You are on page 1of 35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.

CONTENT
Clause No. 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 DATE:12Feb2009REV:00Page1/35 1.1 1.2 2.1 2.2 2.3 2.4 3.1 3.2 3.3 8.1 8.2 8.3 8.4 8.5 8.6 Description General SiteConditions BriefSystemDescription DesignConsiderations Unloading,Storage,BlendingandReclaiminginOHPII StorageandReclamationofORE OtherAdditions/ModificationsandUpgradationinexistingOHP NewLimeDoloPlant(RMPIII)andSMSIIICircuit ScopeofWork&BatteryLimits ScopeofWork CommissioningSpares Operational/MaintenanceSpares Delivery ObligationsofPurchaser TechnicalSpecifications/Drgs./Documents/Codes&Standards ListofExclusion ListofApprovedVendors FluidSystem Handling&HoistingEquipment&Components Electrical Instrumentation InformationSystem FluidSystems&PipingEngg.(Lubrication&Hydraulics) Deviations Exclusion ListofDrawingsEnclosed Page No. 2 4 4 5 7 8 9 10 10 12 14 14 15 15 15 15 16 18 21 26 29 29 33 33 34

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 1. GENERAL 1.1SiteConditions Location Bhilai Steel Plant (BSP), SAIL is located at Bhilai in Durg District of the state of Chhatisgarh in the central region of India. The site lies between 21.50 North latitude and 81.220 East longitude. The nearest convenientrailhead isDurgwhichisabout12KmwestofBhilai.Bhilai/DurgstationsareontheHowrah MumbairaillieofSECRailwayoftheIndianRailways. ThelocationoftheBhilaiisasfollows: FromNewDheli,thenationalcapital FromKolkatta FromChennai FromMumbai The distance from state capital Raipur to Bhilai Steel Plant is 30 Km. it is well connected by rail and road network.ThenearestnationalhighwaysareNH6andNH43crossingtroughRaipur. MeteorologicalData Inthe absenceof Metrological data at Bhilai / Durg,thedataofthe state capital Raipur, 30 Km away,are considered.ThemeteorologicaldetailsatRaipuraregivenbelow: AmbientTemperature Absolutemaximum Absoluteminimum Highestofmeanmonthly AmbientAir Ambientairquality RelativeHumidity Maximum Minimum Climate : : : : 1359Km 868Km 1269Km 1100Km

: : :

47.70C 3.90C 45.20C

: : : :

Industrial 100% 7% TropicalHumid

Rainfall Heaviestrainfallin24hours : AnnualAverage : Wind Predominantwinddirection: Meanwindspeed : Max.windspeed :

370.3mm 1288.2mm

SWtoNE(OctoberFebruary)WestEast(MarSep) 6.8Km/hr 45Km/hr

DATE:12Feb2009REV:00Page2/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. Altitude Averagealtitudeofthelandis300maboveMSL Temperatureinsideshoppremisesisgenerallytakenas50Caboveambient,unlessotherwisespecified. InfrastructureFacilitiesoutsidethePlant Railway Bhilai Steel Plant connected to Indian Railways network Via Bhilai / Durg Stations are SEC Railway on the HowrahMumbai line. The track gauge of SEC railways as well as of the Plant tracks are standard broad gaugei.e1676mm. Road The Plant is well connected to the country by road. National highways NH6 and NH43 both pass trough Raipur. SeaPort ThenearestseaportisVishakhapattanam,approximately550Kmawayfromthesitebyrail. AirTraffic ThenearestAirportconnectedtotheNationalisManaatRaipur,30Kmaway. InfrastructureFacilitiesInsidethePlant Railway ThetrackgaugeforentirePlantcorrespondstotheIndianrailwaystandardbroadgaugei.e1676mm Road Main road and Side roads of the Plants shall have road ways of 7.0 m and 4.0 m width respectively and the temporaryroadsprovidedduringtheconstructionstageshallbedesignedtocatertheneedsofmovementof heavyconstructionvehicles. GeneralRulesandRegulations Allplantunitswithrespecttotheirlocation,layout,generalarrangementanddesignofequipment,structural design, etc. shall be safe to the personnel and conform to the relevant statutory requirements issued by ChattisgarhGovernmentandtheGovernmentofIndiabutnotlimitedtothefollowing. ChattisgarhStateFactoryRules/Acts. IndianElectricityRules/Acts ElectricityRegulatoryCommissionAct IndianPetroleumRegulations/Acts IndianBoilerRegulations/Acts IndianExplosivesActs GasCylindersRules/Acts CarbideofCalciumRules/Acts StaticandmobilePressureVesselsCodes(unifired)Rules/Acts FireProtectionManualissuedbyTariffAdvisoryCommittee(India) PollutionControlRegulations/Acts DATE:12Feb2009REV:00Page3/35

Pollutioncontrolmeasuresshallbeprovidedconsideringthelatestnormsandinternationalstandards.These shouldsatisfythestipulationsofCentralPollutionControlBoardandDepartmentofEnvironmentandForest, GovernmentofIndia. In the event the requirements of this specification exceeds the requirement stipulated in the corresponding standards,regulation,safetycode,thespecificationshallgovern. Intheeventofconflictbetweenthestandard,regulationsandcodes,themoststringentoneshallgovernand thedecisionofthePurchasershallbefinal. 1.2BriefSystemDescription TheturnkeypackageofthisTScomprisesofthefollowingsubsystems: New Ore Handling Plant (OHPII) including receiving, unloading, Stacking & Reclaiming and finally transportingofRawMaterialrequiredforBlastFurnace#8,SinterPlantIII. NewconveyorlineforNewLimeDolomiteplantRMP3andforproposedSMSIII. Modifications/upgradationsofexistingequipment,including: oAnadditionalseriesofconveyorfromOHPItoJH20paralleltoexistingroute. oUpgradationofcapacityofexistingshuttleconveyorsJ9BRSC1. 1. NewOreHandlingPlant(OHPII) Therawmaterialtobehandledbytheproposedsystemismainly,IronOreLump,IronOreFines,LimeStone (BF grade), Lime Stone (SMS grade), Dolomite (BF grade), Dolomite (SMS grade), Quartzite, Manganese ore. These raw materials are mainly required for Blast Furnace, Sinter Plant, LimeDolomite Plant, SMS. All the rawmaterialswillbereceivedattheplantboundarybyrail.ThetypeofWagonwillbeBOXN,BOXNHA,BOY, BOBRN, BOST, BOBS, BOXNEL, BOYL which will transport the raw materials depending upon the location of loadingandtypeofrawmaterials. As per flow diagram/ design considerations, Bidder shall consider the all inter connecting facilities between existing & proposed systems while designing the proposed junction towers / conveyor. Also bidder shall consider any modifications / strengthening of existing junction towers/ conveyor / chutes and complete replacement of chutes in case necessary. Bidder must visit the BSP site for assessment / feasibility of modification,strengthening&replacementworkstobecarriedoutintheexistingfacilitiesbeforesubmission ofoffertoBHEL. 2.DESIGNCONSIDERATIONS (The design considerations shall be the part of scope of work. Any thing missing in clause.3 i,e in scope of work but required as per clause.2 design considerations / flow diagram, then the bidder shall consider the sameintotheirscope) TheOreHandlingPlant(OHPII)hasbeenplannedbasedonthefollowingassumption: A.SizeofRawMaterial 1.LumpIronOre:40mm 2.Ironorefines:8mm 3.LimeStone(BF/SPgrade):60mm 4.Dolomite(BF/SPgrade):60mm 5.Quartzite:50mm DATE:12Feb2009REV:00Page4/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 6.LimeStone(SMSgrade):25mm 7.Dolomite(SMSgrade):25mm 8.Pellets:18mm 9.ManganeseOre:25mm 10.CokeBreeze:25mm B.NoofDaysofWorkingperyear:330days C. Maximum material carrying capacity of each wagon shall be as per IS: 100951982 reaffirmed 2001. Iron orelumpwillbereceivedinTrackHopper&allothermaterialinWagonTipplers.OneTrackHopperwithtwo trackshasbeenconsideredformaterialsreceivedinBOBS/BOBRNwagons(mainlyironore),whereaswagon tippler with side arm charger has been considered for unloading the materials received in BOXN/BOST/ BOXNHA/BOY/BOBS,BOXNEL,BOYLwagons. 2.1UNLOADING,STORAGE,BLENDINGANDRECLAIMINGINOHPII One number Wagon tippler WT no.B1 along with a Track Hopper THB1 with two parallel tracks on it have been envisaged for unloading Iron ore (lump and fines), Limestone & Dolomite (both BF grade and Sinter Plantgrade),Mnore,Quartziteetc. The Wagon Tippler shall be of Rotaside type capable of unloading BOXN and proposed BOXNHA and BOBS, BOY wagons as per IS:100951982, reaffirmed 2001. The rated unloading capacity shall be 20 Tips/hour. Adequatesystemofhandlingstickyrakessuchasvibrator/airblastershallbeprovided. 25.0 t wagon axle load and 110 t gross weight of wagons (BOX, BOXN, BOXN HA ,BOXN HS, BOXN EL, BOYEL) to be considered for design of Wagon Tippler and track hopper. The location of Weigh Bridge shall presently be considered at entry of pre hopper yard. However as the total railway track is being engineered by RITES , thelocationofweighbridgemayundergochangeindetailedengineeringstage. The placement of rakes shall be done by Side arm chargers capable of handling a full rake BOXN, BOXNHA, BOBS,BOY,BOXNEL,BOYELwagons. One (1) no. track hopper with two rail tracks with length of 210 m excluding maintenance bay and holding capacity of 6000.0 T considering material of bulk density of 1.6 t/ cu.m. shall be included in bidders scope. Thesideangleofhopperwithverticalshallbeminimum60deg.hoppershallhavefourcompartments.Track hopper envisaged to accommodate minimum 18 BOBS wagons. Bidder to confirm to maintain sufficient heightofthetrackhoppersuperstructuretotakecareofOHE. 2 nos. Electric hoist of 10.0 t capacity shall be provided for maintenance of Paddle Feeder at both ends of TrackHopperbuilding.Twonos.doubledoorpressurizedcabinshallbeprovidedforpaddlefeederinsidethe track hopper tunnel. Antiderailment device/ check rail shall be provided in the track hopper subject to approvalofRITES. In addition to the above, one dedicated compressor station at track hopper TH3 for unloading of BOBRN wagons is to be provided. Compressed air connection to BOBRN wagons to be provided at 15 mts interval. The details of requirement of compressed air, the pressure and type shall be obtained from RDSO. Other points as applicable for compressed air station shall be considered as per TS for compressed air facilities indicatedelsewhere. Provision of adequate illumination should be there on both pre & post tippler as well as on Merry Go Round circuit. DATE:12Feb2009REV:00Page5/35

