ANALISIS DE PRECIOS UNITARIOS

1.1
1.1.1

PRELIMINARES
Valla Informativa General del Proyecto (GL)
Herramienta
Diseo e Instalacin

1.1.3

Seal Preventiva, Reglamentaria e Informativa (UD)


Herramienta
Diseo e Instalacin

1.2
1.2.1

1.3.1

ROCERIA Y LIMPIEZA (m2)

Localizacin y Replanteo de Redes (m)

1.4.1

DD
DD

Localizacin y Replanteo de sitios de conexiones (incluye topografa y plano rcord) (m)


Mano de obra
Equipo de topografia
Topografo

1.4

GL
m2

LOCALIZACIN Y REPLANTEO

Mano de obra
HERRAMIENTA MENOR

1.3.2

GL
GL

ROCERIA Y LIMPIEZA

Herramienta
Mano de obra

1.3

GL
GL

DD
DD
DD

CAMPAMENTO E INSTALACIONES PROVISIONALES


Campamento e Instalaciones Provisionales (m2)
Concreto simple 17.2 MPa
Teja de zinc cal 33
Guadua sobrebasa L=4 v 3.2 m
Esterilla A 3 x 0.25 M
Puntilla promedio
Puerta en madera

m3
m2
Un
m2
LB
gl

Salida toma electrica general


Salida electrica alumbrado incandecente
Mano de obra
Herramienta menor
Acarreo

1.5

Un
Un
JORNA
PESOS
gl

Puente Peatonal Provisional en Madera (1.4 m.) (m)


Cuarton sajo 2x 4
Tabla fina piso
Puntilla promedio
Mano de Obra
Herramienta menor

m
m2
LB
GL
GL

CAPITULO 2 - DEMOLICIONES
2.1

Demolicin de Pavimentos en Concreto Hidrulico (m3)


Herramienta
Mano de obra
Compresor

2.2

GL
HH
HH

Demolicin de Andenes/Sardineles en Concreto Hidrulico (m3)


Herramienta
Mano de obra

2.1

GL
HH

Demolicin/Transporte de escombro m3
Herramienta
Demolicion manual
Transporte de escombros

GL
m3
m3

CAPITULO 3 - SOBREACARREOS
3.1

Evacuacin de Escombros/Sobrantes en Vehculo Automotor (m3)


Herramienta
Mano de obra
Volqueta

GL
m3
m3-km

3.2

Manejo/Movilizacin de Materiales en Vehculo-No Automotor


Herramienta
Mano de obra

GL
m3

CAPITULO 4 - EXCAVACIONES
4.1.1.1

EXCAVACION MATERIAL COMUN 0-2 (m3)


Herramienta
Mano de obra

4.1.1.2

EXCAVACION MATERIAL COMUN 2-4 (m3)


Herramienta
Mano de obra

4.1.2.1

GL
m3

EXCAVACION ROCA 2-4 (m3)


Herramienta
Mano de obra

GL
m3

EXCAVACION ROCA 0-2 (m3)


Herramienta
Mano de obra

4.1.3.2

GL
m3

EXCAVACION CONGLOMERADO 2-4 (m3)


Herramienta
Mano de obra

4.1.3.1

GL
m3

EXCAVACION CONGLOMERADO 0-2 (m3)


Herramienta
Mano de obra

4.1.2.2

GL
m3

CAPITULO 5 - APUNTALAMIENTOS Y ENTIBADOS

GL
m3

5.1

Entibado Horizontal/ Vertical tipo 1 (m)


Mano de obra
Guadua sobrebasa
Tabla para Formaleta
Puntillas 2"
Cuarton para Formaleta

HH
ML
ML
Lb
ML

CAPITULO 6 - ALCANTARILLADOS
6.2
6.2.3

INSTALACIN DE TUBERA EN PVC CORRUGADA


Instalacion PVC corrugada 8" (m)
Tuberia PVC corrugada 8"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.5

Instalacion PVC corrugada 10" (m)


Tuberia PVC corrugada 10"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.7

m
m
GL

Instalacion PVC corrugada 14" (m)

Tuberia PVC corrugada 14"


Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.11

m
m
GL

Instalacion PVC corrugada 12" (m)


Tuberia PVC corrugada 12"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.9

m
m
GL

m
m
GL

Instalacion PVC corrugada 16" (m)

Tuberia PVC corrugada 16"


Transporte tuberia hasta la brecha
Mano de obra instalacin

m
m
GL

6.2.13

Instalacion PVC corrugada 18" (m)


Tuberia PVC corrugada 18"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.15

Instalacion PVC corrugada 20" (m)


Tuberia PVC corrugada 20"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.17

m
m
GL

Instalacion PVC perfilada 42" (m)


Tuberia PVC perfilada 42"
Transporte tuberia hasta la brecha
Mano de obra instalacin

SUMINISTRO E INSTALACIN DE TUBERA EN PVC CORRUGADA BAJO TIERRA


6.2.3

m
m
GL

Instalacion PVC corrugada 30" (m)


Tuberia PVC corrugada 30"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.19

m
m
GL

Instalacion PVC corrugada 27" (m)


Tuberia PVC corrugada 27"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.19

m
m
GL

Instalacion PVC corrugada 24" (m)


Tuberia PVC corrugada 24"
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.18

m
m
GL

Tuberia bajo tierra PVC corrugada 8" (m)

m
m
GL

localizacion y replanteo
Tubera PVC corrugada 8"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

Tubera PVC corrugada 10"


localizacion y replanteo
Tubera PVC corrugada 10"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

Tubera PVC corrugada 12"


localizacion y replanteo
Tubera PVC corrugada 12"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

Tubera PVC corrugada 14"


localizacion y replanteo
Tubera PVC corrugada 14"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

6.2.11

Tuberia bajo tierra PVC corrugada 16" (m)

localizacion y replanteo
Tubera PVC corrugada 16"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

6.2.11

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

Tuberia bajo tierra PVC corrugada 18" (m)

localizacion y replanteo
Tubera PVC corrugada 18"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un

Reposicin pavimento rgido

6.2.15

Tuberia bajo tierra PVC corrugada 20" (m)


localizacion y replanteo
Tubera PVC corrugada 20"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

6.2.17

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

Tuberia bajo tierra PVC corrugada 24" (m)


localizacion y replanteo
Tubera PVC corrugada 24"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

6.2.18

m3

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

Tuberia bajo tierra PVC corrugada 27" (m)


localizacion y replanteo
Tubera PVC corrugada 27"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

6.2.19

Tuberia bajo tierra PVC corrugada 30" (m)


localizacion y replanteo
Tubera PVC corrugada 27"
Excavacin en conglomerado
lleno con material del sitio
Entibado por metro lineal
Arena de encamado de tuberia
Retiro de material sobrante
Corte con disco mecnico
Demolicin pavimento
Reposicin de subase
Puente provisional
Camara de inspeccion
Reposicin pavimento rgido

6.5

Empotramiento y Anclaje de Tuberas en Concreto simple Clase II (m3)


Concreto simple 3000 psi
Acarreo de material hasta sitio de la obra
Mano de obra
Herramienta menor

6.5

6.6.1

m
un
GL
GL

CAMARAS DE INSPECCIN
Cuerpo de cmara d=1.20 m (h= 2 m)
Acero de refuerzo
Concreto simple 3000 psi
Acarreo de material
Mano de obra
Formaleta para cmara

6.6.5

m3
m3
GL
GL

Cable en acero para soporte de tuberia


Cable en acero 3/6"
Abrazaderas de soporte
Mano de obra
Herramienta menor

6.6

m
m
m3
m3
m
m3
m3
m
m3
m3
un
un
m3

Base y cauela cmara d=1.20 m (un)

Kg
m3
m3
hh
dia

Concreto simple 3000 psi


Acarreo de material hasta sitio de la obra
Mano de obra
Herramienta menor

6.7
6.7.1

TAPAS ALCANTARILLADO
Tapa en HF (un)
Acero de refuerzo
Concreto simple 3000 psi
Mano de obra
Tapa H.F. con aro

6.7.3

m3
m3
GL
GL

Kg
m3
hh
ud

Tapa en Concreto (un)


Acero de refuerzo
Concreto simple 3000 psi
Mano de obra

Kg
m3
hh

Cmaras de inspeccin por unidad


Cuerpo de cmara
Base y cauela
Tapas en concreto
Excavacin y retiro

m
un
un
m3

CAPITULO 8 - RELLENOS COMPACTADOS


8.1

RELLENO COMPACTADO CON MATERIAL EXTRAIDO DE LA EXCAVACION (m3)


Vibrocompactador tipo canguro
Mano de obra

8.2

HH
GL

RELLENO COMPACTADO CON MATERIAL SELECCIONADO (m3)


Material de prestamo
Acarreo de material hasta sitio de la obra
Vibrocompactador tipo canguro
Mano de obra

m3
m3
HH
GL

CAPITULO 10 - SUBSTITUCIONES - SUBBASES Y BASES COMPACTADAS


10.1

Afirmado compactado (m3)


Afirmado
Acarreo de material hasta sitio de la obra
Vibrocompactador tipo canguro
Mano de obra

10.2

Sustitucin en Material granular para encamado de tubera (m3)


Sucio de rio
Acarreo de material hasta sitio de la obra
Herramienta menor
Mano de obra

10.4

m3
m3
HH
GL

m3
m3
GL
GL

Bases para Pavimentos Vehiculares en Material granular triturado tipo Invas (m3)
Material granular triturado
Vibrocompactador tipo canguro
Mano de obra

m3
GL
GL

CAPITULO 12 - OBRAS EN CONCRETO HIDRAULICO


12.1
12.1.3

PAVIMENTOS EN FRANJAS
Pavimentos de franjas Concreto Producido en Obra Clase I (280 Mpa) (m3)
Antisol
Concreto simple 3000 psi
Mano de obra

12.4
12.4.1

CORTES MECANIZADOS
Corte mecanizado de Pavimentos de Concreto Hidrulico (Prof 0.10 m.) (m)
Cortadora
Mano de obra instalacin

12.6
12.6.2

kg
m3
DD

ANDENES - RAMPAS - PEATONALES


Andenes-Rampas-Peatonales en Concreto Producido en Obra Clase II (m3)

m
GL

Concreto simple 3000 psi


Malla electrosoldada 25x 25 cm cal 4
Mano de obra (incuye acarreo)
Herramienta Menor
Base Granular

12.8
12.8.3

m3
m2
hh
GL
m3

CONCRETO MUROS Y PANTALLA


Muros y Pantallas en Concreto Ciclpeo producido en Obra (m3)
Concreto simple 3000 psi
Piedra
Desperdicio
Formaleta
Herramienta
Mano de Obra con acarreo

m3
m3
%
GL
m
m3

CAPITULO 13 - OBRAS CIVILES VARIAS


13.5.1

Trinchos en Guadua (m2)


Exc.Man mat com Hinca paral d<.31m
Guadua sobrebasa L=4 v 3.2 m
Guadua cepa L=6 v 4.8 m
Asfalto liga
Plastico cal 4
Alambre Galvanizado C14
Fibra ecomatrix pavco (3.85x3.00)
Puntillas promedio 1-1/2----3-1/2
Mano de Obra
Acarreo de material

13.5.2

m
Un
Un
KG
m2
KGF
m2
LB
GL
GL

Trinchos provisionales (m)


Exc.Man mat com Hinca paral d<.31m
Guadua cepa L=6 v 4.8 m
Alambre Galvanizado C14
Esterilla
Mano de Obra
Acarreo de material

m
Un
KGF
Bulto
GL
GL

13.5.3

Paddies con postes en concreto, malla eslabonada calb 10 y Piedra tipo gavion (m)
Exc.Man mat com Hinca paral d<.31m
Poste en concreto prefabricado 10 x 10 cm de Long 2 m
Malla eslabonada calibre 10
Alambre de pua
Piedra tipo gavion
Alambre Galvanizado C14
Mano de Obra
Acarreo de material

13.5.4

Drenes horizontales (m)


tuberia de filtro 100 mm
Barrenado drenes y anclajes <.15m
Mano de Obra
Herramienta menor
Acarreo de material

13.17.3

13.21.1

GL
m
m3
da
%
kg
un

ALIVIADEROS
Aliviadero tipo vertedero lateral < 2.0 m de largo (un)
Concreto simple 3000 psi (incluye acarreo y mano de obra)
Afirmado compactado (incluye acarreo y mano de obra)
Acero de refuerzo 60000 psi (incluye mano de obra)
Formaleta
Acarreo de escombros
Excavacion conglomerado

13.21.2

m
m
hh
gl
gl

Pilotines en concreto. Dimetro 0.350 m segn diseo. Incluye concreto f'c = 21 Mpa, perforacin y acero de refuerzo profund
Herramientas
Excavacin mecnica
Concreto 3000 PSI, incluida viga cabezal
Vibrador
Desperdicio
Acero de Refuerzo
Mano de obra (ncluye acarreo de material)

13.21

m
Un
m2
m
m3
KGF
GL
GL

m3
m3
Kg
gl
gl
m3

Aliviadero tipo vertedero lateral < 3.0 m de largo (un)


Concreto simple 3000 psi (incluye acarreo y mano de obra)
Afirmado compactado (incluye acarreo y mano de obra)

m3
m3

Acero de refuerzo 60000 psi (incluye mano de obra)


Formaleta
Acarreo de escombros
Excavacion conglomerado

13.21.3

Aliviadero tipo vertedero lateral < 5 m de largo (un)


Concreto simple 3000 psi (incluye acarreo y mano de obra)
Afirmado compactado (incluye acarreo y mano de obra)
Acero de refuerzo 60000 psi (incluye mano de obra)
Formaleta
Acarreo de escombros
Excavacion conglomerado

13.22

Kg
gl
gl
m3

m3
m3
Kg
gl
gl
m3

CABEZOTE DESCOLE (un)


