You are on page 1of 77

ZXWR RNC (V3.09.

30)
Commissioning Guide
Integration Manual

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATIN you agree to the following terms. If you
do not agree to the following terms, please notice that you are not allowed to use this document.
Copyright 2009 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer,
distribution, use or disclosure of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited.
and
are registered trademarks of ZTE CORPORATION. ZTEs company name, logo
and product names referenced herein are either trademarks or registered trademarks of ZTE
CORPORATION. Other product and company names mentioned herein may be trademarks or trade
names of their respective owners. Without the prior written consent of ZTE CORPORATION or the
third party owner thereof, anyones access to this document should not be construed as granting, by
implication, estopped or otherwise, any license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and personal
security. This product shall be stored, used or discarded in accordance with product manual,
relevant contract or laws and regulations in relevant country (countries).
This document is provided as is and as available. Information contained in this document is
subject to continuous update without further notice due to improvement and update of ZTE
CORPORATIONs products and technologies.

ZTE CORPORATION
Address:

NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057

Website:

http://dms.zte.com.cn (Technical Support)

Email:

TSM.Aftersales@zte.com.cn

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Revision History
Product Version
V3.09.30

Document Version

Serial Number

R1.0

Reason for Revision


First published

Author
Date
2010-07-15

Document Version
R1.0

ZTE Confidential Proprietary

Prepared
by
Hu Zhigang

Reviewed by
Chen Taiming

Approved by
Chen Taiming

2014 ZTE CORPORATION. All rights reserved.

II

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

About This Document


Summary
Chapter

Description

1 Introduction to RNC System


Integration

Introduction to RNC system integration

2 NodeB Integration

Description of NodeB integration

3 Iu-CS Integration

Description of Iu-CS integration

4 Iu-PS Integration

Description of Iu-PS integration

5 Iur Integration

Description of Iur integration

Applicable to: RNC commissioning engineers (both ZTE engineers and ZTEs
subcontractors)

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

III

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

TABLE OF CONTENTS
1 Introduction to RNC System Integration......................................................................1
1.1 Scope of Application.....................................................................................................1
1.2 Acronyms and Abbreviations.........................................................................................1
1.3 RNC External Interfaces...............................................................................................3
1.4 Classification of Transmission Bearer Modes of RNC External Interfaces....................4
1.5 Structure of RNC External Interface Protocol Stack......................................................5
1.6 Principles for RNC Integration.......................................................................................5
1.7 Preparation for RNC Integration....................................................................................6
1.7.1 Check of Hardware...............................................................................................6
1.7.2 Check of Data Configuration................................................................................6
1.8 Parameter Conversion Related with RNC Integration...................................................6
1.8.1 SPC Conversion...................................................................................................6
1.8.2 ATM Address Conversion.....................................................................................7
1.8.3 PVC Bandwidth Unit Conversion..........................................................................8
2 NodeB Integration..........................................................................................................9
2.1 ATM over E1.................................................................................................................9
2.1.1 Description of Integration Parameters for Iub Transmission.................................9
2.1.2 Iub Integration Description..................................................................................10
2.1.3 Physical Layer....................................................................................................10
2.1.4 IMA Layer........................................................................................................... 11
2.1.5 ATM Layer..........................................................................................................13
2.1.6 NBAP Layer........................................................................................................15
2.2 ATM over STM-1.........................................................................................................18
2.2.1 Iub Interface Integration Parameters..................................................................18
2.2.2 Iub Integration Description..................................................................................19
2.2.3 Physical Layer....................................................................................................19
2.2.4 ATM Layer..........................................................................................................20
2.2.5 NBAP Layer........................................................................................................21
2.3 ATM over CSTM-1......................................................................................................21
2.3.1 Iub Integration Parameters.................................................................................21
2.3.2 Iub Integration Description..................................................................................21
2.3.3 Physical Layer....................................................................................................22
2.3.4 IMA Layer........................................................................................................... 23
2.3.5 ATM Layer..........................................................................................................24
2.3.6 NBAP Layer........................................................................................................24
2.4 IP over E1................................................................................................................... 25
2.4.1 Iub Interface Integration Parameters..................................................................25
2.4.2 Iub Integration Description..................................................................................26
2.4.3 Physical Layer....................................................................................................26
2.4.4 HDLC Layer........................................................................................................27
2.4.5 PPP Layer..........................................................................................................27
2.4.6 IP Layer..............................................................................................................28
2.4.7 SCTP Layer........................................................................................................29
2.4.8 OMCB................................................................................................................ 30

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

IV

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

2.4.9 NBAP Layer........................................................................................................30


2.5 IP over FE................................................................................................................... 30
2.5.1 Iub Interface Integration Parameters..................................................................30
2.5.2 Iub Integration Description..................................................................................31
2.5.3 Physical Layer....................................................................................................31
2.5.4 IP Layer..............................................................................................................33
2.5.5 SCTP Layer........................................................................................................33
2.5.6 NBAP Layer........................................................................................................33
2.6 ATM and IP Mixed Transmission................................................................................34
3 Iu-CS Integration.......................................................................................................... 35
3.1 ATM Mode.................................................................................................................. 35
3.1.1 Description of Iu-CS Integration Parameters (E1)...............................................35
3.1.2 Description of Iu-CS Integration Parameters (STM-1)........................................36
3.1.3 Description of Iu-CS Integration..........................................................................37
3.1.4 Physical Layer....................................................................................................37
3.1.5 IMA Layer........................................................................................................... 39
3.1.6 ATM Layer..........................................................................................................39
3.1.7 MTP3B Layer.....................................................................................................41
3.1.8 SCCP Layer and RANAP Layer.........................................................................44
3.2 IP Mode...................................................................................................................... 45
3.2.1 Description of Iu-CS Integration Parameters......................................................45
3.2.2 Description of Iu-CS Integration..........................................................................46
3.2.3 Physical Layer....................................................................................................46
3.2.4 IP Layer..............................................................................................................48
3.2.5 SCTP Layer........................................................................................................49
3.2.6 M3UA Layer.......................................................................................................50
3.2.7 SCCP Layer and RANAP Layer.........................................................................52
4 Iu-PS Integration.......................................................................................................... 53
4.1 ATM Mode.................................................................................................................. 53
4.1.1 Description of Iu-PS Integration Parameters (E1)...............................................53
4.1.2 Description of Iu-PS Integration Parameters (STM-1)........................................54
4.1.3 Description of Iu-PS Integration..........................................................................55
4.1.4 Physical Layer....................................................................................................55
4.1.5 IMA Layer........................................................................................................... 55
4.1.6 ATM Layer..........................................................................................................55
4.1.7 MTP3B Layer.....................................................................................................55
4.1.8 SCCP Layer and RANAP Layer.........................................................................55
4.1.9 GTP-U Layer......................................................................................................55
4.2 IP Mode...................................................................................................................... 56
4.2.1 Description of Iu-PS Integration Parameters......................................................56
4.2.2 Description of Iu-PS Integration..........................................................................58
4.2.3 Physical Layer....................................................................................................58
4.2.4 IP Layer..............................................................................................................60
4.2.5 SCTP Layer........................................................................................................61
4.2.6 M3UA Layer.......................................................................................................61
4.2.7 SCCP Layer and RANAP Layer.........................................................................61
5 Iur Integration............................................................................................................... 63
5.1 ATM Mode.................................................................................................................. 63

