Status of Data Sheets Submision, approval & procurement _ MEP_Q-C2

Data Sheet
Submission
1
2

Electrical
Conduits
Cable Trunking

wires

4
5

Cables
Glands, Lugs

10.03.2012
21.03.2012
13.03.2012/12
.05.2012
10.03.2012
21.03.2012
10.04.2012

Reviewed by
PMC

Approved by
ITUAL

07.06.2012
Material
Status

Make

16.03.2012

05.04.2012

Precision
Precision Make

16.03.2012

25.04.2012

Finolex

16.03.2012
09.04.2012

05.04.2012
09.04.2012

Avocab
HMI/Dowells

Distribution Boards

16.04.2012

16.04.2012

Light Fixtures

Cable Trays

27.03.2012

LA

15.03.2012

DMSGI

Maintenance Free
Earthing

15.03.2012

Sterling

10

Switches/GI Boxes

02.04.2012

09.04.2012

11
12
13
14
15

KWH Meter
GI Cable Trunking
Aviation light

25.04.2012
28.05.2012
04.06.2012

01.05.2012
28.05.2012
18.06.2012

Remarks

Procured
Procurement
started

FRLS to be used

Sample of TPN DB
submitted on
14.04.12. ELCB to be
submitted

ABB

Pending
21.05.2012

Sample submitted on
19.05.2012
Calculation to be
furnished
Calculation to be
furnished

MEM

09.04.2012

ABB

Pending

Conzerv
MEM
Bajaj

Switch/Sockets to be
approved by architect.
to be complied

ELV
15

Cables for Data


Cables for Voice
Cables for FAS
Cables for BMS
Cable Trays
Equipments - BMS
Equipments - Data
Equipments - Voice
Equipments - CCTV
Equipments - Access
Equipments - Boom
Barrier
Equipments - PA
HVAC

04.04.2012
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending

16

M.S.Pipes

21.03.2012

22.03.2012

22.03.2012

Jindal Star

17

GI Ducts

07.04.2012

09.04.2012

09.04.2012

Alpha

18

Insulation

04.04.2012

13.04.2012

16.06.2012

19
20

Valves
Balancing Valve
Three Way Modulating
Valve
Insulation of
Pipes_Methodology
Installation of
AHU_Methodology
Methodology for HVAC
Ducting
VFD
Grills/Diffuser/Damper/F
ire Damper
Air Curtain
Flexible Bellow
Thermometer
Air Veesel
Chemical dosing for
chilled water

04.04.2012
04.04.2012

24.05.2012
04.06.2012

24.05.2012
Pending

Weflo
Advance

02.04.2012

04.06.2012

Pending

Siemens

10.03.2012

14.06.2012

16.06.2012

10.04.2012

28.04.2012

02.05.2012

02.04.2012
02.04.2012
10.04.2012
25.04.2012

30.05.2012
30.05.2012
21.05.2012
19.05.2012

Danfoss
SystemairRavistar
Ravi Star
Easyflex
H Guru
Anu designer

27.04.2012

21.05.2012

ION Exchange

21
18
18
18
19
20
21
22
23
24
25

Finolex

Pending

DBR to be finalised

Pending
Pending

Procurement
started
Procurement
started

K-Flex to be procured

Pending
Pending
Pending

26

Expansion Tank &


Pressurisation System

01.05.2012

30.05.2012

Anergy

27

BTU Meter

16.04.2012

04.06.2012

Honeywell
1 of 6

Status of Data Sheets Submision, approval & procurement _ MEP_Q-C2


Data Sheet
Submission
28
29
30
31

Automatic Balancing
Valve
PIBC Valve
Flexible Duct

Reviewed by
PMC

Approved by
ITUAL

07.06.2012
Material
Status

Make

02.04.2012

04.06.2012

Danfoss

03.04.2012
04.07.2012

04.06.2012
14.07.2012

Advance
U.P.Twiga

Remarks

FPS
31

G.I.Pipes

32

Sprinklers

33

Installation Methodology

35
36
37
38
39
40

Accessories(Hose Reel,
etc.)
Alarm Valve
Check Valve
Y Strainer
Butterfly Valve
Hydrant Valve
Ball Valve

41

34

21.03.2012/25 07.04.2012/28
.04.2012
.04.2012
02.04.2012/09
15.06.2012
.06.2012

09.04.2012

Jindal Star

13.04.2012

Newage

Procurement
Started.

