ROAD METAL RATES

DIVISION: NH Division, PWD, BAREILLY


KM 268
NH-74 ( New N H No -30 )
Km.
No.

Quarry

Quarry
Rate
( Rs)

Distence
from
Quarry to
Site (KM)

part-B

CIRCLE : 28th .Circle, N.H. P.W.D. , Bareilly


BAREILLY

Cost of
cartage
without
loading

Cost of
cartage
excluding
C.P. (Rs)

Total
(3+7)
(Rs)

I.S.
Transit
Tax
(Rs)

Total of
col.
(8+9)
(Rs)

Trade
Tax on
col. 11
(Rs)

G.Total of
col
11+12
(Rs)

10

11

12

Stone Ballast ( 45-90 mm)


268

Lal Kuan

500

64

494.50

268

Lal Kuan

510

64

494.50

449.55

949.55

Remarks

13
up to 50 KM = 439.75

949.55

949.55

51 to 64 KM =

73.50

959.55

959.55

Total

989.55

989.55

Less Loading= (-)19.0


Rs
494.50

1049.55

1049.55

1049.55

1049.55

Stone Ballast ( 45-63 mm)


449.55

959.55

Stone Ballast ( 22.4-53 mm)


268

Lal Kuan

540

64

494.50

449.55

989.55

513.25

16mm-22.4mm/ 11.2mm/13.2mm/ 10-16mm


268

Lal Kuan

600

64

494.50

449.55

1049.55

11.2-2.8 mm / 2.3-9.5 (6.7mm)


268

Lal Kuan

600

64

494.50

449.55

1049.55

Quarry to KM - 268 of NH -74 = 64


KM

Stone grit 5.6 mm and below


268

Lal Kuan

600

64

494.50

268

Lal Kuan

470

64

494.50

449.55

1049.55

1049.55

1049.55

919.55

919.55

919.55

999.55

999.55

999.55

949.55

949.55

949.55

Stone Dust
449.55

stone boulder 25-60 Kgs


268

Lal Kuan

550

64

494.50

449.55

Coarse Sand
268

Lal Kuan

500

300

Local

380

64

494.50

449.55
Fine Sand

380.00

1) Distances from quarry have been taken from the shortest route.
2) Quarry rates have been taken of the respective circle applicable.
3) Cartage rates has been taken approved by SE Lko. Circle in the RMR.
4) Quarry rates are for approved quarry and RMR rates are minimum .
JUNIOR ENGINEER

N.H. Construction Division


P.W.D. Bareilly

EXECUTIVE ENGINEER

N.H. Construction Division


P.W.D. Bareilly

SUPERINTENDING ENGINEER

28th Circle N.H.


P.W.D. Bareilly

ROAD METAL RATES


DIVISION: NH Division, PWD, BAREILLY
KM 300
NH-74 ( New N H No -30 )
Km.
No.

Quarry

Quarry
Rate
( Rs)
3

Distence
from
Quarry
5 to

Cost of
cartage
without
6

Cost of
cartage
excluding
7

Total
(3+7)
(Rs)
8

CIRCLE : 28th .Circle, N.H. P.W.D. , Bareilly


BAREILLY
I.S.
Transit
Tax
9

Total of
col.
(8+9)
10

Trade
Tax on
col.
1111

G.Total of
col
11+12
12

Stone Ballast ( 45-90 mm)


300

Lal Kuan

500

85

594.50

540.45

1040.45

1040.45

1040.45

Stone Ballast ( 45-63 mm)


300

Lal Kuan

510

85

594.50

540.45

1050.45

Lal Kuan

540

85

594.50

540.45

1080.45

Lal Kuan

600

85

594.50

540.45

1140.45

51 to 75 KM =
Total

1080.45

1080.45

Less Loading= (-)19.0


Rs
594.50

1140.45

mean km (from km 295


1140.45 to km 304 )=(83+88)/2

1140.45

1140.45

Lal Kuan

600

85

594.50

540.45

1140.45

Lal Kuan

600

85

594.50

300

Lal Kuan

470

85

594.50

540.45

1140.45

1140.45

1140.45

1010.45

1010.45

1010.45

1090.45

1090.45

1090.45

1040.45

1040.45

1040.45

Stone Dust
540.45

stone boulder 25-60 Kgs


300

Lal Kuan

550

85

594.50

540.45

Coarse Sand
300

Lal Kuan

500

300

Local

380

85

594.50

540.45
Fine Sand

380.00

1) Distances from quarry have been taken from the shortest route.
2) Quarry rates have been taken of the respective circle applicable.
3) Cartage rates has been taken approved by SE Lko. Circle in the RMR.
4) Quarry rates are for approved quarry and RMR rates are minimum .

JUNIOR ENGINEER

N.H. Construction Division


P.W.D. Bareilly

EXECUTIVE ENGINEER

N.H. Construction Division


P.W.D. Bareilly

613.50

Quarry to KM - 300 of NH -74 = 85


KM

Stone grit 5.6 mm and below


300

= 85 km

11.2-2.8 mm / 2.3-9.5 (6.7mm)


300

131.25

1050.45

1050.45

16mm-22.4mm/ 11.2mm/13.2mm/ 10-16mm


300

13
up to 50 KM = 439.75
76 to 85KM @4.25= 42.50

Stone Ballast ( 22.4-53 mm)


300

Remarks

SUPERINTENDING ENGINEER

28th Circle N.H.


P.W.D. Bareilly

Analysis of Rate for PART-B


Seal Coat

513
(ii)

Case - II : Type B
Providing and laying of premix sand seal coat with HMP of appropriate
capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7
mm size and penetration bitumen of suitable grade.
Unit = sqm
Taking output = 7858 sqm (47.16 cum)
a) Labour
Mate
Mazdoor
b) Machinery
HMP of 75 tonnes/hour.
Electric Generator Set 250 KVA
Front end loader 1 cum bucket capacity
Tipper 10 tonne capacity
Add 10 per cent of cost of carriage to cover cost of loading and unloading
Paver finisher hydrostatic with sensor attachment
Smooth wheeled 8-10 tonnes capacity
add : escaslation @ 35 % on machinery
c) Material
Bitumen@ 6.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as passing 11.2 mm sieve
and retained on 2.36 mm sieve applied @ 0.06 cum per 10 sqm

day
day

0.160
4.000

125.00
125.00

20.00
500.00

hour
hour
hour
tonne.km

2.000
2.000
2.000
104 x 5'

11167.00
450.00
520.00
14.50

22334.00
900.00
1040.00
75400.00

hour
hour

2.000
2.000

629.00
297.00

7540.00
1258.00
594.00
30041.20

tonne
cum

5.340
47.160

41682.80
1049.55

222586.15
49496.56

say

41170.99
45288.09
498168.99
63.40
63.40

d) Overhead charges @10% input on (a+b+c)


e) Contractor's profit @10% input on (a+b+c+d)
Cost for 7858 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7858