TwobeltfeedersbelowWagonTipplershalldischargetherawmaterialoneitheroftwoconveyorsi.e.Z1C1 or Z1C2 which, in turn will discharge the material at Junction House JHZ1. From Jn House JHZ1, conveyors Z3C1 & Z3C2 will carry the material and discharge at JHZ3. There will be three incoming conveyors in Junction House JHZ3. The tail end of two conveyors Z3C1 & Z3C2 will start from JHZ1 and Belt conveyor Z3C3fromJHZ2.JunctionhouseJHZ2shallbelocatedinbetweentheJHZ1&JHZ3. The track hopper with four nos. paddle feeders of 1500 tph each, two on conveyors Z2C1 and two on conv. Z2C2 has been envisaged. From Jn. house Z2, either of three conveyors Z3C1, Z3C2 (coming from JHZ1) & Z3C3(beginfromJHZ2)shallcarrythematerialuptoJnhouseZ3.ReversibleshuttleconveyorsZ2RSC1/2at JHZ2 will facilitate to discharge the material on either of any three conveyors. Each conveyor (Z2RSC1 & 2) shallbeabletofeedanyofthreeconveyorsZ3C1,Z3C2&Z3C3.Alsothespaceforfuturereversibleshuttle conveyorshallbeprovidedasshownintheflowdiagramdrg..Therefore,JHZ2shallbedesigned suitably so as to receive material from any of the conveyors coming from Track Hoppers and also load of future reversible shuttle conveyor shall be considered for structural design of junction house JHZ2. Non sticky liners/polymerlinersaretobefixedinthetrackhopperstoimproveflowability. Suitable interchangeability shall be provided below Wagon Tipplers and Track Hoppers for the conveyors by providingDivertergates. Biddertoprovidejumbogallerysuitableforthreenos.mobiletrippersuptoJHZ5fromJHZ4overconveyors Z6C1,Z6C2andZ6C3.Outofthreetrippers,twonos.(Overconv.Z6C2andZ6C3)shallextenduptoJHZ6 and one no. shall have provision of extension to junction house coming in future . Hence, junction house JH Z6shallbedesignedbyconsideringthespace&loadoffutureconveyors.Maintenancehoistofminimum5t capshallbeprovidedforthetrippers.EachofthethreeconveyorsZ6C1,Z6C2andZ6C3shallbecapableof feeding the stackingconv.Z4BC1as well asitself inJHZ4 and stackingconv.Z5BC1aswell as itself inJHZ5. Each of the two conveyors Z6C2 and Z6C3 shall be capable of feeding the stacking conv. Z6BC1 as well as futureconveyorinJunctionHouseJHZ6. The raw material can be either transported via. Jn House Z4, Z5 or Z6 to the respective stacking conveyors Z4BC1, Z5BC1 & Z6BC1 for stockpiling or can be fed directly to the reclaiming conveyors Z7C1/ Z7C2 whichmeansconveymaterialdirectlyfromtheWT/TrackHopperto: (a)TotheBlastFurnace#8StockHouse (b)TotheBaseMixFuel&FluxcrushingcircuitofSinterPlantIII.JHZ11shallbedesignedaccordingly. In Jn House Z3, three nos. Reversible Shuttle conveyors no. Z3RSC1, 2 & 3 can feed any one of conveyor no. Z4C1, C2 & C3. One yard conveyor Z4AC1 and at Junction House JHZ4, three conveyors Z5C1, Z5C2 & Z5 C3shallreceive thematerial from aboveconveyors.Conveyor Z5C1,C2&C3 shall furthercarrythematerial anddischargeonyardconveyorZ5AC1&Z6C1&C2atJunctionHouseJHZ5.AnyoneofconveyorZ6C2& C3willdischargethematerialonyardConveyorZ6AC1atJunctionhouseJHZ6. Suitable interchangeability shall be provided at Junction house JHZ4, 5, 6 & 11 for the conveyors by providingDivertergates. The Stacking conveyors Z4AC1, Z5AC1 & Z6AC1 can form a stockpile 30m wide, 350m long and 10.5 m (maximum)highwiththehelpofTwinboomstackers. Suitable number of electrically operated UnderSlung Cranes, Hoists etc. shall be provided in all floors of Junction Houses and building for maintenance of equipment. InLine Magnetic Separators, Metal Detectors, Belt WeighScales, AirBlasters/ Bin Vibrators shall be provided to make the system complete and the operation/maintenancesmooth. DATE:12Feb2009REV:00Page6/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.

As per flow diagram/ design considerations, Bidder shall consider the all inter connecting facilities between existing & proposed systems while designing the proposed junction towers / conveyor. Also bidder shall consider any modifications / strengthening of existing junction towers/ conveyor / chutes and complete replacement of chutes in case necessary. Bidder must visit the BSP site for assessment / feasibility of modification,strengthening&replacementworkstobecarriedoutintheexistingfacilitiesbeforesubmission ofoffertoBHEL. 2.2STORAGEANDRECLAMATIONOFORE From the Wagon Tipplers WTB1 and the Track Hopper THB1, the raw material is sometimes fed directly to the consuming plant in case of emergency. However, this shall not happen under normal circumstances, when the three Twinboom stackers over conveyors Z4BC1, Z5BC1 & Z6BC1 store the raw material in the designated place of the yard in bed nos. 1 to 6. Flexibility shall be in built in the Jn House Z4, Z5, & Z6 to ensurestackingistroublefree. Bed blending system shall be possible with the stacker running to and fro on the length of the pileor on a lengthbetweentwodefinedpositionincasemorethanonematerialisstoredinabedmarkedbytravellimit switches, which through a relay sequencing circuit, with time control reverses the traveling gear after the travelineachdirectioncoveringthedesiredlengthofthepile.Afteralayerofsomepredeterminedamount is deposited in one traveling direction of the stacker, probes fitted on the stacker boom gives it a raise signalassoonasanetheightofmaterialisformed.Thenextlayeristhenformed. Iron ore may require stockpile formation as described above for blending and uniformity. However, the emphasisonblendingshallbeforironorefineswhichshallbeblendedwhilestacking. Fournos.Bucketwheelreclaimershavebeenenvisagedforbedno.1to6. All stacking line conveyors feeders and stackers etc. shall have a rated capacity of 1500 tph & a designed capacityof1800tph. Allreclaim lineequipmentshallhavearatedcapacity of1500tph and adesigned capacityof1800tph inthe orehandlingarea. Reclamation takes place by the conveyors Z7C3 (Bed no. 1), Z4AC1 (Bed 2or 3), Z5AC1 (Bed no.4 or 5) and Z6AC1(Bed no.6) andthe reclaimed materialviaJnHouse Z4A,B,Z5A,B,Z6AandZ6Bshallreach JnHouse Z7. Two reclaim conveyors Z7C1 and Z7C2 between Z6A to Z7 will receive all the materials from yard for furthertransportation. ReclamationfromOHPtakesplaceforthefollowingcircumstances: Feedingofironorelump,dolomite,limestone,manganese,quartzite,pelletetc.toBF#8stockhouse. TransportingLimestone/Dolomite(SPgrade)andironorefinestoBaseBlendingYardforSinterPlantIII. Two streams of belt conveyors shall reclaim the material from new OHPB yard to above places. Belt conveyor Z7C1 & C2 shall carry the material and transport thru Z8C1, C2, Z9C1, C2, Z10C1, C2 to Z11C1& C2 to Junction house JHZ11. Junction HouseZ11 can discharge the material either to existing conveyors R103/R104ofSinterPlantIIIorproposedconveyorZ12C1/C2ofBF#8,withthehelpofreversibleconveyors Z11RC1 or Z11RC2. To receive the material from Z11RC1 & C2, suitable modification in existing gallery of R103 & R104 is required. Also a junction house JHZ11 with two reversible conveyors & tail end of belt conveyorsZ12C1&C2shallbeerectedabovetheseconveyors.Further,conveyorZ12C1&C2andthenZ13 DATE:12Feb2009REV:00Page7/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. C1 & C2 shall move towards stock house of BF#8 and discharge at JHZ15 onto belt conveyors Z15C1 & Z15 C2. AjunctionhouseJHZ14shallbeprovidedinbetweenthejunctionhousesJHZ13&JHZ15.Twoseriesofbelt conveyors shall discharge the Sinter at the Junction House Z14 over belt conveyor Z15C1 & C2. Junction HouseJHZ14shallbeinthescopeofPurchaseri.e.BSP. Suitable Junction houses with RCC floors, diverter gates & galleries shall be provided to transfer the material from one conveyor to another. The scope of bidder shall finish at JHZ15 with complete drive and discharge (including reversible shuttle conveyor) facilities. The receiving belt conveyor below Z15C1 & C2 shall be in the scope of Purchaser i.e. BSP. However, JHZ15 shall have a provision (inserts/ foundation bolts) to erect outgoingconveyorstoStockHouse. As per flow diagram/ design considerations, Bidder shall consider the all inter connecting facilities between existing & proposed systems while designing the proposed junction towers / conveyor. Also bidder shall consider any modifications / strengthening of existing junction towers/ conveyor / chutes and complete replacement of chutes in case necessary. Bidder must visit the BSP site for assessment / feasibility of modification,strengthening&replacementworkstobecarriedoutintheexistingfacilitiesbeforesubmission ofoffertoBHEL. 2.3OTHERADDITIONS/MODIFICATIONSANDUPGRADATIONINEXISTINGOHP (REF.DRG.NO.MEC/S/9101/11/17/0/00/00/061.B01/R1) 2.3.1.AnAdditionalseriesofconveyorfromOHPtoJ20 Another proposed conveyor No J9C1 parallel to J9C3/J9C4, besides conveyors R102, shall start from Jn. House JH9B and shall discharge the material in a proposed conveyor J9HC1 in existing JH9, which in turn feeds to conveyor J10C2 in new Junction house JH9H . Conv J10C2 can feed proposed conveyor J11C3, J11RC2, J14C2/ J12C2 (Exstg), J15C2. Conv J15C2 shall feed new reversible conv. J15RC1 in junction houseJH15,whichinturncanfeedeitherexistingSMSIIfeedingconv.J15AC1ornewconv.J15BC1.Conv. J15BC1 or another new conv. J15BC2 which shall receive sinter from existing conv. SS10 shall feed new conveyor J16C3 in new junction house JH15B which in turn shall discharge onto new conv. J16C3A in new junction house JH16A. Conv. J16C3A shall discharge onto new conv. J17C3 in JH16A which shall convey materialtoconveyorJ17AC1inJH17(exstg).ConveyorJ17AC1(Capacity1500tph)shalldischargetoeither of the two conveyors J20C3 or J17BC1 through a adjustable flap gate in junction house J17A. further J17B C1 shall discharge the material over J42C2 in JH17B. The capacity of the outgoing conveyors J20C3 and J17BC1/ J42C2 shall be 500tph and 1000tph respectively. Conveyor J20C3 shall be provided with one no. belt weigh scale and have provision of discharging onto existing sinter carrying conveyor J27C5 (Exstg) in junctionhouseJH20(Exstg).ConveyorJ42C2shallhaveprovisionofdischargingontoexistingconveyorJ44 C5injunctionhouseJ42(Exstg). Necessary modification/strengthening shall be carried out in junction house J42 to take care of additional loadsbynewconveyor.SuitableelectricalinterlockshallbeprovidedbetweentheconveyorsJ27C5&J20C3 in junction house JH20 to trip all the incoming conveyors in case feed rate exceeds capacity (500tph) of the corresponding downstream conveyor J27C5. Similar interlock shall also be provided between J44C5 & J44 C2injunctionhouseJH42toavoidanyspillage/chuteblockage. TheseadditionalconveyorswithgatewillfacilitateanewadditionalrouteforBF#7. All above conveyorshallrunadjacent totheexisting conveyor/galleries atsame elevation,conveyor profiles may be decided accordingly. Junction houses JH9H, JH10A, JH15B, JH16A, JH 17A and JH17B shall be new Junction houses. For inter connecting conveyor no. J11C3, J11RC2, J14C2, J15C2, J15RC1, J15BC1, DATE:12Feb2009REV:00Page8/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. J15BC2 , J17C3, J17AC1, J20C3 & J42C2, the existing junction houses (JH10, JH11, JH14, JH15, JH 17, JH20andJH42)shallbesuitablymodifiedtosuitproposedconveyortransferpoints/crossingover. As per flow diagram/ design considerations, Bidder shall consider the all inter connecting facilities between existing & proposed systems while designing the proposed junction towers / conveyor. Also bidder shall consider any modifications / strengthening of existing junction towers/ conveyor / chutes and complete replacement of chutes in case necessary. Bidder must visit the BSP site for assessment / feasibility of modification,strengthening&replacementworkstobecarriedoutintheexistingfacilitiesbeforesubmission ofoffertoBHEL. 2.3.2.UpgradationofReclaimingconveyors The capacity upgradation and utilization of reclaim conveyors are of utmost importance to ensure smooth operation in the OHP. The list of conveyors in the reclaiming circuit that shall be upgraded to 1500 tph are givenintablebelow. Sl. ConveyorNo. Existing belt Existing Proposed belt Proposed No width capacity width capacity 1 J9BRSC1 1400mm 500m3/hr 1400mm 1500TPH Accordingly all necessary modifications/ replacement in drive unit, technology structure, gallery structure andinjunctionhouseshallbeconsideredbythebidder. ThecapacityofallBeltconveyorsshallbe1500tphforallrawmaterialsviz. ironore,limestone,dolomitewith1400mmbeltwidthandbeltspeedshallbe2.0m/swithatroughingangle of 35 deg.. Bulk density of raw material shall be considered as 2.2 t/m3 for power calculation / load data of structuresand1.6t/m3forvolumetriccapacitycalculationofconveyor. As per flow diagram/ design considerations, Bidder shall consider the all inter connecting facilities between existing & proposed systems while designing the proposed junction towers / conveyor. Also bidder shall consider any modifications / strengthening of existing junction towers/ conveyor / chutes and complete replacement of chutes in case necessary. Bidder must visit the BSP site for assessment / feasibility of modification,strengthening&replacementworkstobecarriedoutintheexistingfacilitiesbeforesubmission ofoffertoBHEL. 2.4NEWLIMEDOLOPLANT(RMPIII)ANDSMSIIICIRCUIT Existing conveyor R101/ R102 shall be utilized to convey raw material required for Lime/Dolo Calcination plantRMPIIIandofSMSIIIbytappingtheconveyorfromJnhouseJN102(Withsuitablemodificationinthe JnHouse) andtaking anewroutetotheproposedLime/Dolocalcinationsplant/SMSIII.Anycivil/structural modification works related to installation of new conveyors in existing junction house JN#102 shall be biddersscope. The SMS grade limestone, dolomite and iron ore in existing OHPI shall be reclaimed via. Jn House N101, N102. Belt Conveyors R101/102 coming from OHPI shall now mostly carry Lime stone and dolomite. In JH N102,tworeversibleconveyorR103A &R104AarehavingaprovisionfortakingmaterialtoSinterplantIIIas wellasproposedLimePlant.AdischargechutebelowR103A&R104Atofeedatthetailendofproposedbelt conveyorL1C1shallbeprovidedatJunctionhouseJHN102.BeltconveyorL1C1shalldischargethematerial on L2C1 in junction house JHL2. Conv. L2C1 discharges onto conveyor L3C1 which discharges onto L4C1 in JHL3.Conv.L3C1inturndischargematerialatJunctionHouseJHL4toanyofthetwoconveyorsi.e.L5C1& L7C1withthehelpofdiverterGate. DATE:12Feb2009REV:00Page9/35

