STRUCTURE Fire and Raw Water Pump House

PENDING WORK

COMPLETION DATE actual end

Remarks

Valve pit Doors,windows,rolling shutter Parapet plastering inner and outer side External Plastering Flooring - IPS Rain water pipe Terrace screed concrete,water proofing 3 coats of bitumen on outer RCC wall Painting Plinth protection and drains 2 Clarifeid Water pump house Valve pit IPS Flooring Terrace screed concrete 3 coats of bitumin for RCC wall Back filling alround Doors , windows & Rooling shutter,Louvers Painting Plinth protection and drains Rain water pipe 3 clarified water storage tank Hydro test Base slab flooring cover slab screed concrete water proofing cementious coat Man hole contreting 3 coats of bitumin for RCC wall Back filling 4 Clarriflaculator 50 mm screed concrete Stair case Sludge sump Chamber Above sludge sump Flash mixer chamber outlet channel to CWST Rc walk way(balance slab) water proofing coat 3 coats of bitumin for RCC wall screed concrete at EL 2.11 m slab back filling

30.12.13 10.01.14 25.12.13 25.12.13 30.12.13 15.01.14 28.12.13 30.01.14

05.01.14 05.01.14 30.01.14 20.01.14 25.01.14 30.01.14 30.01.14

30.12.13 05.01.14 10.01.14 13.01.14 05.01.14 10.01.14

30.12.13 25.12.13 27.12.13 29.12.13 30.12.13 31.12.13 25.01.14 30.1.14 22.01.14

5 Centrifuge building 6 chemical house roof slab staircase pedestals at +3.95 m walk way columns and salb Drains(+3.95) IPS flooring Brick work & intels plastering inner and outer painting doors and windows rain water down take pipe terrace water proofing plinth protection and drains 8 Thickner 9 common sludge compartment and sludge pit 10 Dm building panel room Cable trench and Grade slab cable trench screed concrete plastering at bottom of the wall IPS flooring control room brick work and plastering & lintels drain cable trench and pull pit for vessel foundation Grade slab at vessel foundation Brick work and plastering RR masonry at drain and cable trench outlet doors,windows,ventilators,rolling shutter,louvers painting flooring (ips) terrace screed concrete staircase(02nos) Inner and outside plastering rain water downtake pipe cable trench and drain cover slab ppg lining for drain cable trench sreed concrete mono rail panel room false ceiling and false floor 11 WSST near dm plant building burn oil pit(02 nos) plinth beam 12 Dm water storage tank pump foundations 13 Degasser pedestals on +5.2 m slab grade slab & pump foundations plinth beam plastering 14 Filter water storage tank Rcc wall cover slab hydro test and waterproofing screed concrete and flooring man hole cover slab 15 BULK acid and coustic foundation dike wall brick work and steps dike wall plastering plastering Acid/alkali lining 16 Neutralization pit water prooofing/acid/alkali lining Pump pedestals 20.01.14 23.12.13 05.01.14 12.01.14 12.01.14 30.01.14 activity stopped due to shortage of masons 30.12.14 08.01.14 30.1.14 05.02.14 Delayed due to shortage of manpower 22.01.14 03.01.14 07.01.14 20.01.14 30.12.13 30.12.13 15.01.14 22.01.14 20.01.14 15.01.14 30.01.14 25.01.14 30.01.14 07.01.14 27.12.13 25.01.14 30.01.14 15.02.14 30.01.14 15.02.14 30.01.14 30.01.14 10.01.14 05.01.14 10.02.14 30.12.13 21.12.13 structure Yet to start structure Yet to start structure Yet to start 31.12.14 10.01.14 20.01.14 20.01.14 25.01.14 10.03.14 20.02.14 02.03.14 10.03.14 10.03.14 30.01.14 plinth only completed

Due to shortage of manpower actitivty was stopped

17 Filter water pump house 18 UF product water storage tank 19 RO water storage tank 20 RO Reject water tank 21 Sludge holding tank 22 lamella clarifier 23 ETP Clarified water storage tank 24 RO building 25 Guard pond 26 27 28 cable trench grade slab wtp pipe sleepers 30.12.13 60 rmt completed/187rmt 05.01.14 Yet to start Yet to start structure Yet to start structure Yet to start structure Yet to start structure Yet to start structure Yet to start structure Yet to start structure Yet to start structure Yet to start only 02 /06rafts completed