Junior Engineer

Assistant Engineer

Executive Engineer

Analysis of Rate for PART-B


506

Built-up-Spray Grout
Providing, laying and rolling of built-up-spray grout layer over prepared
base consisting of a two layer composite construction of compacted
crushed coarse aggregates using motor grader for aggregates. key
stone chips spreader may be used with application of bituminous
binder after each layer, and with key aggregates placed on top of the
second layer to serve as a Base conforming to the line, grades and
cross-section specified, the compacted layer thickness being 75 mm

Unit = sqm
Taking output = 3000 sqm (225 cum)
a) Labour
Mate
Mazdoor including for brooming of key aggregates
Mazdoor skilled
b) Machinery
Hydraulic self propelled chip spreader both for aggregates and key
aggregates@ 1500 sqm per hour for 3000 x 3 sqm
Bitumen pressure distributor for 3000 x 2 sqm @ 1750 sqm per hour
Tipper 5.5 cum capacity
smooth wheel roller 8 tonnes
Front end loader 1 cum bucket capacity
add : escaslation @ 35 % on machinery
c) Material
Bitumen30 kg per 10 sqm @ 15 kg per 10 sqm for each layer
Crushed stone coarse aggregate passing 53 mm and retained on 2.8
mm sieve @ 0.5 cum per 10 sqm for each layer
Key aggregates passing 22.4 mm and retained on 2.8 mm sieve @
0.13 cum per 10 sqm
d) Overhead charges @10% input on (a+b+c)
e) Contractor's profit @10% input on (a+b+c+d)
Cost for 3000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3000

Junior Engineer

Assistant Engineer

day
day
day

0.400
8.000
2.000

125.00
125.00
130.00

50.00
1000.00
260.00

hour

6.000

1700.00

10200.00

hour

3.430

516.00

1769.88

hour
hour
hour

10.000
6.000
6.000

200.00
297.00
520.00

2000.00
1782.00
3120.00
6605.16

tonne
9.000
cum 300.000

41682.80
989.55

375145.20
296863.64

989.55

38592.27

say

73738.81
81112.70
892239.66
297.41
297.41

cum

39.000

Executive Engineer

Analysis of Rate for PART-B


3004.2

Filling Pot-holes and Patch Repairs with open-Graded Premix


surfacing, 20mm.
Removal of all failed material, trimming of completed excavation to
provide firm vertical faces, cleaning of surface, painting of tack coat on
the sides and base of excavation as per clause 503, back filling the
pot holes with hot bituminous material as per clause 504, compacting,
trimming and finishing the surface to form a smooth continuous
surface, all as per clause 3004.2
Unit = Sqm
Taking out put = 10250 sqm (205 cum)(450 Tonnes)
a) Labour
Mate
Mazdoor
Mazdoor skilled
b) Machinery
Air compressor 250 cfm
HMP 100-110 TPH Capacity
Tipper 10 tonnes capacity
Smooth wheeled roller 8-10 tonnes
add : escaslation @ 35 % on machinery
c) Material
I) Bitumen
ii) Bitumen emulsion for tack coat .
iii) Aggregates
Crushed stone aggregates nominal size 13.2mm
Crushed stone aggregates nominal size 11.2 mm
d) Overhead charges @10% input on (a+b+c)
e) Contractor's profit @10% input on (a+b+c+d)
Cost for 4900 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/10250

Day
Day
Day

3.760
90.000
4.000

125.00
120.00
130.00

470.00
10800.00
520.00

hour
hour
hour
hour

6.000
6.000
45.000
12.000

206.00
11167.00
200.00
297.00

1236.00
67002.00
9000.00
3564.00
28280.70

tonne
tonne

14.970
2.460

41682.80
36075.43

623991.52
88745.55

cum 184.500
cum 92.250

1049.55
1049.55

193641.14
96820.57
112407.15
123647.86
1360126.48
132.70
132.70

say

Junior Engineer

Assistant Engineer

Executive Engineer

Analysis of Rate for PART-B


503

Tack Coat
Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
prepared bituminous/granular surface cleaned with mechanical broom.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate
Mazdoor
b)

Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Emulsion pressure distributor @ 1750 sqm per hour
add : escaslation @ 35 % on machinery

day
day

0.080
2.000

125.00
125.00
sub total

10.00
250.00
260.00

hour
hour
hour

2.800
2.800
2.000

230.00
206.00
516.00

644.00
576.80
1032.00
788.48
3041.28

sub total
c) Material
Bitumen @ 0.25 kg per sqm

tonne

0.875

41682.80
sub total

a+b+c
d) Overhead charges @10% input on (a+b+c)
e) Contractor's profit @10% input on (a+b+c+d)
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Say

Junior Engineer

Assistant Engineer

Executive Engineer

36472.45
36472.45
39773.73
3977.37
4375.11
48126.21
13.75
13.75

Analysis of Rate for PART-B


Ref. to
Sr No MoRTH
Spec.
5.21

Description
(ii) Stress absorbing membrane (SAM) with crack width 6
mm to 9 mm
Providing and laying of a stress absorbing membrane over a
cracked road surface, with crack width 6 to 9 mm after
cleaning with a mechanical broom, using modified binder
complying with clause 521, sprayed at the rate of 11 kg per
10 sqm and spreading 11.2 mm crushed stone aggregates @
0.12 cum per 10 sqm, sweeping the surface for uniform
spread of aggregates and surface finished to conform to
clause 902.
Unit = sqm
Taking output = 10500 sqm
a) Labour
Mate
Mazdoor
b)

Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm capacity
Bitumen pressure distributor @ 1750 sqm per hour
Hydraulic Chip spreader
Smooth wheeled road roller 8-10 tonne

Unit

Quantity

Rate Rs

day
day

0.240
6.000

125.00
120.00
SUB TOTAL

hour
hour
hour
hour
hour

6.000
6.000
6.000
6.000
6.000

230.00
206.00
516.00
1700.00
297.00

ADD 35 % ESCALATION ON MACHINARY


SUB TOTAL
c)

Material
Modified binder
Crushed stone chipping 11.2 mm size

tonne
cum

11.550
105.000

41682.80
1049.55
SUB TOTAL

A+B+C
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 10500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10500
say

Junior Engineer

Assistant Engineer

Executive Engineer

Cost Rs

30.00
720.00
750.00
1380.00
1236.00
3096.00
10200.00
1782.00
17694.00
6192.90
23886.90
481436.33
110202.27
591638.60
616275.50
61627.55
67790.31
745693.36
71.02
71.00

BITUMRN RATE

FOR

( PART-B )

Rate w.e.f.

