Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.

Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Sl No Name & Location of the work 1 1 2 Providing cement concerte pavement from Bandappa's house to Somashettihalli halli Road at Kereguddahalli village, Bangalore North Taluk, Bangalore Dist. Construction of RCC Drain from Kereguddahalli Village, to Bandappa's Garden at Bangalore North Taluk, Bangalore District. Providing concerte Road at Ganigarahalli Village, Somashetty halli Grama Panchayath, Bangalore North Taluk, Bangalore District. Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist. Providing concrete road at chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmipuram, Bangalore North, Bangalore Dist Providing concrete road - stage 1, at Hosahalli village, Jala hobli, Bangalore North, Bangalore Dist Providing concrete road at Kodagalahatti village, Jala hobli, Bangalore North, Bangalore Dist Improvement to the road that joins Tharahunase to Bettenahalli in Jala hobli, Bangalore urban district Improving the road that joins Marenahalli, Jala hobli Providing cement concrete road at 17th ward, 4th Cross, Vrushabhavti Nagar,N.G.O colony, Bangalore. ( Stage 1) Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2) Providing cement concrete road and drainage from Narayanappa's house to Munimuttappa's house and Chikka Kempanna's house to Doddayya's house in Chagalatti, Jala hobli, Bangalore district. Estimated Cost (in lakhs) 3 4.50 Stage of the Work 4 work completed

Year 2009-10 Amount IMPLEMENTING Released AGENCY to IA 5 6 EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore 4.50 Balance If Any 7 0.00 Type of works 8 Road

7.99

work completed

7.99

0.00

Road

3 4 5

8.00 8.00 8.00

work completed work completed work completed

8.00 8.00 8.00

0.00 0.00 0.00

Road Road Road

8.00

work completed

8.00

0.00

Road

7 8 9 10 11

8.00 10.00 4.00 3.49 7.10

work completed work completed work completed work completed work completed

8.00 10.00 4.00 3.49 7.10

0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road

12

8.00

work completed

8.00

0.00

Road

13

14 15

Building of community hall for Margadarshi Mahila Samaaja (R) at No.114, 6th cross, Narasipura layout, Vidyaranyapura, Bangalore Construction of Size Stone masonery Drain at first main road near School in kamala nagar, Bangalore urban District. Stage-1 Construction of Size Stone masonery Drain first main road near Deenaseva School in kamala nagar, Bangalore urban District. Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1 Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd

1.00

work completed

5.00 5.00

work completed work completed

Project Manager, 1.00 Nirmithi Kendra Urban EE, PRED, 5.00 Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore 5.00

0.00

Civic Amenities Road Road

0.00 0.00

16

8.00

work completed

8.00

0.00

Road

17

8.00

work completed

8.00

0.00

Road

18

Building concrete road from Narasimha Murthy's house to Philomina 8.00 school in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North Building concrete road from Rangaswamy's house to Muneshwara temple in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North Building concrete road from Shivalingayya's house to Krishnappa's house in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North Building concrete road from Shankara's house to Muneshwar temple in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North Building cement concrete road from Palakamma Nagara main road to Nagaraju's house in Chikkajaga village, Bangalore North Road development work from Bagalur main road to towards hosahalli (500 meters) Bangalore north talluk, vidya nagara Cement concrete road from Chikkabasavaraju home to Bhimarao home, Bangalore north talluk, uttanahalli vilage Cement concrete road from Venkoba rao home to Aanjanappa home, Bangalore North Talluk Sonnappanahalli grama panchayath, Kaadigaanahalli village Cement concrete road from Rajanna home to Sampangappa home, Kaadigaanahalli village Cement concrete road from Main road to Minchappa home, Bangalore North talluk, Uttanahalli Village Cement concrete road from Muniraju home to Krishnappa home, Bangalore North Talluk, Uttanahalli Village Cement concrete road from Palakammanagara Patil home to Krishnappa home, Bangalore North Talluk, Chikkajala Talluk 8.00

work completed

EE, PRED, Bangalore

8.00

0.00

Road

19

work completed

EE, PRED, Bangalore

8.00

0.00

Road

20

8.00

work completed

EE, PRED, Bangalore

8.00

0.00

Road

21

8.00

work completed

EE, PRED, Bangalore

8.00

0.00

Road

22 23 24 25 26 27 28 29 30 31

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 194.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road Road Road

5.00 Road Development work from Bagaluru Main road to Hosahalli side (500-1000 meters), Vidya Nagar, Bangalore North Talluk Cement concrete road, Behind Mutyalamma Temple, Doddajala village, 5.00 Bangalore north Talluk 194.08

Released from Govt. of India

Administrative sanction EE PRED

Amount Released Balance to IA 193.08 193.08 0.00 1.00 1.00 0.00 194.08 0.00 0.00 0.00

200.00

Nirmithi Kendra Other DC's

0.00 194.08

Sl No
Year

Name & Location of the work 2 Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk, Bangalore Dist. Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa's Garden at Bangalore North Taluk, Bangalore District. Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District. Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist. Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli Road Development work, Marenahalli Joining road, Jaalahalli Hobli Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony, Bangalore. ( Stage 1) Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2) Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli

1 1
2009-2010 2009-2010 2009-2010 2009-2010

Estimated Amount IMPLIMENTING Cost (in Stage of the Work Released AGENCY lakhs) to IA 3 4 5 6 4.50 7.99 8.00 8.00 8.00 8.00 8.00 10.00 4.00 3.49 7.10 8.00 work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore Project Manager, Nirmithi Kendra Urban EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore 4.50 7.99 8.00 8.00 8.00 8.00 8.00 10.00 4.00 3.49 7.10 8.00

Balance If Any 7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Type of works 8 Road Road Road Road Road Road Road Road Road Road Road Road

2 3 4 5

2009-2010 2009-2010 2009-2010 2009-2010 2009-2010

6 7 8 9 10

2009-2010 2009-2010

11 12

2009-2010

13
2009-2010 2009-2010 2009-2010 2009-2010 2009-2010

14 15 16 17 18

2009-2010

19
2009-2010 2009-2010

20

Community hall construction for Margadarshi Mahila Samaja , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District. Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District. Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72

1.00

work completed

1.00

0.00

Civic Amenities Road Road Road Road Road

5.00 5.00 8.00 8.00 8.00

work completed work completed work completed work completed work completed

5.00 5.00 8.00 8.00 8.00

0.00 0.00 0.00 0.00 0.00

8.00 8.00

work completed work completed

8.00 8.00

0.00 0.00

Road Road

2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010

21 22 23 24 25 26 27 28 29 30

Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72 Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North Talluk Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore North Talluk Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn road to Hosahali village Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk

8.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 189.08

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore

8.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 189.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road Road Road

Released from Govt. of India

Administrative sanction EE PRED

Amount Released Balance to IA 188.08 188.08 0.00 1.00 1.00 0.00 189.08 0.00 0.00 0.00 188.08

200.00

Nirmithi Kendra Other DC's

0.00 189.08

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.

Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Sl No


Year

Year 2010-11 Estimated Amount IMPLIMENTING Cost (in Status of the Work Released to Balance If Any Remarks AGENCY lakhs) IA 3 4 5 6 7 8 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 work completed work completed work completed work completed work completed work completed work completed work completed work completed EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Road Road Road Road Road Road Road Road Road

Name & Location of the work 2


Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli

1
2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

1 2 3 4 5 6 7 8 9

2010-2011

10
2010-2011

11
2010-2011

12
2010-2011

13
2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt) Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt) Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt) Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt) Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt)
Road development work Stage - 1 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli Road development work Stage - 2 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli Road development work Stage - 3 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli Road development work Stage - 4 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli Road Construction work Stage - 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli

5.00

work completed

EE PRED

5.00

0.00

Road

5.00

work completed

EE PRED

5.00

0.00

Road

5.00

work completed

EE PRED

5.00

0.00

Road

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 8.00 1.50

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 8.00 1.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road Road Road Road Civic Amenities Water

14 15 16 17 18 19 20 21 22 23 24

2010-2011 2010-2011

Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.
One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk

25

26
2010-2011

Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side) Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)
Borewell digging work, Bagalahalli village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore North Talluk

5.00

work completed

EE PRED

5.00

0.00

Civic Amenities Civic Amenities Water Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Water Civic Amenities Road Road Road Road

27
2010-2011 2010-2011

5.00 1.50 4.41 4.41 4.41 4.41

work completed work completed work completed work completed work completed work completed

EE PRED EE PRED Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra

5.00 1.50 4.41 4.41 4.41 4.41

0.00 0.00 0.00 0.00 0.00 0.00

28 #REF!

2010-2011 2010-2011 2010-2011 2010-2011

#REF! #REF! #REF!

Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights) Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights) K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights) K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights) Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights) Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights) Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights) Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights) Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights) Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights) Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights) R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights)
Borewell work, for Drinking water to Parimala Nagara, Nandini Layout, Mahalakshipuram ward no. 43 Oldage Home building construction work, Sy no.113, Shree Shankara Balaga, New Park road, Malleshwaram, Bangalore Road Development work Stage - 1, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work Stage - 2, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work Stage - 3, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, from Kempapura Maruthi Nagara Mainroad, Bangalore North Talluk

#REF!
2010-2011 2010-2011 2010-2011

4.41

work completed

Nirmithi Kendra

4.41

0.00

#REF! #REF! #REF!

4.41 4.41 4.41 4.41 4.41 4.41 1.47 1.50 1.00 5.00 5.00 5.00 5.00 208.48

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed Released from Govt. of India

Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

4.41 4.41 4.41 4.41 4.41 4.41 1.47 1.50 1.00 5.00 5.00 5.00 5.00 208.48

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Amount Released to IA 158.5 49.98 0.00

2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

#REF! #REF! #REF! #REF! #REF! #REF!