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

5.1.1 Description of Iur Integration Parameters...........................................................63


5.1.2 Description of Iur Integration..............................................................................64
5.1.3 Physical Layer....................................................................................................64
5.1.4 ATM Layer..........................................................................................................64
5.1.5 MTP3B Layer.....................................................................................................64
5.1.6 SCCP Layer and RNSAP Layer.........................................................................64
5.2 IP Mode...................................................................................................................... 65
5.2.1 Description of Iur Integration Parameters...........................................................65
5.2.2 Description of Iur Integration..............................................................................66
5.2.3 Physical Layer....................................................................................................66
5.2.4 IP Layer..............................................................................................................66
5.2.5 SCTP Layer........................................................................................................66
5.2.6 M3UA Layer.......................................................................................................66
5.2.7 SCCP Layer and RNSAP Layer.........................................................................66

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

VI

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

FIGURES

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

VII

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 1-1 RNC external transmission interfaces..........................................................4


Figure 1-2 Structure of protocol stack............................................................................5
Figure 2-3 E1 subunit status..........................................................................................11
Figure 2-4 E1 status at NodeB side...............................................................................11
Figure 2-5 IMA link status..............................................................................................12
Figure 2-6 IMA group status...........................................................................................13
Figure 2-7 PVC status.....................................................................................................14
Figure 2-8 AAL2 status...................................................................................................15
Figure 2-9 SSCOP keep-active signaling......................................................................15
Figure 2-10 NCP and CCP status...................................................................................16
Figure 2-11 Cells status..................................................................................................17
Figure 2-12 Common transport channels.....................................................................17
Figure 2-13 Cell setup standard signaling....................................................................18
Figure 2-14 Direct transfer message.............................................................................18
Figure 2-15 APBE subunit state.....................................................................................20
Figure 2-16 SDTB/SDTA subunit state query................................................................22
Figure 2-17 E1 link status query....................................................................................23
Figure 2-18 IMA link status............................................................................................23
Figure 2-19 IMA group status.........................................................................................24
Figure 2-20 SDTB/SDTA subunit state..........................................................................26
Figure 2-21 E1 link status...............................................................................................27
Figure 2-22 HDLC link status.........................................................................................27
Figure 2-23 Tracing PPP signaling................................................................................28
Figure 2-24 SLA test.......................................................................................................29
Figure 2-25 SCTP status.................................................................................................30
Figure 2-26 Iub Interface Integration Parameters in IP Over FE Mode.......................30

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

VIII

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-27 GIPI subunit state.......................................................................................32


Figure 2-28 Alarm of GIPI external port.........................................................................33
Figure 3-29 E1 subunit state query...............................................................................38
Figure 3-30 APBE subunit state query..........................................................................39
Figure 3-31 PVC link state..............................................................................................40
Figure 3-32 AAL2 link status query...............................................................................41
Figure 3-33 SSCOP link signaling tracing.....................................................................41
Figure 3-34 No. 7 link status..........................................................................................42
Figure 3-35 Adjacent office signaling point status......................................................43
Figure 3-36 Office route query.......................................................................................44
Figure 3-37 Signaling link test result.............................................................................44
Figure 3-38 SCCP connection establishment messages.............................................45
Figure 3-39 GIPI subunit state.......................................................................................47
Figure 3-40 Alarm of GIPI external port.........................................................................48
Figure 3-41 SLA test.......................................................................................................49
Figure 3-42 SCTP state...................................................................................................50
Figure 3-43 AS and ASP state........................................................................................51
Figure 3-44 Active route information.............................................................................52
Figure 3-45 SCCP connection establishment...............................................................52
Figure 4-46 SLA test.......................................................................................................56
Figure 4-47 GIPI subunit state.......................................................................................59
Figure 4-48 Alarm of GIPI external port.........................................................................60
Figure 4-49 SLA test.......................................................................................................61
Figure 4-50 SCCP connection establishment...............................................................62
Figure 5-51 SCCP connection establishment...............................................................64

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

IX

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

TABLES
Table 1-1 Classification of Transmission Bearer Modes of RNC External Interfaces. 4
Table 1-2 The Meaning of Each SSF Value.....................................................................6
Table 2-3 Description of Integration Parameters for Iub Transmission.......................9
Table 2-4 Iub Integration Parameters in ATM Over STM-1 Bearer Mode....................19
Table 2-5 Iub Integration Parameters in ATM Over CSTM-1 Bearer Mode..................21
Table 2-6 Iub Interface Integration Parameters in the IP Over E1 Mode ....................25
Table 3-7 Description of Iu-CS Integration Parameters (E1)........................................35
Table 3-8 Description of Iu-CS Integration Parameters (STM-1).................................36
Table 3-9 Iu-CS Integration Parameters........................................................................45
Table 4-10 Description of Iu-PS Integration Parameters (E1)......................................53
Table 4-11 Description of Iu-PS Integration Parameters (STM-1)................................54
Table 4-12 Description of Iu-PS Integration Parameters..............................................56
Table 5-13 Description of Iur Integration Parameters..................................................63
Table 5-14 Description of Iur Integration Parameters..................................................65

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Introduction
Integration

to

RNC

System

Knowledge

1.1

Understanding the common used WCDMA acronyms and abbreviations.

Getting to know the interfaces involved in the RNC integration.

Understanding the transmission bearer modes used at different interfaces.

Getting to know the protocol structure of different interfaces.

Understanding the principles of RNC integration.

Learning about the preparations for the RNC integration.

Being familiar with the parameter conversions involved in the RNC integration.

Scope of Application
This manual describes the interfaces involved in RNC integration, and the transmission
bearer mode of each interface, the general planning for RNC integration, and the
integration of each interface under various transmission bearer modes.