01- 05 - 2012

CIRCLE : 28th Circle, NH , PWD, BAREILLY


DIVISION : N H Construction Division, PWD ,Bareilly

NH-74

IN KM

268

Distance from Mathura Refinery


Distance from Panipat Refinery

MATERIAL

Bitumen VG30(Bulk)

From

Mathura Refinery

Basic Rates
01-05-2012
Excise
Duty@14%
on 'A'
Education
Cess@
3% on 'B'
Cartage(1.75/km
) excluding 10%
O.H.
2792
km
Cartage(1.75/km
) excluding 10%
O.H.
489X1.75
EMPTY DRUMS
Total
'(A+B+C+D+
E)'
SAY

JUNIOR ENGINEER

Emulsion M/S (Packed


Reconditioned Drums from
Panipat Refinery

248
458
CRMB-55(Bulk)

( Rs )

( Rs )

( Rs )

35740.00

32160.00

35890.00

5003.60

4502.40

5024.60

150.11

135.07

150.74

789.09

789.09

777.95

41682.80

(-)1500
36075.43

41854.43

41683

36075

41854

ASSISTANT

ENGINEER

from

Mathura Refinery

EXECUTIVE ENGINEER

BILL OF QUANTITY

Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded
surfacing From km 264.00 to 275.00 of NH-74 Premix (New NH-30 )
1
2
3
4
5
6
7

Date of Calling Tender


Date of Receiving Tender
Date of Openning Technical bid
Bid Security
Time of Completion
Validity Period
Cost of Tender Form

S. No. Item of work


1 Built-up-Spray Grout

Providing, laying and rolling of built-upspray grout layer over prepared base
consisting of a two layer composite
construction of compacted crushed coarse
aggregates using motor grader for
aggregates. key stone chips spreader may
be used with application of bituminous
binder after each layer, and with key
aggregates placed on top of the second
layer to serve as a Base conforming to the
line, grades and cross-section specified,
the compacted layer thickness being 75
mm
km-265
km-266
km-267
km-269
km-271
km-273
Total
Tack Coat
Providing and applying tack coat with bitumen
emulsion using emulsion pressure distributor at the
rate of 0.25 kg per sqm on the prepared
bituminous/granular
surface
cleaned
with
mechanical broom.
qty same as above item no-1
Filling Pot-holes and Patch Repairs with openGraded Premix surfacing, 20mm.

Unit

Qty.

Rate

sqm
sqm
sqm
sqm
sqm
sqm
sqm

100.00
80.00
80.00
110.00
90.00
105.00
565.00

297.41

168036.65

sqm

565.00

13.75

7768.75

sqm
sqm
sqm
sqm

280.00
245.00
310.00
295.00

Removal of all failed material, trimming of completed


excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat on the sides and base
of excavation as per clause 503, back filling the pot
holes with hot bituminous material as per clause
511, compacting, trimming and finishing the surface
to form a smooth continuous surface, all as per
clause 3004.2
km-265
km-266
km-267
km-269

Per

Amount

S. No. Item of work


km-271
km-273
Total
4

Unit

Qty.

Rate

sqm
sqm
sqm

250.00
265.00
1645.00

Per

Amount

132.70

218283.71

sqm

1645.00

63.40

104287.09

Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade
and cross fall using Type B seal coats
Qty same as above item no-3

Total

Signature of Contractor

Complete Adress of Contractor

498376.21

BILL OF QUANTITY
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded
surfacing From km 264.00 to 275.00 of NH-74 Premix (New NH-30 )
1
2
3
4
5
6
7
S. No.
1

Date of Calling Tender


Date of Receiving Tender
Date of Openning Technical bid
Bid Security
Time of Completion
Validity Period
Cost of Tender Form
Item of work
Built-up-Spray Grout
Providing, laying and rolling of built-upspray grout layer over prepared base
consisting of a two layer composite
construction of compacted crushed coarse
aggregates using motor grader for
aggregates. key stone chips spreader may
be used with application of bituminous
binder after each layer, and with key
aggregates placed on top of the second
layer to serve as a Base conforming to the
line, grades and cross-section specified,
the compacted layer thickness being 75
mm
km-265
km-266
km-267
km-269
km-271
km-273
Total

Tack Coat
Providing and applying tack coat with bitumen
emulsion using emulsion pressure distributor at the
rate of 0.25 kg per sqm on the prepared
bituminous/granular
surface
cleaned
with
mechanical broom.
qty same as above item no-1
Filling Pot-holes and Patch Repairs with openGraded Premix surfacing, 20mm.

Unit

Qty.

Rate
In Figure

sqm
sqm
sqm
sqm
sqm
sqm
sqm

100.00
80.00
80.00
110.00
90.00
105.00
565.00

295.00

sqm

565.00

11.30

Rate
In Words

Removal of all failed material, trimming of


completed excavation to provide firm vertical faces,
cleaning of surface, painting of tack coat on the
sides and base of excavation as per clause 503,
back filling the pot holes with hot bituminous
material as per clause 511, compacting, trimming
and finishing the surface to form a smooth
continuous surface, all as per clause 3004.2
km-265
km-266
km-267
km-269
km-271
km-273
Total
4

sqm
sqm
sqm
sqm
sqm
sqm
sqm

280.00
245.00
310.00
295.00
250.00
265.00
1645.00

130.00

sqm

1645.00

63.00

Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels,
grade and cross fall using Type B seal coats
Qty same as above item no-3
Total

Signature of Contractor

Officer Calling Tender

Complete Adress of Contractor

Officer Accepting Tender

Officer Openning Tender

BILL OF QUANTITY
Name of work : Crack Sealing with Stress absorbing membrane (SAM) with crack width 6
mm to 9 mm repair over a crack road surface From km 264.00 to 274.00 of NH-74 (New NH30 )
1
2
3
4
5
6
7
S. No.
1

Date of Calling Tender


Date of Receiving Tender
Date of Openning Tender
Security E/M
Time of Completion
Validity Period
Cost of Tender Form
Item of work
Stress absorbing membrane (SAM) with
crack width 6 mm to 9 mm
Providing and laying of a stress absorbing
membrane over a cracked road surface, with
crack width 6 to 9 mm after cleaning with a
mechanical broom, using modified binder
complying with clause 521, sprayed at the rate of
11 kg per 10 sqm and spreading 11.2 mm
crushed stone aggregates @ 0.12 cum per 10
sqm, sweeping the surface for uniform spread of
aggregates and surface finished to conform to
clause 902.
km-265
km-266 & 267
km-268 & 269
km-270
km-271 & 272
km-273 & 274
Total

Unit

sqm
sqm
sqm
sqm
sqm
sqm
sqm

Qty.

25th April 2012


11th May 2012
14 th May 2012
Rs. 50000/One Month
Three Months
150+500+88 = 738/Rate
In Figure

In Words

71.00

Rs Seventy One only

800.00
1050.00
1250.00
850.00
1400.00
1200.00
6550.00

I/We here by tender my / our rates ...% above/below/atpar the departmental rates.

Signature of Contractor

Officer calling Tender

Complete Adress of Contractor

Officer Accepting Tender

Officer openning Tender

Analysis Of Rate

For

PART-A

Tack Coat
Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.25 kg per sqm
on the prepared bituminous/granular surface cleaned with
mechanical broom.