2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

#REF! #REF! #REF! #REF!

Administrative sanction EE PRED 158.50 49.98 0.00

Balance 0.00 0.00 0.00

200.00

Nirmithi Kendra Other DC's

208.48

208.48

0.00

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.

Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Sl No


Year

Year 2011-12 Estimated Cost (in lakhs) 3 2.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 Stage of the Work 4 work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed under progress under progress under progress IMPLIMENTING AGENCY 5 EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED Amount Released to IA 6 2.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 Balance If Any 7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.50 2.50 2.50 Type of Works 8 Water Others Others Others Others Others Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Water Water Water

Name & Location of the work 2


Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore

1
2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

1 2 3 4 5 6 7 8 9 10 11

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd Cross Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 3rd Cross Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th Cross Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th Cross Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, Dwaraka Nagara Road development work Maruthi Nagara subroad (cross) road Development work Maruthi Nagara New Layout Road development work Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village, Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

12 13 14 15 16 17 18 19 20 21 22 23 24

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

2011-2012

50
2011-2012

Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00 5.00

under progress work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

2.50 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00 5.00

2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Water Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Water Water Water Water Civic Amenities

5.00

work completed

EE PRED

5.00

0.00

51
2011-2012

Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli Village, Kengeri Hobli Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk Pipeline implementation and Getting power supply from KEB, Maralukunte village, Marenahalli Gramapanchayath, Jala Hobli Road Development work from H.Gollahalli main road to Kabbalamma Temple, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00

work completed

EE PRED

5.00

0.00

Civic Amenities Civic Amenities Road Road Civic Amenities Road Civic Amenities Civic Amenities Civic Amenities Road Road Road Road Road Road Road Road Education Road Education Civic Amenities Civic Amenities

52
2011-2012 2011-2012 2011-2012

3.00 4.25 1.50 5.00

work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED

3.00 4.25 1.50 5.00

0.00 0.00 0.00 0.00

53 54 55

2011-2012

56
2011-2012

5.00

work completed

EE PRED

5.00

0.00

57
2011-2012

5.00 Library construction, Gonipura vilage, Yashawanthapura limits

work completed

EE PRED

5.00

0.00

58
2011-2012

Women empowerment Building work (streeshakti bhavana) Gonipura village, Yashawanthapura limits Gutter construction work from Mallappa home to Narayanaswamy home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2. Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2. Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency. Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency. Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency. Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency. Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22 Ganganagar, Bangalore North Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.

5.00

work completed

EE PRED

5.00

0.00

59
2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

4.00 4.00 4.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 4.00 18.62

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

4.00 4.00 4.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 4.00 18.62

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

60 61 62 63 64 65 66 67 68 69 70 71

work completed Nirmithi Kendra

2011-2012

72
2011-2012

5.00

work completed

EE PRED

5.00

0.00

73
2011-2012

Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, Bangalore North talluk Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, Bangalore North Talluk Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north Talluk Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk Road development work and jalli work Stage - 1, Siddappa layout, Kalkere village, Bangalore north Talluk Road development work and jalli work Stage - 2, Siddappa layout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 1, Motappa ayout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 2, Motappa ayout, Kalkere village, Bangalore north Talluk Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage1 Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2 Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3 Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk

5.00

work completed

EE PRED

5.00

0.00

Civic Amenities Civic Amenities Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road

74
2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91

2011-2012

92
2011-2012

5.00

work completed

EE PRED

5.00

0.00

Road

93
2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

5.00 2.50 2.50 2.50 2.50

work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 2.50 2.50 2.50 2.50

0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road

94 95 96 97

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

Road development work 0 - 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk Road development work 250-500, from Vanirashi channasandra Mainroad to NRI 99 Layout, Bangalore north Talluk Road development work 500 - 750, from Vanirashi channasandra Mainroad to NRI 100 Layout, Bangalore north Talluk Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI 101 Layout, Bangalore north Talluk 98 102 Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, 103 Bangalore North Talluk 104 Concrete road development work, Tirumalapura Village, Bangalore north Talluk Development work in New Layout, Banapathi nagara, GanigaraHalli village, 105 Bangalore north Talluk 106 107 109 5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore north Talluk Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts) Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts) Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts) Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts) Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North. Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North. Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North. Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North.

2.50 2.50 2.50 2.50 5.00 5.00 5.00 5.00 5.00 5.00 2.50

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

2.50 2.50 2.50 2.50 5.00 5.00 5.00 5.00 5.00 5.00 2.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road Road Road Road

2011-2012

110
2011-2012

2.50

work completed

EE PRED

2.50

0.00

Road

111
2011-2012

2.50

work completed

EE PRED

2.50

0.00

Road

112
2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

2.50 2.50 2.50 2.50 2.50 2.50

work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

2.50 2.50 2.50 2.50 2.50 2.50

0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road

113 114 115 116

2011-2012

117 Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) 118 Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) 119 Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district. 120 Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district. 121 Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.

2.50

work completed

EE PRED

2.50

0.00

Road

2011-2012

5.00

work completed

EE PRED

5.00

0.00

Road

2011-2012

5.00

work completed

EE PRED

5.00

0.00

Road

2011-2012

5.00

work completed

EE PRED

5.00

0.00

Road

2011-2012

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

122 123 124

Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk Road development work, 1st cross, Ganesha Layout, Bangalore Talluk

13.00 5.00 5.00 5.00 5.00 5.00

work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

13.00 5.00 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road

Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura 125 Village, Yashwanthpura hobli, Bangalore north Talluk Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, 126 Bangalore North Talluk 127 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk 128 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk 4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara 129 village 130 131
132 133 134 135

2011-2012

5.00 22.50 2.00 2.00


10.00

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED KRIDL EE PRED EE PRED EE PRED EE PRED EE PRED DC

5.00 22.50 2.00 2.00 10.00 10.00 5.00 5.00 5.00 10.00 10.00 614.87

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00
Amount Released to IA 586.25 18.62 10.00 614.87

Road Education Water Water


Civic Amenities Civic Amenities

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout To dig Borewel in Amrutha Nagar
Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore

Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk Road development work from Basavaraju home to Nagaraju home, Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk Gutter work Stage - 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara 2 % Administration expinditure

10.00 5.00 5.00 5.00 10.00 10.00 624.87

Road Road Road Road Others

2011-2012 2011-2012 2011-2012 2011-2012 136 137 138

Released from Govt. of India

Administrative sanctioned Accurded EE PRED Nirmithi Kendra DC TOTAL 596.25 18.62 10.00 624.87

Balance 10.00 0.00 10.00

580.30

Year

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District. Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2012-13 Estimated Stage of the IMPLIMENTING Expenditure Sl No Name & Location of the work Cost (in Work AGENCY incurred lakhs) 1 2 3 4 5 6

Balance If Any 7 2.00 0.00 0.00 0.00 0.00 0.00 0.00

Type of works 8 Water Road Road Road Road Road Road

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

1 2 3 4 5 6 7

Borewell digging work, Coffee Board Layout welfare association , Hebbala Kempapura Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka 1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka 3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka Road development work Stage - 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk

2.00 5.00 5.00 5.00 5.00 5.00 5.00

Under Progress EE PRED, Bangalore Completed Completed Completed Completed Completed Completed EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

0.00 5.00 5.00 5.00 5.00 5.00 5.00

2012-2013

8
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

9
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

10
2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

5.00 5.00 6.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 6.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road Road Road Road Road Road

11 12 13 14 15 16 17 18 19 20 21 22

23
2012-2013 2012-2013

24 25

3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout, Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk CC road construction work, from Main road to till Amir saab home, Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk Concrete road work stage - 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk Concrete road work stage - 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana , Ullala, Yashwanthpura hobli, Bangalore north talluk, Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,

12.00 5.00 5.00 5.00 10.00 4.90

Completed

EE PRED, Bangalore

12.00 0.00 5.00 5.00 10.00 4.90

0.00 5.00 0.00 0.00 0.00 0.00

Water Civic Amenities Road Road Water Road

Under Progress EE PRED, Bangalore Completed Completed Completed Completed EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

2012-2013 2012-2013 2012-2013

26 27 28

2012-2013

29
2012-2013

4.90

Completed

EE PRED, Bangalore

4.90

0.00

Road

30
2012-2013 2012-2013 2012-2013

4.90 2.00 2.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

4.90 2.00 2.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Water Water Water Road Road Civic Amenities Road Road Road Road Road Road Road Road Road Road

31 32 33

2012-2013 2012-2013 2012-2013

34 35 36

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

37 38 39 40 41 42 43 44 45 46

2012-2013

47

Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency, Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk Road development work, from Maragondanahalli mainroad lake main road to Kachaaramma temple road, Bangalore north MP constituency Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

48
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

49
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

50
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

51
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

52
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

53
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

54
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

55
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

56
2012-2013

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

57
2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road Road Road

58 59 60 61 62

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

63 64 65 66

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85

Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk
Parkinsons Agencing research foundation Indira nagar Bangalore

5.00 2.84 4.00 5.00 5.00 5.00 5.00 4.00 4.00 5.00 5.00 5.00 5.00 5.00 2.00 2.00 13.00 2.00 5.00 3.00 1.00 5.00 5.00 4.00 10.00 5.00 5.00 10.00

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

EE PRED, Bangalore Nirmithi Kendra EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 2.84 4.00 5.00 5.00 5.00 5.00 4.00 4.00 5.00 5.00 5.00 5.00 5.00 2.00 2.00 0.00 2.00 5.00 3.00 0.00 5.00 5.00 4.00 10.00 5.00 5.00 10.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Health Water Road Road Road Road Water Water Road Road Road Road Road Water Water Civic Amenities Water Road Road Road Road Road Water Civic Amenities Civic Amenities Road Education

