Professional Documents
Culture Documents
V100R002
Service Dept.
V2.01
Sun Xu
2008-1-21
INTERNAL
Revision History
Date 2007-06-10 2008-1-19 V.1.00 V.2.01 Issue Author Sun Xu Sun Xu Description Initial draft. Revised version.
2008-4-9
Page 1 of 26
INTERNAL
Table of Contents
1 Preparation..................................................................................................................................... 4 1.1 Connection of Experiment Equipment .................................................................................. 4 1.2 Experiment Materials ............................................................................................................ 5 2 Networking Environment.............................................................................................................. 8 2.1 Network Topology ................................................................................................................. 8 2.2 Cabinet and Fiber Configuration......................................................................................... 10 2.3 Service Planning ................................................................................................................. 11 2.3.1 Wavelength Planning ............................................................................................... 11 2.3.2 Signal Flows of Node A and Node B ........................................................................ 12 2.3.3 Signal Flow of Node C ............................................................................................. 13 2.3.4 Signal Flows of Node D and Node E ....................................................................... 14 3 Tasks............................................................................................................................................. 14 3.1 Single-Station Commissioning Tasks.................................................................................. 15 3.1.1 Creating Network Topology (Required) .................................................................... 16 3.1.2 Setting Orderwire, NE, and Board Parameters........................................................ 18 3.1.3 Optical Power Auto-Adjustment (OPA)..................................................................... 18 3.2 System Commissioning Tasks ............................................................................................ 19 3.2.1 Optical Layer Service Grooming .............................................................................. 19 3.2.2 Electrical Layer and Data Service Grooming ........................................................... 20 3.2.3 Service Protection and Testing................................................................................. 21 3.2.4 APE Management .................................................................................................... 22 3.3 Network Maintenance Tasks............................................................................................... 23 3.3.1 Database Maintenance ............................................................................................ 23 3.3.2 Hot Patches and Upgrade of the Product ................................................................ 23 3.3.3 OTN Advanced Network Maintenance (Optional) .................................................... 24
2008-4-9
Page 2 of 26
INTERNAL
Key words:
OSN 6800 OSN 3800 experiment guide networking environment in Xintianxia
Summary:
This experiment guide is for experimenting on NG WDM products on a remote computer. This document provides guides to remote connection and descriptions of networking environment and various tasks on computer.
Reference:
OptiX OSN 6800 Intelligent Optical Transport Platform Configuration Guide (V100R003_02) OptiX OSN 6800 Intelligent Optical Transport Platform Commissioning Guide (V100R003_01) OptiX OSN 6800 Intelligent Optical Transport Platform Alarms and Performance Events Reference (V100R003_01)
2008-4-9
Page 3 of 26
INTERNAL
1 Preparation
Read through the preparation description, to ensure the proper use of the experiment environment.
Instructions for Using the Remote Training Equipment Room (Shenzhen) of the Optical Network
The IP addresses and IDs of NG WDM NEs after remote VPN access are as follows: (IDs of three OSN 6800 NEs): 190, 191, 192 10.69.4.98 (IDs of two OSN 3800 NEs): 193, 194
The NG WDM equipment in Xintianxia is usually shut down. Before an experiment on equipment, contact the WDM product staff in HQ for appointment. Contact person: Sun Xu (ID: 60989) Email: sunxu60989@huawei.com
The versions of NG WDM products in the lab are as follows: The default product version is V100R002. The NG WDM V100R002 is compatible with the V100R003. Hence, the experiment environment supports NE software of V100R002 and V100R003.
The T2000 versions are as follows: The T2000 is over version V200R005 or later. For function differences between each version, refer to the release notes on www.support.huawei.com. For example, the OptiX iManager T2000 V200R006C01B016 Release Notes.