Thereafter, conveyor L7C1 will carry the material and transfer onto conveyor L9C1. Conveyor L9C1 will carrythematerialuptoSurgeBinbuildingJHL9throughreversibleshuttleconv.JL9RSC1.Surgebinbuilding JHL9 shall have 3 nos. bunkers of geometric capacity 190 cub m each for storing iron ore lump/limestone /bauxite. Suitable rod gate and motorized rack and pinion gates shall be fitted at the bottom of bunkers.3 nos. VVF controlled vibro feeders of 350 tph capacity each shall withdraw material from bunker and dischargeitontoconveyorL10C1whichshallconveyuptoJunctionhouse JHL10foronwardtransportation to Surge Bin Building for SMSIII (Surge bin bldg not in bidders scope) through SMS feeding conveyor. Conveyor L10C1completewith discharge facilities andjunction house JHL10 shall be inthescopeof Bidder andSMSfeedingconveyorshallbeinthescopeofpurchaser. The other conveyor L5C1 shall receive material from conveyor L4C1 and discharge at JHL5 on to conv. L6 C1whichshallconveyuptojunctionhouseJHL6anddischargeontolimeplantfeedingconveyorforonward transporttoLime&DolomitecalcinationplantRMPIII.ConveyorL6C1completewithdischargefacilitiesand junction house JHL6 shall be in the scope of Bidder. However, lime plant feeding conveyor shall be in the scopeofpurchaseri.e.BSP. Calcined lime/dolomite is received from the day bins of lime/dolo product storage building of RMP III onto conveyorL8C1.Conv.L8C1dischargesontoconv.L9C2inJHL8whichinturndischargesontoconveyorL10 C1inSurgeBinbuildingJHL9.ThisfinishedproductofRMPIIIistransportedtothejunctionhouseJHL10by conveyorsL10C1whichshallalsocarrylimestone,bauxite,ironorefinesreceiveddirectlyfromOHPIyardto SMSIII.ThescopeofbidderstartsfromtailendonconveyorL8C1includingskirtboardsetc. A fixed hopper of 8 cub m capacity on conveyor L10C1 near JHL9 with VVF controlled vibro feeder of 350 tph capacity shall also be used to transport coke fines as and when required in the storage bins of the bulk material charging system of SMS III. Any other material e.g limestone/ DRI can also be transported under emergencyconditionsthroughfixedhopper. As per flow diagram/ design considerations, Bidder shall consider the all inter connecting facilities between existing & proposed systems while designing the proposed junction towers / conveyor. Also bidder shall consider any modifications / strengthening of existing junction towers/ conveyor / chutes and complete replacement of chutes in case necessary. Bidder must visit the BSP site for assessment / feasibility of modificationworks,strengthening&replacementtobecarriedoutintheexistingfacilitiesbeforesubmission ofoffertoBHEL. 2.5. Two separate Automatic Sampling system complete with sample cutter, collection, sizing, crushing and grindingshallbeprovidedfortheRMHSsystem. 3.SCOPEOFWORK&BATTERYLIMITS. 3.1.SCOPEOFWORK 3.1. Complete Wagon tippler & side arm charger along with onboard electrics and associated equipments. 1 no. In case, if the counter weight of the wagon tippler is of RCC & M.S scrap, the supply ofM.Sscrap,RCCandconstruction/castingofcounterweightshallbeinthebiddersscopeonly. 3.2. Complete Twin boom stackers (with bypass arrangement) along with onboard electrics, boom conveyor belting, storm anchor arrangement & its structure and all associated equipments. 3 nos.. However, rails are excluded from the bidders scope. In case, if the counter weight of the stacker machines is of RCC & M.S scrap OR RCC alone, the supply of M.S scrap & RCC and the construction / casting of counter weight shall be in the bidders scope only. Any AC system required for PLC cabin on machinetobeconsideredbythebidder. DATE:12Feb2009REV:00Page10/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 3.3. Complete Bucker wheel reclaimers along with onboard electrics, boom conveyor belting, storm anchor arrangement & its structure and associated equipments. 4 nos.. However, rails are excluded from bidders scope. In case, if the counter weight of the bucket wheel reclaimer machine is of RCC & M.Sscrap OR RCC alone,the supplyof M.S scrap & RCCand the construction / castingofcounter weight shallbeinthebiddersscopeonly.AnyACsystemrequiredforPLCcabinonmachinetobeconsideredby thebidder. 3.4. Complete Paddle feeders along with onboard electrics and associated equipments. 4 no., Bidder shall consider dust suppression system trolley & other requirements in their scope. However, rails are excludedfrombiddersscope. Bidder shall consider Inputs / outputs for integration of equipments with main system/ conveyor system. Complete design, manufacture, shop floor testing/ joint inspection, shop painting, transportation to site, unloading at site, storage & security at site, local transportation to erection spot, erection & commissioning,P.G.Testing,finalpaintingatsiteandhandingovertocustomerasperFlowdiagrams, Design consideration clause, Technical specs., General technical specs.. Also bidder shall consider anyitems/facilitieswhicharenotspecifically mentioninthisspecs.butarerequiredforthesmooth, safeandtroublefreeoperationofthesystem. Initialfills&consumablestillhandingoverofequipments/systemstothecustomer. Operation & maintenance of equipments / system till handing over to customer. Any problems / accidentsoccurredbeforehandingovertocustomershallberectifiedbythebidder. Two years operation & maintenance spares for the equipments / systems which are in bidders scope. Bidder shall furnish the list along with offer which shall be subjected to BSP approval during systemdetailengineering. Commissioningsparesandinsurancesparesforallequipmentswhichareinbiddersscope. Arrangement of all erection equipment viz. cranes, hoists, winches, etc, and safety appliances, any temporary structural supports as required for erection of plant & equipment. Cross checking of civil foundation works done by other agency during civil construction to avoid mismatches during equipmenterection.Appointmentofsafetyofficerbythecontractorshallbeincluded. Specialized training of Purchasers / Consultants personnel for operation, maintenance, for smooth handingovertheplant. As per flow diagram/ design considerations, Bidder shall consider the all inter connecting facilities between existing & proposed systems while designing the equipments in theirs scope. Also bidder shall consider any modifications / strengthening required in the existing system where the proposed equipments are to be installed. Bidder must visit the BSP site for assessment / feasibility of modification works, strengthening & replacement to be carried out in the existing facilities before submissionofoffertoBHEL. During erection & commissioning of system, the bidder shall coordinate with the conveyor system / othersystemssuppliersforinterfacingandsuccessfulcommissioningoftheentireproject. BHEL shall provide power supply at middle point of stock pile area, from there bidder shall tap the powerforthestacker/reclaimermachines. Progress reporting as per agreed formats, providing documentary evidence of purchase orders on sub vendors with addresses of contact persons, attending all site progress review / engineering review meetings at BSL, Bhilai or at MECON / BHEL, Ranchi, opening an equipped site office with coordinator over seeing all activities. Testing and cold trial run of systems/ sub systems and integrated testing shall be carried out by the successful Bidder on continuous basis for complete system along with associated facilities followed by DATE:12Feb2009REV:00Page11/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. commissioning. On successful commissioning of the various subsystems, PG test of the entire plant shall be carriedoutaselaboratedintherelevantchapter. Receiving delivery of items at site, their proper storage, and handling at site, watch and ward services, removal of debris to a location specified by the Purchaser etc.. Site shall be handed over to the Purchaser in clean and orderly manner to the satisfaction of the customer site engineers after commissioning of the project. Getting Purchasers/ consultants approval for the drawings prepared by the successful Bidder, obtaining required approval from statutory authorities, providing adequate personnel, equipment, tools & tackles for timelycompletionoftheproject. Bidder should deploy experienced site incharge, engineers, supervisors, skilled man power, semiskilled manpower,unskilledmanpowerofsufficientmembersonmutualagreementbetweenbidder,BHELandBSP tocompletetheprojectaspertheschedule. ELECTRICALSCOPELIST BBHEL,VVendor,PFPaddelFeeder,WTWagonTrippler. Sl. Description WT stacker Reclaimer PF No. 1 Motor V V V V 2 VVVF V V V 3 HTCable V V 4 Transformers V V 5 BusDucts 6 MCC V V 7 FieldDevices V V V V 8 LTPowerCable V V V V Control/ Fest V V V V 9 Cable 10 Illumination B V V B 11 PLC/MMI V V 12 ControlDesk V V V 13 ControlPanel V V V V Power JB / V V V 14 ControlJB 3.2.COMMISSIONINGSPARES
GEAR BOXES(Including drives of stackercum reclaimer, wagon tippler,pusher car,CBMS )

1. 2.

