle fastening


Tightening the fixing rails
Longitudinal adjustment Using a water level and using shims before tightening the screws.

For the correct installation of cubicles, it is advised to comply with a tolerance of 0.1 cm / m and a max gap of 0.3 cm on the length of the switchboard.

Schneider Electric

07897542EN indice: D0 - 19

Floor finishing and cubicle fastening


Placing and adjusting on earthquake resistant civil engineering works
Preparation

Drill holes in the floor and the fixing rails.

Tools

Drill.

Placing the fixing rails Place and fix the rails to the floor using the supplied expansion pins, screws and washers. Cut the last rail the required length.

Tools

Socket spanners n.13.

20 - 07897542EN indice: D0

Schneider Electric

Floor finishing and cubicle fastening


Longitudinal adjustment Using a water level and using shims before tightening the screws.

The rails must be very smooth, because adjustment-using actuators is not possible.

Transversal adjustment. Using a spirit level and using shims before tightening the screws.

For the correct installation of cubicles, it is advised to comply with a tolerance of 0.1 cm / m and a max gap of 0.3 cm on the length of the switchboard.

Schneider Electric

07897542EN indice: D0 - 21

Mobile part extraction

Safety rules for use

These tools allow to extract the mobile parts (circuit-breaker, contactor, sectionning truck). The ERT allow to leave the mobile part on the floor. These tools are intended to be used only as an accessory of MCset switchboards. They shall be used when the units have been laid on the floor. They shall not be modified.

Extraction and lowering tool


Overall dimensions and weights
weight 86 kg

A: B: C: D: E:

crank connecting device to the units circuit-breaker supporting rail locating pins for matching to the units wheel brake

The support C rails might be adjusted independently by an action the lever A one side only.

Without lowering (extraction table)


Overall dimensions and weights
weight 60 kg A: B: C: D: E: F: G: connecting device to the units circuit-breaker supporting rail locating pins for matching to the units wheel brake crank for width adjustment screw for height fixing screws for compensation of floor unevenness

For more details: refer to the device attached manual.

22 - 07897542EN indice: D0

Schneider Electric

Mobile part extraction

Procedure to draw-out the mobile part


Warning
The mobile part shall be move with the extraction tools only. Do note apply effort on the connection arms. The extraction of the mobile part shall be done when the units have been laid on the floor.

Starting condition Unit with circuit-breaker in disconnected / test position.

- Open the access door to the circuit-breaker compartment. At the 1st extraction: - Remove the strap part (1). - Remove the block which hold the rod in upper position (2).

- Unplug the connector of LV circuits.

Extraction of the mobile part (procedure is the same with an ERT or an extraction table)

- Move the extraction tool into position in front of the unit (take care that the locating pins engage with the holes provided on the unit).

- Lock the trolley in position by pushing and turning the two latching handles in the indicated way. - After the operation, make sure that the trolley is locked.

- Turn the selector 2 to the position marked with .Then remove the circuit-breaker; pull it out until it comes against the stops of trolley. - Lock the wheels by pressing the brake.

Warning

During this operation the circuit-breaker springs can be tripped automatically.

Schneider Electric

07897542EN indice: D0 - 23

Mobile part extraction

- Return selector to the position . - Unlock the trolley from the unit by turning the two handles in the indicated way.

- Release the brakes on the trolley wheels. - Take away the trolley (1).

Closing the MV door

- Lower the shutter.

To close the door without the circuit-breaker inside: - push the hook A to the top, - push the locking part B in the indicated position, then let A free. The locking system will reset automatically when the circuit-breaker is inserted.

24 - 07897542EN indice: D0

Schneider Electric

Mobile part extraction

Leaving the mobile part on the floor (only with ERT)

- Put the circuit-breaker on the ground by turning the crank (2).

- Set the selector 2 to position

- Take away the trolley.

Schneider Electric

07897542EN indice: D0 - 25

Mobile part extraction

Procedure to draw-in the mobile part


Starting conditions
- Cubicle: the circuit-breaker compartment door is open. - ERT: the rails of trolley are in the lowered position. - Circuit-breaker: it is on the floor with the selector 2 in the position marked .

ERT - Move the trolley under the circuit-breaker until it comes against the stop.

- Set selector 2 to position

- By turning the crank (1), lift the circuit-breaker up to the insertion level.

Insertion with the ERT or with extraction table

- Approach the trolley with the circuit-breaker in front of the unit.

- Move the trolley into position in front of the unit; take care that the locating pins engage with the holes provided on the unit.

26 - 07897542EN indice: D0

Schneider Electric

Mobile part extraction

- Lock the trolley in position by pushing and turning the two latching handles (after the operation, make sure that the trolley is locked).

- Lock the wheels by pressing the brakes.

- Set the selector 2 to position . - Push the circuit-breaker into the

circuit-breaker compartment until it stops. - Set selector 2 to position .

- Unlock the trolley from the unit by turning

the two handles and then pulling them out. - Release the brakes on the trolley wheels. - Remove the trolley.

Schneider Electric

07897542EN indice: D0 - 27

Mobile part extraction

- Push and hold the locking device (A - B). - Plugging-in the connector of LV circuits. (C). If the connector is not properly inserted, the locking device will prevent the door from being closed.

- Lift the black shutter located on the back of the door before closing the door.