Roseria y limpieza
Afirmado compactado
Concreto simple 3000 psi
Acero de refuerzo 60000 psi
Acarreo de material
Mano de obra

m2
m3
m3
Kg
gl
gl

13.23 CANAL DE RAPIDAS CON TAPA COMPLETA Y COLUMPIO (m)


Roseria y lipieza
Excavacion en roca
Afirmado
Concreto 3000 PSI
Formaleta
Acarreo de material
Mano de obra
Acero de refuerzo 60000 psi

m2
m3
m3
m3
gl
gl
gl
kg

13.23 CANAL ABIERTO EN CONCRETO (m)


Roseria y lipieza
Excavacion en conglomerado
Concreto 3000 PSI
Acero de refuerzo 60000 psi
Formaleta

m2
m3
m3
kg
gl

CANAL ABIERTO EN CONCRETO (m)


Roseria y lipieza

m2

Excavacion en conglomerado
Concreto 3000 PSI
Acero de refuerzo 60000 psi
Formaleta

m3
m3
kg
gl

TAPA CANAL
Concreto 3000 PSI
Acero de refuerzo 60000 psi
Formaleta

13.24

13.17
13.17.1

SERVIDUMBRES

CONCRETO
SUMINISTRO E INSTALACION CONCRETO POBRE EN SOLADO DE LIMPIEZA (m3)
Herramientas
Concreto 2000 PSI
Mano de obra

2.3

GL
m3
m3

ESTRUCTURAS EN CONCRETO REFORZADO

13.17.2.1 CONCRETO 3000 PSI (m3)


Cemento gris
Gravilla
Arena
Mezcladora
Mano de obra

13.17.2

Kg
m3
m3
da
m3

Concreto para pilas tipo caisson fc = 21 Mpa (m3)


Herramientas
Concreto 3000 PSI
Vibrador
Desperdicio
Acarreo de material
Mano de obra

GL
m3
da
%
gl
m3

13.17.4

Concreto para capiteles fc =21 Mpa segn diseo (m3)


Herramientas
Concreto 3000 PSI
Impermeabilizante
Formaleta
Vibrador
Desperdicio
Acarreo de material
Mano de obra

13.17.4

GL
m3
m3
m3
da
%
gl
m3

Concreto para muros de contencin segn diseo (m3)


Herramientas
Concreto 3000 PSI
Impermeabilizante
Formaleta
Vibrador
Desperdicio
Acarreo de material
Mano de obra

13.17.5

GL
m3
m3
m3
da
%
gl
m3

SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)


Acero promedio
Alambre
Seguetas y otros
Desperdicios
Mano de obra

Kg
Kg
gl
%
gl

VIADUCTO O PUENTE METLICO PARA LONGITUD MXIMA DE 8 m EXTERIORES

ITEM
Localizacin y replanteo
Excavacin para pilotes
Pilotines en concreto. Dimetro 0.350 m. Incluye concreto f'c = 21 Mpa, perforacin y refuerzo
Solados en concreto pobre e = 0.050 m
Concreto viga cabezal f'c = 21 Mpa
Acero de refuerzo
Estructura metlica para viaducto. Incluye silletas, acabado con base epxica y esmalte epxico
Tubo en polietileno 2 insegn diseno. Incluye abrazaderas de fijacin
Lmina perimetral de proteccin tubera, espesor de 1.2 mm galvanizada y pintada **
Retiro de sobrantes

UN
M2
M3
M3
M3
M3
KGF
KGF
ML
M
M3

VIADUCTO O PUENTE METLICO PARA LONGITUD MXIMA DE 30 m EXTERIORES

ITEM
Localizacin y replanteo
Excavacin para pilotes
Pilotines en concreto. Dimetro 0.350 m. Incluye concreto f'c = 21 Mpa, perforacin y refuerzo
Solados en concreto pobre e = 0.050 m
Concreto viga cabezal f'c = 21 Mpa
Acero de refuerzo
Estructura metlica para viaducto. Incluye silletas, acabado con base epxica y esmalte epxico
Tubo en polietileno 2 insegn diseno. Incluye abrazaderas de fijacin
Lmina perimetral de proteccin tubera, espesor de 1.2 mm galvanizada y pintada **
Retiro de sobrantes

UN
M2
M3
M3
M3
M3
KGF
KGF
ML
M
M3

SUMINISTRO E INSTALACION TUBERIA POLIESTER REFORZADO CON FIBRA DE VIDRIO (GRP)


6.2.30

Suministro/Instalacin de Tuberia bajo tierra GRP 300 mm (m)


Tuberia bajo tierra GRP 300 mm
Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.31

Suministro/Instalacin de Tuberia bajo tierra GRP 350 mm (m)

Tuberia bajo tierra GRP 350 mm


Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.32

m
m
m
GL

Suministro/Instalacin de Tuberia bajo tierra GRP 400 mm (m)

Tuberia bajo tierra GRP 400 mm


Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.33

m
m
m
GL

Suministro/Instalacin de Tuberia bajo tierra GRP 450 mm (m)

m
m
m
GL

Tuberia bajo tierra GRP 450 mm


Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.34

Suministro/Instalacin de Tuberia bajo tierra GRP 500 mm (m)


Tuberia bajo tierra GRP 500 mm
Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.35

m
m
m
GL

Suministro/Instalacin de Tuberia bajo tierra GRP 800 mm (m)


Tuberia bajo tierra GRP 800 mm
Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.40

m
m
m
GL

Suministro/Instalacin de Tuberia bajo tierra GRP 700 mm (m)


Tuberia bajo tierra GRP 700 mm
Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.37

m
m
m
GL

Suministro/Instalacin de Tuberia bajo tierra GRP 600 mm (m)


Tuberia bajo tierra GRP 600 mm
Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

6.2.36

m
m
m
GL

m
m
m
GL

Suministro/Instalacin de Tuberia bajo tierra GRP 1000 mm (m)


Tuberia bajo tierra GRP 1000 mm
Acople para tuberia
Transporte tuberia hasta la brecha
Mano de obra instalacin

SUMINISTRO E INSTALACION TUBERIA POLIETILENO

m
m
m
GL

Suministro/Instalacin de Tuberia polietileno 10" PE 100 PN 12.5


Tuberia polietileno 10"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

Suministro/Instalacin de Tuberia polietileno 8" PE 100 PN 12.5


Tuberia polietileno 8"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

Suministro/Instalacin de Tuberia polietileno 6" PE 100 PN 12.5


Tuberia polietileno 6"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

Suministro/Instalacin de Tuberia polietileno 4" PE 100 PN 12.5


Tuberia polietileno 4"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

Suministro/Instalacin de Tuberia polietileno 3" PE 100 PN 12.5


Tuberia polietileno 3"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado

m
ud
m3
m3

lleno con material del sitio


Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m3
m
GL

Suministro/Instalacin de Tuberia polietileno 2" PE 100 PN 12.5


Tuberia polietileno 2"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

Suministro/Instalacin de Tuberia polietileno 8" PE 100 PN 10


Tuberia polietileno 8"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

Suministro/Instalacin de Tuberia polietileno 8" PE 100 PN 12.5


Tuberia polietileno 8"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

Suministro/Instalacin de Tuberia polietileno 8" PE 100 PN 16


Tuberia polietileno 8"
Soldadura de tuberia
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Transporte tuberia hasta el sitio de construccion
Mano de obra instalacin

m
ud
m3
m3
m3
m
GL

TUBERIA PVC PRESION


Tuberia PVC presin unin platino 10" RDE 21 (m)
Tubera PVC 10"
Lubricante
Transporte tuberia hasta el sitio de construccion
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
ud
m
m3
m3
m3
GL

Tuberia PVC presin unin platino 8" RDE 21 (m)


Tubera PVC 8"
Lubricante
Transporte tuberia hasta el sitio de construccion
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
ud
m
m3
m3
m3
GL

Tuberia PVC presin unin platino 6" RDE 21 (m)


Tubera PVC 6"
Codo 90 PVC presin 6"
Lubricante
Transporte tuberia hasta el sitio de construccion
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
ud
ud
m
m3
m3
m3
GL

Suministro/Instalacin de Tuberia pvc presion 4"


Tuberia pvc presion 4"
Lubricante

m
ud

Transporte tuberia hasta el sitio de construccion


Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
m3
m3
m3
GL

Tuberia PVC presin unin platino 3" RDE 21 (m)


Tubera PVC 3"
Lubricante
Transporte de tuberia hasta el sitio de instalacion
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
ud
m
m3
m3
m3
GL

Tuberia PVC presin unin platino 2 1/2" RDE 21 (m)


Tuberia PVC 2 1/2"
Lubricante
Transporte tuberia hasta el sitio de construccion
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
ud
m
m3
m3
m3
GL

Tuberia PVC presin unin platino 2" RDE 21 (m)


Tuberia PVC 2"
Lubricante
Transporte tuberia hasta el sitio de construccion
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
ud
m
m3
m3
m3
GL

Suministro/Instalacin de Tuberia pvc presion 1 1/2"


Tuberia polietileno 1 1/2"
Lubricante
Transporte tuberia hasta el sitio de construccion
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra instalacin

m
ud
m
m3
m3
m3
GL

TUBERIA PVC PRESION CON DEMOLICION DE PAVIMENTO


9.1.17

TUBERIA PVC PRESIN 2" RDE 21 (m) con demolicin de pavimento

Tubera PVC 2"


Accesorios
Lubricante
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra
Corte con disco mecnico
Demolicin pavimento
Evacuacin de Escombros/Sobrantes en Vehculo Automotor (m3)
Reposicin de subase
Reposicin pavimento rgido

m
ud
ud
m
m
m
gl
m
m3
m3
m3
m3

TUBERIA PVC PRESIN 3" RDE 21 sobre pavimento (m)


Tubera PVC 3"
Accesorios
Lubricante
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra
Corte con disco mecnico
Demolicin pavimento
Evacuacin de Escombros/Sobrantes en Vehculo Automotor (m3)
Reposicin de subase
Reposicin pavimento rgido

m
ud
ud
m
m
m
gl
m
m3
m3
m3
m3

TUBERIA PVC PRESIN 4" RDE 21 sobre pavimento (m)


Tubera PVC 4"
Accesorios
Lubricante
Excavacion en conglomerado
Arena de encamado
lleno con material del sitio
Mano de obra
Corte con disco mecnico
Demolicin pavimento
Evacuacin de Escombros/Sobrantes en Vehculo Automotor (m3)
Reposicin de subase
Reposicin pavimento rgido

m
ud
ud
m
m
m
gl
m
m3
m3
m3
m3

VALVULAS VENTOSAS Y PURGAS


10.2.1.3 Vlvula de cortina en bronce 3" (ud)

Vlvula de 3"
Accesorios
Tefln
Mano de obra instalacin

ud
ud
ud
hh

Vlvula mariposa 10" (ud)


Vlvula mriposa 10"
Accesorios
Camara de inspeccion
Mano de obra instalacin

ud
ud
ud
hh

Suministro/Instalacin de Valvula ventosa 1"


Valvula ventosa 1"
Valvula de bola 1"
Camara de inspeccion
Collarin de derivacion
Mano de obra instalacin

ud
ud
ud
ud
GL

Suministro/Instalacin de Valvula ventosa 2"


Valvula ventosa 2
Valvula mariposa 2"
Camara de inspeccion
Collarin de derivacion
Mano de obra instalacin

ud
ud
ud
ud
GL

Suministro/Instalacin de Valvula ventosa 3"


Valvula ventosa 3
Valvula mariposa 3"
Camara de inspeccion
Collarin de derivacion
Mano de obra instalacin

ud
ud
ud
ud
GL

Suministro/Instalacin de Valvula ventosa 4"


Valvula ventosa 4"
Valvula mariposa 4"
Camara de inspeccion
Mano de obra instalacin

ud
ud
ud
GL

Suministro/Instalacin de Valvula de purga 1"


Valvula de bola 1"
Tee de 1"
Acoples para valvula "
Camara de inspeccion
Mano de obra instalacin

ud
ud
ud
ud
GL

Suministro/Instalacin de Valvula de purga 1 1/2"


Valvula de mariposa 1 1/2"
Tee de 1 1/2"
Acoples para valvula "
Camara de inspeccion
Mano de obra instalacin

ud
ud
ud
ud
GL

Suministro/Instalacin de Valvula de purga 2"


Valvula mariposa 2"
Tee de 2"
Acoples para valvula "
Camara de inspeccion
Mano de obra instalacin

ud
ud
ud
ud
GL

Suministro/Instalacin de Valvula de purga 3"


Valvula de mariposa 3"
Tee de 3"
Acoples para valvula "
Camara de inspeccion
Mano de obra instalacin

ud
ud
ud
ud
GL

Suministro/Instalacin de Valvula purga 4"


Valvula de bola 4"
Tee de 4"
Acoples para valvula "
Camara de inspeccion
Mano de obra instalacin

ud
ud
ud
ud
GL

Vlvula compuerta 12" (ud)


Vlvula compuerta 12"

ud

Accesorios
Mano de obra instalacin

ud
hh

Construccion de tapa en concreto 3.6 m2


Concreto para tapa
Acero de refuerzo
Acarreo material hasta el sitio
Mano de obra instalacin

m3
kg
gl
GL

Membrana Impermeable
Membrana
Marco metalico
Acarreo material hasta el sitio
Mano de obra instalacin

m2
gl
gl
GL

Tapa plastica para tanque


Tapa plastica
Acarreo material hasta el sitio
Mano de obra instalacin

gl
gl
GL

Malla plastica para desarenador 3.6 m2


malla plastica
Marco metalico
Acarreo material hasta el sitio
Mano de obra instalacin

m2
gl
gl
GL

Construccin de vertedero de excesos en desarenador existente (ud)


Mano de obra instalacin

9.1.17

GL

TUBERIA GALVANIZADA 2" (m)

Tubo galvanizado 2"