Oil

seals assembly

1 set of each type 1 set of each type

Input shaft with matching gear wheel GEAR COUPLING

1.

Seal

kit for gear coupling

1 set of each type

DATE:12Feb2009REV:00Page12/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.
H 1 2 J 1 2 3 1. 2. 3. 4. 5. 6. 7. B 1. DIVERTOR GATE Limit switch Oil seals of actuator FOR ALL FLUID COUPLINGS Fusible plug Resilient plate Multidisc plate ELECTRICAL Indicating lamp with holder Power contactor Overload relay Fuses Relay/Timers Push button Brake coil WAGON TIPPLER & ACCESSORIES Assembly of top clamp beam a) Clamp beam pivot pin b) Rubber block 2. Assembly of platform support a) Bush 3. Assembly of side beam a) Rubber block 4. Various limit switches 1 set 1 no. each type 2 nos. 1no. 1 set 2 nos. of each type 2 nos. of each type 1 no of each type 1 no of each type 20% of each rating -Minm 1 no. 20% of each rating -Minm 1 no. 30% of each rating -Minm 1 no. 20% of each rating -Minm 1 no. 20% of each rating -Minm 1 no. 20% of each rating -Minm 2 no. 12 nos. 12 nos.

5. 6.

Pins, Bushes and nuts for coupling Hydraulic Power Pack i ii. iii. iv. v. vi. vii viii Filter elements Pressure/Temperature switch Seals of hydraulic cylinder and pumps etc Hydraulic Hoses James walker (pivot bearing) seal Chain & sprocket Valves Piston rod with seals

1 no.

3 nos. 1 no. each 1 set 1 no. of each type & size 1 no 1 set 1 set 1 set

SIDE ARM CHARGER

DATE:12Feb2009REV:00Page13/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.
1. Hydraulic Power Pack i. Oil Filter ii. Hydraulic Hose kit for iii.Seal / hydraulic motor cylinder iv.Metallic seal for hydraulic pipes v Valves vi Piston rod with seals Limit switch for brakes Couplings Switches Bearing for side guide roller Bearing for travel wheel Rubber spring for coupler buffer Rope for counter weight luffing system Bush for sheaves TWIN BOOM STACKER Fluid Coupling spares i. Fusible Plug ii. Oil seals Coupling bolts for all drives Hoses Solenoid valve with coil Oil filters Metallic seal for Hydraulic pipe Grease Pump element Gear box seal kit 6 sets 6 sets 6 sets 6 sets of each type 6 sets. of each type 15 sets 15 sets 6 nos 6 nos 3 sets 15 sets 6 sets 6 nos 15 sets 20 sets 20 sets 3 sets 2 sets 3 nos. of each type and size 1 no. of each size 1 set of each type 6 sets 1 set 1 set 2 nos 1 set 2 nos of each type 1 no. 1 no. 1 set 1 length 1 no.

2. 3. 4. 5. 6. 7. 8. 9. D 1.

2 3 4. 5. 6. 7.. 6. 7. 8. 9. 10 11 12 13 14 15

lines

Carbon brushes & insulator for current collector of power cable reeling drum Brake limit switch Seal kit for thruster assembly Thruster cylinder All types limit & proximity switch of Brake shoes Cable guide rollers Rail clamp assembly Seal kit for thruster assembly

BUCKET WHEEL RECLAIMER 1. Fluid Coupling Spares i. Fusible Plug ii. Oil seals iii. Coupling bolts for all Hoses Solenoid valve with coil 10 sets of each type 25 sets of each size 5 set of each size 25 sets 10 sets

drive

2 .3

DATE:12Feb2009REV:00Page14/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.
4 5 6 7 8 9 10 11 12 13 14 15 16 Oil filters Metallic seals for hydraulic pipe lines Grease pump element Gear box seal kit (including slew gear bucket wheel) box, Carbon brushes & insulator for current collector of power cable reeling drum Brake limit switches Seal kit for thrustor assembly Hydraulic cylinder seal All type limit & proximity switch of Valves Piston rod with seals Brake shoes Cable guide rollers 25 sets 25 sets 10 nos 25 nos

25 sets 25 sets 25 sets 5 sets of each type 5 sets of each type 5 sets 5 sets 25 sets 30 sets

3.3.OPERATIONAL/MAINTENANCESPARES Bidder shall consider two years operational/ maintenance spares for all the equipments/ systems which are in the scope bidder and the list of spares shall be furnished along with offer. However, the list of spares / quantity furnished by the bidder shall be subjected to the approval of customer BSP during detail engineering. Any additions / deletions in spares by customer BSP shall be absorbed by the successful bidder duringprojectexecution. BIDDER SHOULD CONSIDER IN THEIR PLC / AUTOMATION / CONTROL SYSTEM, ALL NECESSARY REQUIREMENTS (IN PUTS / OUT PUTS) FOR INTERFACING & INTEGRATING WITH CONVEYOR SYSTEM & OTHERSYSTEMSWHICHARENOTINTHESCOPEOFBIDDER. 4.0DELIVERY The project is schedule upto handing over to Purchaser BSP shall be within 24 months from the date of placement of LOI on successful bidder to handing over. The delivery of plant & equipment shall be FOR, BSL site/storesatBhilai,Chhattisgarh. 5.OBLAGATIONSOFPURCHASER Purchaser shall allot leveled land with an undulation of about +500mm from the predetermined level as per thelayoutdrawingforinstallationoftheRawMaterialHandlingSystem. Purchaser shall provide construction power, drinking water during construction on Chargeable basis and space for storage and site office as per general technical specifications (GTS). The bidder shall indicate the detailsrequiredbythemintheprescribedformat. AdditionalPoints Therequirementofconstructionpowerandwatershallbeindicated. List of activities to be performed by the Purchaser for completeness of the work shall be mentioned bytheBidderwithoutfailalongwithoffer. DATE:12Feb2009REV:00Page15/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. TheresourcedeploymentforcarryingoutthejobassuggestedbytheBiddershallbementioned. The Bidder shall confirm the supply of all consumables required for erection, testing and successful commissioningofthesystem. TheBiddershallalsoconfirmtheprovisionofcommissioningsparesrequiredforallequipment. The Bidder shall confirm the supply of all special tools and tackles required for erection, testing and successfulcommissioningofthesystem. The Bidder shall furnish spares for two years normal operation/ maintenance of the offered equipmenttoensureavailabilityoftheequipment.Priceofsuchsparesshallbequotedseparately. 6.0TECHNICALSPECIFICATION/DRGS/DOCUMENTS/CODES&STANDARS Complete detailed specifications for all the equipments / systems & drawings and all other documents , approvedvendorlist,P.Gtestsetc,shallbesenttherespondedbiddersseparatelyintheformofsoftcopies. 7.0LISTOFEXCLUSIONS: 1)Allcivilfoundationworksforequipmentwhicharethebiddersscope. 2)Supply&Erectionofrailsforpaddlefeeder,twinboomstacker&bucketwheelreclaimer. 3)Electricalsexceptonboardelectrics. 8.0LISTOFAPPROVEDVENDORS: This document PREFERRED MAKES OF EQUIPMENT AND SUPPLIES is a part of the tender specification forvariouspackagesofBHILAISTEELPLANT.Themakesofvariousequipmentand suppliesinrespectof imported/indigenous equipment/components/materials are listed out in this document. It is essential that the equipment/component/materials to be supplied from imported/indigenous sources by the Bidder will be of any one of the makes listed against that particular equipment/ component/material in thisdocuments.. IncasetheBidder/Contractorintendstosubstituteanyparticularmakeofequipment/ components/ materials by a make other than that listed in this document, the Bidder shall clearly bring out the same in his tender along with justification and indicate the alternative makes offered by him. It willbeprerogativeofthePurchasertoacceptorrejectthealternativemakessooffered. 8.1FLUIDSYSTEM 8.1.1WaterSupplyFacilities Sl. No. 1 2 ItemDescription Horizontal CentrifugalPumps VerticalTurbine Pumps Manufacturers KirloskarBrothers,KSB,BeaconWeir,Khimline,Jyoti, Sintech,Ghaziabad. KirloskarBrothers,Voltas,WPIL,Jyoti

DATE:12Feb2009REV:00Page16/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. VerticalWetPit 3 SUMotors,KishorePumps,KirloskarBrothers,KSB. TypePumps KSB,SUMotors,KirloskarBrothers,KishorePumps, 4 SubmersiblePumps Darling,BeaconWeir. 5 6 7 8 9 10 11 12 13 14 15 16 17 SlurryPump DosingPump CoolingTowers PressureFilters SluiceGates TravellingWater Screen SludgeScrapper FireHydrants BasketStrainers DuplexStrainers RubberDismantling Joints DieselEngine Softening&DM Plant ROPlants EffluentTreatment Plant Drinkingwater TreatmentPlant BasaltLiners OilSkimmer Akay,SamEngg.,MBE,KBL,KSBPumps,WARMAN. ShapoTools,AsiaLMI(Madras),PositiveMetering Pumps,Toshniwal,MiltonRoyIndia. PCTPL,ShriRamTowerTech,Gammon,Himgiri, SouthernCoolingTower,BDT,GEA Thermax,IonExchange,ResinIndia,Driplex,Doshion, VATechWabag,UEM,Aquatech JashEngineering,IVPL Macmet,Triveni,Otokiln,Mecgale(Nagpur),General Mechanical Triveni,NeoParisrutan,MataIndia,Geomiller NewAgeIndustries,SteelageIndustires,ASCO, Strumech,VijayFire,Zenith FilterationEngrs,J.NMarshall,MasturlalFabrication, ARFEngg,PurolatorFilters,ABB,FiltersMfdIndia FilterationEngrs.,Otokiln,Superflo BDX,CORIEngineers,D.Wren, Cummins/AshokLayland/Ruston Doshi/ResinIndia/Thermax/ThermaxCullinyan/VA Tech/IonExchange/Triveni/GEAEnergySystems/ DriplexWaterEngg,Triveni, UEMIndia,VATech,GEAEnergySystems,Ion Exchange, DriplexWaterEngg,Triveni, UEMIndia,VATech,GEAEnergySystems,Triveni, UEMIndia,VATech,GEAEnergySystems,Driplex Water Engg,Triveni, DEMECH,VidyutGreenBank,EnviroAbrasian,Garden ReachShipBuilders&Engg. JVMEngg.