28 - 07897542EN indice: D0

Schneider Electric

Mobile part extraction

Procedure to extract the VTs

Tools - Fork or ring spanner n.10 (A) - Fork or ring spanner n.13 (B) - Ratched spanner n.10 (C1)

Tools Operating crank (provided).

Cubicles equiped with draw-out VTs

- Close the earthing switch (see page 78). - Draw-out the fuses of the VTs (see page 77). - Remove the 2 fixing bolts by using the operating crank. - Open the access door.

- Disconnect the LV connector of the VT secondaries.

- Remove the 2 bolts. - Remove the 5 nuts fixing and the crosspiece.

- Draw-out the VT truck.

Schneider Electric

07897542EN indice: D0 - 29

Mobile part extraction

Units equipped with fixed VTs

- Close the earthing switch (see page 78). - Remove the 2 fixing bolts by using the operating crank. - Open the access door.

- Disconnect the LV connector of the VT secondaries.

- Disconnect the connection bar of each VT by unscrewing the nut.

- Remove the 2 bolts. - Remove the 5 nuts fixing and the crosspiece. - Remove the VT assembly, by running it on its wheels.

To have an easier access inside the cubicle, remove the bottom sheet of the circuit-breaker compartment and the barriers between phases.

- Open the circuit-breaker compartment door. - Remove the bottom plate of the circuit-breaker compartment by unscrewing the 4 fixing bolts.

- Remove the barriers between phases following the sequence indicated in the figure. - Close again the circuit-breakers and VTs compartment doors.

30 - 07897542EN indice: D0

Schneider Electric

Mobile part extraction

Procedure to insert the VTs and to close the MV cable compartment

If the MV and LV cable connection are not immediately done, proceed with the following instructions.

For unit equipped with draw-out VTs


Tools - Fork or ring spanner n.10 (A) - Fork or ring spanner n.13 (B) - Ratched spanner n.10 (C1) - Assemble the barriers between phases following the sequence indicated in the figure.

- Check that the earthing switch is close (see at page 78). - Replace the VT truck into position.

Operating crank (provided).

- Plug-in the connector of the VT secondaries.

- Remount the crosspiece across the front bottom by means of the 5 nuts and 2 bolts provided.

- Remount the sheet steel bottom plate of the circuit-breaker compartment and fasten it by means of the 4 bolts provided.

Close the door and secure it by means of the 2 bolts to be tightened with the operating crank.

Schneider Electric

07897542EN indice: D0 - 31

Mobile part extraction

For unit equipped with fixed VTs

Tools - Fork or ring spanner n.10 (A) - Fork or ring spanner n.13 (B) - Screwdriver n.10 (C) - Ratched spanner n.10 (D)

- Assemble the barriers between phases following the sequence indicated in the figure.

- Chek that the earthing switch is close (see at page 78). - Replace the VTs. - Connect the connection bar of each VT by screwing the nut.

Operating crank (provided)

- Plug-in the LV connector of the VT.

- Remount the crosspiece across the front bottom by means of the 5 nuts and 2 bolts provided.

- Remount the sheet steel bottom plate of the circuit-breaker compartment and fasten it by means of the 4 bolts provided.

- Close the door and secure it by means of the 2 bolts to be tightened with the operating crank.

32 - 07897542EN indice: D0

Schneider Electric

Access to the interior of the cubicle

AD4 - RD4 cubicle

No access from the rear

Access to the rear adjustment bolts through the cable basement or trench. Additional cables access from the front. Access to the main busbars. Access to MV cables, VTs, earthing switch, CTs secondaries and toroidal CTs. Access to the rear adjustment bolts. Access to the circuit-breaker (AD4). Access to the LV compartment Access to the LV terminal and to the internal arcing detector.

Schneider Electric

07897542EN indice: D0 - 33

Access to the interior of the cubicle

CL4 cubicle (bus-section)

No access from the rear

Additional access to the lower main busbar from the front. Access to the main busbars. Access to VTs and lower main busbar. Access to the rear adjustment bolts. Access to the circuit-breaker. Access to the LV compartment Access to the LV terminal and to the internal arcing detector.

34 - 07897542EN indice: D0

Schneider Electric

Access to the interior of the cubicle

CL4 cubicle (bus-section) with upstream CTs

Access from the rear is imperative for this version

Additional access to the lower main busbar from the front. Access to the main bubars. Access to VTs and lower main busbar. Access to the rear adjustment bolts. Access to the circuit-breaker. Access to the LV compartment. Access to the LV terminal and to the internal arcing detector. Access to the CTs and to the voltage cable measurment.

Schneider Electric

07897542EN indice: D0 - 35

Access to the interior of the cubicle

GL4 cubicle (bus-riser)

No access from the rear

Additional access to the lower main busbar from the front. Access to the main busbars. Access to the CTs secondaries and lower main busbar. Access to the rear adjustment bolts. Access to the LV compartment. Access to the LV terminal and to the internal arcing detector.

36 - 07897542EN indice: D0

Schneider Electric

Access to the interior of the cubicle

TT4 cubicle

No access from the rear

Additional access to the lower main busbar from the front.

Access to the main busbars.

Access to VTs, earthing switch and lower connection. Access to the rear adjustment bolts.

Access to the LV compartment.

Access to the LV terminal and to the internal arcing detector.

