22th Floor, De-Snag list

Date : 31/01/2014

Snag list
AHU,FCU,FIRE DAMPER,AIR PRESSURERIZATION SYSTEM,LIFT PRESSURE RIZATION SYSTEM, FIRE SYSTEM,PA SYSTEM,CCTV, ELEVATOR operation testing Balance. Power redundancy not provided on floor. Main SMDB energy Meter not given. All FCU supply given from single source MCB. Separate PDB not provided in electrical room for Power Sockets LDB not provided for toilets Power sockets not provided in toilet for hand dryer. 6A Power socket provided in Common area & utility area. 6/16A Power Sockets not provided in Passenger Lift lobby. Signage and wall stand not provided for Fire Extinguishers in Electrical room. AHU supply duct and return duct installation balance, hence AHU room not offered for snag Lift lobby, Stair case and Lift Well - Air pressurization fan testing balance. Air Grill not provided on wash room - wooden door. (HRW function will not work properly) Fiber clothing not provided on insulation of chilled water line and drain line for FCU. All 3 no's Hydrant station in common area - Hose real drum movement not free from door. In Office area - hose reel water line support and Pressure gauge not Provided. Hand dryer, Paper holder and Soap dispenser are not installed in toilets. Air Ventilation not provided in Janitor rooms. Air Balancing for Toilet exhaust - pending. Toilet waste water Drain Trap below W/C therefore Cleaning and Maintenance not Possible. Flooring slop checking balance in washroom as water not available. Cleaning required for all floorings. All Fire shaft Key glass broken and Key not Provided. All shaft Tag and SLD not Provided Honey well system Trial Balance FCU operation Trial Balance. Fire skillet fill up pending in Electrical room and telephone room. During the snag LCP panel not working Toilet light switch Emergency and Normal power tag marking balance. Neaten clean required the around the Ceiling fixture and fixture. Insulated Steep Guard not Fitted in SMDB. 185 sqmm cable insulation damaged. Fire extinguisher renewal date expire. ELECTRICAL ROOM During the DDC panel HMI data not installed. Switch socket not installed in DDC Panel Door dropdown seal and Floor Stopper not installed. Tap up box earthing not done. Electrical wiring pipe found PVC conduit in place of GI pipe. Bus-duct and Panel boards cleaning not done - Paint marks not cleaned. Ceiling Junction Box cover not fixed. LV Cables hanging on LV cable tray. Wall bracket not given for fire Extinguishers. Cable laying not properly and armored damage. Transponder not installed. Gland hole not closed in SMDB Panel. DDC panel tag not done. below EDB/LDB conduit rusted and Gland not fitted Properly. For Office area CT install in Main SMDB but Ampere meter or Energy Meter not installed "ELECTRICAL ROOM" - Signage not given on door. SERVICE LIFT LOBBY At wall Paint Cleaning required. handicap Toilet door Frame gap filling required. Diffuser paint touch up balance In handicap Toilet. Sprinkler not installed properly In Handicap toilet LIFT LOBBY SLD not installed In Telephone room DB. Fire shaft -1- Pressure gauge not fitted properly. some places Ceiling cracked found. Tiles alignment not properly near Telephone room. TOILET-OFFICE AREA -1 Door Frame finishing required Both toilet. Door gap filling required. PHE shaft Bracket not painted. Shaft room install Electronics fitting in Place of T5 fittings. color finishing required at store room TOILET-OFFICE AREA -2 Door handle cap not installed w/c -3, Tiles Cracked found back side of w/c-1. Scraches found at Gents Toilet door. Bib coke not installed properly in janitor room. Ceiling Finishing required. BMS cable hanging in Chilled water shaft. Door Frame finishing required Both toilet. Shaft room install Electronics fitting in Place of T5 fittings. PHE shaft Bracket not painted.

Status

Remark

1 of 1

You might also like