GI pipes approved
instead of MS

Pending
02.04.2012

16.04.2012

27.04.2012

Newage

02.04.2012
02.04.2012
02.04.2012
02.04.2012
02.04.2012
02.04.2012

15.05.2012
24.05.2012
24.05.2012
24.05.2012
16.05.2012
15.05.2012

Pending

HD
Weflo
Weflo
Weflo
Newage
Zoloto

Pressure reducing Vlave

19.04.2012

15.05.2012

42

Pressure Gauge

07.04.2012

16.06.2012

20.04.2012

H Guru

43

Fire
Extinguishers(ABC/CO2)

13.04.2012

16.06.2012

17.04.2012

Safex

44
45
46

Paint
Water Flow Switch
Auto Air Vent

25.04.2012
25.04.2012
25.04.2012

17.05.2012
15.05.2012
17.05.2012

47

Heat Detector

25.04.2012

Secutron(Mircom)

48

Smoke Detector

25.04.2012

Secutron(Mircom)

49

Beam Detector

25.04.2012

Secutron(Mircom)

50

IFU

25.04.2012

Secutron(Mircom)

51

MCP

25.04.2012

Secutron(Mircom)

52

Photo Electric Smoke


Detector

25.04.2012

Secutron(Mircom)

53

Fire Alarm Panel

27.04.2012

Secutron(Mircom)

54

Repeater Fire Alarm Panel

27.04.2012

Secutron(Mircom)

55

Response Indicator

30.04.2012

Agni

56

2C x 1.5 sq.mm. Cable

09.05.2012

13.07.2012

Avocab

57
58
59
60
61

Sounder
M.S.Hose Box
Level Switch
Anchor Fasteners

09.05.2012
28.05.2012
28.05.2012
05.07.2012

09.06.2012
09.06.2012
10.07.2012

C.K.Panchal
Techtrol
Hilti

Zoloto

Berger
Honeywell
Honeywell
after finalization of
ELV DBR.
after finalization of
ELV DBR.
after finalization of
ELV DBR.
after finalization of
ELV DBR.
after finalization of
ELV DBR.
after finalization of
ELV DBR.
after finalization of
ELV DBR.
after finalization of
ELV DBR.
after finalization of
ELV DBR.
will be delivered in lots
upto 10th floor
from 03-11-12

PHE
61

Pipes(UPVC)

02.04.2012/02
.05.2012

30.05.2012

62

Pipes(PPR)

02.04.2012/02
.05.2012

06.05.2012

63

Valves

11.07.2012

14.07.2012

64

Catch Basin

11.07.2012

23.07.2012

65

Floor Drain

11.07.2012

23.07.2012

66

Surface channel

11.07.2012

23.07.2012

will be delivered by0711-12


will be delivered in lots
Prince upto 16th floor from 5-11-12 to15-1112
will be delivered on 8Zoloto
11-12
Delivered
Astral
will be delivered by 30Astral
Nov-12
will be delivered by 30Astral
Nov-12
Prince upto 17th floor