Schneider Electric

07897542EN indice: D0 - 37

Access to the interior of the cubicle

DI4 cubicle

No access from the rear

Access to the rear adjustment bolts through the cable basement or trench. Access to the main busbar (if a single DI4 cubicle is placed side-by-side to other units, it is easier to get access from the busbar compartments of the adjacent cubicle). Access to MV cables, earthing switch, fuses and switch. Access to the rear adjustment bolts. Access to the LV compartment. Access to the LV terminal and to the internal arcing detector.

38 - 07897542EN indice: D0

Schneider Electric

Access to the interior of the cubicle

AD4 RHC cubicle (for unit entry from above)

Access from the rear is imperative for this version. Access to MV cables.

Access to the rear adjustment bolts through the cable basement or trench. Additional cables access from the front.

Access to the main busbars.

Access to VTs, earthing switch and CTs secondaries. Access to the rear adjustment bolts.

Access to the circuit-breaker.

Access to the LV compartment.

Access to the LV terminal and to the internal arcing detector.

Access to MV cables.

Schneider Electric

07897542EN indice: D0 - 39

Installation instructions

Preparation of the cubicle to the positioning


Cubicle shall be prepared in the erection site. Operations Racking-out of the mobile part Racking-out of the VTs Removal of the bottom plate of the MV compartment Removal of the barriers between phases Cubicle AD4, CL4-GL4 AD4, CL4-GL4, RD4, TT4 AD4, CL4-GL4, RD4, TT4 AD4, CL4-GL4, RD4, TT4 page 23 29 30 30

Positioning on the cable basement


Note: the positioning can be done by rolling or lifting. Insert the roller (A) under the cubicle by using a lever.

Important
For cubicles equipped with a tunnel, it must be installed before placing the cubicle in position (see page 39).

Place the crossing tools across the cable basement. If the cable basement consists of one uninterrupted opening on the floor, the use of special crossing tools is required. Place the crossing tools across the cable basement, in the location where the unit is to be placed. Move the cubicle by means of rollers and position it in front of the crossing tools. Then push the unit in position.

A: rollers B: crossing tools.

40 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Adjusting cubicles on standard civil engineering works


The operations described here after must only be carried out once the cubicle is positioned on civil engineering works.
Tool - 2 open end spanners n. 18.

Position the support plate E at the rear of the cubicle by gaining access through the maintenance space.

Place the 2 quick cage nuts B at the rear of the cubicle, by gaining access underneath the cubicle.

Screw the lock nut A on each actuator D, place washer C, then screw the actuators in the quick cage nuts.

Lift the rear of the cubicle by screwing the 2 actuators to level the cubicle.

Fastening to the floor on standard civil engineering works


Note: Remove the front panel (if the cubicle is fitted with VT, it is first necessary to remove them, see the chapter Access to the interior of a cubicle).

To be retrieved from the bag of screws and bolts.

Place the fastening screws at the front of the cubicle and tighten them.

Schneider Electric

07897542EN indice: D0 - 41

Installation instructions

Fastening to the floor on earthquake resistant civil engineering works


Note: Remove the front panel (if the cubicle is fitted with VT, it is first necessary to remove them, see the chapter Access to the interior of a cubicle).

To be retrieved from the bag of screws and bolts.

Place the fastening screws at the rear of the cubicle and tighten them.

To be retrieved from the bag of screws and bolts.

Place the fastening screws at the front of the cubicle and tighten them.

Verify correct positioning


Tools - Fork or ring spanner n.10 (A). - Ratchet spanner n.10 (B1). - Spirit level.

Starting situation

Circuit breaker and VT truck removed from the unit. Bottom plate of the circuit-breaker compartment removed from the unit.

- Remount the sheet steel bottom plate of the circuit-breaker compartment. - Fasten the 4 fixing bolts.

- Check that the unit is level by means of a spirit level. - Check that the doors could open and close correctly. - Insert the circuit breaker.

42 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Assembly tunnel
Cubicle configuration: - internal arc version on 4 sides
For the following versions, see drawing ref. 03833411N0: - internal arc version on 4 sides, incoming from the top, - internal arc version on 4 sides (31.5kA / 0.15s), incoming from the top, - internal arc version on 4 sides (31.5kA / 0.15s), incoming from the bottom: the assembly is the same as the previous version. See guide Installation drawing files AAA13028EN - REV B0.

Take out from bolts and screws bag: - nuts F, - bolts G, - washers E.

Tools - Ratchet spanner n.10 (A). - Fork or ring spanner n.10 (B).

- Take out from the wood crate the panels and the roof. - Fix the panels at the rear, then at the front of the cubicle. - Fix the roof. - Respect the assembly as shown on the diagram.

Schneider Electric

07897542EN indice: D0 - 43

Installation instructions

Assembly tunnel
Cubicle configuration: - internal arc version on 4 sides, - IPX1 protection degree.
For the following versions, see drawing ref. 03837230N0: - internal arc version on 4 sides, IPX1, incoming from the top, - internal arc version on 3 sides, IPX1, incoming from the bottom. - internal arc version on 4 sides (31.5kA / 0.15s), IPX1, incoming from the top. - internal arc version on 4 sides (31.5kA / 0.15s), IPX1, incoming from the bottom: the assembly is the same as the previous version.

Take out from bolts and screws bag: - nuts F, - bolts G, - washers E. - Take out from the wood crate the panels and the roof. - Fix the panels at the rear, then at the front of the cubicle. - Fix the roof. - Respect the assembly as shown on the diagram.

