1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Distance relays - basics Operating characteristics Effect of parallel line Phase selection Power swing blocking Communication scheme Switch on to fault Weak end infeed Supervision fuse failure System supervision. Fault locator Stub protection Earth fault protection Auto reclosing systems
ABB ATCF-PT 1
ABB ATCF-PT 2
ABB ATCF-PT 3
ABB ATCF-PT 4
The probability of line faults caused by lightnings are 0,2-3 faults/ 100 km and year
ABB ATCF-PT 5
Persistent faults
can be caused by a broken conductor fallen down can be a tree falling on a line must be located and repaired before normal service
ABB ATCF-PT 6
L3 L1 L2
L1 L2 L3
Z<
L1-N
L2-N
ABB ATCF-PT 7
L3 L1 L2
L1 L2 L3
earth faults
consist of arc and tower footing resistance
Warringtons formula
Rarc =
28707 x L I
1.4
ABB ATCF-PT 8
ABB ATCF-PT 9
ABB ATCF-PT 10
ABB ATCF-PT 11
ZK=Uk/ Ik Uk
A
Uk=0
metallic fault
Zk Z<
Ik
ABB ATCF-PT 12
ZL=R+jX
Z<
Z<
The line impedance must be converted to secondary values with the formula:
CTprim CTsec
Zprim
ABB ATCF-PT 13
t
t3 t2 t1
l
A B
f1 f2 f3
Z<
Z<
Z<
Z<
t
t3 t2 t1
l
ABB ATCF-PT 14
RL
XL
IN
RN
XN
RL
XL
The measured impedance is equal to the positive sequence impedance up to the fault location
ABB ATCF-PT 16
RL
XL
The measured impedance is equal to the positive sequence impedance up to the fault location
ABB ATCF-PT 17
I U=I Z1+ N ( Z0 - Z1 ) 3
ABB ATCF-PT 18
U=IZ1+IN
Z0 - Z1 3
ABB ATCF-PT 19
UF = RF ( I1 + I2 ) RF ( I1 + I2 ) RF1=
ABB ATCF-PT 20
I1
Rf Load import
ZL
Rf Load export
ABB ATCF-PT 21
ZL Um Z<
ZF
If=If1+If2+If3
Full scheme
has a measuring element for each measuring loop and for each zone
Z<
L1-N
L2-N
ABB ATCF-PT 24
2- Operating characteristic
ABB ATCF-PT 25
ABB ATCF-PT 26
ABB ATCF-PT 27
EXTENSION UPWARDS IS DECIDED BY IMPEDANCE OF PROTECTED LINE AND SETTING OF I ZONE OF ADJACENT LINES. IN MOST CASES R-AXIS REACH OF ZONE - II SAME AS ZONE -I IS SATISFACTORY. IF ADDITIONAL RESISTANCES ARE EXPECTED WHICH ZONE - I IS NOT ABLE TO COVER THEN DIFFERENT SETTING FOR ZONE - II IS ADVANTAGEOUS.
ABB ATCF-PT 28
THIS IS THE WIDEST OF ZONES IN WHICH TRIPPING CAN OCCUR AFTER LONGEST TIME DELAY. IS REQUIRED TO GIVE REMOTE BACKUP THOUGH IN MANY CASES IT IS IMPOSSIBLE TO GET COMPEREHENSIVE REMOTE BACK UP.
ABB ATCF-PT 29
Low measured reactance Ratio between fault resistance and resistance is high. Distance protection with mho characteristic can not see an average fault resistance.
RF XF
ABB ATCF-PT 30
Ratio between fault resistance and reactance is high. Distance protection with mho characteristic can not see average fault resistance. Cross polarization has no significant effect.
XF R
RF
ABB ATCF-PT 31
Quadrilateral characteristic improves sensitivity for higher RF/XF ratio. It still has some limitations. -The value of set RF/ XF ratio is is limited by 5 - Remote infeed increases the apparent value of fault resistance. - Requirements on current instrument transformers are stringent.
XF R
RF
ABB ATCF-PT 32
Teleprotection schemes improve the total system behavior. Overreaching permissive schemes increase the sensitivity.
Requirements on CTs are decreased. Independent underreaching zone 1 is sometimes an additional advantage.
ABB ATCF-PT 33
Load impedance limits the reach in resistive direction. High value of RF / XF ratio is generally not necessary.