Codo galvanizado 2"
Abrazaderas
Acarreo
Mano de obra

m
ud
ud
m
HH

9.1.2

Tubera en hg 6" (m)


Valor metro
Soldadura
Pintura
Mano de obra pintura
Abrazadera
Mano de obra instalacin

ml
ml
ml
ml
ml
ml

By pass 2" para tanque de almacenamiento


Valvula de bola 2"
Tuberia PVC 2"
Tee de 2"
codos de 2"
Acoples para valvula
Acarreo hasta el sitio de obra
Mano de obra instalacin

ud
m
ud
ud
ud
ud
GL

Macromedidor 8"
Macromedidor de hf 8"
Valvulas 8"
Accesorios
Camaras de inspeccion
Mano de obra instalacin

ud
ud
gl
gl
gl

Macromedidor 6"
Macromedidor de hf 6"
Valvulas 6"
Accesorios
Mano de obra instalacin

ud
ud
gl
gl

Macromedidor 4"
Macromedidor de hf 4"
Valvulas 4"
Accesorios
Camaras de inspeccion
Mano de obra instalacin

Macromedidor 3"

ud
ud
gl
gl
gl

Macromedidor de hf 3"
Valvulas Mariposa pvc 3"
Camaras de inspeccion
Accesorios
Mano de obra instalacin

ud
ud
gl
gl
gl

Macromedidor 2"
Macromedidor de hf 2"
Valvulas Mariposa pvc 2 "
Accesorios
Camaras de inspeccion
Mano de obra instalacin

ud
ud
gl
gl
gl

Reposicion micromedidor 1/2" (ud)


Contador 1/2"
Herramienta menor
MANO DE OBRA

ud
GL
GL

ESTACIN REGULADORA DE PRESIN 3/4"

Vlvulas de cortina de3/4"


17 Vlvula reguladora de presin
Accesorios PVC y HG
Camara de Inspeccion
Mano de obra

ud
ud
GL
GL
HH

ESTACIN REGULADORA DE PRESIN 1"

Vlvulas de cortina de1"


17 Vlvula reguladora de presin
Accesorios PVC y HG
Camara de Inspeccion
Mano de obra

ud
ud
GL
GL
HH

ESTACIN REGULADORA DE PRESIN 1 1/2"

Vlvulas de cortina de 1 1/2"


Manometro 0 a 200 PSI
Filtro en yee

ud
ud
ud

Vlvula reguladora de presin


Accesorios PVC y HG
Camara de Inspeccion
Mano de obra

ud
GL
GL
HH

1 ESTACIN REGULADORA DE PRESIN 2"

Vlvulas de cortina de 2"


Manometro 0 a 200 PSI
Filtro en yee
Vlvula reguladora de presin
Accesorios PVC y HG
Camara de Inspeccion
Mano de obra

ud
ud
ud
ud
GL
GL
HH

ESTACIN REGULADORA DE PRESIN 3"

Vlvulas de cortina de 3"


Manometro 0 a 200 PSI
Filtro en yee
Vlvula reguladora de presin
Accesorios PVC y HG
Camara de inspeccion
Mano de obra

ud
ud
ud
ud
GL
gl
HH

ESTACIN REGULADORA DE PRESIN 4"

Vlvulas de cortina de 4"


Manometro 0 a 200 PSI
Filtro en yee
Vlvula reguladora de presin
Accesorios PVC y HG
Camara de inspeccion
Mano de obra

ud
ud
ud
ud
GL
gl
HH

ESTACIN REGULADORA DE PRESIN 6"


Vlvulas de cortina de 6"
Manometro 0 a 200 PSI
Filtro en yee
Vlvula reguladora de presin
Accesorios PVC y HG
Cmara de vlvulas en concreto

ud
ud
ud
ud
GL
GL

Mano de obra

HH

ESTACIN REGULADORA DE PRESIN 8"


Vlvulas de cortina de 8"
Manometro 0 a 200 PSI
Filtro en yee
Vlvula reguladora de presin
Accesorios PVC y HG
Cmara de vlvulas en concreto
Mano de obra

ud
ud
ud
ud
GL
GL
HH

DESARENADORES Y TANQUES DE ALMACENAMIENTO


Desarenador 3.6 m3
concreto 3000 psi
Acero de refuerzo

Tuberia polietileno 3"


Tee de 3"
Vlvula mariposa 3"
Accesorios

m3
kg
m
ud
ud
gl

Desarenador 12.5 m3
concreto 3000 psi
Acero de refuerzo

Tuberia polietileno 6"


Tee de 6"
Vlvula mariposa 6"
Accesorios

m3
kg
m
ud
ud
gl

Desarenador 20 m3
concreto 3000 psi
Acero de refuerzo

Tuberia polietileno 6"


Tee de 6"
Vlvula mariposa 6"
Accesorios

Desarenador 26 m3

m3
kg
m
ud
ud
gl

concreto 3000 psi


Acero de refuerzo

Tuberia polietileno 6"


Tee de 6"
Vlvula mariposa 6"
Accesorios

m3
kg
m
ud
ud
gl

Desarenador 78 m3
concreto 3000 psi
Acero de refuerzo

Tuberia polietileno 6"


Tee de 6"
Vlvula mariposa 6"
Accesorios

m3
kg
m
ud
ud
gl

Filtro grueso dinamico


concreto 3000 psi
Acero de refuerzo
Material filtrante
Tuberia polietileno 2 " pn 12.5
Tee de 2"
Valvula de bola 2"
Accesorios

m3
kg
m3
m
ud
ud
gl

FILTRO GRUESO ASCENDENTE 6m2


Excavacion a mano
Acarreo interno y Retiro de Sobrantes
Conformacion
Solados de limpieza e= 5cm
Cinta PVC
Losa de Fondo
Filtro drenajes (Suelos)
Concreto muros camara
Acero de Refuerzo 60000 psi
Relleno con Material selec. De sitio
Cmaras y cajas para vlv. Y desagues
material filtrante
tuberias y accesorios

M3
M3
M2
M2
ML
M3
ML
m
ML
M3
ud
m3
gl

FILTRO LENTO ARENA 15m2


Excavacion a mano
Acarreo interno y Retiro de Sobrantes

M3
M3

Conformacion
Solados de limpieza e= 5cm
Cinta PVC
Losa de Fondo
Filtro drenajes (Suelos)
Concreto muros camara
Acero de Refuerzo 60000 psi
Relleno con Material selec. De sitio
Cmaras y cajas para vlv. Y desagues
material filtrante
tuberias y accesorios

M2
M2
ML
M3
ML
m
ML
M3
ud
m3
gl

Lecho filtrante
Material filtrante para filtro grueso acendente en capas
Acarreo hasta el sitio de obra
Mano de obra instalacin

m3
m3
gl

Falso fondo para filtros m2


falso fondo
Mano de obra instalacin

m2
gl

Tanque de almacenamiento 300 m3


concreto 3000 psi
Solado de limpieza
Excavacion
Afirmado
Acarreo y evacuacion de escombros
cinta pvc
Filtro drenajes (Suelos)
Acero de refuerzo
Tuberia hierro galvanzada 6"
Valvula de mariposa 6"
Accesorios

m3
m3
m3
m3
m3
m
m
kg
m
ud
gl

Tanque de almacenamiento 427 m3


concreto 3000 psi
Solado de limpieza
Excavacion
Afirmado
Acarreo y evacuacion de escombros
cinta pvc
Filtro drenajes (Suelos)
Acero de refuerzo

m3
m3
m3
m3
m3
m
m
kg

Tuberia hierro galvanzada 6"


Valvula de mariposa 6"
Accesorios

m
ud
gl

Tanque de almacenamiento 635 m3


concreto 3000 psi
Solado de limpieza
Excavacion
Afirmado
Acarreo y evacuacion de escombros
cinta pvc
Filtro drenajes (Suelos)
Acero de refuerzo
Tuberia hierro galvanzada 6"
Valvula de mariposa 6"
Accesorios

m3
m3
m3
m3
m3
m
m
kg
m
ud
gl

Tanque de almacenamiento 45 m3
concreto 3000 psi
Solado de limpieza
Excavacion
Afirmado
Acarreo y evacuacion de escombros
cinta pvc
Filtro drenajes (Suelos)
Acero de refuerzo
Tuberia hierro galvanzada 6"
Valvula de mariposa 6"
Accesorios

m3
m3
m3
m3
m3
m
m
kg
m
ud
gl

Tanque de almacenamiento 250 m3


concreto 3000 psi
Solado de limpieza
Excavacion
Afirmado
Acarreo y evacuacion de escombros
cinta pvc
Filtro drenajes (Suelos)
Acero de refuerzo
Tuberia hierro galvanzada 6"
Valvula de mariposa 6"
Accesorios

Tanque de almacenamiento 2879 m3

m3
m3
m3
m3
m3
m
m
kg
m
ud
gl

concreto 3000 psi


Solado de limpieza
Excavacion
Afirmado
Acarreo y evacuacion de escombros
cinta pvc
Filtro drenajes (Suelos)
Acero de refuerzo
Tuberia hierro galvanzada 6"
Valvula de mariposa 6"
Accesorios

m3
m3
m3
m3
m3
m
m
kg
m
ud
gl

Canaleta Parshall
Canaleta Parshall
Mano de obra

ud
ud

CONEXIN DE DOMICILIARIA A RED DE ALCANTARILLADO


Kit Silla Yee 250 x 110
Caucho kit silla yee 250 x 110
Tuberia pvc corrugada 110 mm
Excavacion
lleno
Mano de obra
Soldadura 1/4 gal

ud
ud
ud
ud
ud
GL
ud

Acometida Domiciliaria para Acueducto


Mano de obra
Collares de derivacin
Tubera PEAD 20 mm
Uniones Soldadas D=1/2
Excavacion
lleno
Soldadura liquida Agua Fria 1/4 Gl
Limpiador removedor 1/4 Gl

HH
Und
ML
Und
m3
m3
Und
Und

Tuberia PVC 3" excavacion y relleno


Excavacion en conglomerado
Arena de encamado

m3
m3

lleno con material del sitio

m3

Bomba dosficadora de sulfato de Aluminio


Bomba docificadora de sulfato
Mano de obra instalacin

ml
ml

OS UNITARIOS

1.00
1.00

28,000
700,000
SUBTOTAL

1.00
1.00

728,000

18,000
110,000
SUBTOTAL

1.00
1.00
SUBTOTAL

SUBTOTAL

1,200
300
1,500

29,663
60,000
98,000
SUBTOTAL

0.10
1.10
3.50
1.30
0.50
0.30

1,000
4,941
5,941

12,000
3,000

0.020
0.020
0.020

18,000
110,000
128,000

1,000
4,941

0.100
0.100

28,000
700,000

593
1,200
1,960
3,753

227,819
7,341
2,656
3,248
2,500
35,000

22,782
8,075
9,296
4,222
1,250
10,500

0.08
0.08
0.10
253.32
0.50

29,710
23,955
253,320
1
22,900
SUBTOTAL

2.00
1.40
0.50
0.05
1.00

97,632

2,000
20,500
2,500
60,000
1,000
SUBTOTAL

1.00
3.00
0.85
SUBTOTAL

SUBTOTAL

SUBTOTAL

1,000
77,000
22,900
100,900

900
3,500
5,430
SUBTOTAL

500
76,500
77,000

1,000
77,000
22,900

1.00
1.00
5.00

1,000
11,121
75,412
87,533

500
5,100

1.00
1.00
1.00

4,000
28,700
1,250
3,000
1,000
37,950

1,000
3,707
88,720

1.00
15.00

2,476
1,996
25,332
253
11,450

900
3,500
27,150
31,550

1.00
1.00

900
22,000
SUBTOTAL

1.00
1.00

22,900

1,054
15,400
SUBTOTAL

1.00
1.00
SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

70,014
30,400
100,414

75,086
10,700
SUBTOTAL

5,065
36,800
41,865

70,014
30,400

1.00
1.00

5,063
28,400
33,463

5,065
36,800

1.00
1.00

1,057
20,800
21,857

5,063
28,400

1.00
1.00

1,054
15,400
16,454

1,057
20,800

1.00
1.00

900
22,000

75,086
10,700
85,786

1.00
2.00
1.50
1.00
1.00

23,500
830
5,500
5,100
5,200
SUBTOTAL

1.05
1.05
1.00

43,710

34,407
4,000
10,000
SUBTOTAL

1.05
1.05
1.00
SUBTOTAL

SUBTOTAL

77,651
5,250
15,000
97,901

85,462
5,500
18,000
SUBTOTAL

1.05
1.05
1.00

52,519
4,725
12,000
69,244

73,953
5,000
15,000

1.05
1.05
1.00

36,127
4,200
10,000
50,327

50,018
4,500
12,000

1.05
1.05
1.00

23,500
1,660
8,250
5,100
5,200

89,735
5,775
18,000
113,510

114,547
6,000
21,000

120,274
6,300
21,000

SUBTOTAL

1.05
1.05
1.00

147,574

150,656
7,000
24,000
SUBTOTAL

1.05
1.05
1.00

189,539

187,004
8,000
27,000
SUBTOTAL

1.05
1.05
1.00
SUBTOTAL

SUBTOTAL

SUBTOTAL

379,302
15,750
40,000
435,052

878,440
25,200
45,000
SUBTOTAL

303,793
12,600
35,000
351,393

361,240
15,000
40,000

1.05
1.05
1.00

252,869
10,500
31,000
294,369

289,327
12,000
35,000

1.05
1.05
1.00

196,354
8,400
27,000
231,754

240,828
10,000
31,000

1.05
1.05
1.00

158,189
7,350
24,000

922,362
26,460
45,000
993,822

1.00
1.05
1.50
1.40
2.00
0.20
0.30
2.00
0.20
0.30
0.20
0.08
0.20

3,753
50,327
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

1.00
1.05
1.50
1.40
2.00
0.20
0.30
2.00
0.20
0.30
0.20
0.08
0.20

$ 556,284

3,753
69,244
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

1.00
1.05
1.60
1.50
2.00
0.30
0.40
2.00
0.20
0.30
0.20
0.08
0.20

3,753
72,706
50,195
24,640
87,420
17,354
9,465
14,600
17,507
31,802
7,590
137,634
101,481
$ 576,147