Tools - Ratchet spanner n.10 (A). - Fork or ring spanner n.10 (B).

44 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Assembly tunnel
Cubicle configuration: - internal arc version on a wall
For the following versions, see drawing ref. 03833411N0: - internal arc version on 4 sides, incoming from the top, - internal arc version on 4 sides (31.5kA / 0.15s), incoming from the top, - internal arc version on 4 sides (31.5kA / 0.15s), incoming from the bottom: the assembly is the same as the previous version. See guide Installation drawing files AAA13028EN - REV B0.

Take out from bolts and screws bag: - nuts F, - bolts G, - washers E.

Tools - Ratchet spanner n.10 (A). - Fork or ring spanner n.10 (B). - Take out from the wood crate the panels and the roof. - Fix the panel at the front and the plate at the rear of the cubicle. - Fix the roof on the front panel and on the wall. - Respect the assembly as shown on the diagram.

Schneider Electric

07897542EN indice: D0 - 45

Installation instructions

Assembly tunnel
Cubicle configuration: - gas exhaust, - IPX1 protection degree.

For the following versions, see drawing ref. 03833229N0: - gas exhaust, IPX1, incoming from the

top. Take out from bolts and screws bag: - bolts G,

- washers E. Tools - Ratchet spanner n.10 (A). - Fork or ring spanner n.10 (B). - Take out from the wood crate the panels and the roof. - Fix the panels at the rear, then at the front of the cubicle. - Fix the roof. - Respect the assembly as shown on the diagram.

46 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Cubicle coupling
Cubicle configuration: - gas exhaust, - AD4, CL4-GL4, TT4, DI4, RD4.
For more details, see drawing ref. 03833104N0.

Take out from bolts and screws bag: - nuts F and I, - bolts G and H, - washers L. Tools - 2 ratchet spanners n.13 (A) with the relevant extension.

- In order to put in place the 2nd cubicle, operate as for the 1st cubicle. - Fasten the two units together (9 fixing points). - For access to the fixing points, see the chapter Access to the interior of the cubicles.

Schneider Electric

07897542EN indice: D0 - 47

Installation instructions

Cubicle coupling
Cubicle configuration: - gas exhaust, - incoming from the top, - AD4.
For more details, see drawing ref. 03833104N0.

Take out from bolts and screws bag: - nuts F and I, - bolts G and H, Tools - 2 ratchet spanners n.13 (A) with the relevant extension. - 2 ratchet spanners n.10 (B).

- In order to put in place the 2nd cubicle, operate as for the 1st cubicle. - Fasten the two units together (12 fixing points). - For access to the fixing points,see the chapter Access to the interior of the cubicles.

48 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Cubicle coupling
Cubicle configuration: - gas exhaust, - IPX1, - AD4, CL4-GL4, TT4, DI4, RD4.
For more details, see drawing ref. 03833104N0. Take out from bolts and screws bag:

- nuts F and I, - bolts G and H, - washers L. Tools - 2 ratchet spanners n.13 (A) with the relevant extension. - 2 ratchet spanners n.10 (B). - In order to put in place the 2nd cubicle, operate as for the 1st cubicle. - Fasten the two units together (12 fixing points). - Join the top panels with the crosspiece C as show in the picture. - For access to the fixing points, see the chapter Access to the interior of the cubicles.

Schneider Electric

07897542EN indice: D0 - 49

Installation instructions

Cubicle coupling
Cubicle configuration: - internal arc protection on 3 sides, - AD4, CL4-GL4, TT4, DI4, RD4.
For more details, see drawing ref. 03833105N0.

Take out from bolts and screws bag: - nuts F , - bolts G .

Tools - 2 ratchet spanners n.13 (A) with the relevant extension. - In order to put in place the 2nd cubicle, operate as for the 1st cubicle. - Fasten the two units together (9 fixing points). - For access to the fixing points, see the chapter Access to the interior of the cubicles.

50 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Cubicle coupling
Cubicle configuration: - internal arc protection on 4 sides, - AD4, CL4-GL4, TT4, DI4, RD4, - tunnel.
For more details, see drawing ref. 03833105N0.

Take out from bolts and screws bag: - nuts F and I, - bolts G and H, - washers L. Tools - 2 ratchet spanners n.13 (A) with the relevant extension. - 2 ratchet spanners n.10 (B).

- In order to put in place the 2nd cubicle, operate as for the 1st cubicle. - Fasten the two units together (15 fixing points). - Join the top panels with the crosspiece C as show in the picture. - For access to the fixing points, see the chapter Access to the interior of the cubicles.

Schneider Electric

07897542EN indice: D0 - 51

Installation instructions

Cubicle coupling
Cubicle configuration: - internal arc protection on 4 sides, - incoming from the top, - AD4.
For more details, see drawing ref. 03833105N0.

Take out from bolts and screws bag: - nuts F and I, - bolts G and H.

Tools - 2 ratchet spanners n.13 (A) with the relevant extension. - 2 ratchet spanners n.10 (B). - In order to put in place the 2nd cubicle, operate as for the 1st cubicle. - Fasten the two units together (12 fixing points). - For access to the fixing points, see the chapter Access to the interior of the cubicles.