ABB ATCF-PT 34
ABB ATCF-PT 35
ABB ATCF-PT 36
ABB ATCF-PT 37
ABB ATCF-PT 38
ILOAD ZL RF
IFA
1+
IFB I FA
ABB ATCF-PT 40
RC AL C
ABB ATCF-PT 41
RC AL C
ABB ATCF-PT 42
ABB ATCF-PT 43
ZOM ZL
ZA< overreaching
ABB ATCF-PT 44
ZA<
ABB ATCF-PT 45
ZOM
PARALLEL LINE EARTH CURRENT = IEP = 3IOP INDUCED VOLTAGE IN THE FAULT LOOP = I EP ZOM / 3 DISTANCE RELAY PH- EARTH UNIT MEASURES Z = VPH- E / = ZL IPH
= ZL
ABB ATCF-PT 46
ABB ATCF-PT 47
SETTING OF ZONE 1.
SETTING OBJECTIVE IS TO AVOID OVERREACH BEYOND THE REMOTE END IN CASE SHOWN BELOW. ALSO SETTING SHOULD COVER AS MUCH OF THE LINE AS POSSIBLE ( MIN 50 % + SAFETY MARGIN )
PH- E
D
1+
Z = X ZL SET KO =
ABB ATCF-PT 50
ZOL - ZL 3ZL
- KOM
1 + KO
ZOL - ZL 3ZL
- KOM
WITH THE ABOVE FOR OTHER CASES VIZ PARALLEL LINES SWITCHED OFF AND NOT EARTHED & BOTH LINES IN SERVICE THE REACH WILL REDUCE AS GIVEN BELOW.
- 60%
ABB ATCF-PT 51
Z = ZL SET
ABB ATCF-PT 52
1+
(ZOL
ZL ) / 3ZL + KOM 1 + KO
-
]
AND REACH TO 120 %
K0
ZOL - ZL 3 ZL
+ KOM
Z ZL
Z 0. 44
THIS MEANS IN THE CASE OF 2nd ZONE SET TO 120 % OF ZL WOULD HAVE A REACH OF 173 % OF Z L. IN NORMAL PRACTICE THIS PROVIDES NO PROBLEMS AS OVERRECH IN TO FOLLOWING LINE IS REDUCED BY INTERMEDIATE INFEEDS AT REMOTE STATION.
ABB ATCF-PT 53
ALT 2 BY USING DIFFERENT GROUPS OF SETTING PARAMETERS FOR DIFFERENT OPERATING CONDITIONS OF PROTECTED DOUBLE CIRCUIT LINE.
ABB ATCF-PT 54
KN1 =
[ [ [
ZL
KOM
ZOM ZOL
3ZL ZOL
KN2 =
ZL
KOM
3ZL
KN3 =
ZOL - ZL 3ZL
]
/ 3ZL
WHERE
ABB ATCF-PT 55
K OM
ZOM
KN2 , KN3 IDENTICAL TO ALT 1 CASE 2 - DOUBLE CIRCUIT PARALLEL LINE IN OPERATION. ZOL - ZL KOM + 3ZL KN1 =
ABB ATCF-PT 56
4-Phase selection
ABB ATCF-PT 57
ABB ATCF-PT 58
UR IR Us Is UT IT
RN2
RNPh
2 . ( 1 + Kn )
&
3Io > 0.2 IpHMAX
UR - UT < IR
R4 + j X4
70
Us - UR < R4 + j x4 IS UT - UR < R4 + j x4 IT
2.R2 R RPh
ABB ATCF-PT 60
jX PHASE SELECTION
R 3 PH FAULTS. THIS IS SIMILAR TO PH - PH FAULTS WITH FOLLOWING DEVIATIONS.
2. R2
ABB ATCF-PT 62
ABB ATCF-PT 63
ABB ATCF-PT 64
R
t
t = 40 ms
ABB ATCF-PT 65
V = 0.8PU
V = 1.1 PU
R
ABB ATCF-PT 66
ABB ATCF-PT 67
6- Communication scheme
ABB ATCF-PT 68
IN THE ABSENCE OF COMMUNICATION LINK -THE OPERATION ZONE OF END ZONE FAULT IS LONGER. -AUTO RECLOSING IS NOT POSSIBLE.