2 Borewell digging work in Bhuvaneshwari Nagara layout Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore Drinking water supply to Saptagiri layout, Doddabidarakallu village Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency
Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore

Under Progress EE PRED, Bangalore completed Completed Completed EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

2012-2013 2012-2013

Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku
Road development work from, AK colony to Devegere village, Devagere village, K.Gollahalli village, Kengeri Hobli, Bangalore South talluk Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk

86 87 88 89 90 91 92 93 94

Under Progress EE PRED, Bangalore Completed Completed Completed Completed Completed Completed Completed EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore Nirmithi Kendra EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk
Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli Gramapanchayath, Bangalore north Talluk

2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli
Building construction for councelling center and other activities, Mahila Dakshata samiti Bengaluru,

Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli hobli, Bangalore south talluk PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

95 96 97 98 99 100

1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village

2.00 2.00 2.50 2.50 2.00 5.00 5.00 5.00

Completed Completed Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

2.00 2.00 2.50 0.00 2.00 5.00 5.00 5.00

0.00 0.00 0.00 2.50 0.00 0.00 0.00 0.00

Water Water Road Road Water Road Road Road

Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk


Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk 1 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency, Bangalore

Under Progress EE PRED, Bangalore Completed Completed Completed Completed EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk Road development, Masjid road, Brother colony, Chikkabanavara, 101 Yashwanthpura hobli, Bangalore north talluk 102 Road developmentwork, from Mahalingam home to Ganganna home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk 103 Road developmentwork, from Harish Home to Manohar home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk Road developmentwork,1st cross, Brother colony, Chikkabanavara, 104 Yashwanthpura hobli, Bangalore north talluk
Total

2012-2013

5.00 5.00 505.54

Completed Completed

EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 482.04

0.00 0.00 23.50 Expenditu re incurred 469.20 12.84 0.00 482.04

Road Road

2012-2013 2012-2013

Released from Govt. of India

Administrative sanctioned Accurded EE PRED Nirmithi Kendra Other DC's TOTAL 492.70 12.84 0.00 505.54

Balance 23.50 0.00 0.00 23.50

500.00

Year

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District. Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2013-14 Estimated Stage of the IMPLIMENTING Expenditure Sl No Name & Location of the work Cost (in Work AGENCY incurred lakhs) 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Balance If Any 7 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 5.00 5.00 5.00 5.00 5.00

Type of works 8 Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Water Road Road Road Road Road

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

Road development work, Maruthi Nagara, Bangalore north Talluk Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk Concrete Road work, Chikkabanavara village, Bangalore north Talluk, Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk Road development road, Sadguru Layout, Bangalore North Layout Road development work, Main road, Shiradi Layout, Bangalore north Talluk Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk Road development work, Netravathi Layout, Bangalore north talluk RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk 1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.00 5.00 5.00 5.00 5.00 5.00

Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00

Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore

2013-2014

27 28

Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Kodigehalli main road to Kodigehalli lake road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work stage - 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency Road development work stage - 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency Road development work Stage - 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency Road development work Stage - 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk, Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk Road development work stage - 1, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency Road development work stage - 2, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Student hostel constructio work, KR Puram vidhanasabha constituency, Shri ramakrishna vivekananda sadhana kshrethra Bangalore north MP constituency Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from dalappa home to gramapanchayath new building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Cement concrete road construction work for rest of the village roads, chagalahatti village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 29 30 31 32 33 34 35 36 37 38 39 40 41 2013-2014 42 2013-2014 43 2013-2014 2013-2014 44 45 2013-2014 2013-2014 46 47 2013-2014 48 2013-2014 2013-2014 2013-2014 49 50

5.00

Completed

EE PRED, Bangalore

5.00

0.00

Road

5.00 5.00 5.00 5.00 5.00

Under Progress

Nirmithi Kendra

2.50 0.00 0.00 0.00 0.00

2.50 5.00 5.00 5.00 5.00

Civic Amenities Road Road Road Road

Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore

5.00 15.00 5.00

Completed Under Progress Completed

EE PRED, Bangalore Nirmiti Kendra EE PRED, Bangalore

0.00 7.50 5.00

5.00 7.50 0.00

Road Road Others

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

51 52 53 54 55 56 57 58

Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk concrete road work, from Kempapur main road to Palani home, Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli
Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore

5.00 5.00 5.00 5.00 5.00 4.00 4.00 5.00

Completed Completed Completed Completed Completed Completed Completed Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 4.00 4.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Road Road Road Road Road Road Road Road

2013-2014 59 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.00

Completed Completed Completed Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 5.00 5.00 0.00

0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 0.00 0.00 2.00

Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Road Others Others Water

Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Completed Completed Completed Completed Completed Completed EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency Jalli work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency Jalli work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk

Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Completed Completed EE PRED, Bangalore EE PRED, Bangalore

Under Progress EE PRED, Bangalore

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

79 80 81 82 83 84 85

pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist
formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore

5.00 5.00 5.00 5.00 5.00 5.00 5.00

Under Progress EE PRED, Bangalore Completed Completed DC Chikkamagalur DC Chikkamagalur

0.00 5.00 5.00 0.00 0.00 0.00 0.00

5.00 0.00 0.00 5.00 5.00 5.00 5.00

Water Civic Amenities Civic Amenities Roads Roads Roads Roads

Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore

2013-2014 86 2013-2014 2013-2014 2013-2014 87 88

Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward UttaraKhand Floods rehabilatiton fund
Total

5.00 4.00 10.00 446.00

Under Progress EE PRED, Bangalore Under Progress EE PRED, Bangalore -

0.00 0.00 0.00 253.00

5.00 4.00 10.00 193.00 Expenditure incurred 233.00 10.00 10.00 0.00 253.00

Roads Water Others

Released from Govt. of India

250.00

Administrative sanctioned Accurded EE PRED 406.00 Nirmithi Kendra 20.00 Other DC's 10.00 Uttar Khand 10.00 TOTAL 446.00

Balance 173.00 10.00 0.00 10.00 193.00

Abstract:

payment to be made towards works sanction during previous year since


For the year 2011-12
Sl No 1 2 Name & Location of the work Estimated Cost (in lakhs) Expenditure incurred Balance If Any

Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in M Hosahalli village, Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Chokkanahalli Village, Marenahalli Gramapanchayath, Jala hobli Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Marasandra village, Marenahalli Gramapanchayath, Jala hobli Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Marasandra village, Marenahalli Gramapanchayath, Jala hobli

5.00 5.00

2.50 2.50

2.50 2.50

Water

Water 5.00 2.50 2.50 Water 5.00 2.50 2.50 Water

Total

20.00

10.00

10.00

For the year 2012-13

Sl.No 1 2 3 4 5

Name & Location of the work

Estimated Cost (in lakhs)

Expenditure incurred

Balance If Any

Concrete road construciton work, TurahuNase village, Jala Hobli, Bangalore north Talluk

2.50 5.00

0.00 0.00 0.00 0.00 0.00

2.50 5.00 1.00 13.00 2.00

Road Civic Amenities Road Civic Amenities Water

Bus stop shelter in Tavarekere village, Tavarekere hobli, Bangalore South Talluk Concrete road construction work form Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengeri hobli Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency Borewell digging work, Coffee Board Layout welfare association , Hebbala Kempapura

1.00 13.00 2.00

Total 2011-12 2012-13 2013-14 Total 2% administrative charges for the year 2012-13 2% administrative charges for the year 2013-14 Toal Grand total

23.50 20.00 23.50 446.00 489.50 0.00 0.00 0.00 489.50

0.00 10.00 0.00 253.00 263.00 0.00 0.00 0.00 263.00

23.50 10.00 23.50 193.00 226.50 10.00 10.00 20.00 246.50

Name of The M.P : D.B.Chandre Gowda

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore North Final

Years 2009-2014

Sl No Name & Location of the work Year 1 2 Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North 1 Taluk, Bangalore Dist. 2 Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa's Garden at Bangalore North Taluk, Bangalore District. 3 Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District. 4 Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist. Providing concerete to roadrata chandranagar, Kuvempu Road, 5 Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist 6 Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk 7 Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli 8 Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli 9 2009-2010 Road Development work, Marenahalli Joining road, Jaalahalli Hobli Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti 10 Nagar,N.G.O colony, Bangalore. ( Stage 1) 11 Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2) 12 2009-2010 Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli 3

Estimate Stage of d Cost the Work (in lakhs) 4 4.50 5

IMPLIMENTING AGENCY 6

Amount Type of Released to Balance If Any works IA 7 4.50 8 0.00 Road 9

work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed Project Manager, work Nirmithi Kendra completed Urban work EE, PRED, Bangalore completed

2009-2010

7.99

7.99

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010

10.00

10.00

0.00 Road

2009-2010

4.00

4.00

0.00 Road

3.49

3.49

0.00 Road

2009-2010

7.10

7.10

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010

13 Community hall construction for Margadarshi Mahila Samaja , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore 14 Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.