Unit = sqm
Taking output = 3500 sqm
a) Labour
day
day

Mazdoor

0.080
2.000

125.00
125.00
sub total

b)

10.00
250.00
260.00

Machinery
Mechanical broom @ 1250 sqm per hour

hour

2.800

230.00

644.00

Air compressor 250 cfm

hour

2.800

206.00

576.80

Emulsion pressure distributor @ 1750 sqm per hour

hour

2.000

516.00

1032.00

add : escaslation @ 35 % on machinery


sub total
c)

Material

Bitumen @ 0.25 kg per sqm

tonne

0.875

41781.44

sub total
a+b+c
d) Overhead charges @10% input on (a+b+c)
e)

Contractor's profit @10% input on (a+b+c+d)

13.78
Say

Executive Engineer
NH C.D.P.W.D.Bareilly

Analysis Of Rate

36558.76
39860.04
3986.00

48230.64

Rate per sqm = (a+b+c+d+e)/3500

A.E.

36558.76

4384.60

Cost for 3500 sqm = a+b+c+d+e

J.E.

788.48
3041.28

J.E.(T)

For

PART-A

13.78

Superindenting Engineer
NH28th Circle p. w.d.Bareilly

10.4

3004.2

Filling Pot-holes and Patch Repairs with open-Graded


Premix surfacing, 20mm.
Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 511, compacting, trimming and
finishing the surface to form a smooth continuous surface, all
as per clause 3004.2
Unit = Sqm
Taking out put = 10250 sqm (205 cum)(405 tonne)
a)

Labour
Mate
Mazdoor
Mazdoor skilled

Day
Day
Day

3.760
90.000
4.000

125.00
120.00
130.00

470.00
10800.00
520.00

Air compressor 250 cfm

hour

6.000

206.00

1236.00

HMP 100-110 TPH Capacity

hour

6.000

11167.00

67002.00

Tipper 5.5 tonnes capacity

hour

45.000

200.00

9000.00

Smooth wheeled roller 8-10 tonnes


add : escaslation @ 35 % on machinery
c) Material

hour

12.000

297.00

3564.00
28280.70

Crushed stone aggregates nominal size 13.2mm


Crushed stone aggregates nominal size 11.2mm
Bitumen 60/70

cum
cum
tonne

184.500
92.250
14.970

210413.03
105206.51
625468.09

Bitumen emulsion for tack coat including vertical sides of pot


hole.
d) Overhead charges @10% input on (a+b+c)

tonne

2.460

1140.45
1140.45
41781.44
36075.43

b)

e)

Machinery

115070.59

Contractor's profit @10% input on (a+b+c+d)

126577.65

Cost for 10250 sqm = a+b+c+d+e

1392354.11

Rate per sqm = (a+b+c+d+e)/10250

135.84
say

J.E.

A.E.

Executive Engineer
NH C.D.P.W.D.Bareilly

513

Seal Coat

Analysis Of Rate

88745.55

J.E.(T)

For

PART-A

135.84

Superindenting Engineer
NH28th Circle p. w.d.Bareilly

(ii) Case - II : Type B


Providing and laying of premix sand seal coat with HMP of
appropriate capacity not less than 75 tonnes/ hours using
crushed stone chipping 6.7 mm size and penetration bitumen
of suitable grade.

Unit = sqm
Taking output = 7858 sqm (47.16 cum)
a) Labour
Mate

day

0.160

125.00

20.00

day

4.000

125.00

500.00

HMP of 75 tonnes/hour.

hour

2.000

11167.00

22334.00

Electric Generator Set 250 KVA


Front end loader 1 cum bucket capacity

hour
hour

2.000
2.000

450.00
520.00

900.00
1040.00

tonne.km

104 x 5'

14.50

75400.00

Mazdoor
b) Machinery

Tipper 10 tonne capacity


Add 10 per cent of cost of carriage to cover cost of loading
and
unloading
Paver
finisher hydrostatic with sensor attachment

hour

2.000

629.00

Smooth wheeled 8-10 tonnes capacity

hour

2.000

297.00

7540.00

add : escaslation @ 35 % on machinery


c)

1258.00
594.00
30041.20

Material

Bitumen@ 6.80 kg per 10 sqm


Crushed stone chipping of 6.7 mm size defined as passing
11.2 mm sieve and retained on 2.36 mm sieve applied @
0.06 cum
per 10 charges
sqm
d)
Overhead
@10% input on (a+b+c)

tonne
cum

5.340
47.160

41781.44
1140.45

223112.86
53783.62
41652.37

e) Contractor's profit @10% input on (a+b+c+d)


Cost for 7858 sqm = a+b+c+d+e

45817.61
503993.66

Rate per sqm = (a+b+c+d+e)/7858

64.14
say

J.E.

A.E.

Executive Engineer

J.E.(T)

NH C.D.P.W.D.Bareilly

Analysis Of Rate
506

Built-up-Spray Grout

64.14

Superindenting Engineer
NH28th Circle p. w.d.Bareilly

For

PART-A

Providing, laying and rolling of built-up-spray grout layer over


prepared base consisting of a two layer composite
construction of compacted crushed coarse aggregates using
motor grader for aggregates. key stone chips spreader may
be used with application of bituminous binder after each layer,
and with key aggregates placed on top of the second layer to
serve as a Base conforming to the line, grades and crosssection specified, the compacted layer thickness being 75
mm
Unit = sqm
Taking output = 3000 sqm (225 cum)
a) Labour
Mate

day

0.400

125.00

50.00

Mazdoor including for brooming of key aggregates

day

8.000

125.00

1000.00

Mazdoor skilled
b) Machinery
Hydraulic self propelled chip spreader both for aggregates
and key aggregates@ 1500 sqm per hour for 3000 x 3 sqm

day

2.000

130.00

260.00

hour

6.000

1700.00

10200.00

Bitumen pressure distributor for 3000 x 2 sqm @ 1750 sqm


per hour
Tipper 5.5 cum capacity

hour

3.430

516.00

1769.88

hour

10.000

200.00

2000.00

smooth wheel roller 8 tonnes


Front end loader 1 cum bucket capacity
add : escaslation @ 35 % on machinery
c) Material
Bitumen30 kg per 10 sqm @ 15 kg per 10 sqm for each layer
Crushed stone coarse aggregate passing 53 mm and
retained on 2.8 mm sieve @ 0.5 cum per 10 sqm for each
Key aggregates passing 22.4 mm and retained on 2.8 mm
sieve
0.13 cumcharges
per 10 sqm
d) @
Overhead
@10% input on (a+b+c)
e) Contractor's profit @10% input on (a+b+c+d)
Cost for 3000 sqm = a+b+c+d+e

hour
hour

6.000
6.000

297.00
520.00

1782.00
3120.00
6605.16

tonne
cum

9.000
300.000

41781.44
1080.45

376032.92
324136.36

cum

39.000

1140.45

44477.73
77143.40
84857.75
933435.20

Rate per sqm = (a+b+c+d+e)/3000


say
J.E.