1.2

Acronyms and Abbreviations


16QAM

16 Quadrature Amplitude Modulation

AMC

Adaptive Modulation and Coding

AMR

Adaptive Multi Rate

ATM

Asynchronous Transfer Mode

CBS

Cell Broadcast Service

CCTrCH Coded Composite Transport Channel


CN Core Network

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

CPICH

Common Pilot Channel

CQI Channel Quality Indicator


DPCCH Dedicated Physical Control Channel
DPDCH Dedicated Physical Data Channel
FDDFrequency Division Duplex
HARQ

Hybrid Automatic Repeat Request

HSDPA High Speed Downlink Packet Access


HS-DPCCH

High Speed-Dedicated Physical Control Channel

HS-DSCH

High Speed-Downlink Shared Channel

HS-PDSCH

High Speed-Physical Downlink Shared Channel

HS-SCCH

High Speed-Shared Control Channel

IR

Incremental Redundancy

OVSF

Orthogonal Variable Spreading Factor

PDU

Protocol Data Unit

QoS

Quality of Service

QPSK

Quadrature Phase Shift Keying

RAB

Radio Access Bearer

RACH

Random Access Channel

RB Radio Bearer
RNC

Radio Network Controller

RNS

Radio Resource System

RRC

Radio Network Control

RT Real Time
SIB System Information Block
SIR Signal-to-Interference Ratio

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

SRNC

Serving Radio Network Controller

STTD

Space Time Transmit Diversity

TCP/IP Transmission Control Protocol/Internet Protocol


TFCI

Transport Format Combination Indicator

TFRC

Transport Format Resource Combination

TFRI

Transport Format and Resource Indicator

TPCTransmit Power Control


TTI Transmission Time Interval
UE User Equipment
UL Up Link(Reverse Link)
UMTS

Universal Mobile Telecommunications System

URA

UTRAN Registration Area

UTRA

Universal Terrestrial Radio Access

UTRAN Universal Terrestrial Radio Access Network


WCDMA Wideband Code Division Multiple Access

1.3

RNC External Interfaces


RNC external transmission interfaces are shown in Figure 1 -1.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 1-1 RNC external transmission interfaces

1.4

Classification of Transmission Bearer Modes of


RNC External Interfaces
RNC external transmission bearer modes can be divided as described in Table 1 -1..

Table 1-1 Classification of Transmission Bearer Modes of RNC External Interfaces


Type of interface

Interface transmission bearer mode


ATM
IP

Iub interface

ATM+IP
IPoverE1
IPoverE1+IP
ATM

Iu interface (including CS and


PS)

IP
ATM+IP (ATM bears signaling, IP bears services)
IP+ATM (IP bears signaling, ATM bears services)

Iur interface

ATM
IP

When the mixed networking method is used at the Iub interface, usually non-real-time

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

data service runs on IP bearer of the RNC or NodeB, and real time service, signaling,
and OMCB data stream run on ATM or IPoverE1 bearer.

1.5

Structure of RNC External Interface Protocol


Stack
The structure of RNC external interface protocol stack is shown in Figure 1 -2.

Figure 1-2 Structure of protocol stack

1.6

Principles for RNC Integration


1.

Integrate the control plane first, and then the user plane.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

2.

Integrate the control plane and the user plane in the bottom-up order on the
protocol stack.

1.7

Preparation for RNC Integration

1.7.1

Check of Hardware

1.7.2

1.

RNC has been installed and powered on, and is running normally.

2.

RNC has been connected with the interfaces involved in the integration physically.

3.

NodeB has been installed and powered on, and is running normally.

Check of Data Configuration


1.

Related integration parameters have been obtained and data configuration of RNC
has finished.

2.

Data configuration of NodeB has finished.

1.8

Parameter
Integration

1.8.1

SPC Conversion

Conversion

Related

with

RNC

SPC provided by the operator is usually in the format: X-Y (X stands for SSF, and Y
stands for SPC), and the SPC mode (14 bit or 24 bit) will also be specified. When
configure data, we should convert Y into a decimal coding. If the SPC mode is 14 bit, we
will convert it into 3-8-3 mode; if it is 24 bit, we will convert it to 8-8-8 mode.
For example: In the RNC integration of Yanji Unicom in Jilin province, the SPC of
Ericssons MGW is 3-2052 (14 bit), which means SSF=3, SPC=2052, and the SPC
mode is 24 bit.
1.

SSF has 2 bits, and its value is between 0-3. The meaning of each value is shown
in Table 1 -2.

Table 1-2 The Meaning of Each SSF Value


SSF Value

Stands for

00

International network

01

Spare (for international use only)

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

SSF Value

Stands for

10

National network

11

Reserved for national use

From the above table, if SSF=3, SPC is reserved for national use.

1.8.2

2.

The SPC mode is 14 bit, so it should be converted to 3-8-3 mode.

3.

SPC=2052, which is a hexadecimal coding. We should convert it to a binary digit


first which is 10000001010010, and then according to the 3-8-3 mode, divide it to
001-00000000-100 (If there are less than three digits at the first part, add 0).
Finally, convert each segment into decimal number; the result is 1.0.4.

ATM Address Conversion


ATM takes the address formats as follows.

The commonly used format is E164 at present.


ZTEs M31 supports E164 and NSAP formats, and NASP is the default one.
For example:
If the RNC ATM address provided by the operator is in E164 format: 070320000000000,
then we need to convert it to the NSAP format.
The AFI of the E614 format is 45, which is a hexadecimal number. Put it before
070320000000000, we can get 45070320000000000. And then divide it at two-digit
interval from left to right. If the last segment has only one digit, put an F at the end, for
example 45.07.03.20.00.00.00.00.0F. Finally, convert each two-digit segment into a
decimal number. The result is the ATM address in NSAP format, which is
69.07.03.32.00.00.00.00.15.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

1.8.3

PVC Bandwidth Unit Conversion


Usually the bandwidth unit is cps at the CN side, and ZTE uses kpbs in data
configuration at the RNC side. The ATM cell has 53 bytes, therefore 1 cps = 1*53*8 bps
= 424 bps = 0.424 Kbps.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

NodeB Integration

Knowledge

Understanding the way of integration at the control plane of the Iub interface.

Learning about the integration of the radio cells.

Being familiar with the OMCB integration in different bearer mode.

2.1

ATM over E1

2.1.1

Description of Integration Parameters for Iub Transmission


Table 2-3 Description of Integration Parameters for Iub Transmission
Protoco
l layer

RNC
default
value

Parameter

NodeB
default
value

Configure
via
jumper

E1/T1 resistance
Physical
layer

Transmi
ssion
network

E1/T1 frame format


E1/T1 long and short cables (currently,
RNC supports short cable only)
Scrambling code type of link direction in
IMA link configuration

IMA
layer

Near-end clock sending mode of IMA


Group

CTC
mode

ITC
mode

Tx frame length and Rx frame length of


IMA group
ATM

PVC type (AAL5, AAL2)


PVC
type
/service
type

PCR

AAL2/
CBR

valid

AAL2/
RTVBR

valid

AAL2/

valid

ZTE Confidential Proprietary

SCR

MBS

CDVT

valid
valid

valid

valid

2014 ZTE CORPORATION. All rights reserved.

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protoco
l layer

RNC
default
value

Parameter

Transmi
ssion
network

NodeB
default
value

UBR
AAL5/
CBR

valid

valid

VPI/VCI
PATH ID (valid only for AAL2)
ATM address
Upper-level user type of AAL5
(NCP,CCP, ALCAP)
CCP port No.
NBAP

NodeB ID
Local cell No.
Tx and Rx frequency points

2.1.2

Iub Integration Description


Follow the bottom-up order on the protocol stack to integrate the physical layer, IMA
layer, ATM layer and NABP layer in turn.

2.1.3

Physical Layer
1.