52 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Cubicle coupling
Cubicle configuration: - internal arc protection on 4 sides, - IPX1 protection degree, - AD4, CL4-GL4, TT4, DI4, RD4.
For more details and for the following version, see drawing ref. 03833105N0: - internal arc protection 3 sides, tunnel, - internal arc protection 4 sides, - internal arc protection 4 sides, tunnel, incoming from the top.

Take out from bolts and screws bag: - nuts F and I, - bolts G and H, - washers L. - In order to put in place the 2nd cubicle, operate as for the 1st cubicle. - Fasten the two units together (15 fixing points). - Join the top panels with the crosspiece C as show in the picture. - For access to the fixing points, see the chapter Access to the interior of the cubicles.

Tools - 2 ratchet spanners n.13 (A) with the relevant extension. - 2 ratchet spanners n.10 (B).

Schneider Electric

07897542EN indice: D0 - 53

Installation instructions

Connection of earthing busbar

Take out from bolts and screws bag: - nuts I, - bolts H, - washers E. - For access to the fixing points, see the chapter Access to the interior of the cubicles.

Tools - 2 ratchet spanners n.17 (A) with the relevant extension. - Ring spanner n.17 (B). - Torque spanner (C).

- Tightening torques 30 Nm.

54 - 07897542EN indice: D0

Schneider Electric

Installation instructions

End panels assembling


Cubicle configuration: - gas exaust.
For more details, see drawing ref. 03835598N0.

Important
End panels are fixed to the cubicles with bolts and nuts. Assembling must be carried out on the erection site.

Take out from bolts and screws bag: - bolts F-G-H, - nuts I, - washers L-M-N.

:G+I+L :H+I+L :F+I+L :G+L :H+L :H+I+M+N

Tools - 2 ratchet spanners n.10 (A) with the relevant extension.

Operating instructions: - Position the profile C and fix them as show. - Position the panel D and fix them in the upper locations. - Position the panel E and fix them in the upper locations. - Finish the fixing of the 2 panels as show. - Apply the adhesive plate B on panel D. - Repeat the operation for the right side. - For access to the fixing points, see the chapter Access to the interior of the cubicles.

Schneider Electric

07897542EN indice: D0 - 55

Installation instructions

End panels assembling


Cubicle configuration: - gas exhaust, - incoming from the top, - AD4.
For more details, see drawing ref. 03837100N0.

Take out from bolts and screws bag: - bolts F-G-H, - nuts I, - washers L-M-N.

:G+I+L :H+I+L :F+I+L :G+L :H+L :H+I+M+N Tools - 2 ratchet spanners n.10 (A) with the relevant extension.

Operating instructions: - Position the profile C and fix them as show. - Position the panel D and fix them in the upper locations. - Position the panel E and fix them in the upper locations. - Finish the fixing of the 2 panels as show. - Position the panel O and fix them as show. - Apply the adhesive plate B on panel D. - Repeat the operation for the right side.

- For access to the fixing points, see various possibilities of access to the interior of the cubicles.

56 - 07897542EN indice: D0

Schneider Electric

Installation instructions

End panels assembling


Cubicle configuration: - Internal arc protection on 3 sides.
For more details, see drawing ref. 03837101N0.

Take out from bolts and screws bag: - bolts H, - nuts G and I, - washers L-M-N.

:H+L :H+I+L :H+I+L+N :G+H+M Tools - 2 ratchet spanners n.10 (A) with the relevant extension.

Operating instructions: - Position and fix the uprights D and E and the traverse C. - Position and fix the traverse A and F. - Position and fix the panel O. - Position and fix the panels P and Q. - Position and fix the panel S, the plate R and the supporting T. - Repeat the operation for the right side.

- For access to the fixing points, see various possibilities of access to the interior of the cubicles.

Schneider Electric

07897542EN indice: D0 - 57

Installation instructions

End panels assembling


Cubicle configuration: - Internal arc protection on 4 sides.
For more details, see drawing ref. 03837102N0.

Take out from bolts and screws bag: - bolts H, - nuts G and I, - washers L-M-N. :H+L :H+I+L :H+I+L+N :G+H+M Tools - 2 ratchet spanners n.10 (A) with the relevant extension.

Operating instructions: - Position and fix the uprights D and E and the traverse C. - Position and fix the traverse A and F. - Position and fix the panel O. - Position and fix the panels P and Q. - Position and fix the panel S, the plate R and the supporting T. - Position and fix the panel U. - Repeat the operation for the right side.

- For access to the fixing points, see various possibilities of access to the interior of the cubicles.

58 - 07897542EN indice: D0

Schneider Electric

Installation instructions

End panels assembling


Cubicle configuration: - internal arc protection on 4 sides. - incoming from the top,
For more details, see drawing ref. 03837103N0.

Take out from bolts and screws bag: - bolts H, - nuts G and I, - washers L-M-N. :H+L :H+I+L :H+I+L+N :G+H+M Tools - 2 ratchet spanners n.10 (B) with the relevant extension for one. Operating instructions:

- Position and fix the uprights D and E and the traverse C. - Position and fix the traverse A and F. - Position and fix the panel O. - Position and fix the panels P and Q. - Position and fix the panel S, the plate R and the supporting T. - Repeat the operation for the right side. - For access to the fixing points, see various

possibilities of access to the interior of the cubicles.