A.E.

Executive Engineer

J.E.(T)

Superindenting Engineer

NH C.D.P.W.D.Bareilly

Sr No

Ref. to
MoRTH
Spec.

311.15
311.00

NH28th Circle p. w.d.Bareilly

Analysis of Rate( PART-A )


Description

Unit

Quantity

Rate Rs

Cost Rs

5.21

(ii) Stress absorbing membrane (SAM) with crack width 6 mm to 9 mm

Providing and laying of a stress absorbing membrane over a cracked road


surface, with crack width 6 to 9 mm after cleaning with a mechanical
broom, using modified binder complying with clause 521, sprayed at the
rate
11 kg per 10 sqm and spreading 11.2 mm crushed stone
Unit of
= sqm
Taking output = 10500 sqm

a) Labour
Mate

day

0.240

125.00

30.00

Mazdoor

day

6.000

120.00

720.00

SUB TOTAL
b)

750.00

Machinery
Mechanical broom @ 1250 sqm per hour

hour

6.000

230.00

1380.00

Air compressor 250 cfm capacity

hour

6.000

206.00

1236.00

Bitumen pressure distributor @ 1750 sqm per hour


Hydraulic Chip spreader
Smooth wheeled road roller 8-10 tonne

hour
hour
hour

6.000
6.000
6.000

516.00
1700.00
297.00

3096.00
10200.00
1782.00
17694.00
6192.90

ADD 35 % ESCALATION ON MACHINARY


SUB TOTAL
c)

Material
Modified binder
Crushed stone chipping 11.2 mm size

tonne

11.550

cum

105.000

23886.90

41781.44

482575.58

1140.45

119747.73
602323.30

SUB TOTAL
A+B+C

626960.20

d)

Overhead charges @ input on (a+b+c)

e)

Contractor's profit @ input on (a+b+c+d)

62696.02
68965.62

Cost for 10500 sqm = a+b+c+d+e

758621.85

Rate per sqm = (a+b+c+d+e)/10500

72.25
say

J.E.

A.E.

Executive Engineer

J.E.(T)

NH C.D.P.W.D.Bareilly

Analysis Of Rate
10.5

3004.2

72.25

Superindenting Engineer
NH28th Circle p. w.d.Bareilly

For

PART-A

Filling Pot-holes and Patch Repairs with Bituminous


concrete,
Removal 40mm.
of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous

Unit = Sqm
Taking out put = 4900 sqm (196 cum)(450 Tonnes)
a) Labour
Mate
Mazdoor
Mazdoor skilled
b) Machinery
Air compressor 250 cfm
HMP 100-110 TPH Capacity
Tipper 10 tonnes capacity
Smooth wheeled roller 8-10 tonnes
add : escaslation @ 35 % on machinery

Day
Day
Day

2.920
70.000
3.000

125.00
120.00
130.00

365.00
8400.00
390.00

hour
hour
hour
hour

6.000
6.000
45.000
12.000

206.00
11167.00
200.00
297.00

1236.00
67002.00
9000.00
3564.00
28280.70

tonne
tonne

22.500
1.180

41781.44
36075.43

940082.29
42569.00

cum
cum
cum

99.750
65.550
114.000

1140.45
1140.45
1140.45

113759.89
74756.50
130011.30
15926.38

13.2-10 mm 30 per cent

cum

85.500

1140.45

97508.48

10-5 mm 25 per cent


5 mm and Below43 per cent

cum
cum

71.250
122.550

1140.45
1140.45

81257.06
139762.15

cum
tonne

122.550
9.000

1140.45
1010.45

139762.15
9094.05
18493.77

c) Material
I) Bitumen
ii) Bitumen emulsion for tack coat .
iii) Aggregates
Grading I - 19mm(Nominal size)
20-10mm 35 per cent
10-5 mm 23 per cent
5mm and below40 per cent
Add 5 per cent for wastage
or
Grading-II 13mm (Nominal size)

5 mm and Below43 per cent


Filler 2 per cent
Add 5 per cent for wastage
Any one of the above alternatives of aggregate i.e. 19mm or
13mm nominal size may be adopted as per approved design.
10.5

(i)

for grading I Material


d)
e)

Overhead charges @10% input on (a+b+c)


Contractor's profit @10% input on (a+b+c+d)

143497.81
157847.59

Cost for 4900 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/4900
10.5

say

1736323.46
354.35
354.00

say

148889.32
163778.25
1801560.74
367.67
368.00

(ii) for grading II Material


d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 4900 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/4900

J.E.

A.E.

Executive Engineer
NH C.D.P.W.D.Bareilly

J.E.(T)

Superindenting Engineer
NH28th Circle p. w.d.Bareilly

Analysis Of Rate
3004.2

For

PART-A

Filling Pot-holes and Patch Repairs with open-Graded


Premix surfacing, 20mm.
Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 511, compacting, trimming and
finishing the surface to form a smooth continuous surface, all
as per clause 3004.2
Unit = Sqm
Taking out put = 10250 sqm (205 cum)(405 tonne)
a)

Labour
Mate
Mazdoor
Mazdoor skilled

Day
Day
Day

3.760
90.000
4.000

125.00
120.00
130.00

Air compressor 250 cfm

hour

6.000

206.00

HMP 100-110 TPH Capacity

hour

6.000

11167.00

Tipper 5.5 tonnes capacity

hour

45.000

200.00

Smooth wheeled roller 8-10 tonnes


add : escaslation @ 35 % on machinery

hour

12.000

297.00

b)

Machinery

c)

Material

Crushed stone aggregates nominal size 13.2mm


Crushed stone aggregates nominal size 11.2mm
Bitumen 60/70

cum
cum
tonne

184.500
92.250
14.970

Bitumen emulsion for tack coat including vertical sides of pot


hole.
d) Overhead charges @10% input on (a+b+c)

tonne

2.460

e)

1140.45
1140.45
41781.44
36075.43

Contractor's profit @10% input on (a+b+c+d)

Cost for 10250 sqm = a+b+c+d+e


Rate per sqm = (a+b+c+d+e)/10250

A.E.

Executive Engineer
NH C.D.P.W.D.Bareilly

J.E.(T)

say
Superindenting
NH28th Circle p.

