Professional Documents
Culture Documents
130
120
110
Current (Amp)
100
90
80
X: 77.15 Y: 75
70
60
50 30
40
50
60
70
90
100
110
120
130
50
40
Velocity (miles/hr)
30
20
10
50
100
150
250
300
350
400
0.9
0.8
0.7
Depth of discharge
0.6
0.5
0.4
0.3
0.2
0.1
10
15
20
25 Distance traveled/mile
30
35
40
45
50
Depth of discharge = 0.8 Distance travelled = 28.3 miles Complete 14 cycles before hitting 80% discharge = 87 min Average velocity the whole trip = 19.52 miles/hr 2/ Vehicles acceleration during1 test cycle:
Graph of vehicle acceleration during 1 test cycle 1.5
0.5
Acceleration (m/s 2)
-0.5
-1
-1.5
-2 0
50
100
150
250
300
350
400
200
150
Torque (ft-lb)
100 50 0 0
50
100
150
250
300
350
400
50
40
Power (HP)
30
20
10
50
100
150
250
300
350
400
Average output power from the motor over 1 test cycle = 8 HP 5/ Power provided by traction batteries during 1 test cycle:
45
40
35
30
Power (KW)
25
20
15
10
50
100
150
250
300
350
400
Average power provided by traction batteries over 1 test cycle = 7 KW 6/ Vehicles current flow during 1 test cycle:
Graph of current flow during 1 test cycle 350
300
250
200
Current (A)
150 100 50 0 0
50
100
150
250
300
350
400
40
35
Velocity (miles/hr)
30
25
20
15
10
50
100
200
250
300
0.9
0.8
0.7
Depth of discharge
0.6
0.5
0.4
0.3
0.2
0.1
10
20
30 40 Distance traveled/mile
50
60
70
Depth of discharge = 0.8 Distance travelled = 57 miles Complete 28 cycles before hitting 80% discharge = 140 min Average velocity the whole trip = 24.43 miles/hr 2/ Vehicles acceleration during1 test cycle:
0.6
0.4
0.2
Acceleration (m/s 2)
-0.2
-0.4
-0.6
-0.8
50
100
200
250
300
100
80
Torque (ft-lb)
60
40
20
50
100
200
250
300
16
14
12
Power (HP)
10
50
100
200
250
300
Average output power from the motor over 1 test cycle = 6 HP 5/ Power provided by traction batteries during 1 test cycle:
Graph of power provided by batteries during 1 test cycle 16
14
12
10
Power (KW)
50
100
200
250
300
Average power provided by traction batteries over 1 test cycle = 5.5 KW 6/ Vehicles current flow during 1 test cycle:
100
80
Current (A)
60
40
20
50
100
200
250
300
50
40
Velocity (miles/hr)
30
20
10
200
400
800
1000
1200
1400
0.9
0.8
0.7
Depth of discharge
0.6
0.5
0.4
0.3
0.2
0.1
10
15
20 Distance traveled/mile
25
30
35
40
Depth of discharge = 0.8 Distance travelled = 26.7 miles Complete 3.6 cycles before hitting 80% discharge = 83 min Average velocity the whole trip = 19.3 miles/hr 2/ Vehicles acceleration during1 test cycle:
Graph of vehicle acceleration during 1 test cycle 2
1.5
Acceleration (m/s 2)
0.5
-0.5
-1
-1.5 0
200
400
800
1000
1200
1400
250
200
Torque (ft-lb)
150
100
50
200
400
800
1000
1200
1400
60
50
40
Power (HP)
30 20 10 0 0
200
400
800
1000
1200
1400
Average output power from the motor over 1 test cycle = 8 HP 5/ Power provided by traction batteries during 1 test cycle:
50
40
Power (KW)
30
20
10
200
400
800
1000
1200
1400
Average power provided by traction batteries over 1 test cycle = 7.5 KW 6/ Vehicles current flow during 1 test cycle:
Graph of current flow during 1 test cycle 450
400
350
300
Current (A)
250
200
150
100
50
200
400
800
1000
1200
1400