3,753
97,901
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

3,753
52,843
50,195
24,640
87,420
17,354
9,465
14,600
17,507
31,802
7,590
137,634
101,481

3,753
102,796
53,541
26,400
87,420
26,031
12,620
14,600
17,507
31,802
7,590
137,634
101,481
$ 623,175

1.00
1.05
1.70
1.60
2.00
0.40
0.50
2.00
0.25
0.35
0.25
0.08
0.25

3,753
113,510
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

1.00
1.05
1.80
1.70
2.00
0.50
0.60
2.00
0.30
0.40
0.30
0.08
0.30

$ 693,448

3,753
147,574
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

1.00
1.05
1.90
1.80
2.10
0.60
0.70
2.00
0.30
0.40
0.30
0.08

3,753
119,186
56,887
28,160
87,420
34,708
15,775
14,600
21,883
37,103
9,488
137,634
126,851

3,753
154,953
60,233
29,920
87,420
43,385
18,930
14,600
26,260
42,403
11,385
137,634
152,222
$ 783,098

3,753
189,539
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431

3,753
199,016
63,580
31,680
91,791
52,062
22,085
14,600
26,260
42,403
11,385
137,634

0.30

507,405
SUBTOTAL

1.00
1.05
2.00
1.90
2.00
0.70
0.80
2.00
0.30
0.40
0.30
0.08
0.30

$ 848,471

3,753
231,754
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

1.00
1.05
2.20
2.00
3.00
0.80
0.90
2.00
0.40
0.50
0.30
0.08
0.40

3,753
243,342
66,926
33,440
87,420
60,739
25,240
14,600
26,260
42,403
11,385
137,634
152,222
$ 905,364

3,753
294,369
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

1.00
1.05
2.40
2.20
4.00
0.90
1.00
2.00
0.50
0.60
0.40
0.08
0.50

152,222

3,753
309,087
73,619
35,200
131,130
69,416
28,395
14,600
35,013
53,004
11,385
137,634
202,962
$ 1,105,199

3,753
351,393
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405

3,753
368,963
80,311
38,720
174,840
78,093
31,550
14,600
43,767
63,605
15,180
137,634
253,703

SUBTOTAL

1.00
1.05
2.60
2.40
4.00
1.20
1.50
2.00
0.60
0.70
0.60
0.08
0.60

$ 1,304,718

3,753
435,052
33,463
17,600
43,710
86,770
31,550
7,300
87,533
106,008
37,950
1,720,431
507,405
SUBTOTAL

1.05
1.05
1.00
1.00

$ 1,522,263

345,700
22,900
150,000
2,844
SUBTOTAL

1.05
1.00
1.00
1.00
SUBTOTAL

2,310
2,000
8,400
1,420
14,130

4,303
345,700
22,900
12,928
75,000
SUBTOTAL

362,985
24,045
150,000
2,844
539,874

2,200
2,000
8,400
1,420

21.60
1.84
1.84
6.00
1.00

3,753
456,805
87,004
42,240
174,840
104,124
47,325
14,600
52,520
74,206
22,770
137,634
304,443

92,945
636,088
42,136
77,566
75,000
923,735

0.50
0.50
1.00
1.00

345,700
18,900
80,000
2,844
SUBTOTAL

48.00
0.44
1.00
1.00

265,144

4,303
345,700
22,900
150,000
SUBTOTAL

57.0
0.54
2.0
SUBTOTAL

SUBTOTAL

SUBTOTAL

9,900
7,700
17,600

13,500
22,900
14,500
7,700
SUBTOTAL

919,200
238,815
85,000
90,000
$ 1,333,015

16,500
7,700

1.30
1.30
0.60
1.00

245,271
186,678
25,855
457,804

574,500
238,815
85,000
25,000

0.600
1.00

206,544
152,108
22,900
150,000
531,552

4,303
345,700
12,928

1.60
1.00
1.00
3.60

172,850
9,450
80,000
2,844

17,550
29,770
8,700
7,700
63,720

1.20
1.20
0.80
1.00

45,000
22,900
14,500
12,928
SUBTOTAL

1.30
1.30
1.00
1.00

106,008

35,000
22,900
1,500
10,000
SUBTOTAL

1.30
1.00
1.00
SUBTOTAL

SUBTOTAL

6,470
397,555
103,380
507,405

5,900
1,400
SUBTOTAL

65,000
10,250
12,000
87,250

5,626
345,700
68,920

1.00
1.00

45,500
29,770
1,500
10,000
86,770

50,000
10,250
12,000

1.15
1.15
1.50

54,000
27,480
11,600
12,928

5,900
1,400
7,300

1.00
10.00
8.90
1.00
0.60

345,700
2,540
12,928
1,155
70,000
SUBTOTAL

0.40
0.60
7%
0.5
1.00
1.00

529,312

345,700
63,800
244,760
25,000
1,000
150,000
SUBTOTAL

0.67
4.00
67%
33%
47%
65%
150%
0.1
1.00
1.00

138,280
38,280
17,133
12,500
1,000
150,000
357,193

525
2,000
2,400
773
1,881
3,126
2,020
2,500
25,000
8,500
SUBTOTAL

0.67
2.00
0.65
0.5
1.00
1.00

345,700
25,400
115,057
1,155
42,000

350
8,000
1,600
258
878
2,032
3,030
250
25,000
8,500
49,898

525
2,400
3,126
10,000
13,000
4,500

350
4,800
2,032
5,000
13,000
4,500

SUBTOTAL

1.40
1.40
0.8
3
0.5
65%
1.00
1.00

29,682

2,500
43,515
950
400
63,800
3,126
120,000
25,000
SUBTOTAL

1.00
1.00
0.2
1
1

3,500
60,921
760
1,200
31,900
2,032
120,000
25,000
245,313

21,023
60,000
12,928
400
10,200
SUBTOTAL

21,023
60,000
2,586
400
10,200
94,209

acin y acero de refuerzo profundidad 6 metros (un)


1.00
6.00
0.87
0.42
0.05
69.27
1.00

1,000
7,656
362,387
18,000
362,387
4,303
110,000
SUBTOTAL

3.92
1.20
274.4
1.0
1.0
9.20

794,454

651,978
106,008
4,303
60,000
200,000
19,068
SUBTOTAL

4.86
1.80

1,000
45,936
313,770
7,560
18,119
298,069
110,000

2,555,754
127,210
1,180,743
60,000
200,000
175,426
4,299,133

651,978
106,008

3,168,613
190,814

340.2
1.0
1.0
13.80

4,303
70,000
285,000
19,068
SUBTOTAL

10.90
4.50
763
1.0
1.0
34.50

5,441,446

651,978
106,008
4,303
100,000
370,000
19,068
SUBTOTAL

3.00
0.162
0.77
25.85
1.00
1.00
SUBTOTAL

SUBTOTAL

11,882
24,019
12,153
182,530
35,000
45,800
253,000
181,759
746,143

593
33,463
345,700
4,303
5,000
SUBTOTAL

2.00

17,823
17,173
266,213
111,231
45,000
200,000
657,440

5,941
80,064
60,767
345,700
35,000
22,900
253,000
4,303

2.00
0.30
0.26
18.20
1.00

7,106,560
477,036
3,283,189
100,000
370,000
657,846
11,994,631

5,941
106,008
345,700
4,303
45,000
200,000

2.00
0.30
0.20
0.53
1.00
2.00
1.00
42.24

1,463,881
70,000
285,000
263,138

1,186
10,039
89,882
78,315
5,000
184,422

593

1,186

0.30
0.26
18.20
1.00

33,463
345,700
4,303
5,000
SUBTOTAL

10,039
89,882
78,315
5,000
184,422

20,000

1.00
1.00
1.00

1,500
207,960
100,000
SUBTOTAL

350.00
0.84
0.56
0.25
1.00

309,460

650
45,000
55,000
56,000
35,600
SUBTOTAL

1.00
1.00
0.50
5%
1.00
1.00

227,500
37,800
30,800
14,000
35,600
345,700

1,500
345,700
18,000
345,700
22,900
180,000
SUBTOTAL

1,500
207,960
100,000

1,500
345,700
9,000
17,285
22,900
180,000
576,385

1.00
1.00
1.00
1.00
0.20
5%
1.00
1.00

1,500
345,700
5,793
35,400
18,000
345,700
22,900
200,000
SUBTOTAL

1.00
1.00
1.00
1.00
0.20
5%
1.00
1.00

1,500
345,700
5,793
35,400
3,600
17,285
22,900
200,000
632,178

1,500
345,700
5,793
55,200
18,000
345,700
22,900
200,000
SUBTOTAL

1,500
345,700
5,793
55,200
3,600
17,285
22,900
200,000
651,978

1.00
0.04
1.00
5%
1.00

3,172
2,300
80
3,172
800

3,172
92
80
159
800

SUBTOTAL

CANT

4,303

VR. UNIT
12.0
3.0
1.2
0.2
1.1
150.0
700.0
10.0
12.0
3.0

3,753.0
100,414.0
576,385.0
309,460.0
632,178.0
4,303.0
8,200.0
11,518.0
57,200.0
12,500.0

VR. PCIAL
45,036.0
301,242.0
691,662.0
68,081.0
695,396.0
645,450.0
5,740,000.0
115,180.0
686,400.0
37,500.0

SUBTOTAL

CANT

9,025,947

VR. UNIT
44.0
6.0
20.0
2.7
1.1
150.0
2,550.0
30.0
36.0
3.0

3,753.0
80,414.0
410,398.0
269,460.0
476,191.0
3,903.0
8,200.0
95,000.0
57,200.0
12,500.0
SUBTOTAL

1.05
0.20
1.05
1.00
SUBTOTAL

SUBTOTAL

134,376
37,741
6,300
18,000
196,417

153,091
202,873
7,000
21,000
SUBTOTAL

102,860
37,436
5,250
15,000
160,546

127,977
188,707
6,000
18,000

1.05
0.20
1.05
1.00

165,132.0
482,484.0
8,207,960.0
727,542.0
523,810.0
585,450.0
20,910,000.0
2,850,000.0
2,059,200.0
37,500.0
36,549,078

97,962
187,181
5,000
15,000

1.05
0.20
1.05
1.00

VR. PCIAL

160,746
40,575
7,350
21,000
229,671

1.05
0.20
1.05
1.00

183,135
212,500
7,000
24,000
SUBTOTAL

1.05
0.20
1.05
1.00

266,142

198,273
220,799
8,000
24,000
SUBTOTAL

1.05
0.20
1.05
1.00
SUBTOTAL

SUBTOTAL

SUBTOTAL

344,115
74,997
15,750
35,000
469,862

454,894
474,143
25,200
40,000
SUBTOTAL

282,546
70,077
12,600
30,000
395,223

327,729
374,983
15,000
35,000

1.05
0.20
1.05
1.00

220,610
62,324
10,500
30,000
323,434

269,091
350,384
12,000
30,000

1.05
0.20
1.05
1.00

208,187
44,160
8,400
24,000
284,747

210,105
311,619
10,000
30,000

1.05
0.20
1.05
1.00

192,292
42,500
7,350
24,000

477,639
94,829
26,460
40,000
638,928

1.05
0.09
0.64
0.32
0.32
0.72
1.00

155,492
120,000
33,463
86,770
8,000
5,000
16,000
SUBTOTAL

1.05
0.09
0.56
0.32
0.25
0.72
1.00

244,913

99,510
100,000
33,463
86,770
8,000
5,000
12,000
SUBTOTAL

1.05
0.09
0.49
0.26
0.23
0.72
1.00
SUBTOTAL

66,565
8,100
16,313
22,560
1,820
3,600
8,000
126,958

30,084
80,000
33,463
86,770
8,000
5,000
6,000
SUBTOTAL

1.05
0.09
0.36
0.17

104,486
9,000
18,739
27,333
1,960
3,600
12,000
177,118

63,395
90,000
33,463
86,770
8,000
5,000
8,000

1.05
0.09
0.42
0.21
0.21
0.72
1.00

163,267
10,800
21,333
27,333
2,580
3,600
16,000

31,588
7,200
14,054
18,222
1,680
3,600
6,000
82,344

13,995
70,000
33,463
86,770

14,695
6,300
11,963
14,317

0.19
1.05
1.00

8,000
5,000
4,000
SUBTOTAL

1.05
0.09
0.25
0.09
0.16
1.05
1.00

58,065

6,151
60,000
33,463
86,770
8,000
5,000
4,000
SUBTOTAL

1.05
0.09
0.56
0.32
0.25
0.72
1.00
SUBTOTAL

SUBTOTAL

115,951

104,486
9,000
18,739 nata ud hizo estos apu
27,333
1,960
3,600
12,000
177,118

111,683
100,000
33,463
86,770
8,000
5,000
12,000
SUBTOTAL

79,271
9,000
18,739
27,333
1,960
3,600
12,000
151,903

99,510
100,000
33,463
86,770
8,000
5,000
12,000

1.05
0.09
0.56
0.32
0.25
0.72
1.00

6,459
5,400
8,282
7,809
1,260
5,250
4,000
38,460

75,496
100,000
33,463
86,770
8,000
5,000
12,000

1.05
0.09
0.56
0.32
0.25
0.72
1.00

1,540
5,250
4,000

117,267
9,000
18,739
27,333
1,960
3,600
12,000
189,899

157,072

1.05
0.03
1.05
0.64
0.38
0.26
1.00

153,036
40,795
5,000
33,463
86,770
8,000
14,000
SUBTOTAL

1.05
0.03
1.05
0.56
0.32
0.25
1.00

237,134

97,797
40,795
5,000
33,463
86,770
8,000
13,000
SUBTOTAL

1.05
0.02
0.03
1.05
0.49
0.26
0.23
1.00

102,687
1,224
5,250
18,739
27,333
1,960
13,000
170,193

57,052
212,495
40,795
5,000
33,463
86,770
8,000
12,000
SUBTOTAL

1.05
0.03

160,688
1,224
5,250
21,333
32,539
2,100
14,000

59,905
4,250
1,224
5,250
16,313
22,560
1,820
12,000
123,322

26,284
40,795

27,599
1,224

1.05
0.42
0.21
0.21
1.00

5,000
33,463
86,770
8,000
10,000
SUBTOTAL

1.05
0.03
1.05
0.36
0.17
0.19
1.00

78,029

15,930
40,795
5,000
33,463
86,770
8,000
9,000
SUBTOTAL

1.05
0.03
1.05
0.30
0.13
0.18
1.00
SUBTOTAL

11,772
1,224
5,250
10,039
10,846
1,400
8,000
48,531

10,235
40,795
5,000
33,463
86,770
8,000
7,500
SUBTOTAL

1.05
0.02
1.05
0.20
0.07
0.13
1.00

16,727
1,224
5,250
11,963
14,317
1,540
9,000
60,021

11,211
40,795
5,000
33,463
86,770
8,000
8,000

1.05
0.02
1.05
0.25
0.09
0.16
1.00

5,250
14,054
18,222
1,680
10,000

10,747
816
5,250
8,282
7,809
1,260
7,500
41,664

7,426
40,795
5,000
33,463
86,770
8,000
7,000

7,798
816
5,250
6,693
5,900
1,056
7,000

SUBTOTAL

1.05
0.20
0.06
1.00
0.40
1.00
1.00
2.00
0.10
0.50
0.20
0.10

34,513

7,421
11,388
10,750
41,865
86,770
17,600
12,000
7,300
87,533
31,550
106,008
507,405