Schneider Electric

07897542EN indice: D0 - 59

Installation instructions

Fitting the main busbars


For more details, see drawing ref. 03835661N0. For access to busbars, see various possibilities of access to the interior of the cubicles. Tools - Fork or ring spanner n. 19 (A). - 2 ring spanners n.19 (B1) or as alternative. - 2 ratchet spanners n.19 (B2). - torque spanner (C). Cubicle type AD4-CL4-GL4-TT4-RD4 and DI4. Cubicle type CL4 and GL4

- Fit the main busbars between the 2 units. - Insert the bolts and tighten them (to be recommended tightening value).

This procedure shall be repeated for any unit added to the switchboard.

1 : self-locking nut 2 : nut 3 : washer 4 : screw

60 - 07897542EN indice: D0

Schneider Electric

Installation instructions

1250A main busbars


630 and 1250A tee-connections

Main busbars top view

Lower main busbars top view (CL4-GL4)

Schneider Electric

07897542EN indice: D0 - 61

Installation instructions

2000 / 2500A main busbars


630 / 1250A tee-connections

Main busbars top view

2000 / 2500A tee-connections

Lower main busbars top view

2000 / 2500 A tee-connections

Lower main busbars top view (CL4-GL4)

62 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Fitting joint covers


For more details, see drawing ref. 03835661N0. - Stanley knife. cubicle AD4

Choosing proper joint covers


Choose the proper joint cover type according to the needs of each unit of the switchboard as shown in the following drawing. Tools cubicle TT4 in any middle position y 630A cubicle AD4 in any middle position cubicle AD4 in any middle position outgoing y 630A cubicle DI4 in any middle position outgoing y 630A

cubicle DI4 right side end outgoing y 630A

cubicle AD4 right side end outgoing y 630A

cubicle DI4 left side end outgoing y 630A

cubicle AD4 left side end outgoing y 630A

cubicle TT4 left end panel y 630A

right side end or

cubicle TT4 right side end y 630A

or

or

or

or

right side end panel

left side end panel

Cutting joint covers


Cut the joint covers as shown in the drawings in this page and in the following one.

03833376N0
4 cut
th

1st cut
1 cut
st

2nd cut

3rd cut

3rd cut

2nd cut

right end

right end

left end

4th cut

1st + 4th cut

2nd + 3rd cut

right end

intermediate

intermediate

Schneider Electric

07897542EN indice: D0 - 63

or

cubicle AD4 left side end

cubicle CL4

Installation instructions

1st cut
4th cut 3rd cut 2nd cut 1st cut

2nd cut

3rd cut

5th cut

right end

right end

left end

4th cut

1st + 4th cut

2nd + 3rd cut

right end

intermediate

intermediate

2nd + 5th cut

2nd + 3rd + 5th cut

right end

left end

intermediate

1st cut
1st cut 2nd cut

2nd cut

1st + 2nd cut

right end

right end

intermediate

without cut
1st cut 2nd cut

1st + 3rd cut

2nd + 4th cut

3rd cut

4th cut

64 - 07897542EN indice: D0

Schneider Electric

Installation instructions

Positioning the joint covers

clip

- Open the joint cover and put it into position on the busbar joint.

- Close it and fix by using the proper pins. - Closing the MV cable compartment. - Replace the VT truck into position (see page 31 for the description of this operation).

Schneider Electric

07897542EN indice: D0 - 65

Connection of the LV cables

LV cable connections

Entry from the bottom.


- Entry from the bottom in every single cubicle. LV cables shall be run to the LV compartment inside the vertical duct on the right end side provided for every single unit. - To install the LV cables in the vertical duct, you should extract the circuit breaker and the VTs (see page 28 and 34). Maximum entry section available for LV cables.

Entry from the top.


Tools - Socket spanners n.10.

- Drill.

- Remove the 2 fixing bolts (1) of the LV entry steel sheet. - Make a hole in the sheet according to the number and type of cables. - Install the grommets (not supply) on the sheet and insert the cables. - Remount the metal sheet (2 screws).

66 - 07897542EN indice: D0

Schneider Electric

Connection of the LV cables

LV cable connections

Tools - Socket spanners n.10.

- To reach the terminal blocks of the LV cables, take off the top front sheet metal (remove the 6 fixing bolts). - Connect the cables to the terminal blocks according to the schematic diagrams.

Closing the top entry LV cable steel sheet.

To keep the panel protection degree between 2 cubicles, the top entry LV cable sheet must be install: - on the right for all cubicles, - on the left on the cubicle positioned at the right side end of the switchboard. To make an easier installation, the fixing holes are oblong.

Schneider Electric

07897542EN indice: D0 - 67

Earthing circuit equipotential connection and MV cable earthing

Starting conditions

If the MV cables have not been connected at the erection of the switchboard, in order to get access to the connecting terminals, it is necessary to carry out the following operations: - remove circuit-breakers and VTs (both fixed and withdrawable versions) (see pages 23), - remove barriers between phases and the bottom plates of the circuit-breaker compartment (see pages 29).

Equipotential connection of the switchboards earth to the substation earth


After connecting the earth links between units, the earth circuit shall be bonded to the substation earth. To that purpose, the earth conductor is provided with holes suitable for M10 bolted connections. The link to the substation earth can be ran through an unused cable grommet.

Tools - Ratchet spanner n.17 (A1). - Fork or ring spanner n.17 (B).

68 - 07897542EN indice: D0

Schneider Electric

Earthing circuit equipotential connection and MV cable earthing

Connection of MV cables
General

- Remove the bottom metal plates in the cable compartment.

