You are on page 1of 4

Date:

Standard Work Combination Sheet


Process: Product:
# Description of Operation Step Manual

Manual = Automatic = Walk =


Time (draw solid line vertically at takt time)

Available time: Required output:


Time Automatic Walk

Takt Time: Entered by:

Multicycle time study to obtain average time


Sample 1 2 3 4 5 6 7 8 9 10 Average #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

Totals

Rev. 10/17/2005

Copyright Oct 2005. All Rights Reserved.

(619)244-8705

www.ProgressivEdge.com

Date:

Oct 17, 2005

Standard Work Combination Sheet


Process: Product:
#

Manual = 66 seconds Billy B. Automatic = Walk =

Left Bracket Assembly Tough Truck

Available time: Required output:

440 minutes 400 per day

Takt Time: Entered by:

Description of Operation Step Manual

Time (seconds) Automatic Walk

Time (draw solid line vertically at takt time) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75

Multicycle time study to obtain average time


Sample 1 4.5 2 5.5 3 5.5 4 4.9 5 5.1 6 5.0 7 4.9 8 5.0 9 5.0 10 Avg 5.1 5.05

1 2 3 4 5 6

Form Bracket Paint Bracket (Auto is dry time) Connect Support to Bracket Clean Test Pack

5 15 3 20 12 14

3 30

2 3

15.0 15.0 14.8 14.9 15.0 15.0 15.0 15.0 15.2 15.0 14.99 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3 20 12 14 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### #####

20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0 14.0

Total Time

69

33

Rev. 10/17/2005

Copyright Oct 2005. All Rights Reserved.

(619)244-8705

www.ProgressivEdge.com

Date:

Standard Work Sheet


Cell: Product: Cell Layout Available time: Required output: # Takt Time: Entered by: Description of Operation Step Manual Time Automatic Walk

Flow

Quality Check

Standard WIP

Safety

Total:

Copyright Oct 2005. All Rights Reserved. Rev. 10/17/2005

(619)244-8705

www.ProgressivEdge.com

Date:

Oct 17, 2005

Standard Work Sheet


Cell: The Bracket Makers Product: Tough Truck Cell Layout Available time: 440 Minutes Required output: 400 # Takt Time: 66 seconds Entered by: Billy B. Description of Operation Step Manual 1 Form Bracket 2 Paint Bracket (Auto is dry time) 3 Connect Support to Bracket
#1 Press to form Brackets

Time Automatic 3 30 Walk 2 3

5 15 3 20 12 14

4 Clean
#6 Pack 20 Brackets Max. 20 Brackets Max.

5 Test 6 Pack

#2 Paint Booth with Dry Rack

#5 Test

#4 Clean

#3 Connect Support to Bracket

Flow

Quality Check

Standard WIP

Safety

Total Time:

69

33

Copyright Oct 2005. All Rights Reserved. Rev. 10/17/2005

(619)244-8705

www.ProgressivEdge.com