18 19 20 21 22 23 24

PlateHeatExchangers Alfalaval,GEAEcoflex,IDMC SurgeTanks AnupEngg.,ZenithErectors,Haldia.,PerfectEngg., SakthiHitech

DATE:12Feb2009REV:00Page17/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. C.I.Valves(gate, KirloskarBrothers,Steam&Mining,IVPL,AVValves, 25 globe,NRV) ShivDurga,BDK,Fouress. Audco,Fouress,BHEL,Sakhi,KSB,Steam&Mining, CSValves(gate, BDK, 26 NRV) Kirloskar,Virgo AudcoL&T,VassInd.,Xomox,Virgo,BDK,Steam& 27 PlugValves Mining. 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 BallValves GMValves ButterflyValves (Manually& Electricallyoperated) DiaphragmValves FloatValve ControlValve SolenoidValve AirReleaseValve PressureReducing Valve Strainer/Filter ElectricActuators RotoryPneumatic Actuators Hoses Pipesa)MS/GI b)DI RCCPipes&Fittings HDPEPipes&Fittings PVCPipes&Fittings SSPipes/SSFittings Audco,KSB,ALSaunders,Xomox,Virgo,BDK,Virgo, Leader,Steam&Mining,NECO,UpadhyayValves, KalpanaValves L&T,Fouress,KirloskarBrothers,IVPL,VIRGO,AL Saunders,Steam&Mining,Keystone,BDK,XOMOX. ALSaunders,FluidSystem,BDK,Steam&Mining. Leader,IVPL,IMEngineers,Steam&Mining. BHEL,L&T,Fouress,IL,MILControls,NECOScharbet, Darling Rotex,Sicmag,Scharder,NECOINDFOS,Eastern Pneumatic,Bluestar,AVCON,ASCO,Mercury ShivaDurga,IVPL,IMEngineers,Steam&Mining, SchroderDuncum,FluidLineValves. JNM,Fouress,Bestobell,IL,Mazda,NirmalInd.,Forbes Marshal Otokiln,Superflo,TriveniPlenty,FilterMfg.Ind., Purolator,FilterationEngineers BeaconRotork,Auma,MarshEngineers,Keystone, Limitorque,Antrieb,IL,Palghat ALSaunders,Xomox,ELOMatic,Virgo,L&T,Flocon, PrecisionProcessingEquipt.Co. Aeroflox/Markwel/SeniorFlexonics,Inalsa,Teksons SAIL/TATA/Jindal/Zenith/Man/SAW/Surindra/Welspun/ Prakesh ElectroSteelCasting SURIndustrialPipes,HindCeramics,IndianHumePipes, DayaCuncrching. EMCO,KWHHeliplasticPolyolefins,Oriplast Oriplast,Finolex,BharatPipe&Fittings,Supreme Industries. HeavyMetalTubes,NobelTubes,RajendraMech.Ind., Vitrag,SAIL,PoonamEnterprises,N.L.Hazra, M.S.Fittings

DATE:12Feb2009REV:00Page18/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. ChoksyTubes,MJPatel,NagardasKanji,Poonam Seamless,Stainless Enterprises,SandulkAsia,NobleTubes,AlliedSteel, 46 SteelPipes/Tubes SAIL,MaharastraSeamless(P)Ltd, EBYInd.,HighTech,Hydrotechnic,HydroAirEngg., Fittingsforthe ProjectToolings,Shivananda,M.J.Patel,NoblesTubes, 47 abovePipes/Tubes AlliedSteel,PoonamEnterprises,N.L.Hazra, M.S.Fittings Wrapping&Coating RustechProducts,HOTACO,IWL,MPTarProducts 48 forpipes ChemicalDosing HindustanDorrOliver,TellabsChemicals, 49 System Chembonddrewtreatltd.,NALCO 8.2.HANDLING&HOISTINGEQUIPMENT&COMPONENTS 8.2.1Equipment Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 ItemDescription EOTCrane (Upto10Tcapacity EOTCrane (Upto50Tcapacity) EOTCrane (Above50Tcapacity) UnderslungCranes(Upto 5tonly) ElectricHoists Manufacturers Armsel, Avon, FAFECO, Mukand, WMI,Anupam, Shivpra,Tubrofurguson HEC, Jessop, Mukand, Hyderabad Ind. Ltd.,WMI, FAFECO,Unique,Anupam Jessops,HEC,Mukand,FAFECO,Unique,WMI,. Armsel,Brady&Morris,Shivpra

Armsel, Shivpra,WH Brady, Brady & Morris,Grip Engrs., Hitech,CenturyCrane HEC, L&T, Hyderabad Ind., Mukand, EqiptEngrs, TransferCars ELECON,TRF Chain Pulley Blocks & hand Armsel, Century Cranes, Brady & Morris, LightLift Ind., operatedtravellingcranes. Hitech,MREngg.LiftingEquipment Beekay, HEC, Armsel, Century Cranes, Nirmal ShuntingWinch Equipments,Mining&MHEquipment,Cyclo transmission Brady&Morris,CenturyCranes,Hitech,Grip JibCrane Engrs.,Elite,LightLifting,Armsel CrawlerMountedMobile TIL,HyderabadIndustries,TATAP&H Crane Excavator/Shovel TIL,HEC,HyderabadIndustries,BEML Elevator/Lift OTIS,OMEGA,Kone,ECE

8.2.2MechanicalComponents/Equipment Sl.No. 13 14 ItemDescription Hooks Flexible/Gearedcoupling Manufacturers HermanMohta,FreeTradingCorporation,SteelForgings &Engg.. Hicliff,Concord,Wellman,GBM,Alliance,NewAllenbery

DATE:12Feb2009REV:00Page19/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. Works,Elecon, 15 Wirerope BharatWireRope,OrionRopes,UshaMartin BearingsforCranes SKF,FAG Bearingsforother 16 SKF,FAG,TataTimken,AsianBearings,NRB,MBM equipment VacoOilSeals,RubberEquipment&Engg.SealjetIndia 17 OilSeals (Pune),Sealpack,ChampionSeals 18 LubricationFittings Lubcon,AFMC,Prakash,Lincoln 19 LubricatingSystems AFMC,Prakash,GrindwellNorton,LincolnHelios NewAllenburry,GreavesCotton,ELECON,ShantiGears, 20 Gearbox Flender,AREngg,Kirloskar,I.C. VickersSperry,Yuken,Manesmann,Rexroth,Hugglands 21 HydraulicSystems DenisonParker Fluidomat,GhatgePatil,VOITH,PrembrillCentrifugal 22 HydraulicCoupling blowers:REITZ,FlahtWood,JamesHowden(UK) SteinHeurtey,Techint,LOI,WeswanNorthAmerican, 23 Burners Ecllpse,Hotwork EasternEquipment,GEFFI(Germany)SAFMATFrance), 24 Recuperators NorthAmericanMinnt.Co.ThermalTransferCorporation (USA) Hydraulic Rexroth,Vickers,Wipro,UshaTelehoist, 25 Power/Cylinders Veljan,Yuken,Oscar. HighPressure Vickers,Yuker,Rexroth,Hugglands,Denison 26 Vane/PistonPump 27 Crusher Sayaji,HEC,McNallyBharat,TRF,ELECON Electromag,BCH,IndustriesSyndicate,Storm 28 DCEMBrake Kraft,SpeedOControl Electromag,BCH,SpeedOControl,Jayshree, 29 TracktypeLimitSwitch EP&C,BengalTechnocrats 30 ThrusterBrake Electromag,BCH,SpeedoControl,Elite 31 BeltchangingDevice Nilos,Shawalmex NorthlandRubber,PhoenixYule,Oriental 32 ConveyorBelting Rubber IC,TRF,ELECON,McNallyBharat,L&T,HEC, 33 VibratingScreen Orien,Electromag,HydrabadIndustries 34 VibratoryFeeder Electromag,IC,TRF,OrienEngineers, ELECON,McNallyBharat Electromag,WMI,MagnetCorporation,Electro 35 MagneticSeparators magneticInd.,Ericz,Sartorius,HansBockels, KruppForder,Technick,L&T Prepec,Technomech,NuconIndustries, 36 PneumaticActuators OSCAREquipt,VeljanHydair. ElectroMechanical PREPEC,Technomech,Pebco 37 Actuators 38 Rubberliner TEGA,Kaveri 39 Polymerliner TEGA,Kaveri DATE:12Feb2009REV:00Page20/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 40 Polyetheleneliner Kaveri,Tega 41 Polyurethaneliner Kaveri,Tega 42 CastBasaltliner DECCAN,EnviroAbrasion HoschEquipment,VinarIDC,KaveriMacmet, Hindustan BeltScraper/Belt UdyogLtd.,KaramChandThapper,CobitEngg,Elecon, 43 Cleaner TRF,Promac,BMHConcare 44 BeltSwitches Jayshree,PROTOCONTROL,EPC 45 BinVibrator Electromag,ElectromagneticIndustries,IC Prisector(UK),RamsayEngg(USA),EastmnCrusher, 46 Samplers Advancedsystemsampling(P)Ltd. 47 BeltVulcanisers ShawAlmex,NilosIndia,SVDattar SectorGates,Diverter Vinar,IDC,Macmet,TRF,PrecisionProcessing,Moktali, 48 Gates,RackandPinion Holtzman,Mining&Material,ChennaiRadha, Gatesetc. 49 FlexowelConveyors METSO,Flexowel MoktaliEngrs.,TRF,EquiptEngrs,Redler 50 DragChainConveyors India,EnviroAbrasion,KaramChandThapar, Moktali,GoldenElectrical,HindustanUdyog,Vinar, 51 BucketElevator Cobit,ShreeConveyor,IDC,Orien,Macmet,Elecon,TRF 52 BeltFeeder Vinar,IDC,HEC,Orien,Macmet,Elecon,TRF,Cobit 53 Reclaimer Metso,L&T,Elecon,TRF,HEC 54 Stacker Metso,L&T,Elecon,TRF,HEC 55 StackerCumReclaimer Metso,L&T,Elecon,TRF,HEC 56 WagonTippler L&T,HEC,Elecon,TRF,Metso 57 WagonLoader L&T,HEC,Elecon,TRF,Metso BeltWeighFeeders& Kistler Morse,SartoriusMechatronics, 58 WeighHopper Transweigh,Avery,JensonNicholson KistlerMorse,Transweigh,Avery,Sartorius 59 BeltWeighScale Mechatronics,JensonNicholson 60 Conveyorbeltpulleys Elecon,TRF,McNallyBharat,Macmet,HEC Elecon,TRF,McNallyBharat,Kali,Hindustan 61 ConveyorIdlers UdyogLtd.,Macmet PneumaticHandling 62 TTG,Scorpio Equipment 63 Frontendloader TIL,HyderabadIndustriesLtd., 64 Forklifttruck Godrej,Voltas,TIL 8.3.ELECTRICAL Thelistofacceptablemakesforvariouselectricalandautomationequipmentisgivenbelow. A)POWERDISTRIBUTIONEQUIPMENT SL. EQUIPMENT NO. 1 TRANSFORMERS a)DISTRIBUTION TRANSFORMER(OILTYPE)(11 PREFERREDMAKES ABB/AREVA//CGL/BHEL/BHARATBIJLEE/VOLT AMP/KIRLOSKAR/INTRAVIDYUT/

DATE:12Feb2009REV:00Page21/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. or6.6/0.433KV) b)DRYTYPETRANSFORMER INTRAVIDYUT/VOLTAMP/KEC ABONDSTRAND/S&S,MADRAS/HIVELM/SIEMENS 2 11kV/6.6KVISOLATOR /DREISCHERPANICKER. 3 415VSWITCHBOARD SIEMENS/L&T/GEPOWER/SCHNEIDER STARDRIVE/C&S/PCE/ECC/BRIGHTENGINEERS/ 4 LTBUSDUCT VIDHYUTCONTROL 5 BATTERY a)NICKELCADMIUM AMCO/HBLNIFE b)VALVEREGULATED LEADACIDMAINTENANCE HBLNIFE/AMARARAJA/EXIDE FREEBATTERY(VRLA) c)BATTERY(PLANTE) HBLNIFE/AMARARAJA/EXIDE CHHABI/HBLNIFE/CALDYNE/AMARARAJA/ 6 BATTERYCHARGER/DCDB KIRLOSKAR 7 PROTECTIVERELAYS AREVA/ABB/SIEMENS/ER 8 AUXILIARYRELAYS ABB/ER/SIEMENS/AREVA HEATSRINKABLECABLE RAYCHEM/DENSON/MSEAL 9 JOINTINGKITS/STRAIGHT THROUGHJOINTS(H.T) IMP/AE/MECO/SECUREMETERS/CONZERV/L&T/ 10 METER(ANALOGUETYPE) RISHAV ABB/SILKANS/INSTRANS/PRAGATI/IMP/AE/ 11 CURRENTTRANSFORMERS KAPPA/PRAYOG/SIEMENS/L&T 12 13 14 POTENTIALTRANSFORMER 11KV/6.6KVCABLES ABB/BHEL/SILKANS/PRAGATI/IMP/KAPPA/ PRAYOG/SIEMENS/ABB/INDOCOIL/PRECISION ASIANCABLES(RPG)/CCI/UNIVERSAL/NICCO/ POLYCAB/HAVELLS

DIGITALTYPEMULTIFUNCTION CONSERVE/L&T/SECURE/ER/RISHAV METER

B)LTPANELS,DRIVES,AUTOMATION&CONTROLACCESSORIES.