1.00

1.00

0.00

Civic Amenities

5.00

5.00

0.00 Road

2009-2010

Page 24

2009-2010

Construction of Size Stone masonery Drerinat first main road near 15 School in kamala nagar, Bangalore urban District. 16 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1 17 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd 18 Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency

Final work EE, PRED, Bangalore 5.00 completed 8.00 work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed

5.00

0.00 Road

8.00

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010

8.00

8.00

0.00 Road

2009-2010 19

2009-2010

2009-2010

2009-2010

Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency Concrete Road Construction work from Shivalingayya home to 20 Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72 Concrete Road Construction work from Shankara Home to 21 Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72 22 Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk 23 Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk 24 Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk 25 Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village 26 Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North Talluk 27 Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore North Talluk 28 Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk 29 Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn road to Hosahali village 30 Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk

8.00

work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed work EE, PRED, Bangalore completed

8.00

0.00 Road

8.00

8.00

0.00 Road

8.00

8.00

0.00 Road

5.00

5.00

0.00 Road

2009-2010

5.00

5.00

0.00 Road

2009-2010

5.00

5.00

0.00 Road

2009-2010

5.00

5.00

0.00 Road

2009-2010

5.00

5.00

0.00 Road

2009-2010

5.00

5.00

0.00 Road

2009-2010

5.00

5.00

0.00 Road

2009-2010

5.00

5.00

0.00 Road

2009-2010

5.00 189.08

5.00 189.08

0.00 Road 0

2009-2010

Page 25

Final Concrete road construction work Stage -1, from Kalakele 1 Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, Concrete road construction work Stage -2, from Kalakele 2 Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, 3 2010-2011 4 2010-2011 Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli Road development work from Doddagollarahalli Banian tree road to 5 Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk 6 Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli 7 Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli 8 Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli Improvement and Metalling to the road from CTR Road, to Rakhum 9 school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt) Improvement and Metalling to the road from CTR Road, to Rakhum 10 school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt) Improvement and Metalling to the road from CTR Road, to Rakhum 11 school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt) Improvement and Metalling to the road from Tharahunase to 12 bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt) Improvement and Metalling to the road from Tharahunase to 13 bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt) 14 Road development work Stage - 1 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 15 Road development work Stage - 2 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli 5.00 5.00 work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed 5.00 0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

5.00

0.00 Road

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

work EE PRED completed

5.00

0.00 Road

2010-2011

5.00

work EE PRED completed

5.00

0.00 Road

2010-2011

5.00

work EE PRED completed

5.00

0.00 Road

2010-2011

5.00

work EE PRED completed work EE PRED completed work EE PRED completed

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

Page 26

2010-2011

16 Road development work Stage - 3 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 17 Road development work Stage - 4 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 18 Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli 19 Road Construction work Stage - 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 20 Road Construction work Stage - 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 21 Road Construction work Stage - 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 22 Road Construction work Stage - 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 23 Road Construction work Stage - 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Construction of sky light roofing for the park at Kethamaranahalli in 24 Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore. 25 One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk Construction of RCC deck slab & RCC drain at Maruthinagar, 26 Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side) Construction of RCC deck slab & RCC drain at Maruthinagar, 27 Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)

Final work 5.00 EE PRED completed 5.00 work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work Nirmithi Kendra completed work Nirmithi Kendra completed work Nirmithi Kendra completed

5.00

0.00 Road

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road

2010-2011

5.00

5.00

0.00 Road Civic Amenities

2010-2011

8.00

8.00

0.00

2010-2011

1.50

1.50

0.00 Water Civic Amenities Civic Amenities

2010-2011

5.00

5.00

0.00

2010-2011

5.00

5.00

0.00

2010-2011

28 Borewell digging work, Bagalahalli village, Marenahalli 2010-2011 Gramapanchayath, Jala Hobli, Bangalore North Talluk Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd #REF! main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights) 2010-2011 Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh #REF! Temple main circle, K.R.Puram assembly constituency (6 Nos solar 2010-2011 street Lights) #REF! 2010-2011 K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights)

1.50

1.50

0.00 Water

4.41

4.41

0.00

Street lighting Street lighting Street lighting

4.41

4.41

0.00

4.41

4.41

0.00

Page 27

2010-2011

K.R Puram Bus stand, K.R.puram railway station front gate K.R. #REF! puram assembly contituency ( 6 No's solar street lights)

Final work Nirmithi Kendra 4.41 completed work Nirmithi Kendra completed work Nirmithi Kendra completed work Nirmithi Kendra completed work Nirmithi Kendra completed work Nirmithi Kendra completed work Nirmithi Kendra completed work Nirmithi Kendra completed work Nirmithi Kendra completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

4.41

0.00

Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting Street lighting

Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. #REF! puram assembly contituency ( 6 No's solar street lights) 2010-2011 Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd #REF! cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street 2010-2011 lights) #REF! 2010-2011 Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights)

4.41

4.41

0.00

4.41

4.41

0.00

4.41

4.41

0.00

2010-2011

Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, #REF! Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights) #REF! Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights) Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights) Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights) R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights)

4.41

4.41

0.00

4.41

4.41

0.00

2010-2011 #REF! 2010-2011 #REF! 2010-2011 #REF! 2010-2011

4.41

4.41

0.00

4.41

4.41

0.00

1.47

1.47

0.00

#REF! Borewell work, for Drinking water to Parimala Nagara, Nandini 2010-2011 Layout, Mahalakshipuram ward no. 43 #REF! Oldage Home building construction work, Sy no.113, Shree Shankara 2010-2011 Balaga, New Park road, Malleshwaram, Bangalore #REF! Road Development work Stage - 1, Lake Behind Road, Ganigara 2010-2011 village, Yashawanthapura Hobli, Bangalore North Talluk #REF! Road Development work Stage - 2, Lake Behind Road, Ganigara 2010-2011 village, Yashawanthapura Hobli, Bangalore North Talluk #REF! Road Development work Stage - 3, Lake Behind Road, Ganigara 2010-2011 village, Yashawanthapura Hobli, Bangalore North Talluk #REF! Road Development work, from Kempapura Maruthi Nagara 2010-2011 Mainroad, Bangalore North Talluk

1.50

1.50

0.00 Water Civic Amenities

1.00

1.00

0.00

5.00

5.00

0.00 Road

5.00

5.00

0.00 Road

5.00

5.00

0.00 Road

5.00 208.48

5.00 208.48

0.00 Road 0

1 2011-2012

Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore

2.00

work EE PRED completed

2.00

0.00 Water

Page 28

2011-2012

2 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross 3 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd Cross 4 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 3rd Cross 5 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th Cross 6 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th Cross 7 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, Dwaraka Nagara Road development work 8

Final work 5.00 EE PRED completed 5.00 work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

5.00

0.00 Others

5.00

0.00 Others

2011-2012

5.00

5.00

0.00 Others

2011-2012

5.00

5.00

0.00 Others

2011-2012

5.00

5.00

0.00 Others

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00 Maruthi Nagara subroad (cross) road Development work

5.00

0.00 Road

2011-2012 9 2011-2012

5.00 Maruthi Nagara New Layout Road development work

5.00

0.00 Road

2011-2012

2011-2012

10 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development Road Development work 1 & 2nd road, from Hesaraghatta road to 11 Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk 12 Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk 13 Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk 14 Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk 15 Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli 16 Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli 17 Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk 18 Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk

5.00

5.00

0.00 Road

5.00

5.00

0.00 Road

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

Page 29

2011-2012

Cement concrete road work, from Rajanna home to till Sangappa 19 home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk 20 Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk 21 Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk Borewell digging, Motor implimentation & Getting power supply form 22 KEB, M.Hosahalli village, Borewell digging, Motor implimentation & Getting power supply form 23 KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli Borewell digging, Motor implimentation & Getting power supply form 24 KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli Borewell digging, Motor implimentation & Getting power supply form 25 KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli 26 Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku 27 Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku 28 Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku 29 Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku 30 Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk Road development work (0-100) form Acharya collage road to 31 Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work (100-200) form Acharya collage road to 32 Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work (200-300) form Acharya collage road to 33 Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work form Acharya collage road to 34 Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk 35 Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk

Final work 5.00 EE PRED completed 5.00 work EE PRED completed work EE PRED completed under progress under progress under progress under progress EE PRED EE PRED

5.00

0.00 Road

5.00

0.00 Road

2011-2012

5.00 5.00 5.00

5.00 2.50 2.50

0.00 Road 2.50 Water 2.50 Water

2011-2012 2011-2012

2011-2012

5.00

EE PRED

2.50

2.50 Water

2011-2012

5.00

EE PRED

2.50

2.50 Water

2011-2012

5.00

2011-2012

work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

5.00

0.00 Road

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

Page 30

36 2011-2012 37 2011-2012 38 2011-2012 39 2011-2012 40 2011-2012 41 2011-2012 42 2011-2012 43 2011-2012 44 2011-2012 45 2011-2012 46 2011-2012 47 2011-2012 48 2011-2012 49 2011-2012 50 2011-2012 51 2011-2012

Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk

Final work 2.50 EE PRED completed 2.50 work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

2.50

0.00 Road

2.50

0.00 Road

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

5.00

5.00

0.00 Water

5.00

5.00

0.00 Water

5.00

5.00

0.00 Water

5.00

5.00

0.00 Water Civic Amenities Civic Amenities Civic Amenities

5.00

5.00

0.00

5.00

5.00

0.00

2011-2012

52 Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli Village, Kengeri Hobli

3.00

3.00

0.00

Page 31

2011-2012

Road development work from Gudimavu main road to Devagere 53 Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk 54 Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk 55 Pipeline implementation and Getting power supply from KEB, Maralukunte village, Marenahalli Gramapanchayath, Jala Hobli Road Development work from H.Gollahalli main road to Kabbalamma 56 Temple, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 57

Final work 4.25 EE PRED completed 1.50 work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

4.25

0.00 Road

1.50

0.00 Road Civic Amenities

2011-2012

5.00

5.00

0.00

2011-2012

5.00

5.00

0.00 Road Civic Amenities Civic Amenities Civic Amenities

2011-2012

5.00 Library construction, Gonipura vilage, Yashawanthapura limits

5.00

0.00

2011-2012

2011-2012

2011-2012

2011-2012

2011-2012

58 Women empowerment Building work (streeshakti bhavana) Gonipura village, Yashawanthapura limits Gutter construction work from Mallappa home to Narayanaswamy 59 home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk Improvement and Asphalting to roads in sonnappa layout at 60 bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage 2. Improvement of Asphalting to roads in sonnappa layout at 61 bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage 2. 62 Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency 63 Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency 64 Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency. 65 Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency. 66 Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency. 67 Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency. 68 Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk 69 Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk

5.00

5.00

0.00

4.00

4.00

0.00

4.00

4.00

0.00 Road

4.00

4.00

0.00 Road

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

5.00

5.00

0.00 Education

2011-2012

5.00

5.00

0.00 Road

2011-2012

Page 32

2011-2012

70 Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk 71 Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22 Ganganagar, Bangalore North 72 Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. 73 Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. 74 Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. 75 Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk 76 Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk 77 Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk 78 Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, Bangalore North talluk 79 Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk 80 Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, Bangalore North Talluk 81 Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north Talluk 82 Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk 83 Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk 84 Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk 85 Road development work and jalli work Stage - 1, Siddappa layout, Kalkere village, Bangalore north Talluk 86 Road development work and jalli work Stage - 2, Siddappa layout, Kalkere village, Bangalore north Talluk

Final work 4.00 EE PRED completed 18.62 work Nirmithi Kendra completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

4.00

0.00 Education Civic Amenities Civic Amenities Civic Amenities Civic Amenities

18.62

0.00

2011-2012

5.00

5.00

0.00

2011-2012

5.00

5.00

0.00

2011-2012

5.00

5.00

0.00

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

Page 33

2011-2012

87 Road development work and Jalli work Stage - 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk 88 Road development work and Jalli work Stage - 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk 89 Road development work and Jalli work Stage - 1, Motappa ayout, Kalkere village, Bangalore north Talluk 90 Road development work and Jalli work Stage - 2, Motappa ayout, Kalkere village, Bangalore north Talluk Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur 91 village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1 Formation of concrete road Development near Sri.Anjaneya swamy 92 temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2 Formation of concrete rod development near sri.Anjaneya swamy 93 temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3 94 Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk 95 Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk 96 Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk 97 Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk 98 Road development work 0 - 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 99 Road development work 250-500, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 100 Road development work 500 - 750, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 101 Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 102

Final work 2.50 EE PRED completed 2.50 work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

2.50

0.00 Road

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

5.00 Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk

5.00

0.00 Road

2011-2012

2011-2012

103 Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, Bangalore North Talluk

5.00

5.00

0.00 Road

Page 34

2011-2012

104 Concrete road development work, Tirumalapura Village, Bangalore north Talluk 105 Development work in New Layout, Banapathi nagara, GanigaraHalli village, Bangalore north Talluk 106 5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk 107 Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore north Talluk

Final work 5.00 EE PRED completed 5.00 work EE PRED completed work EE PRED completed work EE PRED completed work completed

5.00

0.00 Road

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

Road

2011-2012 109 2011-2012 110 2011-2012 111 2011-2012 112 2011-2012 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts) Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts) Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts) Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts) 2.50

work EE PRED completed

2.50

0.00 Road

2.50

work EE PRED completed

2.50

0.00 Road

2.50

work EE PRED completed

2.50

0.00 Road

2.50

work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

2.50

0.00 Road

2011-2012

113 Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North. 114 Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North. 115 Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North. 116 Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North. Improvement and metalling the roads from channasandra main road 117 to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) Improvement and metalling the roads from channasandra main road 118 to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) Improvement and metalling of roads at 1st cross Udaya layout, 119 Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district.

2.50

2.50

0.00 Road

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

2.50

2.50

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

Page 35

2011-2012

2011-2012

Improvement and metalling of roads at 2nd cross, srirama layout, 120 Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district. Improvement and metalling of roads at 3nd cross, srirama layout, 121 Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district. 122 Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk 123

Final work 5.00 EE PRED completed 5.00 work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed work KRIDL completed work EE PRED completed work EE PRED completed work EE PRED completed work EE PRED completed

5.00

0.00 Road

5.00

0.00 Road

13.00

13.00

0.00 Road

2011-2012

5.00 Road development work, 1st cross, Ganesha Layout, Bangalore Talluk

5.00

0.00 Road

2011-2012 124 2011-2012

5.00 Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk

5.00

0.00 Road

2011-2012

125 Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk 126 Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk Road development work, From Hesaraghatta road to Kengal 127 Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk Road development work, From Hesaraghatta road to Kengal 128 Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk 129 4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara village 130 To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout

5.00

5.00

0.00 Road

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

5.00

5.00

0.00 Road

2011-2012

22.50

22.50

0.00 Education

2011-2012

2.00

2.00

0.00 Water

2011-2012

131 To dig Borewel in Amrutha Nagar 2011-2012 132 2011-2012 Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore

2.00

2.00

0.00 Water Civic Amenities Civic Amenities

10.00

10.00

0.00

2011-2012

2011-2012

2011-2012

133 Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency Road development work form Kempapura mainroad to 134 Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk Road development work from Basavaraju home to Nagaraju home, 135 Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk 136 Gutter work Stage - 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk

10.00

10.00

0.00

5.00

5.00

0.00 Road

5.00

5.00

0.00 Road

5.00

5.00

0.00 Road

2011-2012

Page 36

2011-2012 2011-2012

137 Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara 138 2 % Administration expinditure

Final work 10.00 EE PRED completed 10.00 624.87 DC

10.00 10.00 614.87

0.00 Road 0.00 Others 10 2.00 Water 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

1 2 3 4 5 6 7

2012-2013 8 2012-2013 9 2012-2013 10 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 11 12 13 14 15 16 17 18 19 20

Borewell digging work, Coffee Board Layout welfare association , Hebbala Kempapura Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka 1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka 3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka Road development work Stage - 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

2.00

Under Progress

EE PRED, Bangalore

0.00 5.00 5.00 5.00 5.00 5.00 5.00

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 6.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore Page 37

5.00 5.00 6.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road

2012-2013

21

Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

Final 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore

5.00 5.00

0.00 Road 0.00 Road

2012-2013

2012-2013

22 Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk 3 Borewell digging, Motor pump & Tank work, Ward 39, 23 Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout, 24 Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk CC road construction work, from Main road to till Amir saab home, 25 Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk CC road construction work, Bank colony, Tavarekere village, 26 Tavarekere Hobli, Bangalore south talluk Drinking water overhead Tank construction work, Vinayaka Nagara, 27 Ramohalli Gramapanchayath Limits Concrete road work, from Murugesh home to Hanumantappa home, 28 Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk Concrete road work, from Chennaveerayya home to Nanjappa home, 29 Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk Concrete road work, from Indramma home to Anganavadi, 30 Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, 31 Bangalore 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, 32 Bangalore Drinking water supply work, ChannaVenkatappa home street, 33 Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk 34 Concrete road work stage - 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk 35 Concrete road work stage - 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk Orphanage home, Cultural hall construction in 3 acers of land, Shree 36 bhavana rushi padmapeeta mahasamstana , Ullala, Yashwanthpura hobli, Bangalore north talluk, Tar road work, 790-948, Bhovipalya main road, Doddajala 37 Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 948-1106, Bhovipalya main road, Doddajala 38 Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 1106-1264, Bhovipalya main road, Doddajala 39 Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 1264-1422, Bhovipalya main road, Doddajala 40 Gramapanchayath, Jaala Hobli, Bangalore north Talluk

12.00 Completed EE PRED, Bangalore Under Progress

12.00

0.00 Water Civic Amenities

5.00

EE PRED, Bangalore

0.00

5.00

2012-2013

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 10.00 Completed EE PRED, Bangalore 4.90 Completed EE PRED, Bangalore

5.00 5.00 10.00 4.90

0.00 Road 0.00 Road 0.00 Water 0.00 Road

2012-2013 2012-2013 2012-2013

2012-2013

4.90 Completed EE PRED, Bangalore

4.90

0.00 Road

2012-2013

4.90 Completed EE PRED, Bangalore 2.00 Completed EE PRED, Bangalore 2.00 Completed EE PRED, Bangalore 4.00 Completed EE PRED, Bangalore

4.90 2.00 2.00 4.00

0.00 Road 0.00 Water 0.00 Water 0.00 Water

2012-2013 2012-2013 2012-2013

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road Civic Amenities

2012-2013

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore Page 38

5.00 5.00 5.00 5.00 5.00

0.00

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

0.00 Road 0.00 Road 0.00 Road 0.00 Road

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

41 42 43 44 45

Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

Final 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 5.00

0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road

2012-2013

46 Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency, 47 Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency, Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli 49 Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli 50 Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 48 51 Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013 52 2012-2013

2012-2013

Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work for cross roads, Maruthi Nagara, 53 Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 54 Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013 55 2012-2013 56 2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

Page 39

57 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 58 59 60 61

Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk

Final 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 5.00

0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road

2012-2013

62 Road development work, from Maragondanahalli mainroad lake main road to Kachaaramma temple road, Bangalore north MP constituency 63 Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli 64 Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli 65 Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli 66 Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, Kannur main road to Kannuru Lake road, 67 Hosuru, Yalahanka, Bangalore north talluk 68 Parkinsons Agencing research foundation Indira nagar Bangalore 69 70 71 72 73 74 75 76 77 78 79 2 Borewell digging work in Bhuvaneshwari Nagara layout Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore Drinking water supply to Saptagiri layout, Doddabidarakallu village Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 2.84 Completed Nirmithi Kendra 4.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 4.00 Completed EE PRED, Bangalore 4.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore Page 40

5.00 5.00 2.84 4.00 5.00 5.00 5.00 5.00 4.00 4.00 5.00 5.00 5.00 5.00

0.00 Road 0.00 Road 0.00 Health 0.00 Water 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Water 0.00 Water 0.00 Road 0.00 Road 0.00 Road 0.00 Road

