Northeast Boundary Tunnel

Source: EHT Traceries, 2013

DC WATERS NORTHEAST BOUNDARY TUNNEL IS COMING TO YOUR NEIGHBORHOOD. LOOK INSIDE FOR MORE DETAILS ON THIS EXCITING PROJECT!

Source: Earth911.com

dcwater.com

NOTICE OF PUBLIC MEETING AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT FOR THE NORTHEAST BOUNDARY TUNNEL PROJECT.

Northeast Boundary Tunnel


The proposed Northeast Boundary Tunnel (NEBT) is a large, deep, sewer tunnel that would increase the capacity of the existing sewer system in the District, signicantly mitigating sewer ooding and improving the water quality of the Anacostia River. The NEBT is a major component of DC Waters DC Clean Rivers Project, required as a part of a Federal Consent Decree between DC Water, the District, U.S. Environmental Protection Agency, and U.S. Department of Justice. Flows captured by the tunnel system would be delivered to DC Waters Blue Plains Advance Wastewater Treatment Plant for treatment prior to discharge to the Potomac River.
WHAT ARE THE MAJOR COMPONENTS OF THE NEBT?

27,000 foot long; 23 foot diameter reinforced concrete tunnel, constructed about 100 feet below the ground surface using a Tunnel Boring Machine

Flooding on Rhode Island Avenue, NW at the Rhode Island Avenue Metro Station

WHAT IS AN ENVIRONMENTAL ASSESSMENT?

Lady Bird Tunnel Boring Machine

Diversion facilities sited near chronic ood areas to relieve the existing sewer system and divert ows to the NEBT during storm events Ventilation control facilities to regulate air ow in the tunnel system

Provides a description of the construction associated with the NEBT Describes design alternatives examined for the NEBT Discusses impacts to the community and environment including trafc, noise and air quality, water quality, utilities and other infrastructure, health and safety and socioeconomics

HOW CAN I REVIEW THE ENVIRONMENTAL ASSESSMENT?

PLEASE ATTEND THE PUBLIC MEETING!

45-day public review and comment period from February 17 April 2, 2014 View and download online:

DC Water will hold a public meeting to share information on the NEBT project and the contents of the Environmental Assessment.
DATE: February 27, 2014 6:30 p.m. - 8:30 p.m. LOCATION: McKinley Technology High School 151 T Street, NE Washington, DC 20002

http://www.dcwater.com/NortheastBoundaryTunnelEA

Hardcopies at the following locations beginning February 21, 2014:

Bethesda Baptist Church, 1808 Capitol Avenue, NE Brentwood Recreation Center, 2311 14th Street, NE Gallaudet University Library, 800 Florida Avenue, NE Martin Luther King Jr. Memorial Library, 901 G Street, NW McKinley Tech. High School, 151 T Street, NE Mt. Pleasant Library, 3160 16th Street, NW Northwest One Library, 155 L Street, NW Trinidad Recreation Center, 1310 Childress Street, NE Watha T. Daniel-Shaw Library, 1630 7th Street, NW

For more information or for individuals requiring special assistance at the meeting, please contact Clean Rivers Community Outreach at (202) 787-4447 or by email at dccleanrivers@dcwater.com.

WE WANT TO HEAR FROM YOU!

Please submit comments using one of the following methods:


ONLINE: EMAIL:
dccleanrivers@dcwater.com http://www.dcwater.com/NortheastBoundaryTunnelEA

MAIL: DC Clean Rivers Project (Attn: NEBT) DC Water and Sewer Authority 5000 Overlook Avenue SW Washington, DC 20032