Work Measurement Sheet for the Month of :NOV-DEC, 2013

ABB
Qty Upto Date

Civil Works Price Schedule for Design, Supply & Installation of Static VAR Compensator at 220 kV New Kotlakpat Grid, Lahore ( ADB-14-2009)
Description Item No. I 1 2 3 II 1 2 3 4 5 6 7 III A 1 B 1 C 1 Lump sum Site Clearance, Earth Work & Design: Clearing and grubbing of the complete site area for bushes, vegetation, trees, roots and weeds etc.. Filling, Leveling and Compaction of the fill material (borrowed granular / River run granularly material/sandy soil ) in layers of 150mm thickness (max) 95% modified proctor density to raise the site area. Removal of existing Foundations, Gravel, Hindrances as per site survey complete in all respect. 132kV Bay Extension Civil Works for Circuit Breaker foundation with fixing & setting of anchor bolt complete in all respect. Civil Works for Disconnector with earth switch combined foundation with fixing & setting of anchor bolt complete in all respect. Civil Works for Disconnector foundation with fixing & setting of anchor bolt complete in all respect. Civil Works for Current Transformer foundation with fixing & setting of anchor bolt complete in all respect. Civil Works for Voltage transformers foundation with fixing & setting of anchor bolt complete in all respect. Civil Works for Post Insulator foundation with fixing & setting of anchor bolt complete in all respect. Civil Works for Gantry Foundation with fixing & setting of anchor bolt complete in all respect. SVC Equipment Foundations Lightning Tower Civil Works for Lightning Tower Foundation with fixing & setting of anchor bolt complete in all respect. Breaker Civil Works for Breaker Foundation with fixing & setting of anchor bolt complete in all respect. Measuring Transformer Civil works for Measuring Transformers (CT/VT) for SVC foundation with fixing & setting of anchor bolt complete in all respect. Symbol

Percentage weight
Total No. Unit Step 1 per of foundations

Previous Step 1 Step 2 Step 1

Current Step 2 Step 1

Todate Step 2

Step 2 Per foundation foundation


100% 100% 100%

Lot Lot Lot

1 1 1

0 0

100% 100%

100% 100%

Pad
B2 D3 D4 C4 C5 K12 GA Each Set Set Each Each Each Each 3 1 1 3 3 1 4 70% 70% 70% 70% 70% 70% 70%

Pedestal
30% 30% 30% 30% 30% 30% 30% -

Pad

Pedestal

A1 B1 C1 C2 C3 D1 D2 F1 F2 F2 F3 F4 F5 F5 F6

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

3 3 4 4 1 14 2 3 3 3 3 3 3 3 3

70% 70% 70% 70% 70% 70% 70% 100% 100% 100% 100% 100% 100% 100% 100% Pad

30% 30% 30% 30% 30% 30% 30%

D 1 F 1 2 3 4 5 6 7 8 G 1

Disconnector Civil works for Disconnector for SVC foundation with fixing & setting of anchor bolt complete in all respect. Reactor Civil works for TCR-21 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings Civil works for TSC-22 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings Civil works for TSC-21 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings Civil works for CF-31 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings Civil works for CF-32 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings Civil works for CF-32 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respect. Civil works for CF-33 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings Civil works for CF-33 Reactor foundation having fiber glass reinforcement instead of steel reinforcement with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings Grounding Transformer Civil works for Earthing Transformer Foundation with fixing & setting of anchor bolt complete in all respects as per Layout and attached drawings

Complete

Pedestal 30% -

G1

Each

70%

______________________________ Verified by ABB Site Representative

_____________________________ Verified By Nespak Representative

Work Measurement Sheet for the Month of :NOV-DEC, 2013

ABB
Qty Upto Date

Civil Works Price Schedule for Design, Supply & Installation of Static VAR Compensator at 220 kV New Kotlakpat Grid, Lahore ( ADB-14-2009)
Description Item No. H 1 K 1 2 3 4 5 6 7 8 9 Lump sum Cooler Civil works for Coolers (Heat Exchangers) with fixing & setting of anchor bolt complete in all respects as per attached drawings Insulator Support Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Symbol

Percentage weight
Total No. Unit Step 1 per of foundations

Previous Step 1 Step 2 Step 1

Current Step 2 Step 1

Todate Step 2

Step 2 Per foundation foundation


70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% Complete 100% 100% 100% 100% 100% 100% 100% Pad 70% 70% 70% 70% 30% Pedestal 30% 30% 30% 30% 70% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%