SL.N O. 1 2

SUBGROUP MCC(NONDRAWOUT) POWERDISTRIBUTIONBOARD (PDB)

MAKES SCHNEIDER/L&T/SIEMENS/GEPOWER HINDUSTANCONTROL/VENUS/SIEMENS/ABB/ L&T/GEPC/HAVELLS

DATE:12Feb2009REV:00Page22/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 3 CONTROLDESK&POST HINDUSTANCONTROL/POWER&PROTECTION/ ECC/VENUS/BCH/HAVELLS/GEMCO HINDUSTANCONTROL/POWER&PROTECTION/ ECC/VENUS/BCH/HAVELLS/GEMCO HINDUSTANCONTROL/POWER&PROTECTION/ ECC/VENUS/GEPC/BCH ABB/ROCKWELLAUTOMATION/SIEMENS/VACON /SCHNEIDER/L&T ROCKWELLAUTOMATION/ABB/SCHNEIDER/ SIEMENS ABB(800XA)/GEFANUC(PACRx7i)/ROCKWELL AUTOMATION(CONTROLOGIX)/SIEMENS(S7 SERIES) TATALIBERT(EMERSON)/GE/FUJI/DB ELECTRONICS ABB/BHARATBIJLEE/CGL/KIRLOSKARELECTRIC ALSTOM/SIEMENS ALSTOM/KEC/CGL/SIEMENS BHEL/ABB/CGL/SIEMENS/KIRLOSKARELECTRIC/ ALSTOM/WEG/GE KIRLOSKARELECTRIC/POWERBUILD/NEWALLEN BERRY/IEC/AUMA ALSTOM/BHARATBIJLE/ABB/CGL KIRLOSKARELECTRIC/SIEMENS CGL/ALSTOM/SIEMENS/KIRLOSKARELECTCO. SIEMENS/ABB/KIRLOSKARELECTCO./ALSTOM/ CGL DEMAG AUMA/ROTORK/LIMITORQUE SCHNEIDER/ABB/L&T/GEPOWER/SIEMENS

LOCALCONTROLSTATION(LCS) LIGHTINGDISTRIBUTIONBOARD MLDB,SLDB VVVFACDRIVE

SOFTSTARTER

PROGRAMMABLELOGIC CONTROLER(PLC) UNINTERRUPTEDPOWER SUPPLY(UPS) LTACMOTOR(SQ.CAGE) LTACMOTORS(CRANEDUTY) HTACMOTOR LTACGEARED MOTOR FLAMEPROOFLTSQUIRREL CAGEACMOTOR SLIPRINGMOTOR(OTHERTHAN CRANEDUTY) LTACVVVFMOTORSFOR ROLLERTABLEAPPLICATION STALLTORQUEMOTOR ACTUATOR MOTORPROTECTIONCIRCUIT BREAKER(MPCB)

10 11 12 13 14 15

16

17 18 19 20

DATE:12Feb2009REV:00Page23/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 21 MOULDEDCASECIRCUIT BREAKERS(MCCB) MINIATURECIRCUITBREAKER (MCB) EARTHLEAKAECIRCUIT BREAKER.(ELCB) HRCFUSES VACUUMCONTACTOR(LT) ACPOWERCONTACTORS CRANEDUTYPOWER CONTACTORS THERMALOVERLOAD RELAY ELECTRONICTHERMAL OVERLOADRELAY CONTROLSWITCHES /SELECTORSWITCHES PUSHBUTTONS TIMERS/TIMEDELAYRELAY AUXILIARYRELAYS SIEMENS/ABB/L&T/GEPOWER/SCHNEIDER HAVELLS/MDSLEGRAND/SCHNEIDER/STANDARD /GEPOWER/HAGAR(L&T)/ABB/SIEMENS HAVELLS/MDSLEGRAND/SCHNEIDER/STANDARD /GEPOWER/HAGAR(L&T)/ABB/SIEMENS L&T/SIEMENS/BUSMAN/GEPOWER/INDOASIAN SIEMENS/L&T/ABB/SCHNIEDER ABB/L&T/SCHNEIDER/SIEMENS/GEPOWER/ BCH ABB/SCHNEIDER/L&T/SIEMENS/GEPOWER ABB/C&S/BCH/L&T/SCHNEIDER/GEPOWER/ SIEMENS FANOX/SAMWHA/MOELLER/LG/SPECHER& SCHUH ABB/ALSTOM/BCH/KAYCEE/GEPOWER/ SIEMENS BCH/L&T/SCHNEIDER/SIEMENS/GEPOWER ABB/BCH/L&T/GEPOWER/SIEMENS/EAPL ABB/BCH/L&T/SCHNEIDER/GEPOWER/ SIEMENS EPCC(KAKKU)/SCHNIEDER/SIEMENS/ STROMKRAFT/TELEMECHANIQUE BCH/EPCC(KAKKU)/AGMECHANIC/ESSEN GEPOWER/JAIBALAJI/SCHNEIDER/SIEMENS EPCC(KAKKU)/AGMECHANIC/TELEMECHANIQUE /JAYSHREEENTERPRISES/STROMKRAFT/PROTO CONTROL EPCC(KAKKU)/AGMECHANIC/TELEMECH/ JAYSHREEENTERPRISES/STROMKRAFT/

22

23 24 25 26

27

28

29

30 31 32 33

34

MASTERCONTROLLER

35

LIMITSWITCHES

36

PULLCORDSWITCHES

37

BELTSWAYSWITCH

DATE:12Feb2009REV:00Page24/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. PROTOCONTROL 38 GRAVITYTYPELIMIT SWITCH ROTARYLIMIT SWITCH PROXIMITY&PHOTO ELECTRICSENSORS EPCC(KAKKU)/STROMKRAFT/KAYCEE EPCC(KAKKU)/AGMECHANICENTERPRISE/ SCHNEIDER/TELEMECH ROCKWELL/SCHNIEDER/SIEMENS/OMRON/SICK / DELTA/LINE&LINDE/TELEMECHANIQUE HUBNER/HEIDENHEIN/ROCKWELLAUTOMATION (ALLENBRADLEY)/LEONARDBAURGERMANY/SICK (GERMANY) SIEMENS/L&T/BINAY/ESSEN/BCH/VAISHNO

39

40

41

PULSEENCODER

42

INDICATINGLAMP LEDTYPE HOOTER/BUZZER/ BELL/SIRENS

43

EPCC(KAKKU)/KHERAJ ADVANIOERLIKON/AREVA/APLAB/CONTROL& DYNAMICS/DIGICONINSTRUMENTATIONLTD./ L&T/MINILEC ADVANIOERLIKON/ECIL/INSTRUMENTATIONLTD. /MASIBUS/PYROTECH/SIEMENS BAJAJ/CROMPTONGREAVES/GELIGHTING/ PHILIPS/OSRAM/SIGMA BAJAJ/CROMPTONGREAVES/GELIGHTING/ PHILIPS CCI/DELTON/FINOLEX/NICCO/UNIVERSAL ANCHOR/ELLORA/MDSLEGRAND/PRECISION/ HAVELLS GOVAN/BALIGA/FLEXPRO/SUDHIR/CEAG/FCG/ SIGMA CGL/KHAITAN/BAJAJ CGL/KHAITAN/HAVELS

44

SOLIDSTATEANNUNCIATOR

45

TEMP.SCANNER

46

LAMPS LIGHTFITTING

47

(FIXTURES)COMPLETEWITHALL ACCESSORIESEXCEPTLAMP. LIGHTINGWIRE(PVC) 5A/15APIANOSWITCH FLAMEPROOFLIGHT FITTING EXHAUSTFANS CEILLINGFANS

48 49

50 51 52

DATE:12Feb2009REV:00Page25/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 53 54 55 PERSONALCOMPUTER LAPTOP/NOTEBOOK HRCFUSE(SEMICONDUCTOR PROTECTION) ELECTRONICWEIGHINGSYSTEM HP/DELL./LENOVO/IBM IBM/HP/LENOVO/DELL BUSMANN/JEMULLER/FERRAZ/GEPOWER/ SIEMENS ABB/SARTORIOUS/SANMAR/SCHENK/ TRANSWEIGH/KELK CCI/UNIVERSAL/NICCO/RPGCABLES(ASIAN)/ POLYCAB/FINOLEX/TORRENT/HAVELLS CCI/LAPP/NICCO/RPGCABLES(ASIAN)/ UNIVERSAL/POLYCAB/FINOLEX/TOSHNIWAL/ DELTON CCI/LAPP/NICCO/RPGCABLES(ASIAN)/ UNIVERSAL/TOSHNIWAL/DELTON CCI/BELDEN/LAPP/FINOLEX/POLYCAB/NICCO/ TOSHNIWAL/DELTON

56

57

PVCPOWERCABLES(LT)

58

PVCCONTROLCABLES HEATRESISTANTCABLES (EPR/CSP&SR) SCREENEDCABLES& SPECIALCABLES

59

60 61 62 63 64

CABLETERMINATIONKITS(XLPE) MSEAL,3M/RAYCHEM TERMINAL CONNECTOR TRAILINGCABLES WELDINGSOCKET CONNECTWELL/ESSENDINKY/PHOENIX/WAGO/ LAPP LAPP/CCI/UNIVERSAL/ASIAN/NICCO BCH/SCHNIDER/BEST&CROMPTON/EPOWER /HAVELL/JAIBALAJI ELECTROMAG/EPCC(KAKKU)/STERLING MAGNETICS/SUPERLIFT ELECTROMAG/BCH/EPCC(KAKKU) BCH/ELECTROMAG/AMPCONTROL/EPCC/ SIEMENS/RESITECH/NARKHEDGE GEPOWER/ABB/CGL/UNISTAR/BHEL BENGALTECHNOCRAT,/ELECTROZAVOD/ ELECTROMAG BCH