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

2012-2013 2012-2013 2012-2013

Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny Borewell digging work for drinking water, BHEL layout welfare 81 assocation, Rajarajeshwari Nagara Bangalore water supplying work, Amrutha halli Mainroad to Shobha piper mart 82 opposite, Byatarayanapura BBMP, Bangalore 80 83 Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward 84 No.7 Bangalore Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku Road development work from, AK colony to Devegere village, 86 Devagere village, K.Gollahalli village, Kengeri Hobli, Bangalore South talluk Concrete road development work, from Ashwathkatte to Motamma 87 home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk Road development work from Main road to Ankappa home, Kalkere 88 village, Bangalore north talluk 85 89 Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli Gramapanchayath, Bangalore north Talluk 2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli Building construction for councelling center and other activities, Mahila Dakshata samiti Bengaluru,

Final 5.00 Completed EE PRED, Bangalore 2.00 Completed EE PRED, Bangalore 2.00 Completed EE PRED, Bangalore 13.00 Under Progress EE PRED, Bangalore

5.00 2.00 2.00 0.00 2.00

0.00 Road 0.00 Water 0.00 Water 13.00 Civic Amenities

2012-2013 2012-2013

2.00 completed EE PRED, Bangalore

0.00 Water

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2012-2013

3.00 Completed EE PRED, Bangalore Under Progress

3.00

0.00 Road

2012-2013

1.00

EE PRED, Bangalore

0.00 5.00 5.00 4.00 10.00

1.00 Road 0.00 Road 0.00 Road 0.00 Water 0.00 Civic Amenities Civic Amenities

2012-2013 2012-2013

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 4.00 Completed EE PRED, Bangalore 10.00 Completed Nirmithi Kendra

2012-2013 2012-2013 90 91 2012-2013

2012-2013

92 Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga 93 Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli hobli, Bangalore south talluk PU college building work, Janasave trust, Channenahalli, Tavarekere 94 hobli, Bangalore south talluk 1 Borewell digging, Vayunandana Layout, Bangalore north MP 95 constituency 96 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 97 Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk Concrete road work, Turahunase Village, Jala Hobli, Bangalore north 98 Talluk 1 bore digging work, ward no.6, Thanisandra, Byatarayanapura 99 Constituency, Bangalore

5.00 Completed EE PRED, Bangalore

5.00

0.00

5.00 Completed EE PRED, Bangalore 10.00 Completed EE PRED, Bangalore 2.00 Completed EE PRED, Bangalore 2.00 Completed EE PRED, Bangalore 2.50 Completed EE PRED, Bangalore 2.50 Under Progress EE PRED, Bangalore

5.00 10.00 2.00 2.00 2.50 0.00 2.00 5.00

0.00 Road 0.00 Education 0.00 Water 0.00 Water 0.00 Road 2.50 Road 0.00 Water 0.00 Road

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

2.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore Page 41

2012-2013

100 Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk

2012-2013

2012-2013

2012-2013

101 Road development, Masjid road, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk Road developmentwork, from Mahalingam home to Ganganna home, 102 Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk Road developmentwork, from Harish Home to Manohar home, 103 Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk 104 Road developmentwork,1st cross, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

Final 5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00 Completed EE PRED, Bangalore 505.54

5.00 482.04

0.00 Road 23.5 5.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road

2012-2013

2013-2014 2013-2014 2013-2014 2013-2014

Road development work, Maruthi Nagara, Bangalore north Talluk Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi 2 Nagara, Bangalore north Talluk Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi 3 Nagara, Bangalore north Talluk Concrete work , From Main road to Yallappa home, Gulbarga slum, 4 Maruthi Nagara, Bangalore north Talluk 5 Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk Road development work, from Ganapathi nagara Main road to 6 Narasimhayya home, Bangalore north Talluk 7 8 9 10 11 12 13 14 15 Concrete Road work, Chikkabanavara village, Bangalore north Talluk, Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk

Under Progress Under 5.00 Progress Under 5.00 Progress Under 5.00 Progress 5.00 5.00 5.00 5.00 5.00 5.00 5.00 Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore Page 42

Road development road, Sadguru Layout, Bangalore North Layout Road development work, Main road, Shiradi Layout, Bangalore north 16 Talluk Road development work, 1st cross road, Shiradi Layout, Bangalore 17 north Talluk Road development work, 2nd cross road, Shiradi Layout, Bangalore 18 north Talluk

2013-2014 2013-2014 2013-2014

19 20

Road development work, Netravathi Layout, Bangalore north talluk

Final 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 2.00 5.00 Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 0.00 0.00

0.00 Road 0.00 Road 2.00 Water 5.00 Road

2013-2014

RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk 1 Borewell digging work for Bagaluru village, Bagalur 21 Gramapanchayath, Jala hobli, Bangalore north taluk Road development work, Kodigehalli mainroad to borewell, 22 Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 23 Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Nanjundeshware layout Main road, 24 Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 25 Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 26 Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 27 Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Kodigehalli main road to Kodigehalli lake 28 road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 29 Road development work stage - 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency 30 Road development work stage - 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency 31 Road development work Stage - 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency 32 Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency 33 Road development work Stage - 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north 34 Talluk, Road development work from Lakshmipura village to Lakshmipura 35 Janata colony, Bangalore north Talluk 36 Road development work stage - 1, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency 37 Road development work stage - 2, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore

5.00 5.00 5.00 5.00

0.00 Road 0.00 Road 0.00 Road 0.00 Road

2013-2014 2013-2014 2013-2014

2013-2014

5.00 Completed EE PRED, Bangalore Page 43

5.00

0.00 Road

2013-2014

2013-2014 2013-2014

Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency Road developent work, From Kalkere Graveyard to Patalappa home, 39 Kalkere village, Bangalore north MP constituency 38 40 Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 41 Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

Final 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore

5.00 5.00 5.00

0.00 Road 0.00 Road 0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014 42 2013-2014

2013-2014

Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Student hostel constructio work, KR Puram vidhanasabha 43 constituency, Shri ramakrishna vivekananda sadhana kshrethra Bangalore north MP constituency 44 Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from K.gollahalli main road to 45 Dairy Krishnappa home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from Beerappa home to Papanna 46 home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from dalappa home to 47 gramapanchayath new building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Cement concrete road construction work for rest of the village roads, 48 chagalahatti village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk concrete road construction in SPG colony, Tavarekere illage, 49 Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, 50 Kodigehalli gramapanchayath, Bangalore north talluk Road development work, Aniketana nagara mainroad, Kodigehalli 51 gramapanchayath, Bangalore north taluk 52 53 Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

5.00

Under Progress Under Progress Under Progress Under Progress Under Progress

Nirmithi Kendra

2.50

2.50

Civic Amenities

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore Under Progress

0.00

5.00 Road

2013-2014

15.00

Nirmiti Kendra

7.50 5.00 5.00 5.00 5.00 5.00

7.50 Road 0.00 Others 0.00 Road 0.00 Road 0.00 Road 0.00 Road

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore

2013-2014

54 Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk 55 Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

Page 44

2013-2014

56 Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk 57 Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk concrete road work, from Kempapur main road to Palani home, 58 Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk Concrete road work, from Palani home to vishwanath home, 59 Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk Cement concrete road work, to 1st & 2nd crosss, Somashettihalli 60 gramapanchayath, Yashwanthpura hobli Cement concrete road work, to 3rd and 4th crosss, Somashettihalli 61 gramapanchayath, Yashwanthpura hobli Road development work, 1st cross, Maruthi Nagara, Somashettihalli 62 gramapanchayath, Yashwanthpura hobli 63 Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District

Final 4.00 Completed EE PRED, Bangalore

4.00

0.00 Road

4.00 Completed EE PRED, Bangalore

4.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore

5.00

0.00 Road

2013-2014

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 5.00 5.00 5.00 Under Progress Under Progress Under Progress EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 5.00

0.00 Road 0.00 Road 0.00 Road 0.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 5.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 0.00 Road 5.00 Road 5.00 Road 0.00 Others

2013-2014 2013-2014 2013-2014 2013-2014

2013-2014 2013-2014 64 65 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 66 67 68 69 70 71 2013-2014 2013-2014 72

Under Progress Under 5.00 Progress

5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore 5.00 Completed EE PRED, Bangalore Under Progress Under 5.00 Progress 5.00 EE PRED, Bangalore EE PRED, Bangalore

2013-2014 2013-2014 2013-2014

improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. 73 Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore Road development work, 1st & 2nd Cross, richard layout, Kalkere 74 village, Bangalore north MP constituency Road development work, 3rd & 4th Cross, richard layout, Kalkere 75 village, Bangalore north MP constituency

2013-2014

76 Jalli work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore

Page 45

2013-2014 2013-2014

77 Jalli work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency Borewell digging work, Jagalahatti village, Marenahalli 78 Gramapanchayath, Jala Hobli, Bangalore north talluk 79 pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk 80 compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist 81 Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist formation of metalling the roads Mr.Krishnamurthy's house roads in 82 kalkere Village, Bangalore North Bangalore Improvement and metalling the roads of Mr.Puttaswamy layout roads 83 in Channasandra Village Bangalore North Parlimentary Constituency Bangalore formation of Metalling the roads of Richard's layout water Tank roads 84 in Kalkere Village Bangalore North Parlimentary Constituency Bangalore Concrete road construction (chain 0 to85 meters) 9th cross, Near 85 Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk Concrete road construction (chain 0 to85 meters) 9th cross, Near 86 Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk Borewell digging work in New layouts of Tippenahalli and 87 doddabidarakallu villages, Doddabidarakallu ward 88 UttaraKhand Floods rehabilatiton fund

Final 5.00 Completed EE PRED, Bangalore 2.00 5.00 Under Progress Under Progress EE PRED, Bangalore EE PRED, Bangalore