Check the status of E1 subunit, and query the E1 subunit status of the
corresponding DTB at the RNC side.
To query the state, right-click DTB on the rack figure, select Show Board
Properties Pages > Subunit Configuration > Subunit Detail > State
information > State Query.
If the availability Status and the HW Status are both normal, the subunit status is
normal. If they are abnormal, please check whether theres any problem with the
DTB board, whether E1 is connected properly, and whether DIP and jumper are
normal.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

10

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-3 E1 subunit status

2.

Check E1 L1-L32 on the DTB panel. If the E1 LED indicators are flashing slowly at
1 HZ, all the E1 links are normal.

3.

Check the status of all the E1 lines at the NodeB side, and make sure these E1
links have been added to corresponding IMA group in the configuration at the
NodeB side and the Status is Normal.

Figure 2-4 E1 status at NodeB side

2.1.4

IMA Layer
1.

Check the status of the corresponding IMA E1 link in the RNC.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

11

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

To query the state, click RNC ManagedElement(P) > RNC configuration


centralized management > Dynamic data management object > IMA link.
In the normal status, both Local terminal and Remote terminal of all the IMA E1
links are in the Active state.

Figure 2-5 IMA link status

2.

Check the status of the corresponding IMA group in the RNC


To query the state, click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > IMA group.
If the Local state and the Remote state are both Running, the status of this IMA
group is normal. If it is abnormal, check whether the configuration of the integration
parameters of the two IMA groups, for instance, the scrambling and descrambling
configuration, are consistent.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

12

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-6 IMA group status

2.1.5

ATM Layer
1.

Check the status of corresponding PVC in the RNC. The status at Root side and
Branch side should be both normal.
To query the status, click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > PVC.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

13

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-7 PVC status

2.

Check the status of corresponding AAL2 in the RNC. The Administrative status
should be Unblock, the Local Block Status and the Remote Block Status should
be both Not Congested, and the Path Resetting Status should be No.
To query the status, click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > AAL2 PATH.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

14

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-8 AAL2 status

3.

For the AAL5 of non-OMCB type, trace SSCOP at the transport network SAAL
layer. In the normal state, there should be SSCOP keep-alive POLL and STAT
messages sent and received between the RNC and the NodeB.

Figure 2-9 SSCOP keep-active signaling

4.

2.1.6

For the AAL5 of OMCB type, ping the NodeB operation and maintenance address
on the OMCB server. In the normal state, the link between the OMCB and the
NodeB should be able to be established.

NBAP Layer
1.

Query NCP and CCP status of the corresponding NodeB in the RNC.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

15

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

To query the status, click RNC ManagedElement(P) > RNC configuration


centralized management > Dynamic data management object > NodeB port.
In the normal status, the Administrative State is Unlock, the Operational Status
is Enabled, and the Availability Status of CCP is Normal, the Availability Status
of NCP is unavailable.

Figure 2-10 NCP and CCP status

2.

Check the status of cells under the corresponding NodeB in the RNC.
To query the status, click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > Cell and
Channel..
In the normal status, the Administrative State is Unlock, the Existing State is
Existing, and the Availability Status is Normal.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

16

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-11 Cells status

3.

Log in to the NodeB from the DMS to check whether the common transport
channels are complete. Keep on refreshing the query. In the normal state, there
should be one BCH, one PCH, one RACH and two FACHs all the time.

Figure 2-12 Common transport channels

4.

After the above items have been checked, block and unblock the local cells on the
EOMS, and trace the RNC signaling, there should be cell setup standard

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

17

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

signaling.

Figure 2-13 Cell setup standard signaling

5.

Turn on the testing UE and register on the network, there will be messages of
rrcConnectionSetupComplete and initialdirectransfer having been sent from the
UE to the RNC.

Figure 2-14 Direct transfer message

6.

After the above steps are performed, the integration of the Iub interface has been
completed.

2.2

ATM over STM-1

2.2.1

Iub Interface Integration Parameters


ATM over STM-1 and ATM over E1 are two different transmission bearer modes.
Therefore, as to integration, they mainly differ from each other in the integration of the

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

18

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

transport layer, while the integrations of the other protocol layers of the two bearer
modes are the same. The basic integration parameters of ATM over STM-1 are shown in
Table 2 -4.

Table 2-4 Iub Integration Parameters in ATM Over STM-1 Bearer Mode
Protocol
layer
Physical
layer

RNC
default
value

Parameter

Transmission
network

NodeB
default
value

Fiber multiplexing structure (SDH-AU4,


SDH-AU3, SONET-STS-3)
ATM OAM functional switch
PVC type (AAL5, AAL2)

ATM

PVC type/
service type

PCR

AAL2/CBR

valid

AAL2/RTVBR

valid

AAL2/UBR

valid

AAL5/CBR

valid

SCR

MBS

CDVT
valid

valid

valid

valid
valid

VPI/VCI
PATH ID (valid only for AAL2)
ATM address
Upper-level user type AAL5 (NCP, CCP,
ALCAP)
CCP port No.
NBAP

NodeB ID
Local cell No.
Tx and Rx frequency points

2.2.2

Iub Integration Description


Follow the bottom-up order on the protocol stack to integrate the physical layer, IMA
layer, ATM layer and NABP layer in turn.

2.2.3

Physical Layer
1.

Check the state of APBE subunit, and the subunit state of corresponding APBE at
the RNC side. For APBE/2, there is only one subunit; for APBE, there are four
subunits. In the normal state, the subunit Availability Status and HW Status
should both be normal.
To query the state, right-click APBE on the rack figure, and click Show Board
Properties Pages > Subunit Configuration > Subunit Detail > State

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

19

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

information > State Query.

Figure 2-15 APBE subunit state

2.

Check the state of APBE LED indicators. In the normal state, the ACT LED
indicator should be constantly on.
ACT1-4 and SD1-4 correspond to 1-4 optical interfaces respectively. The ACT1
LED indicator constantly on indicates that the current optical interface is active, and
SD1 LED indicator constantly on indicates that the current optical interface receives
optical signal.

2.2.4

ATM Layer
For integration method, please see Section 2.1.5.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

20

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

2.2.5

NBAP Layer
For integration method, please see Section 2.1.6.

2.3

ATM over CSTM-1

2.3.1

Iub Integration Parameters


ATM over CSTM-1 differs from ATM over E1 in the transmission bearer. Therefore, as to
integration, they mainly differ from each other in the integration of the transport layer,
while the integrations of the other protocol layers of the two bearer modes are the same.
The basic integration parameters of ATM over CSTM-1 are shown in Table 2 -5.

Table 2-5 Iub Integration Parameters in ATM Over CSTM-1 Bearer Mode
Protocol
layer
Physical
layer

RNC
default
value

Parameter

Transmission
network

NodeB
default
value

Fiber multiplexing structure (SDH-AU4,


SDH-AU3, SONET-STS-3)
ATM OAM functional switch
SDT-PCM arrangement mode
PVC type (AAL5, AAL2)

ATM

PVC type/
servic type

PCR

AAL2/CBR

valid

AAL2/RTVBR

valid

AAL2/UBR

valid

AAL5/CBR

valid

SCR

MBS

CDVT
valid

valid

valid

valid
valid

VPI/VCI
PATH ID (valid only for AAL2)
ATM address
Upper-level user type AAL5 (NCP, CCP,
ALCAP)
CCP port No.
NBAP

NodeB ID
Local cell No.
Tx and Rx frequency points

2.3.2

Iub Integration Description


Follow the bottom-up order on the protocol stack to integrate physical layer, IMA layer,

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

21

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

ATM layer and NABP layer in turn.