2008-4-9
Page 4 of 26
INTERNAL
To reduce the workload of creating NEs and a large number of logical fiber connections, the following networking script is attached to the OptiX OSN 6800 & 3800 Experiment Guide. Use WinRaR to uncompress the file and import the uncompressed file to the T2000. For detailed procedure for importing the data, refer to the description of data restoration in the OptiX iManager T2000 Administrator Guide. Please refer to: OptiX OSN 6800&3800 Experiment Guide (shenzhen)
2.01(Accessories)T2000 Script
Caution: 1. After an experiment is finished, make sure to re-deliver all NE databases whose configurations are changed, to restore the NE configuration data. For detailed operations of restoring the database, refer toOptiX OSN 6800&3800 V100R001 Product Software Upgrade Guide . 2. Login to an NE by using script importing uses user root, and multiple root users may force each other to log out during login. Hence, after proper login to an NE by script importing, switch all login users of NEs to the created NE user accounts. For how to create and switch an NE user, refer to the description of security management in the OptiX iManager T2000 Administrator Guide. 2. Do not change important information of the NE, such as the ID or IP address. Otherwise, other persons who remotely use the computer environment are affected. 3. In some areas where the network access is slow, the T2000 may be running slowly, or the operation response may not be timely. In this situation, wait for a while. Do not try the operation repeatedly, which may increase network burden.
2008-4-9
Page 5 of 26
INTERNAL
Caution: Before an experiment, make sure that all the files mentioned in this document is ready and that courses of basic principles and configuration of NG WDM products are learnt.
Relevant product manuals are as follows: OptiX OSN 6800 Intelligent Optical Transport Platform Configuration Guide (V100R003_02 and higher version) OptiX OSN 6800 Intelligent Optical Transport Platform Commissioning Guide (V100R003_02 and higher version) OptiX OSN 6800 Intelligent Optical Transport Platform Alarms and Performance Events Reference (V100R003_02 and higher version) OptiX OSN 6800 Intelligent Optical Transport Platform Hardware Description (V100R003_02 and higher version) Software Quality Inspection Standard V1.0 of OSN 6800 V1R1 & OSN 3800 V1R1 OptiX OSN 6800&3800 V100R001 Product Software Upgrade Guide
Online training materials are as follows: The navigation path is as follows: Log in to the online Huawei university, and choose Online Classroom > Technical Support > NG WDM Multimedia Course.
Caution: The information of login in English should be registered separately. Register in staff register in the login user interface, and the permitted password is hwsoe238.
For the training materials, refer to the following: Extensive training materials of this product are on www.support.Huawei.com.
2008-4-9 Huawei Confidential. No disclosure without permission. Page 6 of 26
INTERNAL
The link of materials is NG WDM Slides. The navigation path is Documentation > Optical Network Product Line > WDM > OptiX OSN 6800 > Function and Feature.
The related material list and links are as follows: Category Installation None None OptiX OSN 3800 6800 Protection Training Material Name Multimedia Course Chinese None Chinese /English Chinese /English Chinese /English Chinese /English Chinese /English Chinese /English Chinese /English Chinese Chinese Slide None Chinese Chinese /English Chinese /English Chinese /English Chinese /English Chinese /English Chinese /English Chinese None Chinese
OptiX OSN 3800 6800 Optical Layer Grooming OptiX Principle OSN 3800 6800 Electrical Layer
Optical Transport Network NG WDM System Overview and Networking Applications NG WDM Deployment Commissioning Operation None None
2008-4-9
Page 7 of 26
INTERNAL
2 Networking Environment
2.1 Network Topology
Station A: (ID190) Station D: (ID193)
ROADM
Subnet1
OADM (MR4)
OADM (MR4)
Subnet2
ROADM
OADM (MR2)
Station B: (ID191)
Station E: (ID194)
D4 R O A M D4 A01 M R 4 M R 4
Station A: (ID190)
Station C: ( ID192)
2008-4-9
Page 8 of 26
INTERNAL
B01
M R 2
M R 2
M R 2
M R 2 B01
A01
M R 4
M R 4 A01
Station D: (ID193)
Station A: (ID192)
This system consists of five NEs. Three stations are OSN 6800 and two are OSN 3800. Stations A and B are NEs for verifying the primary functions. They carry most protection and services. The service adding and dropping is scheduled by the ROAM and D40 boards. Station C is for the pass-through of services within the ring. The MR4 interconnects fixed wavelengths between the two rings. Stations E and F is for verifying the network feature of tangent rings. Service adding, dropping, and pass-through are realized on the MR2.
Caution: This networking does not support ASON WDM at the optical layer or IPA and ALC experiments. To ensure recycled environment, the field operator should not change the fiber connection.