ABB ATCF-PT 69
ABB ATCF-PT 70
ABB ATCF-PT 71
Z<
Z<
Carrier send CS = Z< forward, under or overreach Trip = ZM1 + ZM2 (t2 + CR) + ZM3 x t3
ABB ATCF-PT 72
ABB ATCF-PT 73
Z<
Z<
Carrier send CS = Z< reverse zone Trip = ZM1 + ZM2 (t2 + CR x T0) + ZM3 x t3
ABB ATCF-PT 74
BLOCKING SCHEMES ARE USED WHEN COMMUNICATION SIGNALS SHALL NOT BE TRANSMITTED OVER FAULTY LINE FOR RELIABILITY REASONS Ex : BOOSTING OF SIGNAL NOT PERMITTED.
ABB ATCF-PT 75
ABB ATCF-PT 76
A:1
B:1
Relay A:2 sees fault in forward direction and sends carrier to B:2 3 Fault cleared at B:1, current direction changed on line 2 4 Carrier from A:2 and forward looking measuring element in relay A:2 does not reset before relay B:2 detects the fault in forward direction and trips, also relay A:1 will trip when receiving carrier from B:1
A:2
B:2
A:1
B:1
A:2
B:2
ABB ATCF-PT 77
C.R.L allows slowly resetting communication equipment without risk of tripping the healthy line.
8- Switch on to fault
ABB ATCF-PT 78
U=0 V
Z<
ABB ATCF-PT 79
ABB ATCF-PT 80
CR Z<
t3 t2 t1
CS (echo) CR Z<
CS
CS = ZM2 CS (echo)=CR x low voltage x no start forward or reverse TRIP = ZM1 + ZM2(CR + t2)
ABB ATCF-PT 81
ABB ATCF-PT 82
IN CASE OF PERMISSIVE UNDERREACH SCHEME THE LAST 10-20 % TOWARDS WEAK END WILL BE CLEARED IN ZONE II TIME . IF THIS IS NOT ACCEPTABLE OVERREACH SCHEME SHOULD BE USED. IN BLOCKING SCHEME WEAK END CB CANNOT BE TRIPPED . IN SUCH CASE DIRECT TRIPPING FROM ZONE I AND ACCLERATED ZONE MUST BE USED.
ABB ATCF-PT 83
ABB ATCF-PT 84
ABB ATCF-PT 85
ABB ATCF-PT 86
UNSYMMETRICAL LOAD CONDITION CHECK GIVES ALARM WHEN ANY PH CURRENT IS LOWER THEN 80% OF LARGEST PH CURRENT. ALSO LARGEST PH CURRENT MUST BE > 15% OF NOMINAL CURRENT. LOSS OF VOLTAGE SUPERVISION CAN TRIP OR GIVE ALARM WHEN ALL 3 PH VOLTAGES ARE LOW FOR MORE THEN 7 SECS.
ABB ATCF-PT 87
ABB ATCF-PT 88
IFA
DA
P
RF
UA
FA RF UA = IA P ZL + ID A
IA pZL
P - p k1 + k2 - k3 RF = 0
IA
ABB ATCF-PT 89
RF
L F
ZA
A IA
pZL
IF RF
( I - p )ZL B ZB IB
UA=IA X P ZL + IFA X RF DA
pZL
( 1- p ) ZL ZB
(I-P) ZL +ZB DA = ZA+ZL +ZB
ZA
ABB ATCF-PT 90
p2 - p k1 + k2 - k3 RF = 0 DA = WHERE (1-p) ( Z1A + Z1L + Z1B ) 2 Z1A + ZIL + 2Z1B UA Z1B K2 = I Z ( Z + Z + 1) A 1L 1L ADD
ABB ATCF-PT 92
>Z
It is not possible for the distance protection relay to measure impedance when the line disconnector is open. Not to risk incorrect operation the distance protection must be blocked and a Stub protection is released. The Stub protection is a simple current relay.
li ne disc open 25ms t rip
&
Bus B
I STU B >
ABB ATCF-PT 93
ABB ATCF-PT 94
Reverse operation
0.6x3I0D
=65
3I0D
3I0 X cos(65-)=3I0D
3I0 >
POLARIZING VOLTAGE CAN HAVE HIGH AMOUNT OF HARMONICS WHEN OUTPUT VOLTAGE IS LOW PARTICULARLY WHEN CVTS ARE PROVIDED. THEREFORE RELAY MUST HAVE BAND PASS FILTER. BAND PASS FILTER PROVIDES SECURE OPERATION DOWN TO 1% OF NOMINAL VOLTAGE.