2.3.3

Physical Layer
1.

Check the subunit state of SDTB/SDTA, and that of the corresponding board at the
RNC side. SDTB has 63 subunits, and SDTA has 126 subunits. In the normal state,
the subunit Availability Status and HW Status should both be normal.
To query the state, right-click SDTB/SDTA on the rack figure, and select Show
Board Properties Pages > Subunit Configuration > Subunit Detail > State
information > State Query.

Figure 2-16 SDTB/SDTA subunit state query

2.

Check the status of all the E1 links at the NodeB side and make sure these E1 links
have been added to the corresponding IMA group in the configuration at the NodeB
side and the Status is Normal.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

22

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-17 E1 link status query

2.3.4

IMA Layer
1.

Check the status of the corresponding IMA E1 link in the RNC.


To query the state, click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > IMA link.
In the normal status, both Local terminal and Remote terminal of all the IMA E1
links are in the Active state.

Figure 2-18 IMA link status

2.

Check the status of the corresponding IMA group in the RNC


To query the state, click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > IMA group.
If the Local state and the Remote state are both Running, the status of this IMA

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

23

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

group is normal.

Figure 2-19 IMA group status

2.3.5

ATM Layer
For the integration method, please see Section 2.1.5.

2.3.6

NBAP Layer
For the integration method, please see Section 2.1.6.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

24

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

2.4

IP over E1

2.4.1

Iub Interface Integration Parameters


Table 2-6 Iub Interface Integration Parameters in the IP Over E1 Mode
Protocol
layer

Physical
layer

Parameter

RNC default
value

Transmission
network

E1/T1 resistance

Resistances of
RNC and NodeB
should be
consistent with
those of the
transmission
network.

E1/T1 frame
format

RNC settings
should be
consistent with
that of the
transmission
network.

NodeB default
value

E1/T1 long and


short cables
(currently, RNC
supports short
cable only)
HDLC
layer

ML-PPP
layer

SCTP
layer

E1 time slot
adopted by
HDLC link
Number of links
in ML-PPP
IP of PPP peer
layers
Four parameters
of SCTP (local
end IP and port
number, peer end
IP and port
number)
IP address in IP
transmission
path, and
bandwidth
CCP port No.

NBAP

Local cell No.


Tx and Rx
frequency points

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

25

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

2.4.2

Iub Integration Description


Follow the bottom-up order on the protocol stack to integrate physical layer, IMA layer,
ATM layer and NABP layer in turn.

2.4.3

Physical Layer
1.

Check the subunit state of SDTB/SDTA, and that of the corresponding board at the
RNC side. SDTB has 63 subunits, and SDTA has 126 subunits. In the normal state,
the subunit Availability Status and the HW Status should both be normal.
To query the state, right-click SDTB/SDTA on the rack figure, and select Show
Board Properties Pages > Subunit Configuration > Subunit Detail > State
information > State Query.

Figure 2-20 SDTB/SDTA subunit state

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

26

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

2.

Check the status of all the E1 links at the NodeB side and make sure these E1 links
have been added to the corresponding IMA group in the configuration at the NodeB
side and the Status is Normal.

Figure 2-21 E1 link status

2.4.4

HDLC Layer
Check the status of all the HDLCs at the NodeB side, and make sure they are added to
the corresponding ML-PPP group in the configuration at the NodeB side, and the Status
is Normal.

Figure 2-22 HDLC link status

2.4.5

PPP Layer
Trace PPP signaling at the NodeB side in the DMS. There should be PPP_
ECHO_REQUEST and PPP_REPLY messages transmitted alternatively.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

27

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-23 Tracing PPP signaling

2.4.6

IP Layer
Test the connectivity of the IP layer with SLA in the RNC. The source address of the test
is the IP address configured for the DSP of RUB, and the target address is the IP
address of the PPP peer layer. In the normal state, the Send Request Number and the
Receive Reply Number should be the same.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

28

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-24 SLA test

2.4.7

SCTP Layer
Check the state of the NodeB SCTP in the RNC.
To query the state, click RNC ManagedElement(P) > RNC configuration centralized
management > Dynamic data management object > Basic Connection
Configuration Information of SCTP.
In the normal state, Associated State should be ESTABLISHED; Congestion Flag
should be Not congestion; and SSM state should be Activated.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

29

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-25 SCTP status

2.4.8

OMCB
Ping the NodeB operation and maintenance address on the OMCB server. The link
between the OMCB and the NodeB should be able to be established.

2.4.9

NBAP Layer
For the integration method, please see Section 2.1.6.

2.5

IP over FE

2.5.1

Iub Interface Integration Parameters


Figure 2-26 Iub Interface Integration Parameters in IP Over FE Mode
Protocol
layer
Physical
layer

Parameter
Media type (GE
optical port, GE
cable port, FE
cable port)

ZTE Confidential Proprietary

RNC default
value

Transmission
network

NodeB default
value

Resistances of
RNC and
NODEB should
be consistent
with those of the
transmission
network.

2014 ZTE CORPORATION. All rights reserved.

30

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer

Parameter
Negotiation mode
(obligation, selfnegotiate)

RNC default
value

Transmission
network

NodeB default
value

Negotiation
mode
(obligation, selfnegotiate)

Duplex mode (full


duplex mode,
half duplex
mode)
MTU
IPV4/IPV6
IP layer

SCTP
layer

IP package
fragmenting and
defragmenting
support
Four parameters
of SCTP (RNC IP
and port, NODEB
IP and port)
IP address in IP
transmission path
NodeB ID
CCP port No.

NBAP

Local cell No.


Tx and Rx
frequency points

2.5.2

Iub Integration Description


Follow the bottom-up order on the protocol stack to integrate physical layer, IMA layer,
ATM layer and NABP layer in turn.

2.5.3

Physical Layer
1.

Check the state of GIPI subunit, and query the subunit state of the corresponding
board at the RNC side.

GIPI with GE interface has one subunit, which corresponds to one GE optical
port or cable port.

GIPI with FE interface has four interfaces, which correspond to 4 FE cable


ports.

In the normal state, the subunit Availability Status and the HW Status should
both be normal.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

31

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

To query the state, click Show Board Properties Pages > Subunit
Configuration > Subunit Detail > State information > State Query.

Figure 2-27 GIPI subunit state

2.

Check whether there is any problem with the external network port of GIPI, In the
normal state, there should be no such an alarm as External Port of Board is
Down.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

32

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 2-28 Alarm of GIPI external port

2.5.4

IP Layer
For the integration method, please see Section 2.4.6.