- Cut the cable grommets according to the number and diameter of cables.

In order to terminate the MV cables, see the relevant manufacturers instructions.

- Fit them to the cables.

One single core or three-core cable per phase


The instructions refer to one phase; repeat the procedure for the other two.

Tools - 2 fork or ring spanners n.19 (A). - Torque spanner (B).

- Bolt the cable lugs to the proper connecting terminal, using the grommets the closest to the rear (tightening torque 50 Nm).

Schneider Electric

07897542EN indice: D0 - 69

Earthing circuit equipotential connection and MV cable earthing

1 to 4 single core cables per phase


The instructions refer to one phase; repeat the procedure for the others.

Tools - Fork or ring spanner n.13 (A). - 2 fork or ring spanners n.19 (B). - Torque spanner (C).

- Bolt the cable lug to the proper connecting terminal. - Insert the cable one by one starting from the one closest to the rear.

Tighten to 50 Nm.

Example of terminals (suggested by Schneider Electric) compatible for cable 630 mm: -Raychem - type TMPP, -Pirelli - type STI-GT, -F&G - type Typ AV 20 E. Cable-terminals: -Cembre - series A-M.

Three-core cable per phase


In order to terminate the cables, see the relevant manufacturers instructions.

- Cut the cable grommets according to the number and diameter of cables.

- Run the three-core cable through the toroidal CT (if requested).

70 - 07897542EN indice: D0

Schneider Electric

Earthing circuit equipotential connection and MV cable earthing

Anchoring supports for MV cables


The operation is the same for all types of cables. Take off from the cubicle components package: the metal bottom plates, the cable anchoring supports, the crosspiece to fix the anchoring supports, the screws bag. Tools - Fork or ring spanner n.13. For access to the cable compartment, see Access to the interior of the cubicles. - Fit the metal bottom plates. - Unused holes shall be closed with cable grommets (not cut). 1: fixing point for the crosspiece. - Fit the crosspiece on the bottom plate (1 bolt nuts assembling). - Fit the anchoring supports on the cable according the picture above for 3 single core cables.

- Take care to not hurt the cable isolating when you clamp the anchoring support.

- Fit the anchoring supports on the cable according the picture above for 1 three-core cables.

Schneider Electric

07897542EN indice: D0 - 71

Earthing circuit equipotential connection and MV cable earthing

Earthing of MV cable shields


The earth braids or wires shall be connected to the left hand side earth conductor provided in each cable compartment. In the presence of toroidal CTs, take care to run the earthing connection through the CT before fixing it. Example: one cable per phase, 3 braids or wires to connect.

rear

rear

front
Example: one cable per phase, 3 braids or wires to connect.

front
Two cables per phase, 6 braids or wires to connect.

Earthing of MV cable shields (DI4)


The earth braid shall be connected to the earth bar on the rear of the switchboard.

72 - 07897542EN indice: D0

Schneider Electric

Earthing circuit equipotential connection and MV cable earthing

Final operations
VT truck replacing
For a description of VT truck replacing, see page 31.

Insertion of circuit-breaker

For a description of insertion of circuit-breaker, see page 26.

Schneider Electric

07897542EN indice: D0 - 73

Fitting fuses in DI4 cubicle

Install FUSARC type fuses with medium type strikes according to IEC 32 - 3IEC 282-1 and DIN 43-625.

For different types of fuse, please contact Schneider Electric.

- The striker end of the fuse is marked.

- The fuse characteristics and direction of mounting are printed on the fuse. - Turn the fuse so that the label is in front (striker at the top end).

- Open the MV compartment. - Insert in first the fuse of the farthest phase.

- Fuses shall never be held in the middle.

- Open the upper field control screen by means of the top end of the fuse.

- Insert the bottom end of the fuse all the way into the lower ring contact.

- Then fit the top end of the fuse in the upper contact and check that the field control screen is properly closed. - Turn the fuse so that the label is in front.

74 - 07897542EN indice: D0

Schneider Electric

Tests on site

Checking and cocking the internal arcing detector(1)


This operation has to be made during assembly of the tunnels (option) or during operation on the roof of the cubicle.

The internal arcing detector is located on the roof of the cubicle. To be operational, it must be in cocking position.

Cocking the internal arcing detector: - push the metal rod (1) in direction of the bottom of the cubicle, - hang up the rod (1) on the support (2).

1: metal rod,

2: support. (1) The internal arcing detector is mounted

according to the internal arcing withstand characteristics of the cubicle.

Schneider Electric

07897542EN indice: D0 - 75

Tests on site

Voltage test on the main circuits

After erection, the equipment shall be tested in order to check the correct installation. The power-frequency test voltage shall be 80% of the rated test value (40kV rms), because the units have already been tested in Schneider Electric factory at 100% of the voltage rated value) and shall be applied to each phase conductor of the main circuit for 1 minute earthing the other two phase conductors.

Warning
This preparation entails the bypass of some interlock. Only appropriately trained staff shall be allowed to operate. The procedures described in the following shall be strictly applied. Voltage transformers and lightening arresters, if any, shall be disconnected during the voltage tests at power frequency in order to avoid severe damages. NB: In units equipped with VTs withdrawable fuse version, disconnect the fuses. In units equipped with fixed VTs, disconnect the VTs power supply primary circuit. CTs secondaries shall be short-circuited at the LV terminal boards (if the auxiliary circuits are open).