65 66 67 68 69 70

LIFTINGMAGNETS POWERPACKFORMAGNETS RESISTORS(CRANE) LTCAPACITORS CABLEREELINGDRUM DCELECTROMAGNETIC

DATE:12Feb2009REV:00Page26/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. BRAKE 71 ELECTROMAGNETIC OVERLOADRELAYS OILDASHPOT OVERLOADRELAYS BHARATHEAVYELECTRICALSLTD/BHARTIA CUTLERHAMMERLTD/KILBURNELECTRICALSLTD. KILBURNELECTRICALSLTD/ELECTROGEAR SIEMENSLTD./INDCOILMANUFACTURINGCO./ 73 CONTROLTRANSFORMERS INTRAVIDYUT/AUTOMATICELECTRICLTD.(AE)/ INDUSHREE/BHARTIACUTLERHAMMERLTD. HINDUSTANCONTROL/ECC/VENUS/MEDITRON/ EPCC

72

74

CRANECONTROLPANELS

8.4.INSTRUMENTATION A. FieldInstruments: Sl. ITEMDESCRIPTION No. 1 Pressure/DifferentialPressure gauge

PREFERREDMAKES

2 3 4

6 7 8 9 10 11

WIKA, Manometer India, A.N. Instruments, Precision Industries, General Instruments, Waaree instruments, Forbes Marshall, Walchandnagar (Tiwac),Hirlekar(DPgauge) Pressure/DifferentialPressure Ifm. WIKA, Kasturba (OrionAshcroft),Switzer, switches. Indfoss,Vasutech, Pressure/DifferentialPressure Emerson(Rosemount),Chemtrols(Fuji),Honeywell, Transmitters Yokogawa,Siemens,ABB WIKA,ManometerIndia,A.N.Instruments,General Temperaturegauges instruments,Waareeinstruments,GEgauges, Walchandnagar,PrecisionIndustries. General Instruments, Nagman Instruments, Thermocouple&RTD/ Toshniwal Industries, Tempsens, Pyroelectric thermowell Instruments, Industrial Instrumentation, Altop, Waree,Detriv. WIKA,ManometerIndia,A.N.Instruments,General TemperatureSwitch Instruments,Indfoss,Switzer,Vasutech. Emerson (Rosemount), Yokogawa, Honeywell, Temperaturetransmitter Siemens,Fuji(Chemtrols,),ABB KrohneMarshall,Instrumentationengineers,Trac, Rotameters Eurekainstruments.Chemtrols,RotaInstruments. Engineering Specialities, Microprecision, OrificePlate&flangesAssembly/ Hydropneumatics, Venturi,Flownozzle ChemtrolsSamil,Instrumentationltd, Emerson(Rosemount),Chemtrols(Fuji),Honeywell, DPtypeFlow/LevelTransmitters Yokogawa,Siemens,ABB Ifm. , KrohneMarshall, Switzer, Levcon, D.K. FlowSwitch Instruments,

DATE:12Feb2009REV:00Page27/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. Yokogawa,Emerson(Rosemount),KrohneMarshall, 12 Electromagneticflowmeter Endress&Hauser,ABB. Emerson(Rosemount),KrohneMarshall,Yokogawa, 13 VortexFlowmeter VortexInstruments Emerson (Rosemount) , Yokogawa, Krohne 14 Mass(coriolis)flowmeter Marshall,ABB,Endress&Hauser,Rockwin. Chemtrol, Levcon Instruments, Pratolina Levelgauge(magnetic&reflex Instruments, Waaree Instruments, Forbes Marshall, 15 type) Techtrol, Sigma, Asian Industrial Valves & Instruments. Chemtrol (Vega), Endress & Hauser, Switzer 16 LevelSwitch(Conductivitytype) Instruments, SB Electromechanical, Techtrol, Nivo Controls,LevelTech Chemtrol (Vega), Endress & Hauser, Switzer LevelSwitch(Capacitance/RF Instruments, SB Electromechanical, Techtrol, Nivo 17 type) Controls,LevelTech LevelSwitch(Tuningfork/Rod Chemtrol (Vega), Endress & Hauser, S.B. 18 type) Electromechanical,NivoControls Emerson,Trac,Chemtrols,ForbesMarshall,DK 19 LevelSwitch(Floattype) Instruments, Levcon Instruments, Techtrol , V Automat,Warree Level Switch/ Transmitter Emerson,Chemtrols(Eckard),Trac,DKInstruments, 20 (Displacertype) LevconInstruments Chemtrol (Vega) , Endress & Hauser, Krohne Level Switch/ Transmitter Marshall, Siemens (Miltronics) ,Toshbro controls 21 (Ultrasonictype) (Enraf) Chemtrol (Vega) , Emerson (Rosemount), , Endress LevelSwitch/Transmitter(Radar &Hauser ,Toshbro controls (Enraf), Krohne 22 type) Marshall Level Switch/ Transmitter Concord International (Dr. Berthold), Emerson (Kay 23 (Nucleonictype) Ray),nECIL. Nivo Controls, Endress & Hauser, S.B. 24 Levelswitch(Electromechtype) Electromechanicals. FisherXomox ,Instrumentation Ltd, Dresser Industries (Masoneilan) , Valtek, Samson 25 Controlvalve Controls(Globe type), Forbes Marshall ( Arca ), ABB, Fouress, Tyco valves (Keystone Butterfly), MIL Controls,Dembla Auma,Limitorque,Marsh,InstrumentationLtd 26 ElectricalActuator (Bernard),Rotork,Keystone. FisherXomox , Instrumentation Ltd., Dresser Industries (Masoneilan), Valtek, Samson Controls, 27 PneumaticActuator ABB, MIL Controls, Forbes Marshall (Arca), Keystone,Virgo,HabonimVaas. 28 Electrohydraulicactuator Reineke,Askania Selfregulatingpressurecontrol Samson Controls, Nirmal Industries, Forbes 29 valve Marshall,InstrumentationLtd. ShreyasBarton, Fisher Xomox, Forbes Marshall 30 I/Pconverters (Moore products), MarshBellofram, MIL controls, ABB,WatsonSmith. DATE:12Feb2009REV:00Page28/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. Instrumentation Ltd., FisherXomox , Dresser 31 PneumaticPositioner Industries (Masoneilan), Samson Controls, Forbes Marshall(Arca),ABB,Fouress,MIL. FisherXomox, ,Siemens, Dresser Industries (Masoneilan), Samson Controls, Instrumentation 32 Electropneumaticpositioner Ltd., Forbes Marshall(Arca), ABB, Fouress, MIL controls. Burkert, Herion, Rotex, SchraderSchovill, 33 SolenoidValve Jucomatic,Avcon,.Asco ShavoNorgren,MarshBellofram,Placka,Schrader 34 Airfilterregulator Schovill. B.ControlroomInstrumentation Sl. ITEMDESCRIPTION No. 1 2 3 4 5 6 7 8 9 10 BargraphIndicator Recorders(ChartLess Microprocessorbasedcontroller Digitalscanners DCPowerSupplyUnit ISInterface/Zenner Signalisolators DistributedControlSystem(DCS) ProgrammableLogicControllers. DigitalIndicator

PREFERREDMAKES Yokogawa(CS3000),Honeywell(Experion+C300), ABB(AC800XA),Emerson(DeltaV),Siemens(PCS 7+S7400H). ReferElectricallist. Pyrotech Electronics, Lectrotek, ChinoLaxsons, Micro systems, Master Electronics, Masibus Instruments,Ranutrol,Honeywell. ChinoLaxsons,MasibusInstruments,Pyrotech Electronics,Lectrotek,Teletherm.Ranutrol Eurotherm,Yokogawa,Chinolaxsons,Honeywell, Siemens,ABB. Yokogawa, Siemens, Honeywell, Eurotherm, Fuji, ABB,ForbesMarshall,Toshiba Lectrotek, Micro systems, Master Electronics, MB controls,MasibusInstruments,Procon. Aplab,Elnova,Siemens,Phoenix,Schneider BarrierPepperl&Fuchs,MTL,Stahl Pepperl&Fuchs,MTL,Stahl,Yokogawa,Forbes Marshall(Protech),ChinoLaxsons,Phoenix IIC,Procon,MicroSystems&Controls,Minilec, Instrumentation Ltd, Lectrotek, Piri systems, Pyrotech Electronics, MB controls & Systems Semuda. Rittal, Pyrotech, Radha Krishna Controls, InstrumentationLtd. Universal Cables, Delton, Thermopads, KEI industries, Paramount Cables, Lapp cables, Cords cables, Uniflex cables, Brooks Cables, Elkay Telelinks, Rajnigandha, Special Cables, TCL Cables, Friends Cable, Daksha Cable, Crystal Cables, Udey PyroCables,ElkayTelelinks,FortGloster ToshniwalCables,GeneralInstruments,Paramount Cables, Udey pyrocables, Cords cables, Brooks, DakshaCables,FriendsCable.

11

Annunciationsystem

12

InstrumentPanels/ControlDesk

13

InstrumentationCable

14

ThermocoupleCompensating Cable

DATE:12Feb2009REV:00Page29/35

8.5.INFORMATIONSYSTEM PreferredMakesforLevelII IBM/HP/SUN automationServerComputers ClientComputers(PC) IBM/Lenovo/HPCompaq/DELLNetworkEquipment Activecomponents CISCO Passivecomponents LUCENT/AMP Applicationsoftwareincluding TechnologySupplier Processcontrolmodels 8.6.FLUIDSYSTEMS&PIPINGENGG(LUBRICATION&HYDRAULICS) PREFERREDMAKEOFITEMS AREA SL. ITEM MAKE NO. Piston/VanePumps& Rexroth/Parker/Kawasaki/ Hydraulics 1 HydraulicMotors Eaton DelPdPumps(ROTODEL)/ 2 GearPump Tushaco/Rexroth/Parker/ Hydraulics/OilLubrication Alfa 3 ScrewPump IMO/Allwiler/Nortek Hydraulics/OilLubrication CentrifugalPumpfor KSB/Halberg/Wier Descaling 4 DescalingSystem PistonPumpfor Uraca/Wepuko/Hauhinco Descaling 5 DescalingSystem KSB/Kirloskar/Voltas/ CentrifugalPump(12Bar Mather&Platt/Beacon/ Water 6 &below) Wier SubmersibleTypeSump KSB/Flygt/Grundfos Sump 7 Pump GreaseLubrication LincolnHelios/BijurDelimon Grease 8 System /Nortek 9 OilLubricationSystem LincolnHelios/ShaanLube OilLubrication Rebs/Dropsa/BijurDelimon AirOilLubrication 10 AirOilSystem /Nortek Rotex,/SchraderDuncan/ 11 AirControls ShavoNorgren/Nucon/ Pneumatics Ross/SMC/Rexroth/Parker HydraulicProportional Rexroth/Parker/Eaton/ 12 Valve Yuken(Japan) Rexroth/Parker/Eaton/ 13 HydraulicSystem Yuken Rexroth/Parker/Eaton/ Hydraulics 14 HydraulicControlValve Yuken 15 HydraulicServoValve Moog/Rexroth 16 ManualValves 16.1 ManualGate/Globe KSB/BHEL/AUDCO/BDK OilLubrication/

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.