7,792
2,278
645
41,865
34,708
17,600
12,000
14,600
8,753
15,775
21,202
50,741
227,958

12,666
20,835
10,750
41,865
86,770
17,600
15,000
7,300
87,533
31,550
106,008
507,405

13,299
3,125
645
41,865
34,708
17,600
15,000
14,600
8,753
15,775
21,202
50,741
237,312

26,284
34,502
10,750
41,865
86,770
17,600
17,000
7,300
87,533
31,550
106,008
507,405

27,598
5,175
1,075
46,052
34,708
19,360
17,000
14,600
8,753
15,775
21,202
50,741
262,038

SUBTOTAL

1.05
0.15
0.06
1.00
0.40
1.00
1.00
2.00
0.10
0.50
0.20
0.10
SUBTOTAL

1.05
0.15
0.10
1.10
0.40
1.10
1.00
2.00
0.10
0.50
0.20
0.10
SUBTOTAL

1.00
2.00
2.00
1.00

241,280
12,189
400.0
25,000
SUBTOTAL

1.00
2.00
1.00
1.00

291,459

1,266,720
400,000
600,000
300,000
SUBTOTAL

1.00
1.00
1.00
1.00
1.00
SUBTOTAL

SUBTOTAL

SUBTOTAL

696,000
216,920
150,000
17,400
50,000
1,130,320

1,044,000
265,640
560,000
70,000
SUBTOTAL

269,120
176,320
150,000
17,400
40,000
652,840

696,000
216,920
150,000
17,400
50,000

1.00
1.00
1.00
1.00

206,480
79,460
120,000
17,400
30,000
453,340

269,120
176,320
150,000
17,400
40,000

1.00
1.00
1.00
1.00
1.00

1,266,720
800,000
600,000
300,000
2,966,720

206,480
79,460
120,000
17,400
30,000

1.00
1.00
1.00
1.00
1.00

241,280
24,379
800
25,000

1,044,000
265,640
560,000
70,000
1,939,640

1.00
1.00
2.00
1.00
1.00

79,460
30,032
3,876
150,000
20,000
SUBTOTAL

1.00
1.00
2.00
1.00
1.00

287,244

212,500
44,080
5,000
180,000
25,000
SUBTOTAL

1.00
1.00
2.00
1.00
1.00
SUBTOTAL

SUBTOTAL

216,920
106,720
168,000
300,000
50,000
841,640

930,000
30,032
156,000
450,000
80,000
SUBTOTAL

1.00

269,120
56,840
130,000
200,000
50,000
705,960

216,920
106,720
84,000
300,000
50,000

1.00
1.00
2.00
1.00
1.00

212,500
44,080
10,000
180,000
25,000
471,580

269,120
56,840
65,000
200,000
50,000

1.00
1.00
2.00
1.00
1.00

79,460
30,032
7,752
150,000
20,000

930,000
30,032
312,000
450,000
80,000
1,802,032

2,679,600

2,679,600

2.00
1.00

600,000
1,000,000
SUBTOTAL

0.72
72.00
1.00
1.00

4,879,600

651,978
4,303
200,000
300,000
SUBTOTAL

3.60
1.00
1.00
1.00
SUBTOTAL

SUBTOTAL

SUBTOTAL

25,891
50,000
50,000
100,000
225,891

200,000
SUBTOTAL

1.05
0.50
1.00
1.00
1.00

200,000
50,000
50,000
300,000

7,192
50,000
50,000
100,000

1.00

38,419
50,000
50,000
100,000
238,419

200,000
50,000
50,000

3.60
1.00
1.00
1.00

469,424
309,816
200,000
300,000
1,279,240

10,672
50,000
50,000
100,000

1.00
1.00
1.00

1,200,000
1,000,000

200,000
200,000

46,284
15,080
6,700
15,000
15,000

48,598
7,540
6,700
15,000
15,000

SUBTOTAL

1.00
1.00
1.00
1.00
1.00
1.00

92,838

112,200
47,100
3,351
3,000
9,600
25,000
SUBTOTAL

1.00
8.00
1.00
3.00
2.00
1.00
1.00

200,251

79,808
41,664
30,032
15,080
3,876
150,000
60,000
SUBTOTAL

1.00
3.00
1.00
1.00
1.00
SUBTOTAL

SUBTOTAL

753,644
396,435
450,000
250,000
1,850,079

450,534
110,799
350,000
450,000
200,000
SUBTOTAL

1,099,639
1,280,790
800,000
500,000
300,000
3,980,429

753,644
132,145
450,000
250,000

1.00
3.00
1.00
1.00
1.00

79,808
333,312
30,032
45,240
7,752
150,000
60,000
706,144

1,099,639
426,930
800,000
500,000
300,000

1.00
3.00
1.00
1.00

112,200
47,100
3,351
3,000
9,600
25,000

450,534
332,396
350,000
450,000
200,000
1,782,930

1.00
3.00
1.00
1.00
1.00

399,367
96,568
400,000
280,000
180,000
SUBTOTAL

1.00
3.00
1.00
1.00
1.00

1,549,070

345,075
81,320
200,000
350,000
150,000
SUBTOTAL

1.00
1.00
1.00
SUBTOTAL

SUBTOTAL

51,000
25,000
5,600
150,000
30,000
261,600

25,000
47,700
5,600
200,000
100,000
SUBTOTAL

3.00
2.00
1.00

60,000
10,000
30,000
100,000

17,000
25,000
5,600
150,000
30,000

3.00
1.00
1.00
1.00
1.00

345,075
243,960
200,000
350,000
150,000
1,289,035

60,000
10,000
30,000

3.00
1.00
1.00
1.00
1.00

399,367
289,703
400,000
280,000
180,000

75,000
47,700
5,600
200,000
100,000
428,300

70,180
70,000
95,000

210,540
140,000
95,000

1.00
1.00
1.00
1.00

1,150,000
120,000
300,000
200,000
SUBTOTAL

3.00
2.00
1.00
1.00
1.00
1.00
1.00

2,215,540

196,504
70,000
120,000
1,850,000
150,000
350,000
250,000
SUBTOTAL

3.00
2.00
1.00
1.00
1.00
1.00
1.00
SUBTOTAL

1,115,085
140,000
85,000
1,212,500
400,000
400,000
300,000
3,652,585

241,280
70,000
85,000
2,150,000
500,000
550,000
350,000
SUBTOTAL

3.00
2.00
1.00
1.00
1.00
1.00

589,512
140,000
120,000
1,850,000
150,000
350,000
250,000
3,449,512

371,695
70,000
85,000
1,212,500
400,000
400,000
300,000

3.00
2.00
1.00
1.00
1.00
1.00
1.00

1,150,000
120,000
300,000
200,000

723,840
140,000
85,000
2,150,000
500,000
550,000
350,000
4,498,840

856,080
150,000
1,062,560
6,902,000
800,000
700,000

2,568,240
300,000
1,062,560
6,902,000
800,000
700,000

1.00

500,000
SUBTOTAL

3.00
2.00
1.00
1.00
1.00
1.00
1.00

12,832,800

1,334,000
150,000
1,335,000
15,080,000
800,000
800,000
700,000
SUBTOTAL

2.73
191.27
10.00
2.00
3.00
1.00
SUBTOTAL

SUBTOTAL

4,041,025
1,866,930
2,539,160
130,000
1,863,540
500,000
10,940,655

651,978
4,303
126,958
65,000
621,180
700,000
SUBTOTAL

1,781,465
823,026
580,650
51,200
289,703
100,000
3,626,044

651,978
4,303
126,958
65,000
621,180
500,000

14.19
1,419.08
30.00
2.00
3.00
1.00

4,002,000
300,000
1,335,000
15,080,000
800,000
800,000
700,000
23,017,000

651,978
4,303
58,065
25,600
96,568
100,000

6.20
433.87
20.00
2.00
3.00
1.00

500,000

9,252,057
6,106,280
3,808,740
130,000
1,863,540
700,000
21,860,617

16.05
1,605.24
35.00
2.00
3.00
1.00

651,978
4,303
126,958
65,000
621,180
800,000
SUBTOTAL

44.18
4,417.56
40.00
2.00
3.00
1.00

24,610,230

651,978
4,303
126,958
65,000
621,180
800,000
SUBTOTAL

3.61
324.90
9.00
20.00
4.00
2.00
1.00
SUBTOTAL

2,353,641
1,398,045
2,902,500
769,200
120,128
32,000
800,000
8,375,514

16,454
22,900
3,200
25,246
26,313
632,178
61,500
651,978
4,303
14,290
450,000
322,500
1,500,000
SUBTOTAL

29.00
20.00

28,801,519
19,008,761
5,078,320
130,000
1,863,540
800,000
55,682,140

651,978
4,303
322,500
38,460
30,032
16,000
800,000

13.00
13.00
15.00
9.00
10.00
2.20
8.00
6.50
700.00
6.00
2.00
5.00
1.00

10,465,812
6,907,348
4,443,530
130,000
1,863,540
800,000

213,902
297,700
48,000
227,214
263,130
1,390,792
492,000
4,237,857
3,012,100
85,740
900,000
1,612,500
1,500,000
14,280,935

16,454
22,900

477,166
458,000

25.00
20.00
18.00
4.80
12.00
10.00
1,200.00
15.00
2.00
12.00
1.00

3,200
25,246
26,313
632,178
61,500
651,978
4,303
14,290
450,000
322,500
2,500,000
SUBTOTAL

1.05
1.05
1.00

24,933,904

200,000
50,000
60,000
SUBTOTAL

1.05
1.00
SUBTOTAL

399,000
56,000
455,000

651,978
309,460
33,463
106,008
31,550
26,313
61,500
4,303
236,250
621,180
5,000,000
SUBTOTAL

175.60
6.15
184.44
43.04
184.44
60.00
345.00
17,559.78

210,000
52,500
60,000
322,500

380,000
56,000

148.05
5.00
150.00
35.00
150.00
50.00
240.00
14,805.00
40.00
2.00
1.00

80,000
504,920
473,634
3,034,454
738,000
6,519,780
5,163,600
214,350
900,000
3,870,000
2,500,000

96,525,343
1,547,300
5,019,450
3,710,280
4,732,500
1,315,650
14,760,000
63,705,915
9,450,000
1,242,360
5,000,000
207,008,798

651,978
309,460
33,463
106,008
31,550
26,313
61,500
4,303

114,485,902
1,902,560
6,171,916
4,562,160
5,819,082
1,578,780
21,217,500
75,559,733

40.00
2.00
1.00

236,250
621,180
5,000,000
SUBTOTAL

274.11
11.69
584.60
116.92
584.60
70.00
500.00
27,411.30
60.00
2.00
1.00

246,989,993

651,978
3,600
33,463
106,008
31,550
26,313
61,500
4,303
236,250
621,180
7,435,000
SUBTOTAL

25.53
1.29
38.64
9.02
38.64
25.00
36.00
2,553.18
15.00
2.00
1.00
SUBTOTAL

16,646,172
398,584
1,293,010
955,768
1,219,092
657,825
2,214,000
10,986,334
3,543,750
1,242,360
530,000
39,686,895

651,978
309,460
33,463
106,008
31,550
26,313
61,500
4,303
236,250
621,180
2,930,000
SUBTOTAL

178,715,646
42,091
19,562,470
12,394,455
18,444,130
1,841,910
30,750,000
117,950,824
14,175,000
1,242,360
7,435,000
402,553,886

651,978
309,460
33,463
106,008
31,550
26,313
61,500
4,303
236,250
621,180
530,000

126.51
4.82
192.60
33.71
192.60
45.00
200.00
12,651.45
40.00
2.00
1.00

9,450,000
1,242,360
5,000,000

82,484,671
1,490,050
6,444,974
3,573,000
6,076,530
1,184,085
12,300,000
54,439,189
9,450,000
1,242,360
2,930,000
181,614,859

