Professional Documents
Culture Documents
xls" Program
Version 1.3
Monorail Size:
Select:
Design Parameters:
Beam Fy =
Beam Simple-Span, L =
Unbraced Length, Lb =
Bending Coef., Cb =
Overhang Length, Lo =
Unbraced Length, Lbo =
Bending Coef., Cbo =
Lifted Load, P =
Trolley Weight, Wt =
Hoist Weight, Wh =
Vert. Impact Factor, Vi =
Horz. Load Factor, HLF =
Total No. Wheels, Nw =
Wheel Spacing, S =
Distance on Flange, a =
RR(max)=9.13
Lo=3
L=17
W12x50
x=8.313
S=0.75
36
17.0000
17.0000
1.00
3.0000
11.5000
1.00
6.000
0.400
0.100
15
10
4
0.7500
0.3750
Results:
Parameters and Coefficients:
Pv =
7.400 kips
Pw =
1.850 kips/wheel
Ph =
0.600 kips
ta =
0.640 in.
= 0.097
Cxo = -1.903
Cx1 =
0.535
Czo = 0.192
Cz1 = 2.319
ksi
W12x50
ft.
ft.
Pv=7.4
Nomenclature
ft.
ft.
kips
kips
kips
%
%
ft.
A=
d=
tw =
bf =
tf =
k=
rt =
in.^4
in.^3
in.^4
in.^3
in.^4
in.^6
in.
fbx = Mx/Sx
Lb/rt = Lb*12/rt
Fbx = 12000*Cb/(Lb*12/(d/Af)) <= 0.60*Fy
1 of 3
"MONORAIL.xls" Program
Version 1.3
fby = My/Sy
fwns = Mt*12/(Sy/2) (warping normal stress)
fby(total) = fby+fwns
Fby = 0.75*Fy
Mx = (Pv/2)*(Lo+(Lo-S))+w/1000*Lo^2/2
My = (Ph/2)*(Lo+(Lo-S))
fbx = Mx/Sx
Lbo/rt = Lbo*12/rt
Fbx = 12000*Cbo/(Lbo*12/(d/Af)) <= 0.60*Fy
fby = My/Sy
fwns = Mt*12/(Sy/2) (warping normal stress)
fby(total) = fby+fwns
Fby = 0.75*Fy
(continued)
2 of 3
"MONORAIL.xls" Program
Version 1.3
tw
X
Pw
Pw
Z
Point 2
tf
Point 0
Point 1
bf
3 of 3