2.5.5

SCTP Layer
For the integration method, please see Section 2.4.7.

2.5.6

NBAP Layer
For the integration method, please see Section 2.1.6.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

33

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

2.6

ATM and IP Mixed Transmission


Interconnect the ATM link and the IP link perceptively; they should be both unblocked.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

34

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Iu-CS Integration

3.1

ATM Mode

3.1.1

Description of Iu-CS Integration Parameters (E1)


Table 3-7 Description of Iu-CS Integration Parameters (E1)
Protocol
layer

RNC
default
value

Parameter

NodeB
default
value

Configure
via
jumper

E1/T1 resistance
Physical
layer

Transmission
network

E1/T1 frame format


E1/T1 long and short cables (currently, RNC
supports short cable only)
Scrambling code type of link direction in
IMA link configuration

IMA
layer

Near-end clock sending mode of IMA Group

CTC
mode

ITC
mode

Tx frame length and Rx frame length of IMA


group
PVC type (AAL5, AAL2)

ATM

PVC
type/service
type

PCR

AAL2/CBR

valid

AAL2/RTVBR

valid

AAL2/UBR

valid

AAL5/CBR

valid

SCR

MBS

CDVT
valid

valid

valid

valid
valid

VPI/VCI
PATH ID (valid only for AAL2)
ATM address/ATM address coding plan
Maximum length of SAAL message
signaling package
Signaling point coding
MTP3B

SLC
SSF
Upper-level user type of MTP3 (ALCAP)

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

35

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer
SCCP

RNC
default
value

Parameter

NodeB
default
value

Transmission
network

IT message sending timer of SCCP


IT message receiving timer of SCCP
PLMN

RANAP

RNC ID
LAC
SAC

3.1.2

Description of Iu-CS Integration Parameters (STM-1)


In most scenarios, STM-1 bearer mode is used at the Iu interface (via the optical port of
the APBE board). Only in few pilot offices, the Iu interface is connected via E1 port of the
DTB/IMAB board.

Table 3-8 Description of Iu-CS Integration Parameters (STM-1)


Protocol
layer
Physical
layer

RNC
default
value

Parameter

Transmission
network

Fiber multiplexing structure (SDH-AU4,


SDH-AU3, SONET-STS-3)
ATM OAM functional switch
PVC type (AAL5, AAL2)

ATM

PVC
type/service
type

PCR

AAL2/CBR

valid

AAL2/RTVBR

valid

AAL2/UBR

valid

AAL5/CBR

valid

SCR

MBS

CDVT
valid

valid

valid

valid
valid

VPI/VCI
PATH ID (valid only for AAL2)
ATM address/ATM address coding plan
Maximum length of SAAL message
signaling package
Signaling Point Coding
MTP3B

SLC
SSF
Upper-level user type of MTP3 (ALCAP)

SCCP

IT Message Sending Timer of SCCP


IT Message Receiving Timer of SCCP

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

36

NodeB
default
value

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer

Parameter

RNC
default
value

Transmission
network

NodeB
default
value

PLMN
RANAP

RNC ID
LAC
SAC

3.1.3

Description of Iu-CS Integration


The integration should follow the bottom-up order on the protocol stack: physical layer,
IMA layer, ATM layer, MTP3B layer, SCCP layer, and RANAP layer.

3.1.4

Physical Layer
1.

Check the E1 subunit state, and that of the corresponding DTB board at the RNC
side. The subunit Availability Status and the HW Status should both be normal.
To query the state, right-click the DTB board on the rack figure and select Show
Board Properties Pages > Subunit Configuration > Subunit Detail > State
information > State Query.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

37

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-29 E1 subunit state query

2.

Check whether the E1 LED indicators L1-L32 on the DTB panel flash at 1 Hz (slow
flash).

3.

For the APBE board in the STM-1 transmission mode, check the subunit state of
the APBE and that of the corresponding APBE board at the RNC side.

APBE/2 has only one subunit.

APBE has four subunits.

In the normal state, the subunit Availability Status and the HW Status should both
be normal.
To query the state, right-click the APBE board on the rack figure and select Show
Board Properties Pages > Subunit Configuration > Subunit Detail > State
information > State Query.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

38

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-30 APBE subunit state query

3.1.5

IMA Layer
For the integration method, please see Section 2.1.4.

3.1.6

ATM Layer
1.

Check the corresponding PVC state in the RNC.


To query the state, Click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > PVC.
The state of the Root side and the Branch side should both be Normal.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

39

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-31 PVC link state

2.

Check the corresponding AAL2 state in the RNC.


To check the state, Click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > AAL2 PATH.
In the normal state, the Administrative Status should be Unblock, the Local
Block Status and Remote Block Status should be Not Congestion, and the
Path resetting Status should be No. If multi AAL2 links are configured, you
should block them one by one to make a call test.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

40

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-32 AAL2 link status query

3.

For AAL5, it is required to trace the SSCOP of the SAAL at the transport network
layer. In the normal state, there should be SSCOP keep-alive messages POLL and
STAT sending between the RNC and the MGW.

Figure 3-33 SSCOP link signaling tracing

3.1.7

MTP3B Layer
1.

Check the status of the corresponding No.7 link in the RNC.


To query the state: Click RNC ManagedElement(P) > RNC configuration

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

41

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

centralized management > Dynamic data management object > No. 7 link.
In the normal state, MTP3 Link Status should be In Service; Not Congested,
and MTP3 Link Status (traffic) should be No Alarm; Normal.

Figure 3-34 No. 7 link status

2.

Query the status of the adjacent office signaling point in RNC.


To query the status, Click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > Adjacent
Office signaling point.
In the normal state, Access Flag should be Accessible. Right-click an office ID,
you can see information of the current route.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

42

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-35 Adjacent office signaling point status

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

43

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-36 Office route query

3.

The status of adjacent office signaling point can also be queried by tracing the
signaling of the MTP3B layer in the RNC. In the normal state, you can see the RNC
send the SLTM message, the MGW reply with the SLTA message, and the MGW
send the SLTM message, the RNC replies with the SLTA message. That means
the transmission at the MTP3B layer is unblocked, and the adjacent office signaling
point is reachable.

Figure 3-37 Signaling link test result

3.1.8

SCCP Layer and RANAP Layer


For the SCCP layer, when the UE location is changed, trace the signaling at the SCCP
layer. If there are the CR and CC messages, and no alarm about the subsystem 1 or
142, the SCCP layer is normal.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

44

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-38 SCCP connection establishment messages

After the above steps are performed, the integration of the Iu-CS interface is completed.

3.2

IP Mode

3.2.1

Description of Iu-CS Integration Parameters


Table 3-9 Iu-CS Integration Parameters
Protocol
layer

Physical
layer

Parameter

RNC
default
value

Transmission
network

Media type (GE optical


port, GE cable port, FE
cable port)

Resistance of RNC
and NodeB should
be consistent with
that of the
transmission
network.

Negotiation mode
(obligation, selfnegotiate)

RNC settings
should be
consistent with that
of the transmission
network.

