HM 150.16
Learning Objectives / Experiments investigation of pumps in series and parallel connection - determining the head - recording the pump characteristics - determining the hydraulic power - determining the operating point
G.U.N.T Gertebau GmbH, Hanskampring 15-17, D-22885 Barsbttel, Phone +49 (40) 67 08 54-0, Fax +49 (40) 67 08 54-42, E-mail sales@gunt.de, Web http://www.gunt.de We reserve the right to modify our products without any notifications.
HM 150.16
1 tank, 2 overflow, 3 water connection, 4 ball valve in the intake pipe, 5 pump, 6 pump switch, 7 drain delivery pipe, 8 manometer
1 water connection, 2 tank, 3 overflow, 4 ball valve in the intake pipe, 5 pump 1, 6 and 7 ball valves for switching the pumps between series and parallel operation, 8 pump 2, 9 ball valve in the delivery pipe; P pressure
Characteristic curves: blue: one pump in operation, red: parallel connected pumps, green: series-connected pumps; H head, Q flow rate