470.00
10800.00
520.00
1236.00
67002.00
9000.00
3564.00
28280.70

210413.03
105206.51
625468.09
88745.55
115070.59
126577.65
1392354.11
135.84
135.84
Engineer
w.d.Bareilly

DETAILS OF MEASURMENTS
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
surfacing From km 295.00 to 304.00 &km264.oo to 274.00of NH-74 (New NH-30 )
S. No.
Item of work
no.
L
B
H/D
Qty
Built-up-Spray Grout
1
Providing, laying and rolling of built-upspray grout layer over prepared base
consisting of a two layer composite
construction of compacted crushed
coarse aggregates using motor grader
for aggregates. key stone chips
spreader may be used with application
of bituminous binder after each layer,
and with key aggregates placed on top
of the second layer to serve as a Base
conforming to the line, grades and crosssection specified, the compacted layer
thickness being 75 mm

km-295

1
1
1
1
1
1
1

6.70
12.40
24.70
21.60
18.70
6.80
26.00

4.00
5.80
3.70
4.80
4.20
3.90
4.60

km-296

1
1
1
1
1
1
1
1
1

10.40
22.40
27.20
12.90
20.80
12.80
8.60
20.40
10.90

3.40
6.40
4.80
3.80
4.60
3.60
4.20
3.80
4.70

km-297

1
1
1
2
1
1

9.60
14.20
7.40
16.50
3.90
6.70

5.70
5.80
5.40
4.00
2.70
3.30

26.80
71.92
91.39
103.68
78.54
26.52
119.60
518.45
35.36
143.36
130.56
49.02
95.68
46.08
36.12
77.52
51.23
664.93
54.72
82.36
39.96
132.00
10.53
22.11
341.68

km-298

1
1
1
2
1
2

9.80
16.80
20.85
12.00
11.20
6.00

4.20
5.80
3.90
4.00
4.60
3.60

km-299

1
1
1
1
1
1
1
1

6.40
7.70
17.60
3.40
16.50
5.40
18.90
10.40

3.70
3.90
3.55
2.20
2.90
3.80
4.10
3.90

km-300

1
1
1
1
1
1
1
1

20.40
9.90
11.80
22.20
16.00
17.90
7.40
16.40

2.70
4.00
3.20
2.90
3.75
3.80
3.50
3.70

km-301

1
1
1
1
1
1
1

6.70
11.20
3.80
22.20
6.90
9.80
33.30

3.30
3.50
2.40
3.00
3.20
4.20
2.80

km-302

1
1
1
1
1
2
1
1

15.40
8.40
12.00
4.80
15.80
5.60
6.80
12.30

2.70
3.00
3.30
1.80
4.20
2.20
3.20
3.50

km-303

1
1
1
1
1
1
1
1
1

4.70
23.40
9.10
28.00
21.50
5.50
16.25
26.40
7.50

2.50
3.70
2.60
4.80
3.15
2.65
3.90
4.30
3.55

41.16
97.44
81.32
96.00
51.52
43.20
410.64
23.68
30.03
62.48
7.48
47.85
20.52
77.49
40.56
310.09
55.08
39.60
37.76
64.38
60.00
68.02
25.90
60.68
411.42
22.11
39.20
9.12
66.60
22.08
41.16
93.24
293.51
41.58
25.20
39.60
8.64
66.36
24.64
21.76
43.05
270.83
11.75
86.58
23.66
134.40
67.73
14.58
63.38
113.52
26.63
542.21

1
1
1
1
1
1
1
1

11.20
6.40
9.40
22.00
7.80
4.20
2.40
3.80

2.90
4.80
3.20
4.80
3.05
2.10
1.90
2.10

32.48
30.72
30.08
105.60
23.79
8.82
4.56
7.98
244.03
4007.79

1
1
1
1
1
1
1

6.40
8.60
10.80
5.60
17.60
12.60
9.70

3.10
2.60
4.10
3.20
4.40
3.80
4.00

km-266

1
1
1
1
1

6.40
11.30
21.50
8.80
11.80

3.70
4.20
4.80
3.30
4.60

km-267

1
1
1
1

9.40
9.00
12.80
6.60

3.90
3.40
4.00
3.60

km-268

1
2
1
1

11.70
9.50
6.50
16.20

3.25
3.00
4.50
4.10

km-269

1
1
1
1

6.90
11.70
18.60
12.00

3.75
4.50
3.90
3.30

19.84
22.36
44.28
17.92
77.44
47.88
38.80
268.52
23.68
47.46
103.20
29.04
54.28
257.66
36.66
30.60
51.20
23.76
142.22
38.03
57.00
29.25
66.42
190.70
25.88
52.65
72.54
39.60
190.67

km-304

Total (A)
km-265

km-270

1
1
1
1

10.60
14.40
5.80
11.90

3.20
2.80
2.40
3.70

km-271

1
1
1
1
1

21.50
3.00
11.50
7.90
13.55

3.65
1.60
4.40
3.90
4.30

km-272

1
1
1
1
1
1
1
1

8.80
24.60
6.90
28.50
4.80
11.80
9.60
12.80

3.60
3.90
3.40
3.05
3.00
3.80
3.40
3.70

km-273

1
1
1
1
1
1
1

10.50
7.50
8.20
8.40
10.50
4.40
14.40

2.60
2.20
4.00
3.20
2.80
2.70
3.30

km-274

1
1
1
1
1

12.20
4.20
6.20
9.80
7.20

2.85
1.95
2.70
2.40
3.30

Total (B)

33.92
40.32
13.92
44.03
132.19
78.48
4.80
50.60
30.81
58.27
222.95
31.68
95.94
23.46
86.93
14.40
44.84
32.64
47.36
377.25
27.30
16.50
32.80
26.88
29.40
11.88
47.52
192.28
34.77
8.19
16.74
23.52
23.76
106.98
2081.41

Filling Pot-holes and Patch Repairs


with open-Graded Premix surfacing,
20mm.
Removal of all failed material, trimming
of completed excavation to provide firm
vertical faces, cleaning of surface,
painting of tack coat on the sides and
base of excavation as per clause 503,
back filling the pot holes with hot
bituminous material as per clause 511,
compacting, trimming and finishing the
surface to form a smooth continuous
surface, all as per clause 3004.2

km-295

1
1
1
1
1
1
1
1

7.00
12.80
18.60
9.40
10.60
32.80
7.90
27.90

4.20
5.80
3.90
4.40
3.45
4.85
4.00
4.80

km-296

1
1
1
2
1
1
1
1
1

12.40
32.40
9.60
28.50
19.45
12.90
36.00
22.40
14.90

3.60
6.40
4.75
3.85
3.30
4.85
3.30
4.80
4.80

km-297

1
1
1
1
1
1

10.60
6.40
19.40
5.90
18.40
9.70

6.30
3.80
5.40
3.50
5.00
3.80

29.40
74.24
72.54
41.36
36.57
159.08
31.60
133.92
578.71
44.64
207.36
45.60
219.45
64.19
62.57
118.80
107.52
71.52
941.64
66.78
24.32
104.76
20.65
92.00
36.86
345.37

km-298

1
1

9.80
22.80

4.20
5.80

41.16
132.24

1
1
1
2

15.70
31.70
14.60
8.80

3.55
3.90
4.80
3.90

km-299

1
1
1
1
1
1
1
1
1

8.40
14.45
7.90
6.50
21.60
36.40
6.90
12.90
15.40

4.70
4.10
3.90
3.00
4.30
4.80
3.80
4.90
4.50

55.74
123.63
70.08
68.64
491.49
39.48
59.25
30.81
19.50
92.88
174.72
26.22
63.21
69.30
575.37