5.00 0.00 0.00

0.00 Others 2.00 Water 5.00 Water Civic Amenities Civic Amenities

2013-2014

5.00 Completed DC Chikkamagalur

5.00

0.00

2013-2014

5.00 Completed DC Chikkamagalur 5.00 5.00 Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress EE PRED, Bangalore EE PRED, Bangalore

5.00 0.00 0.00

0.00

2013-2014 2013-2014

5.00 Roads 5.00 Roads

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Roads

2013-2014

5.00

EE PRED, Bangalore

0.00

5.00 Roads

2013-2014

5.00 4.00

EE PRED, Bangalore EE PRED, Bangalore -

0.00 0.00 0.00


253

5.00 Roads 4.00 Water 10.00 Others


193

2013-2014 2013-2014 2013-2014

10.00 446

Page 46

Physical and Financial Progress on Implemntation of MPLADS works in Raw Bangalore North data Final Name of The M.P : D.B.Chandre Gowda Estimate Stage of d Cost the Work (in lakhs) Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress

Years 2009-2014 Amount Balance Released If Any to IA

Sl No Name & Location of the work Year 1 2 3

IMPLIMENTING AGENCY

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

Road development work, Maruthi Nagara, Bangalore north Talluk Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore 4 north Talluk Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, 5 Bangalore north Talluk Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore 6 north Talluk 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Concrete Road work, Chikkabanavara village, Bangalore north Talluk, Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk Road development road, Sadguru Layout, Bangalore North Layout Road development work, Main road, Shiradi Layout, Bangalore north Talluk Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk Road development work, Netravathi Layout, Bangalore north talluk

5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed Under Progress Under 5.00 Progress 2.00

RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk 1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore 21 north taluk Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, 22 Yashwanthpura Hobli, Bangalore north talluk Page 47

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 5.00

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

23 24 25 26 27 28 29 30 31 32 33 34

Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Raw data Final Yashwanthpura Hobli, Bangalore north talluk Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work, Kodigehalli main road to Kodigehalli lake road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk Road development work stage - 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency Road development work stage - 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency Road development work Stage - 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency Road development work Stage - 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency

Under Progress Under 5.00 Progress Under 5.00 Progress Under 5.00 Progress 5.00 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed

RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk, Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore 35 north Talluk Road development work stage - 1, Motappa Layout, Kanakanagara, Channasandra village, 36 Bangalore north MP constituency Road development work stage - 2, Motappa Layout, Kanakanagara, Channasandra village, 37 Bangalore north MP constituency

Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore 39 north MP constituency Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri 40 Hobli, Bangalore South Talluk 41 Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 42 Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Student hostel constructio work, KR Puram vidhanasabha constituency, Shri ramakrishna 43 vivekananda sadhana kshrethra Bangalore north MP constituency Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, 44 Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa home, 45 K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli 46 Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Concrete road construction work, from dalappa home to gramapanchayath new building, 47 K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk Page 48

38

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore Nirmithi Kendra EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2013-2014

5.00 Completed 5.00 5.00 5.00 5.00 5.00 Under Progress Under Progress Under Progress Under Progress Under Progress

5.00 2.50 0.00 0.00 0.00 0.00

0.00 2.50 5.00 5.00 5.00 5.00

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

Cement concrete road construction work for rest of the village roads, chagalahatti village, Raw data Final Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra 49 vidhasabha constituecny, bangalore south talluk RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, 50 Bangalore north talluk Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore 51 north taluk 48 52 53 54 55 56 57 58 59 60 61 62 63 Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk concrete road work, from Kempapur main road to Palani home, Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District

5.00 Completed 15.00 Under Progress

EE PRED, Bangalore Nirmiti Kendra EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

0.00 7.50 5.00 5.00 5.00 5.00 5.00 5.00 4.00 4.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 5.00

5.00 7.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00

5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 4.00 Completed 4.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 5.00 5.00 5.00 5.00 Under Progress Under Progress Under Progress Under Progress Under Progress

64 and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli 65 66 67 68 69 70 71 72 73 Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore Page 49

5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed

2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014 2013-2014

74 75 76 77 78 79 80 81 82 83 84 85 86 87 88

Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore Raw datanorth Final MP constituency Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency Jalli work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency Jalli work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward UttaraKhand Floods rehabilatiton fund Total

Under Progress Under 5.00 Progress 5.00 5.00 Completed 5.00 Completed Under Progress Under 5.00 Progress 2.00 5.00 Completed 5.00 Completed 5.00 5.00 5.00 5.00 5.00 4.00 Under Progress Under Progress Under Progress Under Progress Under Progress Under Progress

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore DC Chikkamagalur DC Chikkamagalur EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore -

0.00 0.00 5.00 5.00 0.00 0.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 253

5.00 5.00 0.00 0.00 2.00 5.00 0.00 0.00 5.00 5.00 5.00 5.00 5.00 4.00 10.00 193 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10.00 446 2.00 Under Progress

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

1 2 3

Borewell digging work, Coffee Board Layout welfare association , Hebbala Kempapura Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka

5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed

Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka Road development work, from Backword community colony to Main road, Kannuru village, 4 Yalahanka 5 6 7 8 9 10 1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka 3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka Road development work Stage - 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk Page 50

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

0.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Raw data Final Bangalore north Talluk Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, 12 Kengeri Hobli, K.gollahalli 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk 3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout, Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk CC road construction work, from Main road to till Amir saab home, Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk Concrete road work stage - 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk Concrete road work stage - 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana , Ullala, Yashwanthpura hobli, Bangalore north talluk, Page 51

5.00 Completed 6.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 12.00 Completed 5.00 Under Progress

5.00 Completed 5.00 Completed 10.00 Completed 4.90 Completed 4.90 Completed 4.90 Completed 2.00 Completed 2.00 Completed 4.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 6.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 12.00 0.00 5.00 5.00 10.00 4.90 4.90 4.90 2.00 2.00 4.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

37 38 39 40 41 42 43 44 45 46 47

Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Raw dataHobli, Final Bangalore north Talluk Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency, Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,

5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2012-2013

48 Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 49 Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, 50 Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 51 Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 52 Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli Gramapanchayath 53 Limits, Yashwanthpura hobli, Bangalore north talluk 54 Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk 55 Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk 56 Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli 57 Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north 58 Talluk Page 52

5.00 Completed

5.00

0.00

2012-2013

5.00 Completed

5.00

0.00

2012-2013

5.00 Completed

5.00

0.00

2012-2013

5.00 Completed 5.00 Completed 5.00 Completed

5.00 5.00 5.00

0.00 0.00 0.00

2012-2013 2012-2013

2012-2013

5.00 Completed

5.00

0.00

2012-2013

5.00 Completed 5.00 Completed 5.00 Completed

5.00 5.00 5.00

0.00 0.00 0.00

2012-2013 2012-2013 2012-2013

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013

59 60 61 62 63 64 65 66 67

Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Raw dataBangalore Final north Talluk Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk Road development work, from Maragondanahalli mainroad lake main road to Kachaaramma temple road, Bangalore north MP constituency Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk

5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 2.84 Completed 4.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 4.00 Completed 4.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 2.00 Completed 2.00 Completed 13.00 Under Progress

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore Nirmithi Kendra EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.84 4.00 5.00 5.00 5.00 5.00 4.00 4.00 5.00 5.00 5.00 5.00 5.00 2.00 2.00 0.00 2.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 0.00

68 Parkinsons Agencing research foundation Indira nagar Bangalore 2 Borewell digging work in Bhuvaneshwari Nagara layout Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore 70 north talluk Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North 72 MP constituency Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North 73 MP constituency 74 75 76 77 78 79 80 81 82 83 Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore Drinking water supply to Saptagiri layout, Doddabidarakallu village Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency 71 69

84 Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore Page 53

2.00 completed

2012-2013 2012-2013

Raw data Final 85 Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku Road development work from, AK colony to Devegere village, Devagere village, K.Gollahalli 86 village, Kengeri Hobli, Bangalore South talluk 87 Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk

5.00 Completed 3.00 Completed 1.00 Under Progress

EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore Nirmithi Kendra EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore EE PRED, Bangalore

5.00 3.00 0.00 5.00 5.00 4.00 10.00 5.00 5.00 10.00 2.00 2.00 2.50 0.00 2.00 5.00 5.00 5.00 5.00 5.00 482.04

0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 0.00 0.00 0.00 23.5

2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 2012-2013 88

Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli 89 Gramapanchayath, Bangalore north Talluk 2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, 90 Jala Hobli Building construction for councelling center and other activities, Mahila Dakshata samiti 91 Bengaluru, Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli 93 hobli, Bangalore south talluk PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south 94 talluk 95 1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency 96 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 97 Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk 92

5.00 Completed 5.00 Completed 4.00 Completed 10.00 Completed 5.00 Completed 5.00 Completed 10.00 Completed 2.00 Completed 2.00 Completed 2.50 Completed 2.50 Under Progress

98 Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk 99 1 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency, Bangalore 100 101 102 103 104 Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk Road development, Masjid road, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk Road developmentwork, from Mahalingam home to Ganganna home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk Road developmentwork, from Harish Home to Manohar home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk Road developmentwork,1st cross, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk Total

2.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 5.00 Completed 505.54

2011-2012 2011-2012 2011-2012

1 Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd 3 Cross 2 Page 54

work completed work 5.00 completed work 5.00 completed 2.00

EE PRED EE PRED EE PRED

2.00 5.00 5.00

0.00 0.00 0.00

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara Raw data Final 3rd Cross Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th 5 Cross Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th 6 Cross Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, 7 Dwaraka Nagara Road development work 4 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Maruthi Nagara subroad (cross) road Development work Maruthi Nagara New Layout Road development work Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village, Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku Page 55