2008-4-9
Page 9 of 26
INTERNAL
ROADM 40CH
TO 2
1 FIU 2 3 4 5 MR2 OBU1 LDG LWXD MR2 PIU FIU SCC AUX O A U 1 F S I C U C
P I U P I U A U X
Node: 193
Node: 194
Node: 192-0
F O M M I A R R U U 4 4 1
Node: 192-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 FAN O L L N N T T X X O S L A 4 4 S S Q Q C C L C D U GG 2 2 M M S S P S G D 1 O A U 1 S S C C C C
A U X
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 FAN O L L N NT T A 4 4 S S Q Q U GG 2 2 M M 1 X O S C L C S P S L L W D X G D O A U 1 S C C
Node: 190-1
P I U A U X
Node: 191-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 FAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 FAN
Station name Rack Weight Rack factual configure power Rack count
TO 2 209.9 560.2 4
F S O I C B U2 U 1
D 4 0 V
R O A M
R O A M
D 4 0 V
O F S B I C U U C 1
P I U A U X
F S O I C B U2 U 1
D 4 0 V
R O A M
R O A M
D 4 0 V
O F S B I C U U C 1
P I U A U X
Station name Rack Weight Rack factual configure power Rack count
TO 1 218.8 506.6 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 2 3 4 5 6 7 8 9 10 11 1213 14 15 16 17 18 19 FAN
Node: 190-0
FAN
Node: 191-0
For detailed fiber connection, refer to the following: Please refer to: OptiX OSN 6800&3800 Experiment Guide (shenzhen)
2008-4-9
Page 10 of 26
INTERNAL
Subnet 1
192 192.3THz 192.2THz 192.1THz 193 194 192 LDG LWX LDGD
Subnet 2
Use the even wavelengths in C band. Working path: 2 x L4G, using 196.0 THz. Protection path: 2 x L4G, using 195.9 THz. Working path: 2 x NS2, using 195.8 THz. Protection path: 2 x NS2, using 195.7 THz. The LDG uses 192.3 THz. The LWXD uses 192.2 THz. The LDGD uses 192.1 THz.
2008-4-9
Page 11 of 26
INTERNAL
190
193
192
191
194
Stations 193 and 194 communicate by using the ESC, and other stations communicate by using the OSC. LDGD services exist between stations 190 and 193. LDG services of variable wavelength exist between stations 191 and 194. Four L4G boards form a VLAN SNCP between stations 190 and 191. Two sets of NS2 and TQM boards form the client-side 1+1 protection.
2008-4-9
Page 12 of 26
INTERNAL
SC2 East lineside ODF West lineside ODF FIU OA ROAM OA ROAM OA OA FIU
OD O T U O O T T U U O T U O T U O O T T U U
OD O T U
West client-side NE
East client-side NE
2008-4-9
Page 13 of 26
INTERNAL
SC2 West lineside ODF East lineside ODF OA OADM Unit OADM Unit OA FIU
FIU
OA OA
O T U
O T U
O T U
O T U
West client-side NE
East client-side NE
3 Tasks
Task Creating Network Topology (Required) Single-station commissioning (Required. One out of two) Setting Orderwire, NE, and Board Parameters Optical Power Auto-Adjustment (OPA) System commissioning Optical Layer Service Grooming Electrical Layer and Data
2008-4-9
Finished
Finished Finished
APE Single-station optical layer service Board optical layer service Services of GE, Any, and
APE Management
INTERNAL
Service Grooming
Discrete trail handling (optional) Database backup and restoration Package loading upgrade Hot patch loading
Network maintenance
Database Maintenance Hot Patches and Upgrade of the Product OTN Advanced Network Maintenance (Optional)
Caution: For detailed operations of experiment tasks, refer to the "Experiment Materials" section. After ten required experiments, basic capability of network commissioning and maintenance of NG WDM products should be gained. After the optional experiments, deep understanding of OTN optical transport hierarchy should be gained.
Caution: This section covers most single-station software commissioning tasks. Ensure that the following documents are ready: OptiX OSN 6800 Intelligent Optical Transport Platform Configuration Guide (V100R003_02 and higher version) OptiX OSN 6800 Intelligent Optical Transport Platform Commissioning Guide (V100R003_02 and higher version)
2008-4-9 Huawei Confidential. No disclosure without permission. Page 15 of 26
INTERNAL
OptiX OSN 6800 Intelligent Optical Transport Platform Hardware Description (V100R003_02 and higher version) OptiX iManager T2000 Administrator Guide Instructions for Using the Remote Training Equipment Room (Shenzhen) of the Optical Network To ensure that the remote experiment can be properly carried out, the field users should not adjust the MVOA of the system.