km-300

1
1
2
1
1
1
2
1

22.80
12.60
15.00
9.80
18.40
21.80
9.40
22.60

4.25
4.80
3.50
5.80
4.60
3.80
3.90
4.40

km-301

1
1
1
1
1
1
1

8.40
18.20
6.80
32.20
9.25
11.40
36.30

3.65
3.90
2.80
3.60
3.75
4.40
3.80

km-302

1
1
1
2
1
1
1

17.25
9.40
16.80
7.80
21.20
9.80
18.80

3.90
3.60
3.80
3.20
4.40
3.75
3.90

96.90
60.48
105.00
56.84
84.64
82.84
73.32
99.44
659.46
30.66
70.98
19.04
115.92
34.69
50.16
137.94
459.39
67.28
33.84
63.84
49.92
93.28
36.75
73.32
418.23

km-303

1
1
1
1
1
1
1
1
1

14.70
25.40
12.85
38.20
24.00
6.80
20.80
28.80
9.85

4.20
3.90
3.85
3.45
4.50
3.65
3.90
4.80
4.00

km-304

1
1
1
1
1
1
1

16.60
9.20
16.60
10.80
7.20
24.40
7.30

4.80
4.80
4.65
3.75
2.90
3.90
2.85

km-265

1
1
1
1
1
1
1

16.80
8.70
13.80
25.90
19.60
14.65
10.70

3.50
2.80
4.10
3.90
4.90
4.80
4.60

km-266

1
1
2
1
1
1

6.90
21.30
18.00
26.80
20.75
16.80

3.75
4.20
3.80
5.40
3.80
4.60

km-267

1
1
1
1
1

9.90
29.80
28.80
22.80
6.80

4.50
3.60
4.80
4.10
4.60

km-268

1
2
1
1

21.70
12.50
38.50
19.65

3.95
3.80
4.50
4.70

Total (A)

61.74
99.06
49.47
131.79
108.00
24.82
81.12
138.24
39.40
733.64
79.68
44.16
77.19
40.50
20.88
95.16
20.81
378.38
5581.66
58.80
24.36
56.58
101.01
96.04
70.32
49.22
456.33
25.88
89.46
136.80
144.72
78.85
77.28
552.99
44.55
107.28
138.24
93.48
31.28
414.83
85.72
95.00
173.25
92.36
446.32

km-269

1
1
1
1
1
1

11.90
18.85
22.00
18.00
20.20
12.80

3.75
4.80
3.50
4.20
4.25
3.85

km-270

1
1
1
1

18.60
34.80
9.80
33.30

3.60
3.40
2.90
4.10

km-271

1
1
1
2
1
1

21.90
7.70
21.50
16.00
29.90
16.60

3.80
3.60
4.40
4.50
4.10
4.60

km-272

1
1
1
1
1
1
1
1

10.80
27.60
7.90
37.20
25.80
13.60
19.90
14.10

3.75
4.25
3.40
3.70
2.75
4.80
3.85
3.80

km-273

1
1
1
1
1
1
1

12.20
7.50
28.20
8.40
30.50
4.40
14.40

2.60
2.20
4.00
3.20
2.80
2.70
3.30

km-274

1
1
2
1
1
1

12.20
5.20
15.50
26.90
11.80
8.75

3.30
3.00
3.50
3.70
3.30
3.60

Total (B)

44.63
90.48
77.00
75.60
85.85
49.28
422.84
66.96
118.32
28.42
136.53
350.23
83.22
27.72
94.60
144.00
122.59
76.36
548.49
40.50
117.30
26.86
137.64
70.95
65.28
76.62
53.58
588.73
31.72
16.50
112.80
26.88
85.40
11.88
47.52
332.70
40.26
15.60
108.50
99.53
38.94
31.50
334.33
4447.78

DETAILS OF MEASURMENTS
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
surfacing From km 295.00 to 304.00& km 264.00 to 274.00 of NH-74 (New NH-30 )
S. No.
Item of work
Unit
Qty.
Rate
Per
Amount
3
Seal Coat
Providing and laying seal coat sealing
the voids in a bituminous surface laid to
the specified levels, grade and cross fall
using Type B seal coats

qty same as above item no-3 (A)

5581.66

qty same as above item no-3 (B)


4447.78
4

Stress absorbing membrane (SAM) with


crack width 6 mm to 9 mm
Providing and laying of a stress absorbing
membrane over a cracked road surface, with
crack width 6 to 9 mm after cleaning with a
mechanical broom, using modified binder
complying with clause 521, sprayed at the rate
of 11 kg per 10 sqm and spreading 11.2 mm
crushed stone aggregates @ 0.12 cum per 10
sqm, sweeping the surface for uniform spread of
aggregates and surface finished to conform to
clause 902.

km-295

1
1
1
1
1
1
1
1
1
1
1

17.00
45.80
22.80
38.80
49.50
42.00
18.95
62.00
59.40
7.90
27.90

2.50
2.80
3.70
2.45
2.80
2.75
3.00
3.45
3.40
2.60
2.80

42.50
128.24
84.36
95.06
138.60
115.50
56.85
213.90
201.96
20.54
78.12
1175.63

km-296

1
1
1
1
1
1
1
1
1
1
1

32.40
18.60
38.60
114.80
21.40
42.80
29.45
28.60
19.60
38.40
31.50

2.90
3.10
4.40
2.80
2.85
3.00
3.65
2.90
3.75
3.80
3.10

93.96
57.66
169.84
321.44
60.99
128.40
107.49
82.94
73.50
145.92
97.65
1339.79

km-297

1
1
1
1
1
1
1
1
1

20.60
16.40
32.50
66.60
27.55
46.10
49.40
14.90
29.70

3.30
3.80
3.15
4.60
3.90
2.90
3.75
3.50
3.40

67.98
62.32
102.38
306.36
107.45
133.69
185.25
52.15
100.98
1118.55

km-298

1
1
1
1
1
1
1
2

19.80
54.20
26.40
16.70
24.40
32.80
44.60
38.80

3.20
4.45
3.10
2.95
3.75
4.80
3.80
4.10

km-299

1
1
1
1
1
1
1
1
1

8.40
27.90
76.40
43.80
30.50
58.70
48.60
12.90
35.40

2.70
3.40
4.80
3.65
2.90
3.65
3.80
2.90
3.50

63.36
241.19
81.84
49.27
91.50
157.44
169.48
318.16
1108.88
22.68
94.86
366.72
159.87
88.45
214.26
184.68
37.41
123.90
1292.83