NodeB
default
value

Duplex mode (full duplex


mode, half duplex mode)
MTU
IPV4/IPV6
IP layer

IP package fragmenting
and defragmenting
support
Four parameters of
SCTP (RNC IP and port,
NODEB IP and port)

SCTP
layer

IP address in IP
transmission path
SCTP CRC check mode
SCTP client/server mode

M3UA

Network profile
Routing CONTEXTID

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

45

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer

Parameter

RNC
default
value

Transmission
network

NodeB
default
value

APP server AS usage ID


AS traffic mode
N value of load sharing
mode
IT Message Sending
Timer of SCCP
SCCP

IT Message Receiving
Timer of SCCP
Subsystem 1, 142
PLMN

RANAP

RNCID
LAC
SAC

3.2.2

Description of Iu-CS Integration


The Iu-CS integration should follow the bottom-up order on the protocol stack: physical
layer, IP layer, SCTP layer, M3UA layer, SCCP layer, and RANAP layer.

3.2.3

Physical Layer
1.

Check the state of GIPI subunit, and query the subunit state of the corresponding
GIPI board at the RNC side.

GIPI with GE interface has one subunit, which corresponds to one GE optical
port or cable port.

GIPI with FE interface has four interfaces, which correspond to four FE cable
ports.

In the normal state, the subunit Availability Status and the HW Status should be
normal.
To query the state, right-click GIPI board on the rack figure, and select Show
Board Properties Pages > Subunit Configuration > Subunit Detail > State
information > State Query.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

46

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-39 GIPI subunit state

2.

Check whether there is any problem with the GIPI external port. In the normal state,
there is no such an alarm as External Port of Board is Down.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

47

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-40 Alarm of GIPI external port

3.2.4

IP Layer
In the RNC test the connectivity of the IP layer with the SLA. The Send Request
Number and the Receive Reply Number should be the same.

The source address of test is the IP address configured for the DSP of the RUB,
and the target address is the address configured for the user plane of MSC/MGW.

The source address of test is the IP address configured for SCTP, and the target
address is the SCTP address configured for SGSN.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

48

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-41 SLA test

3.2.5

SCTP Layer
Check the state of the MSC SCTP in the RNC.
To query the state, click RNC ManagedElement(P) > RNC configuration centralized
management > Dynamic data management object > Basic Connection
Configuration Information of SCTP.
In the normal state, Associated State should be ESTABLISHED; Congestion Flag
State should be Not Congestion; and SSM State should be Activated.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

49

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-42 SCTP state

3.2.6

M3UA Layer
1.

In the RNC, query the state of the AS and ASP used at the M3UA layer.
To query the state, Click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > As and Asp.
The AS State and ASP State should be Active.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

50

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-43 AS and ASP state

2.

In the RNC, query the state of the office maintained by the M3UA.
To check the state, click RNC ManagedElement(P) > RNC configuration
centralized management > Dynamic data management object > Adjacent
Office signaling point.
In the normal state, information of the active route can be checked.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

51

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 3-44 Active route information

3.2.7

SCCP Layer and RANAP Layer


For the SCCP layer, when the UE location is changed, trace the signaling at the SCCP
layer. If there are CR and CC messages, and no alarm about the subsystem 1 or 142,
the SCCP layer is normal.

Figure 3-45 SCCP connection establishment

After the above steps are performed, the integration of the Iu-CS interface is completed.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

52

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Iu-PS Integration

4.1

ATM Mode

4.1.1

Description of Iu-PS Integration Parameters (E1)


Table 4-10 Description of Iu-PS Integration Parameters (E1)
Protocol
layer

RNC
default
value

Parameter

NodeB
default
value

Configure
via
jumper

E1/T1 resistance
Physical
layer

Transmission
network

E1/T1 frame format


E1/T1 long and short cables (currently,
RNC supports short cable only)
Scrambling code type of link direction in
IMA link configuration

IMA
layer

Near-end clock sending mode of IMA


Group

CTC
mode

ITC
mode

Tx frame length and Rx frame length of


IMA group
PVC type (SIG_AAL5, USER_AAL5)

ATM

PVC
type/service
type

PCR

AAL5/CBR

valid

SCR

MBS

CDVT
valid

VPI/VCI
Maximum length of SAAL message
signaling
Signaling point coding
MTP3B

SLC
SSF
IT message sending timer of SCCP

SCCP

IT message receiving timer of SCCP


Subsystem 1,143

RANAP

PLMN
RNC ID
LAC

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

53

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer

RNC
default
value

Parameter

Transmission
network

NodeB
default
value

SAC
GTP-U

4.1.2

Destination GTP-U address


Local GTP-U address and mask

Description of Iu-PS Integration Parameters (STM-1)


In most scenarios, STM-1 bearer mode is used on the Iu interface (connected via the
optical port of the APBE board). Only in few pilot offices, the Iu interface is connected by
an E1 on the DTB/IMAB board.

Table 4-11 Description of Iu-PS Integration Parameters (STM-1)


Protocol
layer

Physical
layer

RNC
default
value

Parameter
Fiber multiplexing structure (SDH-AU4,
SDH-AU3, SONET-STS-3)

Transmission
network

Configure
via
jumper

ATM OAM functional switch


PVC type (SIG_AAL5, USER_AAL5)

ATM

PVC
type/service
type

PCR

AAL5/CBR

valid

SCR

MBS

CDVT
valid

VPI/VCI
Maximum length of SAAL message
signaling
Signaling point coding
MTP3B

SLC
SSF
IT message sending timer of SCCP

SCCP

IT message receiving timer of SCCP


Subsystem 1,143
PLMN

RANAP

RNC ID
LAC
SAC

GTP-U

Destination GTP-U address

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

54

NodeB
default
value

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer

Parameter

RNC
default
value

Transmission
network

NodeB
default
value

Local GTP-U address and mask

4.1.3

Description of Iu-PS Integration


The integration should follow the bottom-up order on the protocol stack: physical layer,
IMA layer, ATM layer, MTP3B layer, SCCP layer, and RANAP layer.

4.1.4

Physical Layer
For the integration method, please see Section 3.1.4.

4.1.5

IMA Layer
For the integration method, please see Section 3.1.5.

4.1.6

ATM Layer
For the integration method, please see Section 3.1.6.

4.1.7

MTP3B Layer
For the integration method, please see Section 3.1.7.

4.1.8

SCCP Layer and RANAP Layer


For the integration method, please see Section 3.1.8.

4.1.9

GTP-U Layer
In the RNC, test the connectivity of the IP layer with the SLA. The source IP address is
the GTP-U address configured at the RNC side and the target IP address the GTP-U
address configured for the SGSN. In the normal state, the Send request Number is the
same as the Receive reply Number.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

55

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 4-46 SLA test

4.2

IP Mode

4.2.1

Description of Iu-PS Integration Parameters


Table 4-12 Description of Iu-PS Integration Parameters
Protocol
layer
Physical
layer

Parameter

Media type (GE


optical port, GE
cable port, FE
cable port)
Negotiation mode
(obligation, selfnegotiate)

ZTE Confidential Proprietary

RNC
default
layer

Transmission
network

NodeB
default
layer

Resistances of RNC
and NodeB should
be consistent with
those of the
transmission
network.
RNC settings should
be consistent with
those of the
transmission
network.