The leads from the testing equipment shall be connected to the MV cable lugs of a unit. This requires the opening of a lower door during the test for passing the above-mentioned leads.

During the voltage tests, all the unit shall be fitted with the relevant circuit-breakers. The circuit-breakers shall be plugged in service position and closed. Since hand closing is not permitted with closed doors, a special procedure is required (see below) when auxiliary power supply is not available. Obviously, the MV cables shall be disconnected and the earthing switch shall be opened.

How to prepare the units


Operations to be carried out on units not directly connected to the testing equipment

- Circuit-breaker in disconnected position and the compartment door open. - Lift the locking rod A located on the top of the circuit-breaker mechanism. - Insert spacer U to keep the rod in raised position. - Push the circuit-breaker to the service position and remove spacer U. - Charge the closing spring of the circuit-breaker and close it by pressing pushbutton I .

For a complete description of the following operations, please consult the SF circuit-breaker instruction for use handbook.

76 - 07897542EN indice: D0

Schneider Electric

Tests on site

Operations to be carried out on the unit to be connected to the testing equipment


Starting conditions The circuit-breaker is in disconnected position, or in test / disconnected position or removed from the unit. Remove the possible keys or padlocks preventing the operation of the earthing switch. Verify that the voltage indicating lamps are off.

Withdraw the VT fuses

Starting conditions - Selector 6 in position

- Set selector 6 to . This operation requires first to pull outward the selector and then to turn it. This operation turns off the CTs secondaries.

- Insert the crank into hole 7 and turn counter clockwise until further rotation becomes impossible.

- Set selector 6 to withdrawn position

The symbols marked on the blue front cover of the circuit-breaker summarise the above-mentioned procedure.

Schneider Electric

07897542EN indice: D0 - 77

Tests on site

Close the earthing switch

Push the pushbutton of the earthing switch electromechanical lock. If the cubicle is not equipped with this option, go directly to the following sequence.

Set selector 4 to

This operation requires first to pull outward the selector and then to turn it.

Insert the crank into hole 5 and turn it clockwise until the earthing switch position indicator reads on.

Turn selector 4 clockwise to position I.

The earthing switch is in closed position. The MV cables are short-circuited and earthed. The selector in this position prevents the insertion of the circuit-breaker.

The symbols marked on the yellow front cover summarise the above-mentioned procedure. For more protection, it is possible to prevent the insertion of the circuit-breaker by setting the selector P as shown in the following drawing.

78 - 07897542EN indice: D0

Schneider Electric

Tests on site

Prevent the insertion of the circuit-breaker


Open the VT compartment door

Set selector P to

Remove the 2 screws indicated in the figure and open the lower door. Make ineffective the interlock preventing the opening of the earthing switch with open door by entering the slot indicated with a screwdriver and pushing it downwards. This operation allows the access to the earthing switch operating shaft.

Warning
The operation described is allowed only for testing configuration; this operation, performed when the switchboard is in service, is extremely dangerous because it makes the operator reach the live parts.

Schneider Electric

07897542EN indice: D0 - 79

Tests on site

Open the earthing switch

Push the pushbutton of the earthing switch electromechanical lock. If the cubicle is not equipped with this option, go directly to the following sequence.

Set selector 4 to . This operation requires first to pull outward the selector and then to turn it.

Insert the crank into hole 5 and turn its counter clockwise until the earthing switch position indicator reads off.

Set selector 4 to position O.

The earthing switch is in open position.

The symbols marked on the yellow front cover summarise the above-mentioned procedure.

80 - 07897542EN indice: D0

Schneider Electric

Tests on site

Restore the possibility of circuit-breaker insertion

Set selector P in horizontal position With the circuit-breaker in disconnected position and the compartment door open, lift the locking rod A located on the top of the circuit-breaker mechanism. Insert spacer U to keep the rod in raised position.

Push the circuit-breaker to the service position and remove spacer U. Charge the closing spring of the circuit-breaker and close it by pressing pushbutton I .

Connect the leads from the testing equipment to the MV cable lugs.

After performing the test

- Move the circuit-breaker to the disconnected position. - Close the earthing switch. - Remove the test leads. If provided, reinstall the VT truck. - Close the door and secure it by fixing the 2 bolts. - Open the earthing switch. - Plug-in the VT fuses.

Schneider Electric

07897542EN indice: D0 - 81

82 - 07897542EN indice: D0

Schneider Electric

Schneider Electric group service centers are there to provide: - engineering and technical assistance, - commissioning, - training, - preventive and corrective maintenance, - adaptation work, - spare parts. Call your sales representative who will put you in touch with your nearest Schneider Electric group service center or directly call the following telephone number: +33 (0)4 76 57 60 60 Grenoble France.

Schneider Electric Industries SAS


89, boulevard Franklin Roosevelt F-92505 Rueil-Malmaison Cedex Tel: +33 (0)1 41 29 85 00 www.schneider-electric.com www.merlin-gerin.com

As standards, specifications and designs change from time to time, please ask for confirmation of the information given in this publication. This document has been printed on ecological paper.

Publishing: Schneider Electric Industries SAS. Design: Profil. Printing: 03/2008

07897542EN - REV. D0

07897542EN - REV. D0 a Schneider Electric Industries SAS All rights reserved.

You might also like