km-300

1
1
1
1
1
2
1

22.80
112.60
54.70
40.80
62.80
9.40
22.60

3.25
3.80
3.35
3.25
3.80
2.90
3.40

74.10
427.88
183.25
132.60
238.64
54.52
76.84
1187.83

km-301

1
1
1
1
1
1
1
1

18.40
48.20
6.80
67.20
30.00
79.00
11.40
36.30

3.60
3.90
2.80
3.60
4.00
3.75
4.40
3.30

66.24
187.98
19.04
241.92
120.00
296.25
50.16
119.79
1101.38

km-302

1
1
1
1
1
1
1
1
1
1

17.25
9.40
66.60
9.00
11.80
20.50
77.80
33.50
9.80
48.80

3.90
3.60
4.50
3.20
4.40
3.30
3.20
4.20
4.75
3.90

km-303

1
1
1
1
1
1
1
1

36.80
105.40
22.50
78.00
6.80
49.80
58.00
9.85

4.20
3.90
6.60
4.10
3.65
3.90
4.80
3.00

km-304

1
1
1
1
1
1
1
1

16.60
90.00
36.60
42.50
10.80
7.20
40.00
7.30

3.80
2.80
4.30
3.70
3.75
2.90
2.90
2.85

km-265

1
1
1
1
1
1
1

16.80
28.70
42.80
25.90
29.60
44.00
10.70

3.50
2.80
3.55
3.90
4.20
4.60
4.60

km-266

1
1
1
1
1
1

6.90
31.60
19.50
26.80
30.75
16.80

3.75
4.70
3.30
4.40
3.80
4.60

Total (A)

67.28
33.84
299.70
28.80
51.92
67.65
248.96
140.70
46.55
190.32
1175.72
154.56
411.06
148.50
319.80
24.82
194.22
278.40
29.55
1560.91
63.08
252.00
157.38
157.25
40.50
20.88
116.00
20.81
827.90
11889.40
58.80
80.36
151.94
101.01
124.32
202.40
49.22
768.05
25.88
148.52
64.35
117.92
116.85
77.28
550.80

km-267

1
1
1
1
1

9.90
39.80
52.80
22.80
6.80

4.50
3.60
3.70
4.10
4.60

44.55
143.28
195.36
93.48
31.28
507.95

km-268

1
2
1
1
1
1

21.70
22.00
45.00
35.60
8.50
19.65

3.95
3.80
3.30
4.40
4.50
4.70

85.72
167.20
148.50
156.64
38.25
92.36
688.66

km-269

1
1
2
1
1
1

38.90
18.85
36.50
34.00
70.20
12.80

3.75
4.80
4.30
3.00
3.25
3.85

145.88
90.48
313.90
102.00
228.15
49.28
929.69

km-270

1
1
1
1

18.60
45.50
9.80
48.50

3.60
3.40
2.90
4.00

66.96
154.70
28.42
194.00
444.08

km-271

1
1
1
1
1
1

21.90
120.00
37.70
55.50
9.90
26.80

3.80
4.00
4.40
4.00
4.10
4.60

83.22
480.00
165.88
222.00
40.59
123.28
1114.97

km-272

1
1
1
1
1
1
1
1

10.80
27.60
47.90
52.90
107.20
43.60
9.90
34.80

3.75
4.25
3.40
3.50
3.70
4.80
3.85
3.80

40.50
117.30
162.86
185.15
396.64
209.28
38.12
132.24
1282.09

km-273

1
1
1
1
1
1
1
1

12.20
7.50
48.20
8.40
42.00
30.50
24.40
14.40

2.60
2.20
4.10
3.20
5.20
2.80
2.70
3.30

km-274

1
1
1
1
1

12.20
35.20
6.90
31.80
60.80

3.30
3.00
3.70
3.80
3.60

Total (B)

Junior Engineer
NH, PWD, Bareilly

Assistant Engineer

31.72
16.50
197.62
26.88
218.40
85.40
65.88
47.52
689.92
40.26
105.60
25.53
120.84
218.88
511.11
7487.31

BILL OF QUANTITY
S. No.
1

Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
surfacing From km 295.00 to 304.00 & km 264.00 to 274.00 of NH-74 (New NH-30 )
Item of work
Unit
Qty.
Rate
Per
Amount
Built-up-Spray Grout
Providing, laying and rolling of built-up-spray grout
layer over prepared base consisting of a two layer
composite construction of compacted crushed coarse
aggregates using motor grader for aggregates. key
stone chips spreader may be used with application of
bituminous binder after each layer, and with key
aggregates placed on top of the second layer to serve
as a Base conforming to the line, grades and crosssection specified, the compacted layer thickness
being 75 mm ( from km 294.00 to 304.00 ) A
sqm
4007.79
311.15
sqm
1247022.30
sqm
2081.41
sqm
619038.85
( from km 264.00 to 274.00 ) B
297.41
Filling Pot-holes and Patch Repairs with openGraded Premix surfacing, 20mm.
Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat on the sides and base
of excavation as per clause 503, back filling the pot
holes with hot bituminous material as per clause 511,
compacting, trimming and finishing the surface to
form a smooth continuous surface, all as per clause
3004.2 (from km 294.00 to 304.00) A
sqm
5581.66 135.84
sqm
758212.69
sqm
4447.78 132.70
sqm
590199.35
( from km 264.00 to 274.00 ) B
#
Providing and laying seal coat sealing the voids in a
#
bituminous surface laid to the specified levels, grade
#
and cross fall using Type B seal coats (from km
#
294.00 to 304.00 ) A
#
sqm
5581.66
sqm
358007.67
sqm
4447.78
63.40
sqm
281972.97
( from km 264.00 to 274.00 ) B
Stress absorbing membrane (SAM) with crack width 6 mm
to 9 mm
Providing and laying of a stress absorbing membrane over a
cracked road surface, with crack width 6 to 9 mm after cleaning
with a mechanical broom, using modified binder complying with
clause 521, sprayed at the rate of 11 kg per 10 sqm and
spreading 11.2 mm crushed stone aggregates @ 0.12 cum per
10 sqm, sweeping the surface for uniform spread of aggregates
and surface finished to conform to clause 902.
( from km
294.00 to 304.00 ) A

( from km 264.00 to 274.00 ) B

sqm
sqm

11889.40
7487.31

72.25
71.00

Total

J.E.

A.E.

Executive Engineer
NHCD PWD Bareilly

sqm
sqm

859005.58
531598.66

5245058.07

Superinding Engineer
NH 28th Circle PWD Bareilly

SUMMARY OF COST
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open Graded Premix
surfacing From km 295.00 to 304.00 &km264.oo to 274.00of NH-74 (New NH-30 )
.
S.No.
1

2
3
4
5
6

Item of Work
Filling Pot-holes with B.U.S.G.& Patchrepair with open graded Premix
surfacing From km 295.00 to 304.00 &
km 264.00 to 274.00 of NH-74(NewNH-30)

Total 'A'
Contingency 2.8%
Quality Control 1% on A
W.C. Establishment 1.5% on A
Centage Charges 9% on A
Labour cess 1% on A
Total

Amount

5245058.07

5245058.07
146861.63
52450.58
78675.87
472055.23
52450.58

6047551.96

Say 60.48 Lacs

Junior Engineer
NH, PWD, Bareilly

Assistant Engineer
NH, PWD, Bareilly

Executive Engineer
NH, PWD, Bareilly