DATE:12Feb2009REV:00Page30/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. Valveswith&without Descaling gearforHighPressure application ManualGate/Globe KSB/BHEL/VIRGO/AUDCO Valveswith&withoutfor /BDK/Fouress/Akay 16.2 LowPressureapplication (16BarandLow) 16.3 ButterflyValve AUDCO/VIRGO/BDK AUDCO/FOURESS/BDK/ 16.4 BallValve VIRGO CheckValve(DiscType) AUDCO/BDK/FOURESS 16.5 LowPressure CheckValve(Spring AUDCO/BDK/FOURESS 16.6 Loaded)LowPressure CheckValve(Spring AUDCO/BDK 16.7 Loaded)HighPressure CheckValve(DiscType) AUDCO/BDK 16.7 HighPressure ForbesMarshall/Samsung/ ControlValveforoil Fisher/RKControls/Nirmal OilLubrication 17 lubricationsystem IndustrialControls SprayValveforDescaling Hunt/Elwood Descaling 18 System Upadhyay/Steam&Mining/ Water 19 AirReleaseValve BDK Air/GasSafetyRelief Moorco/L&T/Fainger/ Descaling 20 Valve Mankenberg Actuatorsforoperating L&T/Virgo/Rotex/AVCON OilLubrication 21 Valves Accumulatorwithsafety Christie/Hydac/Parker/ Hydraulics 22 shutoffblock EPE Christie/Hydac/Parker/ Hydraulics 23 AccumulatorChargingKit EPE Accumulatorfor WSR/BHPV/ISGEC Descaling 24 DescalingSystem Hydac/Pall/Internormen/ Hydraulics 25 PressureFilter Parker Hydac/Pall/Internormen/ Hydraulics 26 ReturnFilter Parker Internormen/Hydac/Pall/ OilLubrication 27 BasketFilter BallFilters Ball&Kirch,/Hydac/Fluid Descaling/Water 28 AutoBackwashFilter engineering Superflo/Hydac/EPE/ 29 BasketStrainerforwater Hydraulics/OilLubrication Internormen/Multitex IngersollRand/Aerotechnic Descaling 30 HPCompressor Coltri 31 HeatExchanger AlfaLaval/Indswep/Tranter Hydraulics/OilLubrication Sigma/Levcon/Shridhan/ Hydraulics/OilLubrication/ 32 LevelIndicatorSwitch Magnetrol/Buhler/Tectral/ Descaling DATE:12Feb2009REV:00Page31/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. WEKA/Peneberthy/Kobold Hydraulics/OilLubrication/ A.N.Instruments/H.Guru/ PressureGauge& 33 Wika/ForbesMarshal/ Descaling/UtilityServices TemperatureGauge Stauff/Hydac/kobold Rexroth/Switzer/Hydac/ Hydraulics/OilLubrication/ 34 PressureSwitch Parker/Dadfoss(Indfoss)/ Descaling Kobold DifferentialPressure FisherRosemount/Forbes Descaling 35 Transmitter Marshall Switzer/Hydac/Stauff/ Hydraulics/OilLubrication/ 36 Thermostat VermaTrafag/Johnson Descaling Control/Kobold DifferentialPressure Switzer/Danfoss/Indfoss/ Hydraulics/OilLubrication/ 37 GaugecumSwitch Hydac Descaling 38 PressureTransmitter Hydac/ForbesMarshall Hydraulics Hydac/ForbesMarshall/ 39 TemperatureTransmitter Kobold/JohnsonControl ForbesMarshall/Stauff/ OilLubrication/ 40 FlowSwitch Kobold/Rockwin/SMC/ Descaling HYLOC/FlowMon 41 FlowmetercumTotaliser Rockwin/ForbesMarshall 42 Pipes/Tubes Jindal/Ratnamani/ Maharashtra CarbonSteelSeamless Seamless/MJPatel/Indian 42.1 Pipes/Tubes Seamless/GandhiSpecial Tubes/BHEL Hydraulics/OilLubrication/ StainlessSteelSeamless Jindal/ChoksiTubes/ 42.2 Descaling Pipes/Tubes Ratnamani/MJPatel MaharashtraSeamless/MJ Patel/GandhiSpecialTubes CarbonSteelERWSAW /SAIL/JindalSaw/ 42.3 Pipes/Tubes Ratnamani/SuryaRoshni/ MAN/Wellspun Hydair/HylocHydoitechnic /MSFittings/NLHazra/ 43 Pipes/TubesFittings ProjectToolingSystems/ Hydraulics/OilLubrication/ TubeBend/Parker/AVIT/ Descaling ZestTechnologies Hydraulics/OilLubrication/ Clamps(Polypropylene ProjectToolingSystems/ Descaling 44 Clamp,UBolts) Stauff/Hydair Hydrokrimp/Indoindustrial Hydraulics/OilLubrication/ 45 Hosewithendfittings /Hydrolines/Superseals/ Descaling Parker Echjay/NLHazra/MS Hydraulics/OilLubrication/ 46 Flanges Fittings Descaling 47 SAEFlange AVIT/Parker/Hyloc/Stauff Hydraulics 48 ElectricalHeater Escorts/Alco/Helios Hydraulics/OilLubrication 49 AirBreathers Internormen/Parker/Hydac Hydraulics/OilLubrication DATE:12Feb2009REV:00Page32/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. Internormen/Hydac/ Hydraulics 50 PortableFilterUnit Rexroth/Parker ContaminationAnalysis PALL/Hydac/Internorman/ Hydraulics 51 Kit Parker 52 Centrifuge AlfaLaval/Westfalia Hydraulics/OilLubrication Filtervac/Pall/Parker/ Hydraulics/OilLubrication 53 VacuumDehydrator Nortek ElectrostaticLiquid KLEENTEK/Ferrocare Hydraulics 54 Cleaner MobileMotorisedPump PALL/Hydac/Internorman/ Hydraulics/Oil 55 MotorFilterUnitforOil Parker Lubrication Filling ChainPulleyBlocks& Batliboi/Moris/WHBrady Hydraulics/OilLubrication 56 HandOperatingTraveling &Co. Cranes 57 SprayNozzles Lechler/Sprayingsystem Descaling/Gearboxes 58 NitrogenBoosterStation Hydac/Parker Hydraulics 59 WaterinOildetector IMA/Parker/UCC Indianoil/HP/BP/Castrol/ 60 Lubricatingoil MobilExxon Indianoil/HP/BP/Castrol/ 61 Hydraulicoil MobileExxon Indianoil/HP/BP/Castrol/ 62 FlushingOil MobileExxon Indianoil/HP/BP/Castrol/ 63 Grease BalmerLourie 64 ExpansionJoint ESBI/STANFLEX/ELAFLEX 9.0.DEVIATIONS(Tobefilledbythebidder) Biddershallclearlyindicatethedeviationfromthetenderspecification Sl. Deviations Clausereference&Details No. 10.0EXCLUSION(Tobefilledbythebidder)

Remarks

DATE:12Feb2009REV:00Page33/35

Biddershallclearlyindicatetheexclusionsfromthetenderspecificaiton Sl. Deviations Clausereference&Details Remarks No. 11.0LISTOFDRAWINGSENCLOSED: ListofdrawingsenclosedwiththisTechnicalSpecificationisfurnishedbelow: Sl. TSDrawingNumber REV DescriptionofDrawing No. 1 MEC/S/9101/11/17/0/00/00/061.B01/R3 3 FLOW DIAGRAM OF ORE SHEET1&2OF2 HANDLINGAND RELATED AREAS 2 MEC/S/9101/11/14/0/00/00/061.B03/R1 1 NEW ORE HANDLING PLANT (OHPII) SHEET1&2OF2 GENERALLAYOUT 3 MEC/S/9101/11/17/0/00/00/061.B05/R3 3 NEW ORE HANDLING PLANT(OHPII) LAYOUT(TECH.) 4 MEC/S/9101/11/17/0/00/00/061.B06/R1 1 BRIEF EQUIPMENT CONVEYOR & SHEET1TO3OF3 LIST(3SHEETS) 5 MEC/S/9101/11/17/0/00/00/061.B07/R0 LAYOUTOFSUBSTORE 6 7 MEC/S/9101/11/17/0/00/00/061.B08/R0 MEC/S/9101/11/17/0/00/00/061.B11/R1 1 AREAREPAIRSHOP LONGITUDINAL SECTION OF WAGON TIPPLERBLDG.& CONV. Z1C1/C2, Z3C1/C2/C3, Z4C1/C2/C3,Z5C1/C2/C3&Z6C1/C2 LONGITUDINAL SECTION OF TRUCK HOPPERBLDG.,CONV. Z2C1/C2&CROSSSECTIONOFYARD

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP.

8 9

MEC/S/9101/11/17/0/00/00/061.B12/R0 MEC/S/9101/11/17/0/00/00/061.B13/R0

0 0

LONGITUDINAL SECTION OF CONV. Z4AC1,Z4BC1,Z5AC1, Z5BC1,Z6AC1,Z6BC1& Z7C1/C2/C3

DATE:12Feb2009REV:00Page34/35

BHEL ISG REF: IS1082013/001; ENQUIRY SPECS FOR MECHANICAL PACKAGE1 (EQUIPMENT) FOR BHILAISTEELPLANTAUGMENTAIONOFRAWMATERIALRECEIPT&HANDLINGFACILITIESWITHNEWOHP. 10 MEC/S/9101/11/17/0/00/00/061.B14/R0 0 LONGITUDINAL SECTION OF CONV. Z8C1/Z8C2, Z9C1/Z9C2 & Z10C1/Z10C2 11 MEC/S/9101/11/17/0/00/00/061.B15/R0 0 LONGITUDINAL SECTION OF CONV. Z11C1/Z11C2 12 MEC/S/9101/11/17/0/00/00/061.B16/R0 0 LONGITUDINAL SECTION OF CONV. Z12C1/Z12C2, Z13C1/Z13C2 & Z15C1/Z15C2 13 MEC/S/9101/11/17/0/00/00/061.B21/R1 1 ADDITIONAL WAGON TIPPLER, STOCKPILE&RELATED FACILITIES: STACKING/RECLAIMINGCONV 14 MEC/S/9101/11/17/0/00/00/061.B22/R1 1 ADDITIONALWAGONTIPPLER, STOCKPILE & RELATED FACILITIES:J9 ATO J10 15 MEC/S/9101/11/17/0/00/00/061.B23/R1 1 ADDITIONALWAGONTIPPLER, STOCKPILE & RELATED FACILITIES:J1 0TO J11 16 MEC/S/9101/11/17/0/00/00/061.B24/R1 1 ADDITIONALWAGONTIPPLER, STOCKPILE&RELATED FACILITIES:J11TOJ14 17 MEC/S/9101/11/17/0/00/00/061.B25/R1 1 ADDITIONALWAGONTIPPLER, STOCKPILE & RELATED FACILITIES:J1 4TO J15 18 MEC/S/9101/11/17/0/00/00/061.B26/R1 1 ADDITIONALWAGONTIPPLER, STOCKPILE & RELATED FACILITIES: 5 TOJ17(2 J1SHEETS) J16 19 MEC/S/9101/11/17/0/00/00/061.B27/R1 1 ADDITIONALWAGONTIPPLER, STOCKPILE & RELATED FACILITIES:J1 7TO J20 20 MEC/S/9101/11/17/0/00/00/061.B28/R0 0 ADDITIONALWAGONTIPPLER, STOCKPILE & RELATED FACILITIES: J17A TO J42 (EXISTING) ELECTRICAL&AUTOMATIONDRAWINGS 21 22 23 MEC/S/9101/11/E9/0/00/00/061.01/R1 SHEET1OF2 MEC/S/9101/11/E9/0/00/00/061.01/R1 SHEET2OF2 MEC/S/9101/11/E1/06/00/00/061.01/R1 1 1 1 AUTOMATIONSYSTEM CONFIGURATION,LEVELI AUTOMATIONSYSTEM CONFIGURATION,LEVELI POWERDISTRIBUTIONSINGLE LINEDIAGRAM(TYP)