H1 K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11

Each Each Each Each Each Each Each Each Each Each Each Each

4 11 14 4 6 1 2 3 2 9 14 2 2 3 3 3 3 3 3 3 12 4 1 1 3 1 750

0 0

10 Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings 11 Civil works for Busbar main /Individual for SVC foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings 12 M 1 2 3 4 5 6 7 R T 1 2 3 4 5 6 Civil Works for T Support Structure foundations for Tubular Busbar with fixing & setting of anchor bolt complete in all respects as per attached drawings Capacitor Civil works for TSC-22 capacitor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for TSC-21 Capacitor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for CF-31 Capacitor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for CF-32 Capacitor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for CF-32 Capacitor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for CF-33 Capacitor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Civil works for CF-33 Capacitor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Resistor Civil works for Resistor foundation with fixing & setting of anchor bolt complete in all respects as per attached drawings Transformer Civil works for 105/150 MVA single phase Transformer Foundation with Steel rail 90 lbs. / yard with fish plates etc., Steel grating of good quality with fixing arrangement, Oil resistant paint on oil flowing area, complete in all respects as per attached drawings Civil works for Pad Mounted 11kV Aux. Transformer 250KVA foundation complete in all respects as per NTDC standard Civil works for Distribution 22kV Aux. Transformer 250KVA foundation complete in all respects per attached drawings Civil works for Fire Protection wall with fixing arrangement of Post Insulator for Tubular Bus complete in all respect./Section views Construction of RCC Transformer way 6m wide complete in all respects as per drawing & specification including Concrete, Steel reinforcement and Steel Rail 90 lbs. / yard with fish plates, Precast cement concrete solid or face blocks (1:3:6), including cost of templates. etc. complete in all respects and as shown in layout Anchor Bolts M30x750

K13/K14 Each M1 M1 M2 M3 M4 M4 M5 R1 T1 T2 T3 FW Each Each Each Each Each Each Each Each Each Each Each Each Lot No

0 0

4 3

4 1

4 3

4 1

______________________________ Verified by ABB Site Representative

_____________________________ Verified By Nespak Representative

Work Measurement Sheet for the Month of :NOV-DEC, 2013

ABB
Qty Upto Date

Civil Works Price Schedule for Design, Supply & Installation of Static VAR Compensator at 220 kV New Kotlakpat Grid, Lahore ( ADB-14-2009)
Description Item No. IV 1 Lump sum Cable Trenches, Roads, Fence and Drainage Civil works for cable trenches for LV power and control cables from HV Bay, Transformers and outdoor MV switchyard to the SVC control building complete with trench Covers, cable trays, Hangers and accessories etc. complete in all respects a) Cable Trench 750mm x 750mm Trenches in 132kV Bay Extension b) Cable Trench 600mm x 600mm Trenches in Transformer Area & SVC area as per trench & conduit layout drawing c) Cable Trench under Transformer way/Roads 600mm x 600mm d) Supply and Laying / Installation for PVC pipes (100 mm dia) complete in all respects as per drawings and specifications Construction of 132kV switchyard site surface drainage & cable trenches water drainage system including pipe with manholes, draw pit and pumps and its connection with cable trenches, road crossing and its disposal system complete in all respects.. Supply and construction of fencing around SVC area, Complete with main Gate & Barbed Wire etc... Providing and fixing main gate with small gate for pedestrians with complete civil works. Supply and placing of river run gravel 40 to 50 mm size in switchyard area.. Civil works (Excavation & Backfilling) for Sub-station grounding system for 132kV outdoor equipment, SVC Area, Transformer Area & SVC control House building Civil works, Supply ,design and installation of outdoor electrification (Normal & emergency) , fittings and allied/ auxiliary works (SVC/ Transformer Bay, fence and road lighting etc.)... Building & Other Allied Works Construction of SVC Control House Building (24x9 m) with all civil works, complete in all respects including doors, indoor fence, overhead cable trays / risers, gates, building lighting (normal & emergency) and electrification, equipmnet/panel grouting material and accessories, eye wash and required equipment / material as per provided drawings and details.
Excavation including dressing, ramming and levelling, Lean concrete, Foundation Building Column upto NSL with plinth beam Brick Masonary upto NSL including DPC Backfilling Column upto roof Roof slab with beam Brick Masonary in super structure Cement sand plaster inside C.H.B Door window lintals i.e sun shade Providing and fixing of wiring pipes & Laying of wires of CHB lighting Fixing of sanitary pipes Flooring Roof proofing complete Finishing work primer coat, 1st & 2nd coat of distamper/paint Fixing of fixtures (Tube lights, fans) Total

Percentage weight
Symbol Total No. Unit Step 1 per of foundations

Previous Step 1 Step 2 Step 1

Current Step 2 Step 1

Todate Step 2

Step 2 Per foundation foundation

Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot

1 1 1 1 1 1 1 1 1 1 50%

Per meter per meter Per meter 100% 50% 100% 100% 50% 50% 50% 50% 50% 50% -

2 3 4 5 5 6 V 1

Lot

Percetage Weightage
10% 15% 7% 5% 3% 10% 10% 10% 5% 5% 4% 1% 5% 5% 3% 2% 100% 0% 0% 0% 0% 50% 100% 100% 100% 32% 100% 100% 100% 32%

Heating, Ventilation and Air Conditioning (HVAC) system for control house building as per provided requirments

Lot

50%

______________________________ Verified by ABB Site Representative

_____________________________ Verified By Nespak Representative