912.98
31.00
1,860.00
279.00
1,860.00
110.00
2,300.00
100,427.25
100.00
2.00
1.00

651,978
309,460
33,463
106,008
31,550
26,313
61,500
4,303
236,250
621,180
33,710,000
SUBTOTAL

1
1

595,239,615
9,593,260
62,241,180
29,576,232
58,683,000
2,894,430
141,450,000
432,138,457
23,625,000
1,242,360
33,710,000
1,390,393,534

2400000
600000

2,400,000
600,000
$ 3,000,000

1.00
1.00
2.00
2.00
2.00
1.00
0.03

165,000
13,636
35,600
33,463
17,600
100,000
43,105
SUBTOTAL

1.00
1.00
7.00
0.16
1.80
1.80
2.00
0.01

30,000
15,600
2,000
800
10,000
8,000
750
57,600
SUBTOTAL

0.36
0.17

33,463
86,770

165,000
13,636
71,200
66,926
35,200
100,000
1,293
453,255

30,000
15,600
14,000
128
18,000
14,400
1,500
576
94,204

11,963
14,317

0.19

8,000
SUBTOTAL

1.00
1.00

27,820

1,825,000
400,000
SUBTOTAL

1,540

1,825,000
400,000
2,225,000

aguas dice mas o menos de be dar 115

aguas dice mas o menos de be dar 157

ANLISIS DE PRECIOS UNITARIOS. APU


CAPITULO 1 PREELIMINARES
1.1

LOCALIZACIN Y REPLANTEO (m)


Unidad

1.2

1.3

Mano de obra

DD

Equipo de topografia

DD

Topografo

DD

LOCALIZACIN Y REPLANTEO DE REDES (m)


Mano de obra

DD

HERRAMIENTA MENOR

DD

ROCERIA Y LIMPIEZA (m2)


Herramienta menor

GL

Mano de obra

m2

CAPITULO 2 DEMOLICIONES
2.1

DEMOLICIN DE CONCRETO HIDRULICO


Unidad
Herramienta

GL

Mano de obra

HH

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
91 de 131

CAPITULO 3 SOBREACARREOS
3.1

MANEJO/MOVILIZACIN DE MATERIALES EN VEHCULO-NO AUTOMOTOR (m3)


Unidad

3.2

Herramienta

gl

Mano de obra

m3

EVACUACIN DE ESCOMBROS /SOBRANTES EN VEHICULOS AUTOMOTOR (m3)


Unidad
Herramienta

GL

Equipo de transporte Volqueta

Da

Permiso utilizacin escombrera

m3

Mano de obra

m3

CAPITULO 4 EXCAVACIONES
4.1

EXCAVACION ZANJA

4.1.1

EXCAVACION ZANJA - MATERIAL COMUN 0-2m (m3)


Unidad
Herramienta incluye eventual equipo para el manejo de aguas

gl

Mano de obra

m3

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
92 de 131

4.1.2

EXCAVACION EN ZANJA - CONGLOMERADO 0-2m (m3)


Unidad
Herramienta incluye eventual equipo para el manejo de aguas

gl

Mano de obra

m3

4.2

EXCAVACION PARA ESTRUSTURAS

4.2.1

EXCAVACION PARA ESTRUSTURAS - MATERIAL COMN 0-2m (m3)


Unidad

4.2.2.

Herramienta incluye eventual equipo para el manejo de aguas

gl

Mano de obra

m3

EXCAVACION PARA ESTRUSTURAS - CONCLOMERADO 0-2m (m3)


Unidad
Herramienta incluye eventual equipo para el manejo de aguas

gl

Mano de obra

m3

CAPITULO 5 RELLENOS COMPACTADOS


5.1

RELLENOS COMPACTADOS CON MATERIAL DE EXCAVACIN (m3)


Unidad

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
93 de 131

5.2

Herramienta y ensayos

gl

Mano de obra

m3

RELLENO COMPACTADO CON MATERIAL SELECCIONADO (m3)


Sucio de rio

m3

Acarreo de material hasta sitio de la obra

m3

Herramienta menor

GL

Mano de obra

GL

CAPITULO 6 CONCRETOS
6.1

CONCRETO PARA SOLADOS e=5 cm (m)


Unidad

6.2

Herramientas

gl

Concreto 2000 PSI

m3

Mano de obra

m3

CONCRETO CLASE II (3000 PSI (m3) 21 Mpa)


Unidad
Cemento gris

Kg

Gravilla

m3

Arena

m3

Mezcladora

da

Mano de obra

m3

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
94 de 131

CAPITULO 7 SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)
7.1

SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)


Unidad
Acero promedio

Kg

Alambre

Kg

Seguetas y otros

gl

Mano de obra

gl

CAPITULO 8 SUMINISTRO E INSTALACION DE TUBERIA EN POLIENTILENO

8.1

SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIN E INSTALACIN DE TUBERIA EN POLIETILENO 100 P


TERMOFUSIN DE TUBERA Y ACCESORIOS (ml)
Unidad
Tubera POLIETILENO PE 100 PN 6 =200 mm

Equipos-Herramientas para Prueba Hidrosttica 8" a 10"

Herramientas menores

Equipo de transporte

Da

Equipos - Herramientas / Fusin de tubera

Transporte tuberia hasta el sitio de construccion

Mano de obra Instalacin

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
95 de 131

8.2

SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIN E INSTALACIN DE TUBERIA EN POLIETILENO 100 P


TERMOFUSIN DE TUBERA Y ACCESORIOS (ml)
Unidad

8.3

Tubera POLIETILENO PE 100 PN 10 =200 mm

Equipos-Herramientas para Prueba Hidrosttica 8" a 10"

Herramientas menores

Equipo de transporte

Da

Equipos - Herramientas / Fusin de tubera

Transporte tuberia hasta el sitio de construccion

Mano de obra Instalacin

SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIN E INSTALACIN DE TUBERIA EN POLIETILENO 100 P


TERMOFUSIN DE TUBERA Y ACCESORIOS (ml)
Unidad

8.4

Tubera POLIETILENO PE 100 PN 12.5 =200 mm

Herramientas menores

Equipos-Herramientas para Prueba Hidrosttica 8" a 10"

Equipo de transporte

Da

Equipos - Herramientas / Fusin de tubera

Transporte tuberia hasta el sitio de construccion

Mano de obra Instalacin

SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIN E INSTALACIN DE TUBERIA EN POLIETILENO 100 P


TERMOFUSIN DE TUBERA Y ACCESORIOS (ml)

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
96 de 131

Unidad
Tubera POLIETILENO PE 100 PN 16 =200 mm

Herramientas menores

Equipos-Herramientas para Prueba Hidrosttica 8" a 10"

Equipo de transporte

Da

Equipos - Herramientas / Fusin de tubera

Transporte tuberia hasta el sitio de construccion

Mano de obra Instalacin

CAPITULO 9 VALVULAS VENTOSAS Y PURGAS

9.1

SUMINISTRO/INSTALACIN DE VALVULA VENTOSA 3" INCLUYE


ACCESORIOS Y CAJA EN CONCRETO
Valvula mariposa 3" BxB

ud

Tee reducida de polietileno termoemsamblada 200 mm x 90 mm PE


100 PN 16

ud

Portaflanche PE 100 PN 16 90 mm
Brida Loca 90 mm
Vlvula de admisin y expulsin de aire doble cmara accin multiple
Hf 3" Brida.

ud
ud

Cmara de Inspeccin/Cada D=1.20 m. Concreto simple Clase II, co


ntapa en concreto.

ud

Mano de obra instalacin Y Equipo de termofusin

GL

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
97 de 131

9.2

SUMINISTRO/INSTALACIN DE VALVULA PURGA 3" INCLUYE


ACCESORIOS Y CAJA EN CONCRETO
Valvula de compuerta elastica 3" BxB

ud

Tee reducida de polietileno termoensamblada 200 mm x 90 mm PE


100 PN 16

ud

Portaflanche PE 100 PN 16 90 mm
Brida Loca 90 mm
Cmara de Inspeccin/Cada D=1.20 m. Concreto simple Clase II, co
ntapa en concreto.

ud

Mano de obra instalacin Y Equipo de termofusin

GL

ud

CAPITULO 10 OBRAS CIVILES VARIAS

10.1

EMPALME Empalme (incluye Suministro, Transporte e Instalacin


Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200
mm, Portaflanche PE 200 mm)
Unidad
Porta flanche PE =200 mm

un

Brida loca metlica 200 mm

un

Adaptador brida universal 200 mm Rango 1 incluye Tornillera


un
Mano de obra

un

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
98 de 131

ARIOS. APU

Cantidad

Valor unitario

Valor Total

0.010

$ 31,399

$ 314

0.02

$ 54,450

$ 817

0.01

$ 92,500

$ 925

SUBTOTAL

$ 2,056

0.100

12,708

1,271

0.100

1,500

150

SUBTOTAL

1,421

1.00

200

200

1.00

1,059

1,059

SUBTOTAL

Cantidad

1,259

Valor unitario

Valor Total

1.00

13,205

13,205

7.50

8,150

61,124

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
99 de 131

SUBTOTAL

Cantidad

74,329

Valor unitario

Valor Total

1.00

$ 900

$ 900

1.00

$ 18,817

$ 18,817

SUBTOTAL

Cantidad

$ 19,717

Valor unitario

Valor Total

1.00

$ 900

$ 900

0.03

$ 406,000

$ 12,180

1.00

$ 480

$ 480

1.00

$ 3,519

$ 3,519

SUBTOTAL

Cantidad

$ 17,079

Valor unitario

Valor Total

1.00

$ 1,861

$ 1,861

1.00

$ 12,144

$ 12,144

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
100 de 131

SUBTOTAL

Cantidad

$ 14,005

Valor unitario

Valor Total

1.00

$ 1,488

$ 1,488

1.00

$ 18,834

$ 18,834

SUBTOTAL

Cantidad

$ 20,322

Valor unitario

Valor Total

1.00

$ 1,363

$ 1,363

1.00

$ 14,434

$ 14,434

SUBTOTAL

Cantidad

$ 15,797

Valor unitario

Valor Total

1.00

$ 955

$ 955

1.00

$ 16,854

$ 16,854

SUBTOTAL

Cantidad

Valor unitario

$ 17,809

Valor Total

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
101 de 131

1.00

$ 3,200

$ 3,200

1.00

$ 9,546

$ 9,546

SUBTOTAL

$ 12,746

1.30

32,700

42,510

1.30

20,880

27,144

1.00

900

900

1.00

6,989

6,989

SUBTOTAL

Cantidad

77,543

Valor unitario

Valor Total

1.00

$ 1,438

$ 1,438

0.05

$ 186,720

$ 9,336

0.05

$ 83,407

$ 4,170

SUBTOTAL

Cantidad

$ 14,944

Valor unitario

Valor Total

350.00

$ 500

$ 175,000

0.84

$ 42,000

$ 35,280

0.56

$ 32,000

$ 17,920

0.25

$ 31,320

$ 7,830

1.00

$ 12,210

$ 12,210

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
102 de 131

SUBTOTAL

$ 248,240

00 kg/cm2 (Kg)

Cantidad

Valor unitario

Valor Total

1.03

$ 2,500

$ 2,575

0.02

$ 3,480

$ 70

1.00

$ 431

$ 431

1.00

$ 741

$ 741

SUBTOTAL

$ 3,817

E TUBERIA EN POLIETILENO 100 PN 6 =200 mm INCLUYE

Cantidad

Valor unitario

Valor Total

1.02

$ 51,645

$ 52,678

1.00

$ 2,000

$ 2,000

0.45

$ 933

$ 420

0.005

$ 210,000

$ 1,050

1.00

$ 5,613

$ 5,613

1.00

$ 1,200

$ 1,200

1.00

$ 3,389

$ 3,389

SUBTOTAL

$ 66,349

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
103 de 131

E TUBERIA EN POLIETILENO 100 PN 10 =200 mm INCLUYE

Cantidad

Valor unitario

Valor Total

1.02

$ 76,544

$ 78,075

1.00

$ 2,000

$ 2,000

0.45

$ 933

$ 420

0.01

$ 210,000

$ 2,100

1.00

$ 5,613

$ 5,613

1.00

$ 1,200

$ 1,200

1.00

$ 3,389

$ 3,389

SUBTOTAL

$ 92,796

E TUBERIA EN POLIETILENO 100 PN 12.5 =200 mm INCLUYE

Cantidad

Valor unitario

Valor Total

1.02

$ 90,584

$ 92,395

0.45

$ 933

$ 420

1.00

$ 2,000

$ 2,000

0.01

$ 210,000

$ 2,100

1.00

$ 5,613

$ 5,613

1.00

$ 1,200

$ 1,200

1.00

$ 3,389

$ 3,389

SUBTOTAL

$ 107,117

E TUBERIA EN POLIETILENO 100 PN 16 =200 mm INCLUYE


ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE
CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
104 de 131