2 of 6

Status of Data Sheets Submision, approval & procurement _ MEP_Q-C2


Data Sheet
Submission
Electrical
Sub Contractor 1
ETA
2 Elevators

3 Transformer

4 HT Panel
5 LT Panels
6 D.G.Set

16.01.2012

Reviewd by
PMC

08.02.2012

29.02.2012
25.04.2012/
07.05.2012/
08.05.2012/
28.05.2012/
05.07.2012

27.04.2012/
07.05.2012/
08.05.2012/
09.07.2012

Approved by
ITUAL

09.06.2012/
07.07.2012

LOI Raised

Expected
time of
arrival

Approved
04.05.2012

Toshiba

11.05.2012

28.06.2012

Kirlosker

Pending

Schneider

Pending

Shivanjali

Pending

Pending
12.05.2012

Approved
Make

09.06.2012/
09.07.2012

Pending

Pending

7 Bus ducts

24.04.2012/
07.05.2012

09.07.2012

09.07.2012

C&S

Pending

8 UPS

16.05.2012/
05.07.2012

09.07.2012

09.07.2012

Hi-Rel

Pending

25.04.2012/
04.05.2012

04.05.2012

10.05.2012

Sondex

06.06.2012

15.08.2012

10 Fans

15.03.2012/
08.05.2012

10.05.2012

10.05.2012

Kruger

06.06.2012

20.09.2012

11 AHUs/FCU

21.03.2012/
04.05.2012

10.05.2012

10.05.2012

ETA

Stock
Transfer

15.08.2012

25.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

15.08.2012

05.06.2012

07.06.2012

Kirlosker

Pending

27.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

30.08.2012

27.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

30.08.2012

27.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

30.08.2012

27.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

30.08.2012

27.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

30.08.2012

27.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

30.08.2012

27.04.2012

30.04.2012

10.05.2012

Grundfos

05.06.2012

30.08.2012

9
HVAC
9 Heat Exchanger

12

Chilled Water
Circulation Pumps

13
FPS
13 Pumps
14
PHE
Sump pump at car
14
park area
Sump pump at
15 Booster Pump
room
Sump pump at
16
Fire pump room
Potable Water
17
Transfer Pump
Booster Pump for
18 Flushing Water
Transfer
Domastic Water
19
Transfer pump
Flushing Water
20
Transfer pump

3 of 6

11.06.2012

Remarks

Factory Visit on
06.07.12 &
09.07.12

4 of 6

List of Shop Drawings From ETA(ANC)


Drawing No.
ETA/GIFT/BM/QC-2/M-101
ETA/GIFT/BM/QC-2/M-101A
ETA/GIFT/TYP/QC-2/M-105
ETA/GIFT/GF/QC-2/M-102

Details
Basement 1 HVAC Ducting Layout
Basement 1 HVAC Section Layout
Level 3-4,6-8,10-12,14-16,18-20,22-24 & 26 HVAC
Ducting Layout
GF HVAC Ducting Layout

ETA/GIFT/GF/SCH/QC-2/M-403

Level Basement to 13 Chilled Water Schematic Diagram

ETA/GIFT/GF/SCH/QC-2/M-404

Level 14 to Roof Chilled Water Schematic Diagram

ETA/GIFT/GF/SCH/QC-2/M-404A

Level Basement to roof chilled water equipment schedule

ETA/GIFT/L-01
ETA/GIFT/B/CT/E-103
ETA/GIFT/B/L/E-101
ETA/GIFT/B/L/E-101-1
ETA/GIFT/B/P/E-102
ETA/GIFT/G/L/E-201
ETA/GIFT/G/P/E-202
ETA/GIFT/1st/L/E-301
ETA/GIFT/1st/P/E-302
ETA/GIFT/1st/CT/E-303
ETA/GIFT/2 nd/L/E-401
ETA/GIFT/2 nd/E/E-402
ETA/GIFT/2 nd/CT/E-403
ETA/GIFT/TF-2/L/E-601
ETA/GIFT/TF-2/L/E-602

Electrical Services general notes & legends


Cable Tray Lauout of Basement
Lighting Conduit Layout of Basement
Basement Ramp light Detail
Power Conduit Layout of Basement
Lighting Conduit Layout of Ground Level
Power Conduit Layout of Ground Level
Lighting Conduit Layout of Level 1
Power Conduit Layout of Level 1
Cable Tray Layout of Level 1
Lighting Conduiting of Level 2
Power Conduiting of Level 2
Cable Tray Layout of Level 2
Lighting Conduiting of Level 5,13 & 21
Power Conduiting of Level 5,13 & 21
Lighting Conduit layout of Lvl 3-5,7-9,11-13,15-17,1921,23-25
Power Conduit layout of Lvl 3-5,7-9,11-13,15-17,1921,23-25
Cable Tray layout of Lvl 3-5,7-9,11-13,15-17,19-21,2325

ETA/GIFT/TF-1/L/E-501
ETA/GIFT/TF-1/P/E-502
ETA/GIFT/TF-1/CT/E-503
ETA/GIFT/FL-02

Fire Alarm general notes & legends

Date
09.03.12
09.03.12
09.03.12
14.03.12
20.03.12
20.03.12
20.03.12
22.03.12
22.03.12
09.03.12
09.03.12
09.03.12
09.03.12
09.03.12
09.03.12
09.03.12
09.03.12
09.03.12
09.03.12
09.03.12
22.03.12
22.03.12
09.03.12
09.03.12
09.03.12
22.03.12