QC~PLAN.

Project No. & Name: Name of Client/ Consultant: SL. ACTIVITY No. 1 Check setting out CONTROLLING DOCUMENT Drawings NATURE & EXTENT ACCEPTANCE OF INSP./TEST CRITERIA Physical verification, - Set out to drawings 100% Visual, 100% Verification at mixer at start of work Visual, 100% PERSON RESP. AT LOCATION Engineer / Foremen/ Quality Engineer - Wet Engineer/ Foremen/ - Free from damage and should be clean Quality Engineer - Mixed to proportions specified Engineer / (Use 1:4 cement sand mortar if not specified) Foremen/ - Mortar to have uniform consistency Quality Engineer - Uniform thickness in joints Engineer / 10 / 12 mm niminal thickness if not specified Foremen/ - Damp proof course laid, if required Quality Engineer - Block work & concrete columns structures Engineer / by wall ties of appropriate type Foremen/ 400 c/c or as specified Quality Engineer - Hollows filled as laying progresses with Engineer/ Foremen/ specified grade of concrete & rebars lapped Quality Engineer -masonary area per span should not be more Supervisor / Engr. / than 30 m2 or as specified Quality Engineer -Number of layers laid per day should not be Engineer/ Foremen/ more than 7 layers of 20cm high blocks Quality Engineer or as per site conditions or as specified - Joints raked / pointed as required (joints Engineer / are to be raked if plastering is required) Foremen/ Quality Engineer - 10 mm in 3 m. Engineer / Foremen/ Quality Engineer - Levels to drawing Engineer / Foremen/ Quality Engineer - Cured for period required Engineer/ Foremen/ (3 days if not specified) Quality Engineer

Masonary Work
Doc.No.CIVIL QC~Plan- 012/ REV. 0 RECORD Inspection Report & Daily masonary log CIVIL QC~Form- 012-01/ REV 0 CIVIL QC~Form- 012-02/ REV 0 ---

1 (a) Check blocks prior to laying 2 Check mortar preparation done with the "Measuring Boxes" 3 Check mortar thickness for each course & for damp proof course 4 Check interface between block work and concrete columns 5 a) Check for infilled re-inforced block work b) check for stiffener beam c) Check for number of layers per daily 6 Check raking of joints to receive plaster Check plumb

Contract Spec. BS 8000 : Part 3 Contract Spec. BS 8000 : Part 3 Contract Spec. BS 8000 : Part 3 Contract Spec. BS 8000 : Part 3 Contract Spec. BS 8000 : Part 3 Contract Spec. BS 8000 : Part 3 Contract Spec. BS 8000 : Part 3 Contract scope BS 8000 : Part 3 Contract scope BS 8000 : Part 3 Contract scope BS 8000 : Part 3 Contract documents

Visual, 100%

Inspection Report & Daily masonary log CIVIL QC~Form- 012-01/ REV 0 CIVIL QC~Form- 012-02/ REV 0 --

Visual, 100% Visual, 100% Verification Visual, 100%

-Inspection Report CIVIL QC~Form- 012-01/ REV 0 --

Visual, 100%

Verification at corners Verification at corners Visual, 100%

Check finished level

Check curing

Inspection Report & Daily masonary log CIVIL QC~Form- 012-01/ REV 0 CIVIL QC~Form- 012-02/ REV 0 Inspection Report & Daily masonary log CIVIL QC~Form- 012-01/ REV 0 CIVIL QC~Form- 012-02/ REV 0 Inspection Report & Daily masonary log CIVIL QC~Form- 012-01/ REV 0 CIVIL QC~Form- 012-02/ REV 0 Daily masonary log CIVIL QC~Form- 012-02/ REV 0