Cantidad

Valor unitario

Valor Total

1.02

$ 109,950

$ 112,149

0.45

$ 933

$ 420

1.00

$ 2,000

$ 2,000

0.01

$ 210,000

$ 2,100

1.00

$ 5,613

$ 5,613

1.00

$ 1,200

$ 1,200

1.00

$ 3,389

$ 3,389

SUBTOTAL

$ 126,870

1.00

293,828

310,068

1.00

525,939

525,939

1.00

21,613

21,613

1.00

21,781

21,781

1.00

696,000

696,000

1.00

300,000

300,000

1.00

60,000

60,000

SUBTOTAL

1,935,401

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
105 de 131

1.00

310,068

310,068

1.00

525,939

525,939

1.00

21,613

21,613

1.00

21,781

21,781

1.00

300,000

300,000

1.00

60,000

60,000

SUBTOTAL

Cantidad

1,239,401

Valor unitario

Valor Total

1.00 $

86,966 $

86,966

1.00 $

74,974 $

74,974

1.00 $

187,920

1.00 $
SUBTOTAL

187,920

45,708 $

45,708
$ 395,569

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
106 de 131

PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO

ITEM

1.2
2.1
4.2
3.1
6.1
6.2
7.1

1.1
4.4
3.1
6.1
6.2
7.1

1.2
1.3
2.1
5.2
5.1
8.4
8.3
9.1
10.1
10.2

DESCRIPCION
1. Canal en concreto aduccin
Localizacin y replanteo
Demolicin de concreto hidrulico
Excavacion en zanja conglomerado 0-2m
Manejo/movilizacin de materiales en vehiculo no automotor
Solado de limpieza e=5 cm
Concreto 3000 PSI
Acero de refuerzo 60000 psi- 4200 Kg/cm2
2. Desgravador
Localizacin y replanteo
Excavacion en conglomerado
Manejo/movilizacin de materiales en vehiculo no automotor
Solado de limpieza e=5 cm
Concreto 3000 PSI
Acero de refuerzo 60000 psi- 4200 Kg/cm2
Pantalla deflectora metalica
3. Cambio aduccin Chambery a PE
3.1 Fase I
Localizacin y replanteo de redes
Rocera y lipieza
Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de ro
Rellenos Compactados con Material excavacin
Tuberia en polietileno PE 100 PN 16 =200 mm incluye termofusin de tubera y accesorios
Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera y accesorios
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm,
Portaflanche PE 200 mm, Codo PE 45 200 mm)
Vlvulas ventosas 3"
Vlvulas de Purga 3"

3.2 Fase II
1.2 Localizacin y replanteo
1.3 Rocera y lipieza
ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE
2.1 Excavacin en Zanja - Material Comn -CALDAS
0.0 a 2.0ZONA
m. 2
CABECERA MUNICIPAL DE ARANZAZU
107 de 131

5.2
5.1
8.3
9.1
10.1
10.2

1.2
1.3
2.1
5.2
5.1
8.3
8.4
9.1
10.1

Rellenos Compactados con material seleccionado sucio de ro


Rellenos Compactados con Material de Obra
Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera y accesorios
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm,
Portaflanche PE 200 mm, Codo PE 45 200 mm)
Vlvulas ventosas 3"
Vlvulas de Purga 3"
3.3 Fase III Parte 1
Localizacin y replanteo
Rocera y lipieza
Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de ro
Rellenos Compactados con Material de Obra
Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera y accesorios
Tuberia en polietileno PE 100 PN 16 =200 mm incluye termofusin de tubera y accesorios
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm,
Portaflanche PE 200 mm, Codo PE 45 200 mm)
Vlvulas ventosas 3"

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
108 de 131

NZAZU
DUCTO

UNIDAD

m
m3
m3
m3
m2
m3
kg

m2
m3
m3
m2
m3
kg
m2

m
m2
m3
m3
m3
m
m
ud
ud
ud

CANTIDADES

53.51
4.00
8.63
16.22
26.76
7.57
1107.00

4.71
8.68
11.28
4.71
1.08
124.00
0.63

1051.80
736.26
631.08
63.11
534.93
715.94
335.86
4.00
1.00
1.00

COSTO DIRECTO
TOTAL

COSTO UNITARIO

$
$
$
$
$
$
$

$
$
$
$
$
$

1,421
74,329
20,322
19,717
14,944
248,240
3,817

$
$
$
$
$
$
$
$

7,373,040
76,038
297,316
175,399
319,790
399,901
1,879,177
4,225,419

2056.00
17,809
19,717
14,944
248,240
3,817
300,000

$
$
$
$
$
$
$
$

1,386,946
9,684
154,582
222,487
70,386
268,099
473,308
188,400

$
$
$

#VALUE!
1,494,608
926,951
8,838,275

$
$
$
$
$
$
$

1,421
1,259
14,005
77,543
12,746
126,870
107,117

$
$
$

6,818,202
90,831,308
35,976,316

395,569 $
#REF!
#REF!

1,582,275
#VALUE!
#VALUE!

#REF!
m
1240.88
$
1,421 $
1,763,290
m2
868.62
$
1,259 $
1,093,588
ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE
m3
744.53
$
14,005
$ ZONA 210,427,115
CALDAS
CABECERA MUNICIPAL DE ARANZAZU
109 de 131

m3
m3
m
ud
ud
ud

m
m2
m3
m3
m3
m
m
ud
ud

74.45
631.09
1240.88
4.00

$
$
$

77,543
12,746 $
126,870 $

8,043,896
157,430,446

395,569 $
#REF!
#REF!

1,582,275
#REF!
#REF!

2.00
2.00

394.75
276.33
236.85
23.69
200.76
311.48
83.27
4.00
1.00

$
$
$

#REF!
560,940
347,893
3,317,084

$
$
$

2,558,932
13,731,907
10,564,465

395,569 $
#REF!

1,582,275
#REF!

$
$
$
$
$
$
$

1,421
1,259
14,005
77,543
12,746
44,086
126,870

Costo directo
AIU (34.36%)
Costo Total

#REF!
#REF!
#REF!

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
110 de 131

PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO
ITEM

DESCRIPCION
1. Canal en concreto aduccin

1.2

Localizacin y replanteo

2.1

Demolicin de concreto hidrulico

4.2

Excavacion en zanja conglomerado 0-2m

3.1

Manejo/movilizacin de materiales en vehiculo no automotor

6.1

Solado de limpieza e=5 cm

6.2

Concreto 3000 PSI

7.1

Acero de refuerzo 60000 psi- 4200 Kg/cm2


2. Desgravador

1.1

Localizacin y replanteo

4.4

Excavacion en conglomerado

3.1

Manejo/movilizacin de materiales en vehiculo no automotor

6.1

Solado de limpieza e=5 cm

6.2

Concreto 3000 PSI

7.1

Acero de refuerzo 60000 psi- 4200 Kg/cm2


Pantalla deflectora metalica
3. Cambio aduccin Chambery a PE
3.1 Fase I

1.2

Localizacin y replanteo de redes

1.3

Rocera y lipieza

2.1

Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.

5.2

Rellenos Compactados con material seleccionado sucio de ro

5.1

Rellenos Compactados con Material excavacin

8.4

Tuberia en polietileno PE 100 PN 16 =200 mm incluye termofusin de tubera y accesorios

8.3

Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera y accesorios

9.1

Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm,
Portaflanche PE 200 mm, Codo PE 45 200 mm)

10.1

Vlvulas ventosas 3"

10.2

Vlvulas de Purga 3"


3.2 Fase II

1.2

Localizacin y replanteo

1.3

Rocera y lipieza

2.1

Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.

5.2

Rellenos Compactados con material seleccionado sucio de ro

5.1

Rellenos Compactados con Material de Obra

8.3

Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera y accesorios

9.1

Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm,
Portaflanche PE 200 mm, Codo PE 45 200 mm)

10.1

Vlvulas ventosas 3"

10.2

Vlvulas de Purga 3"


3.3 Fase III

1.2

Localizacin y replanteo

1.3

Rocera y lipieza

2.1

Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.

5.2

Rellenos Compactados con material seleccionado sucio de ro

5.1

Rellenos Compactados con Material de Obra

8.3

Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera y accesorios

8.4

Tuberia en polietileno PE 100 PN 16 =200 mm incluye termofusin de tubera y accesorios

9.1

Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm,
Portaflanche PE 200 mm, Codo PE 45 200 mm)

10.1

Vlvulas ventosas 3"

10.2

Vlvulas de Purga 3"


3.4 Fase IV

1.2

Localizacin y replanteo

1.3

Rocera y lipieza

2.1

Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.

5.2

Rellenos Compactados con material seleccionado sucio de ro

5.1

Rellenos Compactados con Material de Obra

8.1

Tuberia en polietileno PE 100 PN 6 =200 mm incluye termofusin de tubera y accesorios

8.2

Tuberia en polietileno PE 100 PN 10 =200 mm incluye termofusin de tubera y accesorios

8.3
8.4

Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera y accesorios


Tuberia en polietileno PE 100 PN 16 =200 mm incluye termofusin de tubera y accesorios

9.1

Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm,
Portaflanche PE 200 mm, Codo PE 45 200 mm)

10.1

Vlvulas ventosas 3"

10.2

Vlvulas de Purga 3"

RANZAZU

UEDUCTO
UNIDAD

CANTIDADES

COSTO DIRECTO
TOTAL

COSTO UNITARIO
$

7,373,040

53.51

1,421 $

76,038

m3

4.00

74,329 $

297,316

m3

8.63

20,322 $

175,399

m3

16.22

19,717 $

319,790

m2

26.76

14,944 $

399,901

m3

7.57

248,240 $

1,879,177

kg

1107.00

3,817 $

4,225,419

1,386,946

2056.00 $

9,684

17,809 $

154,582

19,717 $

222,487

14,944 $

70,386

248,240 $

268,099

3,817 $

473,308

300,000 $

188,400

m2
m3
m3
m2
m3
kg
m2

4.71
8.68
11.28
4.71
1.08
124.00
0.63

#VALUE!
m

1051.80

1,421 $

1,494,608

m2

736.26

1,259 $

926,951

m3

631.08
63.11
534.93
715.94
335.86

14,005 $

8,838,275

77,543 $

4,893,584

12,746 $

6,818,202

126,870 $

90,831,308

107,117 $

35,976,316

395,569 $

1,582,275

m3
m3
m
m
ud
ud
ud

4
1
1

#REF!

#VALUE!

#REF!

#VALUE!
#REF!

1240.88

1,421 $

1,763,290

m2

868.62

1,259 $

1,093,588

m3

744.53
74.45

14,005 $

10,427,115

77,543 $

5,773,293

m3

m3

631.09

12,746 $

8,043,896

1240.88

126,870 $

157,430,446

395,569 $

1,582,275

ud

ud

2.00

#REF!

#REF!

ud

2.00

#REF!

#REF!
#REF!

1067.87

1,421 $

1,517,436

m2

747.51

1,259 $

941,109

m3

640.72
64.07
543.10
311.48
756.385

14,005 $

8,973,270

77,543 $

4,968,327

12,746 $

6,922,342

44,086 $

13,731,907

126,870 $

95,962,565

395,569 $

1,582,275

m3
m3
m
m
ud

ud

1.00

#REF!

#REF!

ud

1.00

#REF!

#REF!
#REF!

2569.01

1,421 $

3,650,563

m2

1798.31

1,259 $

2,264,069

m3

1541.41
154.14
1306.56
1879.74
170.49
239.78
279

14,005 $

21,587,391

77,543 $

11,952,525

12,746 $

16,653,383

66349 $
92796 $

124,718,869

521,042 $

124,935,511

126,870 $

35,396,730

395,569 $

1,582,275

m3
m3

m
m
m
m
ud

15,820,790

ud

4.00

#REF!

#REF!

ud

3.00

#REF!

#REF!

Costo directo
AIU (34.36%)
Interventora (7%)
Costo Total

#VALUE!
#VALUE!
#VALUE!
#VALUE!

PRESUPUESTO ARANZAZU RECURSOS FONDO NACIONAL DE CALAMIDADES

SISTEMA DE ACUEDUCTO
(CONSTRUCCIN CANAL DE ADUCCIN, CONSTRUCCIN DESGRAVADOR Y MEJORAMIENTO
LNEA DE ADUCCIN CHAMBERY DESDE LA ABSCISA K2+520,68 HASTA LA ABSCISA K4+429,48)

ITEM

DESCRIPCION

UNIDAD

CANTIDADES

m
m3
m3
m3
m2
m3

53.51
4.00
8.63
16.22
26.76
12.31

kg

1498.28

m2
m3
m3
m2
m3

4.71
8.68
11.28
4.71
1.80

Suministro e instalacin Acero de refuerzo 60000 psi- 4200 Kg/cm2

kg

195.00

Pantalla deflectora metalica

m2

0.63

1. Canal en concreto aduccin


1.2 Localizacin y replanteo de redes
2.1 Demolicin de concreto hidrulico
4,1,2 Excavacion en zanja conglomerado 0-2m
3.1 Manejo/movilizacin de materiales en vehiculo no automotor
6.1 Concreto para solados 2= 5 cm.
6.2 Concreto clase II 3000 PSI
7.1

Suministro e instalacin Acero de refuerzo 60000 psi- 4200 Kg/cm2

2. Desgravador
1.1 Localizacin y replanteo
4,2,2 Excavacion para estructuras conglomerado 0-2 m
3.1 Manejo/movilizacin de materiales en vehiculo no automotor
6.1 Concreto para solados 2= 5 cm.
6.2 Concreto clase II 3000 PSI
7.1

3. Cambio aduccin Chambery a PE


3.1 Fase I
1.2 Localizacin y replanteo de redes
m
707.07
1.3 Rocera y lipieza
m2
494.95
4,1,1 Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.
m3
424.24
5.2 Rellenos Compactados con material seleccionado
m3
42.42
5.1 Rellenos Compactados con Material excavacin
m3
359.60
Suministro, Transporte hasta el sitio de instalacin e Instalacin
8.4
707.07
Tuberia en polietileno PE 100 PN 16 =200 mm incluye termofusin de
m
ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE
CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
115 de 131

10.1
9.1
9.2

Empalme (incluye Suministro, Transporte e Instalacin Adaptador Brida


Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche
PE 200 mm)
Suministro/Instalacin Vlvulas ventosas 3" incluye accesorios y caja en
concreto
Suministro/Instalacin Vlvulas de Purga 3" incluye accesorios y caja en
concreto

3.2 Fase II Parte 1


1.2 Localizacin y replanteo de redes
1.3 Rocera y lipieza
4,1,1 Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.
5.2 Rellenos Compactados con material seleccionado
5.1 Rellenos Compactados con Material excavacin
Suministro, Transporte hasta el sitio de instalacin e Instalacin
8.3 Tuberia en polietileno PE 100 PN 12.5 =200 mm incluye termofusin
de tubera y accesorios
Empalme (incluye Suministro, Transporte e Instalacin Adaptador Brida
10.1 Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche
PE 200 mm)