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed under progress under progress under progress under progress work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.50 2.50 2.50 2.50 0.00 0.00 0.00 0.00

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore Raw data FinalNorth talluk Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk

5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00 5.00

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2011-2012

49 Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk 50 Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk 51 Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli Village, 52 Kengeri Hobli Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli 53 Gramapanchayath village, Bangalore south talluk Page 56

5.00

EE PRED

5.00

0.00

2011-2012

5.00 3.00

EE PRED EE PRED EE PRED

5.00 3.00 4.25

0.00 0.00 0.00

2011-2012 2011-2012 2011-2012

work completed work 4.25 completed

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Raw data Final Gramapanchayath, Bangalore South Talluk Pipeline implementation and Getting power supply from KEB, Maralukunte village, Marenahalli 55 Gramapanchayath, Jala Hobli Road Development work from H.Gollahalli main road to Kabbalamma Temple, K.gollahalli 56 Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 54 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 Library construction, Gonipura vilage, Yashawanthapura limits Women empowerment Building work (streeshakti bhavana) Gonipura village, Yashawanthapura limits Gutter construction work from Mallappa home to Narayanaswamy home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2. Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2. Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency. Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency. Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency. Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency. Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22 Ganganagar, Bangalore North Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk

1.50 5.00 5.00 5.00 5.00 4.00 4.00 4.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 4.00 18.62 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, 78 Bangalore North talluk Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, 79 Bangalore North Talluk Page 57

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED Nirmithi Kendra EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

1.50 5.00 5.00 5.00 5.00 4.00 4.00 4.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 4.00 18.62 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, RawBangalore data Final North Talluk Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north 81 Talluk Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North 82 Talluk 80 83 84 85 86 87 88 89 90 91 Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk Road development work and jalli work Stage - 1, Siddappa layout, Kalkere village, Bangalore north Talluk Road development work and jalli work Stage - 2, Siddappa layout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 1, Motappa ayout, Kalkere village, Bangalore north Talluk Road development work and Jalli work Stage - 2, Motappa ayout, Kalkere village, Bangalore north Talluk Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1

5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 5.00 5.00 5.00 5.00 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2011-2012

92 Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2 93 Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3 94 95 96 97 98 99 100 101 102 Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk Road development work 0 - 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk Road development work 250-500, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk Road development work 500 - 750, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

5.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, Bangalore 103 North Talluk 104 Concrete road development work, Tirumalapura Village, Bangalore north Talluk Page 58

2011-2012 2011-2012 2011-2012

105 106

Development work in New Layout, Banapathi nagara, GanigaraHalli village, Raw Bangalore north data Final Talluk

5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore 107 north Talluk 109 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts) 110 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts) 111 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts) 112 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts) 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North. Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North. Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North. Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North. Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district. Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district. Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district. Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk Road development work, 1st cross, Ganesha Layout, Bangalore Talluk Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk 4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara village Page 59

work completed work 5.00 completed work 5.00 completed 5.00 2.50 work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED

5.00 5.00 5.00 2.50

0.00 0.00 0.00 0.00

2011-2012

2.50

EE PRED

2.50

0.00

2011-2012

2.50

EE PRED

2.50

0.00

2011-2012

2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00 13.00 5.00 5.00 5.00 5.00 5.00 5.00 22.50

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

2.50 2.50 2.50 2.50 2.50 2.50 2.50 5.00 5.00 5.00 13.00 5.00 5.00 5.00 5.00 5.00 5.00 22.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

130 To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout 131 To dig Borewel in Amrutha Nagar

Raw data Final

2.00 2.00 10.00 10.00 5.00 5.00 5.00 10.00 10.00 624.87 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

132 Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore 133 134 135 136 137 138 Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk Road development work from Basavaraju home to Nagaraju home, Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk Gutter work Stage - 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara 2 % Administration expinditure Total

work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED KRIDL EE PRED EE PRED EE PRED EE PRED EE PRED DC

2.00 2.00 10.00 10.00 5.00 5.00 5.00 10.00 10.00 614.87

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma 2 muniyappa home, Bangalore East Talluk, K.R pura Hobli, 1 3 4 5 6 7 8 9 Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt) Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt) Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt) Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt) Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt) Page 60

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

2010-2011 10 2010-2011 11 2010-2011 12 2010-2011 13 2010-2011

5.00

EE PRED

5.00

0.00

5.00

EE PRED

5.00

0.00

5.00

EE PRED

5.00

0.00

5.00

EE PRED

5.00

0.00

2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

Road development work Stage - 1 for Ganapathi nagara, Chikkabanavara village, Raw data Final Yashavanthapura Hobli Road development work Stage - 2 for Ganapathi nagara, Chikkabanavara village, 15 Yashavanthapura Hobli Road development work Stage - 3 for Ganapathi nagara, Chikkabanavara village, 16 Yashavanthapura Hobli Road development work Stage - 4 for Ganapathi nagara, Chikkabanavara village, 17 Yashavanthapura Hobli 14 18 19 20 21 22 23 24 25 Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli Road Construction work Stage - 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Road Construction work Stage - 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 8.00 1.50 5.00 5.00 1.50 4.41 4.41

One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, 26 Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side) 27 Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side) Borewell digging work, Bagalahalli village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore North Talluk Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights) Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights) K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights) K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights) Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights) Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights) Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights) Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights) Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights) Page 61

work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 8.00 1.50 5.00 5.00 1.50 4.41 4.41 4.41 4.41 4.41 4.41 4.41 4.41 4.41

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2010-2011 2010-2011 28 29 2010-2011 2010-2011 2010-2011 2010-2011 30 31 32 33 2010-2011 2010-2011 2010-2011 34 35 36 2010-2011 2010-2011 37

work completed work 4.41 completed work 4.41 completed 4.41 4.41 work completed

work completed work 4.41 completed 4.41 4.41 work completed work completed

2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011 2010-2011

Raw data Final 38 Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights) 39 Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights)

4.41 4.41 1.47 1.50 1.00 5.00 5.00 5.00 5.00 208.48

40 R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights) 41 42 43 44 45 46 Borewell work, for Drinking water to Parimala Nagara, Nandini Layout, Mahalakshipuram ward no. 43 Oldage Home building construction work, Sy no.113, Shree Shankara Balaga, New Park road, Malleshwaram, Bangalore Road Development work Stage - 1, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work Stage - 2, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work Stage - 3, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk Road Development work, from Kempapura Maruthi Nagara Mainroad, Bangalore North Talluk Total Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk, Bangalore Dist. Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa's Garden at Bangalore North Taluk, Bangalore District. Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District. Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist. Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli Road Development work, Marenahalli Joining road, Jaalahalli Hobli

work completed work completed work completed work completed work completed work completed work completed work completed work completed

Nirmithi Kendra Nirmithi Kendra Nirmithi Kendra EE PRED EE PRED EE PRED EE PRED EE PRED EE PRED

4.41 4.41 1.47 1.50 1.00 5.00 5.00 5.00 5.00 208.48

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

1 2009-2010 2009-2010 2009-2010 2009-2010 2 3 4 5 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 6 7 8 9

4.50 7.99

work completed

EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore Project Manager, Nirmithi Kendra Urban

4.50 7.99 8.00 8.00 8.00 8.00 8.00 10.00 4.00 3.49 7.10 8.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

work completed work 8.00 completed work 8.00 completed 8.00 8.00 work completed

work completed work 8.00 completed work 10.00 completed work 4.00 completed 3.49 7.10 8.00 work completed work completed work completed

2009-2010 2009-2010

10 Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony, Bangalore. ( Stage 1) Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, 11 Bangalore. (Stage 2) 12 Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli 13

2009-2010

2009-2010

Community hall construction for Margadarshi Mahila Samaja , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore Page 62

work 1.00 completed

1.00

0.00

2009-2010 2009-2010 2009-2010 2009-2010

14 15 16 17 18

2009-2010 19 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 2009-2010 20 21 22 23 24 25

data nagar, Final Construction of Size Stone masonery Drerinat first main road near School in Raw kamala Bangalore urban District. Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District. Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72 Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72 Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk

work completed work 5.00 completed work 8.00 completed work 8.00 completed 5.00 8.00 work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed work completed

EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore EE, PRED, Bangalore

5.00 5.00 8.00 8.00 8.00

0.00 0.00 0.00 0.00 0.00

8.00 8.00 8.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 189.08

8.00 8.00 8.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 189.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North 26 Talluk Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore 27 North Talluk Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn 29 road to Hosahali village 30 Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk Total 28

Page 63

Physical and Financial Status for the year 2009-10 to 2013-14

Physical Status Sl No Year Amount

Financial Status [In Lakhs]

1 2 3 4 5

Openin Interest/Amoun g t on receive Numbe Numbe Numbe Balance d by Distribution Amount Amount Amount r r r GOI 2009-10 30 189.08 29 189.08 0 0.00 0.00 200.00 16.75 2010-11 47 212.89 47 212.89 0 0.00 27.67 200.00 1.05 2011-12 138 624.87 134 614.87 4 10.00 15.83 500.00 81.85 2012-13 104 505.54 99 482.04 5 23.50 -17.19 500.00 8.09 2013-14 88 446.00 50 253.00 38 193.00 8.86 250.00 0.50 407 1978.4 359 1751.9 47 226.50 Total 2% Adiministation Charges for the Year 2012-13 10.00 10.00 2% Adiministation Charges for the Year 2013-14
Grand Toatl 246.50 1675

Works Sanctioned

Works Completed

Works Under Progress

Total 216.75 228.72 597.68 490.90 259.36

Amount Released to IA 189.08 212.89 614.87 482.04 253.00 1751.88


1742.29 9.59 1.59

Balance 27.67 15.83 -17.19 8.86 6.36