2014 ZTE CORPORATION. All rights reserved.

56

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer

Parameter

RNC
default
layer

Transmission
network

NodeB
default
layer

Duplex mode (full


duplex mode, half
duplex mode)
MTU
IPV4/IPV6
IP layer

IP package
fragmenting and
defragmenting
support
Four parameters of
SCTP
(RNC IP and port,
NodeB IP and port)

SCTP
layer

IP address in IP
transmission path
SCTP CRC check
mode
SCTP client/server
mode
Network profile
Routing context ID

M3UA

APP server as
usage ID
AS traffic mode
N value of load
sharing mode
IT message
sending timer of
SCCP

SCCP

IT message
receiving timer of
SCCP
Subsystem 1,142
PLMN

RANAP

RNCID
RAC
SAC

GTP-U

Destination GTP-U
address
Local GTP-U
address and mask

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

57

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

4.2.2

Description of Iu-PS Integration


The integration should follow the bottom-up order on the protocol stack: physical layer,
IP layer, SCTP layer, M3UA layer, SCCP layer, and RANAP layer.

4.2.3

Physical Layer
1.

Check the state of GIPI subunit, and query the subunit state of the corresponding
GIPI board at the RNC side.

GIPI with GE interface has one subunit, which corresponds to one GE optical
port or cable port.

GIPI with FE interface has four interfaces, which correspond to four FE cable
ports.

In the normal state, the subunit Availability Status and the HW Status should be
normal.
To query the state, right-click GIPI board on the rack figure, and select Show
Board Properties Pages > Subunit Configuration > Subunit Detail > State
information > State Query.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

58

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 4-47 GIPI subunit state

2.

Check whether there is any problem with the GIPI external port. In the normal state,
there is no such an alarm as External Port of Board is Down.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

59

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 4-48 Alarm of GIPI external port

4.2.4

IP Layer
In the RNC, test the connectivity of the IP layer with the SLA. The Send Request
Number and the Receive Reply Number should be the same.

The source address of test is the IP address configured for the DSP of the RUB,
and the target address is the address configured for the user plane of MSC/MGW.

The source address of test is the IP address configured for SCTP, and the target
address is the SCTP address configured for SGSN.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

60

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 4-49 SLA test

4.2.5

SCTP Layer
For the integration method, please see Section 3.2.5.

4.2.6

M3UA Layer
For the integration method, please see Section 3.2.6.

4.2.7

SCCP Layer and RANAP Layer


For the SCCP layer, when the UE location is changed, trace the signaling at the SCCP
layer. If there are CR and CC messages, and no alarm about the subsystem 1 or 142,
the SCCP layer is normal.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

61

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Figure 4-50 SCCP connection establishment

After the above steps are performed, the integration of the Iu-PS interface is completed.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

62

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Iur Integration

5.1

ATM Mode

5.1.1

Description of Iur Integration Parameters


Table 5-13 Description of Iur Integration Parameters
Protocol
layer
Physical
layer

RNC
default
value

Parameter
Fiber multiplexing structure (SDH-AU4,
SDH-AU3, SONET-STS-3)

Transmission
network

Configure
via
jumper

ATM OAM functional switch


PVC type (AAL5, AAL2)

ATM

PVC
type/service
type

PCR

AAL2/CBR

valid

AAL2/RTVBR

valid

AAL2/UBR

valid

AAL5/CBR

valid

SCR

MBS

CDVT
valid

valid

valid

valid
valid

VPI/VCI
PATH ID (valid only for AAL2)
ATM address/ATM address coding plan
Maximum length of SAAL message
signaling
Signaling point coding
MTP3B

SLC
SSF
Upper-level user type of MTP3 (ALCAP)
IT Message sending timer of SCCP

SCCP

IT Message receiving timer of SCCP


Subsystem 1,143
PLMN

RNSAP

RNC ID
LAC
SAC

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

63

NodeB
default
value

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

5.1.2

Description of Iur Integration


The integration should follow the bottom-up order on the protocol stack: physical layer,
IMA layer, ATM layer, MTP3B layer, SCCP layer, and RANAP layer.

5.1.3

Physical Layer
For the integration method, please see Section 3.1.4.

5.1.4

ATM Layer
For the integration method, please see Section 3.1.6.

5.1.5

MTP3B Layer
For the integration method, please see Section 3.1.7.

5.1.6

SCCP Layer and RNSAP Layer


For the SCCP layer, perform an inter-Iur interface soft handover. When the message of
radio link addition request is detected at the Iur interface, trace the SCCP layer. There
should be CR and CC messages, and no alarm about the subsystem 1 or 142.

Figure 5-51 SCCP connection establishment

After the above steps are performed, the integration of the Iur interface is completed.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

64

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

5.2

IP Mode

5.2.1

Description of Iur Integration Parameters


Table 5-14 Description of Iur Integration Parameters
Protocol
layer

Physical
layer

Parameter

RNC default
layer

Transmission
network

Media type (GE


optical port, GE
cable port, FE
cable port)

Resistances of
RNC and NodeB
should be
consistent with
those of the
transmission
network

Negotiation mode
(obligation, selfnegotiate)

RNC settings
should be
consistent with
those of the
transmission
network

NodeB
default
value

Duplex mode (full


duplex mode, half
duplex mode)
MTU
IPV4/IPV6
IP layer

IP package
fragmenting and
defragmenting
support
Four parameters of
SCTP
(RNC IP and port,
NodeB IP and port)

SCTP
layer

IP address in IP
transmission path
SCTP CRC check
mode
SCTP client/server
mode
Network profile

M3UA

Routing
CONTEXTID
APP server AS
usage ID
AS traffic mode

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

65

ZXWR RNC (V3.09.30) Commissioning Guide Internal Use Only

Protocol
layer

Parameter

RNC default
layer

Transmission
network

NodeB
default
value

N value of load
sharing mode

SCCP

IT Message
Sending Timer of
SCCP
IT Message
Receiving Timer of
SCCP
PLMN

RANSAP

RNCID
LAC
SAC

5.2.2

Description of Iur Integration


The integration should follow the bottom-up order on the protocol stack: physical layer,
IP layer, SCTP layer, M3UA layer, SCCP layer, and RANAP layer.

5.2.3

Physical Layer
For the integration method, please see Section 4.2.3.

5.2.4

IP Layer
For the integration method, please see Section 4.2.4.

5.2.5

SCTP Layer
For the integration method, please see Section 4.2.5.

5.2.6

M3UA Layer
For the integration method, please see Section 4.2.6.

5.2.7

SCCP Layer and RNSAP Layer


For the integration method, please see Section 5.1.6.

ZTE Confidential Proprietary

2014 ZTE CORPORATION. All rights reserved.

66