4.00
ud
5.00

ud

3.00

ud

m
m2
m3
m3
m3

1201.73
841.21
721.04
72.10
611.18

1201.73
4.00

ud

SUBTOTAL COSTO DIRECTO


ADMINISTRACIN
UTILIDAD
IMPREVISTOS

TOTAL
INTERVENTORIA
SEGUIMIENTO MAVDT

TOTAL PROYECTO

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
116 de 131

AMIDADES

Y MEJORAMIENTO
ABSCISA K4+429,48)

COSTO
UNITARIO

COSTO DIRECTO
TOTAL
$
$
$
$
$
$
$

10,042,543
76,038
297,316
175,399
319,790
399,901
3,055,164

3,817 $

5,718,935

$
$
$
$

$
$
$
$
$
$

1,836,686
9,684
154,582
222,487
70,386
446,832

3,817 $

744,315

300,000 $

188,400

$
$
$
$
$

$
$
$
$
$
$

120,126,069
1,004,746
623,141
5,941,509
3,289,700
4,583,519

$
$
$
$
$
$

1,421
74,329
20,322
19,717
14,944
248,240

2056.00
17,809
19,717
14,944
248,240

1,421
1,259
14,005
77,543
12,746

126,870 $
89,705,971
ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE
CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
117 de 131

395,569 $

1,582,275

1,935,401 $

9,677,005

1,239,401 $

3,718,203

$
$
$
$
$

$
$
$
$
$
$

156,554,122
1,707,658
1,059,085
10,098,137
5,591,145
7,790,110

107,117 $

128,725,712

395,569 $

1,582,275

$
$
$
$
$
$
$
$

288,559,419
69,254,261
8,656,783
14,427,971
380,898,434
26,662,890
8,317,578
415,878,902

1,421
1,259
14,005
77,543
12,746

24%
3%
5%
7%
2%

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
118 de 131

PRESUPUESTO ARANZAZU RECURSOS PLAN DEPARTAMENTAL DE AGUAS DE CALDA


MEJORAMIENTO LNEA DE ADUCCIN CHAMBERY DESDE LA ABSCISA
K4+429,48 HASTA LA ABSCISA K5+160,84)

ITEM

DESCRIPCION

3.2 Fase II Parte 2


1.2 Localizacin y replanteo de redes
1.3 Rocera y lipieza
4,1,1 Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.
5.2 Rellenos Compactados con material seleccionado
5.1 Rellenos Compactados con Material de Excavacin
Suministro, Transporte hasta el sitio de instalacin e Instalacin Tuberia
8.3 en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera
y accesorios
Suministro/Instalacin Vlvulas ventosas 3" incluye accesorios y caja en
9.1
concreto
Suministro/Instalacin Vlvulas de Purga 3" incluye accesorios y caja en
9.2
concreto
Empalme (incluye Suministro, Transporte e Instalacin Adaptador Brida
10.1 Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche
PE 200 mm)

UNIDAD

m
m2
m3
m3
m3

m
ud
ud

ud

3.3 Fase III Parte 1


1.2 Localizacin y replanteo de redes
m
1.3 Rocera y lipieza
m2
4,1,1 Excavacin en Zanja - Material Comn - 0.0 a 2.0 m.
m3
5.2 Rellenos Compactados con material seleccionado
m3
5.1 Rellenos Compactados con Material de Excavacin
m3
Suministro, Transporte hasta el sitio de instalacin e Instalacin Tuberia
8.3 en polietileno PE 100 PN 12.5 =200 mm incluye termofusin de tubera
y accesorios
m
Suministro, Transporte hasta el sitio de instalacin e Instalacin Tuberia
8.4 en polietileno PE 100 PN 16 =200 mm incluye termofusin de tubera y
accesorios
m
Empalme (incluye Suministro, Transporte e Instalacin Adaptador Brida
9.1 Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche
ESTUDIOS
Y DISEOS
ud DEPARTAMENTO DE
PE 200
mm) DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL
CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
119 de 131

SUBTOTAL COSTO DIRECTO


ADMINISTRACIN
UTILIDAD
IMPREVISTOS

TOTAL
INTERVENTORIA

TOTAL PROYECTO

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
120 de 131

N DEPARTAMENTAL DE AGUAS DE CALDAS

IN CHAMBERY DESDE LA ABSCISA


A ABSCISA K5+160,84)

COSTO
UNITARIO

CANTIDADES

$
$
$
$
$
$

56,825,788
517,443
320,917
3,059,868
1,694,190
2,360,506

364.14
254.90
218.48
21.85
185.20

$
$
$
$
$

364.14

107,117 $

39,005,584

1,935,401 $

5,806,203

1,239,401 $

2,478,802

395,569 $

1,582,275

$
$
$
$
$

$
1,421 $
1,259 $
14,005 $
77,543
12,746 $

48,368,411
521,820
323,631
3,085,750

107,117 $

33,159,139

126,870 $

7,315,324

3.00
2.00

1,421
1,259
14,005
77,543
12,746

COSTO DIRECTO
TOTAL

4.00

367.22
257.05
220.33
22.03
186.76

2,380,472

309.56

57.66

4.00
ESTUDIOS Y DISEOS DE ACUEDUCTO
Y395,569
SANEAMIENTO
BASICO
EN LOS MUNICIPIOS DEL DEPARTAMENTO DE
$
$
1,582,275
CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
121 de 131

SUBTOTAL COSTO DIRECTO


ADMINISTRACIN
IMPREVISTOS
INTERVENTORIA

TOTAL PROYECTO

$
25% $
3% $
5% $
8%

105,194,199
26,298,550
3,155,826
5,259,710
$ 139,908,284
$ 11,192,663
$ 151,100,947

ESTUDIOS Y DISEOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE


CALDAS ZONA 2
CABECERA MUNICIPAL DE ARANZAZU
122 de 131

CLCULO DEL A.I.U.


0

EMPOCALDAS S.A. E.S.P.

CALCULO DETALLADO DEL VALOR PORCENTUAL DE


Duracin estimada del Proyecto en meses
Costo directo total del Proyecto
A.I.U. Asumido para el clculo
Valor total estimado del Proyecto

DESCRIPCION

GASTOS ARRENDAMIENTO Y OFICINA


Valla Informativa General del Proyecto
Arrendamiento de la Oficina Ppal
Servicios pblicos de la Obra
Gastos Oficina Ppal
Transportes en Obra
Arrendamiento Almacn
Gastos oficina principal
Costo de Comunicaciones
Ensayos de Laboratorio
Dotacin Almacen
GASTOS DE LEGALIZACIN E IMPUESTOS
Pliza de Anticipo
Pliza de Cumplimiento
Pliza de Salarios y Prestaciones Sociales
Pliza de Estabilidad
Pliza de Responsabilidad Civil
Impuesto de Seguridad
Estampillas Prouniversidad de Caldas y Universidad Nacional Sede
Manizales
Estampillas Prodesarrollo
Estampillas ProHospital de Caldas
Gastos de Publicacin
Ica y Reteica (Solo en los municipios que aplique)
Impuesto de Industria y Comercio
PERSONAL ADMINISTRATIVO
Secretaria de la Oficina Ppal
Mensajero de la Oficina Ppal
Elementos de Seguridad Personal en Obra

32.00%

UNIDAD

M2
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Gl
%
%
%
%
%
%
%
%
%
%
%
Mes
Mes
Frente

Almacenista de la Obra (Incluye Prestaciones)


Celador de la Obra (Incluye Prestaciones)
PERSONAL TCNICO
Ingeniero Director (Con Prestac. Sociales)
Ingeniero Residente (Con Prestac. Sociales)
Plan de Gestion Social (Con Prestac. Sociales)
Valor total de los Costos de Legalizacin y Administracin
Valor porcentual de la Legalizacin y Administracin
Valor porcentual de los Imprevistos
Valor porcentual de la Utilidad estimada

Valor Total porcentual del A.I.U.

Mes
Mes
Mes
Mes
Mes

LCULO DEL A.I.U.


0

EMPOCALDAS S.A. E.S.P.

TALLADO DEL VALOR PORCENTUAL DEL A.I.U.


3

CANTIDAD

VR UNITARIO

288,559,419

$
$

92,339,014
380,898,433

DEDICACIN Y/O
PORCENTAJE DE
UTILIZACIN

VR. TOTAL

18.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
1.00

$
$
$
$
$
$
$
$
$
$

81,000
200,000
100,000
200,000
400,000
150,000
100,000
100,000
280,000
500,000

100%
25%
100%
25%
100%
100%
25%
100%
100%
100%

$
$
$
$
$
$
$
$
$
$

1,458,000
150,000
300,000
150,000
1,200,000
450,000
75,000
300,000
840,000
500,000

0.12%
0.02%
0.03%
0.24%
0.12%
5.00%

$
$
$
$
$
$

380,898,433
380,898,433
380,898,433
380,898,433
380,898,433
380,898,433

100%
100%
100%
100%
100%
100%

$
$
$
$
$
$

457,078
76,180
114,270
914,156
457,078
19,044,922

1.50%
2.00%
0.10%
0.10%

$
$
$
$

380,898,433
380,898,433
380,898,433
380,898,433

100%
100%
100%
100%

$
$
$
$

5,713,477
7,617,969
380,898
380,898

1.00%

380,898,433

100% $

3,808,984

3.00
3.00
3.00

$
$
$

991,725
991,725
500,000

25% $
25% $
100% $

743,794
743,794
1,500,000

3.00
3.00

$
$

1,347,500
1,239,656

100% $
100% $

4,042,500
3,718,968

3.00
3.00
3.00

$
$
$

6,080,000
2,880,000
2,400,000

20% $
100% $
20% $

3,648,000
8,640,000
1,440,000

68,865,966
24.00%
3.00%
5.00%

32.00%

CLCULO DEL A.I.U.


0

EMPOCALDAS S.A. E.S.P.

CALCULO DETALLADO DEL VALOR PORCENTUAL DE


Duracin estimada del Proyecto en meses
Costo directo total del Proyecto
A.I.U. Asumido para el clculo
Valor total estimado del Proyecto

DESCRIPCION

GASTOS ARRENDAMIENTO Y OFICINA


Valla Informativa General del Proyecto
Arrendamiento de la Oficina Ppal
Servicios pblicos de la Obra
Gastos Oficina Ppal
Transportes en Obra
Arrendamiento Almacn
Gastos oficina principal
Costo de Comunicaciones
Ensayos de Laboratorio
Dotacin Almacen
GASTOS DE LEGALIZACIN E IMPUESTOS
Pliza de Anticipo
Pliza de Cumplimiento
Pliza de Salarios y Prestaciones Sociales
Pliza de Estabilidad
Pliza de Responsabilidad Civil
Impuesto de Seguridad
Estampillas Prouniversidad de Caldas y Universidad Nacional Sede
Manizales
Estampillas Prodesarrollo
Estampillas ProHospital de Caldas
Gastos de Publicacin
Impuesto de Industria y Comercio
PERSONAL ADMINISTRATIVO
Secretaria de la Oficina Ppal
Mensajero de la Oficina Ppal
Elementos de Seguridad Personal en Obra
Almacenista de la Obra (Incluye Prestaciones)

32.00%

UNIDAD

M2
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Gl
%
%
%
%
%
%
%
%
%
%
%
Mes
Mes
Frente
Mes

Celador de la Obra (Incluye Prestaciones)


PERSONAL TCNICO
Ingeniero Director (Con Prestac. Sociales)
Ingeniero Residente (Con Prestac. Sociales)
Plan de Gestion Social (Con Prestac. Sociales)
Valor total de los Costos de Legalizacin y Administracin
Valor porcentual de la Legalizacin y Administracin
Valor porcentual de los Imprevistos
Valor porcentual de la Utilidad estimada

Valor Total porcentual del A.I.U.

Mes
Mes
Mes
Mes

LCULO DEL A.I.U.


0

EMPOCALDAS S.A. E.S.P.

TALLADO DEL VALOR PORCENTUAL DEL A.I.U.


1

CANTIDAD

VR UNITARIO

105,194,199

$
$

33,662,144
138,856,343

DEDICACIN Y/O
PORCENTAJE DE
UTILIZACIN

VR. TOTAL

12.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

$
$
$
$
$
$
$
$
$
$

81,000
200,000
100,000
200,000
400,000
150,000
100,000
100,000
280,000
500,000

100%
25%
100%
25%
100%
100%
25%
100%
100%
100%

$
$
$
$
$
$
$
$
$
$

972,000
50,000
100,000
50,000
400,000
150,000
25,000
100,000
280,000
500,000

0.12%
0.02%
0.03%
0.24%
0.12%
5.00%

$
$
$
$
$
$

138,856,343
138,856,343
138,856,343
138,856,343
138,856,343
138,856,343

100%
100%
100%
100%
100%
100%

$
$
$
$
$
$

166,628
27,771
41,657
333,255
166,628
6,942,817

1.50%
2.00%
0.10%
0.10%
1.00%

$
$
$
$
$

138,856,343
138,856,343
138,856,343
138,856,343
138,856,343

100%
100%
100%
100%
100%

$
$
$
$
$

2,082,845
2,777,127
138,856
138,856
1,388,563

1.00
1.00
1.00
1.00

$
$
$
$

991,725
991,725
500,000
1,347,500

25%
25%
100%
100%

$
$
$
$

247,931
247,931
500,000
1,347,500

1.00

1,239,656

100% $

1,239,656

1.00
1.00
1.00

$
$
$

6,080,000
2,560,000
2,400,000

20% $
100% $
20% $

1,216,000
2,560,000
480,000

24,671,021
24.00%
3.00%
5.00%

32.00%

FNC
PDA

PN 16
PN 12,5
PN 16
PN 12,5

FASE I
707.07
-

FASE II
1201.73
364.14

FASE III
57.66
309.56