EEE 495 Electrical and Electronics Engineering Design II Lecture and Lab Program (Spring 2013-2014) Weeks Date

Starting Monday Lectures Lab Works Homeworks Exam Reports

3.2.2014

Introduction to Power Systems and Bilkent Power Plant Project, Three Phase Syst., Phasor Notations, Complex Power (During Lab+Lecture Hours)

10.2.2014

Per-unit system, Single line diagram, Transformers, Synch. Generators, Power Syst. Simulation SW-PSSE (During Lab+Lecture Hours)

17.2.2014

Power System Elements, Transmission Lines, substations, shunt and series inductors and capacitors (Tuesday p.m.)

Lab 1 Introduction to PSSE, Lab 2.1 Introduction to PSSE Prog. Operation Manual, Graphical User Interface, Users Guide

R.1. General Comprehension of the project and forming groups. (Due:02.24.2014) (Online Submission)

24.2.2014

Power Flow Studies, Solution Techniques (Tuesday p.m.)

Lab 2.2 (Cont.) PSSE Solution and Reporting

3.3.2014

Midterm Exam 1 (March 4th Tuesday p.m.)

Lab 3 Solving for outages (Due: 3.10.2014)

R.2. Report on Environmental, Social, Political, Ethical, Health and Safety, Manufacturability, Sustainability of Proposed Plant(Due: 24 March 2014)

10.3.2014

Turkish Power System Figures, Generation and Consumption, Grid Regulation, EMRA, Transmisson Tariffs (Tuesday p.m.) Generation and Consumption, Grid Regulation, EMRA, Transmisson Tariffs (Tuesday p.m.) Lab 4 Raw Data and Slider File Preparation for a Sample Network and Solution

HW1 Series Capacitor Application (Due: Mach 17, 2014)

17.3.2014

24.3.2014

Lab 4 (cont.) Bilkent PP Raw Electricity Sector Reform, Data Prep. and Contr. Bilkent Interconnections (Tuesday PP Connection, Scaling, p.m.) Voltage Control of Power Systems

HW2 Voltage Control Exercise (Due: 31 March, 2014)

MT Exam 1

10

31.3.2014

Short Circuit Analysis, Contingency Analysis (Tuesday p.m.)

Lab 5 Bilkent P.P. Connection to Different Substations, A non-convergent Power Flow Example

R.3.1. Individual Reports on Site Selection and Power Flow results of group members. Discussion among group members to choose the best connection site and final selection report of the gr. (Due: 14.04.2014)

11

7.4.2014

Short Circuit Analysis (cont.) (Tuesday p.m.)

Lab 6 Short Circuit Studies Example, Short Circuit Study of Bilkent Subsystem, Creation of Bilkent Subsystem Sld. Diagrams

12

14.4.2014

Electricity Market Applications in Turkey (Visiting Speaker) (Tuesday p.m.) Cost Evaluation for Generation & Transmission, Consumer Tariffs (Tuesday p.m.)

R.3.1. Presentation, Connecting Bilkent PP to the Selected Site in R.3.1 ,

13

21.4.2014

Lab 7 N-1 Contingency Studies, N-1 Contingency for Bilkent Subsystem (Section 1) Lab 7 N-1 Contingency Studies, N-1 Contingency for Bilkent Subsystem (Section 2) MT Exam 2

LPA

R.3.2. Bilkent Power Plant Feasibility Report (Due: 16 May 2014 by 5:00 p.m.)

14

28.4.2014

Midterm Exam 2 (Tuesday April 29 p.m.)

15

5.5.2013

(Visiting Speaker)

Cost Calculations, Completion of Technical Studies

16

12.5.2014

Consolidation of technical and economic results to finalize R.3.2 Last week for submission of R3.2.

16

19.5.2014

Fall Semester Final Exams Between 21-29 May 2014 (Wed.-Thurs.)

17

26.5.2014

Last Day for Grades