Crude and Natural Gas Production India

For 3 months of October, November & December 2013

ProductionPerformanceofOil&NaturalGassectorforthemonthofOctober,2013

I.

A.CRUDEOILPRODUCTIONPERFORMANCE

Month/Period

Planned Target(TMT)

Actual Productio n (TMT)

%ageachievement Surplus(+)Shortfall( Surplus(+) Shortfall(overlastyear(%age )Visvistarget ) (%age)

October,2013* April-October, 2013* April-October, 2012

3352.000 22613.000

3179.405 22018.083 22283.565

94.9 97.4

-5.1 -2.6

-0.8 -1.2

B.COMPANY-WISE ACHIEVEMENT Company/State PlannedTarget (TMT) 2045.000 Actual Production (TMT) 1867.000 %ageachievement Surplus(+)Shortfall(-)(%age)

ONGC

91.3

-8.7

Gujarat

424.000

410.000

96.7

AndhraPradesh

22.000

24.000

109.1

TamilNaduAssa

19.000

18.000

94.7

106.000

107.000

100.9

Offshore

1474.000

1308.000

88.7

OIL

328.000

303.953

92.7

-7.3

Assam

327.000

301.716

92.3

ArunachalPradesh

1.000

2.237

223.7

PRIVATE/JVC

979.000

1008.452

103.0

3.0

TOTAL

3352.000

3179.405

94.9

-5.1

C.REASONSFORSHORTFALL Company / State ONGC

Reasonsforshortfall

ClosureofwellstomaintainliftGaspressureduetoenginereplacementandoverhaulingofProcessGas

(Offshore)

Compressor(PGC)atHeera,increasedwatercutinwellB-173A#2YHaffectedproduction.Lessthananticipated

oilgainfromnewdevelopmentwellsofD-1field,delayincommissioningofB-193processplatformaffected production.DelayinexecutionofG-1developmentproject.LesslinecondensarereceiptfromOffshore. ONGC(Gujarat) Lessthananticipatedoil gainfromworkoverandfrequentpowershutdownaffectedproduction.Leakage oildespatchlineofGGS-III&GGS-IV,lowgasliftpressureduetofrequentGEBpowershutdown,ageingoffields resultingdeclineinreservoirpressure&increasedwatercutaffectedproduction. Productionaffectedduetoclosureofsomeofthewellsonaccountoflessofftakeofgasbyconsumers. incrude

ONGC Nadu)

(Tamil

OIL(Assam) Consequentialeffectofbandhsandblockades. Pvt./JVCs (Arunachal Pradesh) Pvt./JVCs (Gujarat) Productionislessduetounderperformanceofnew developmentofwellsand sand/wateringressissuesinolder wellsetc. Lessoilproductionduetointermittentflow.WellAsjol#7closedduetononrevivalafterwork-overjob.Oilwell haveceasedinBhandut.Underperformanceofproducingwellsin Camby&CB-OS/2.Highwatercutinproducing wellsinCB-ON/7.Naturaldecline.Wateringressissuesinwellbores.

AstatementshowingCrudeOilProductionduringOctober,2013andcumulativelyfortheperiodApril-October,2013vis--vis2012-13 isatAnnexure-I.

II.

A.NATURALGASPRODUCTION Month/Period Planned Target (MCM) 3269.504

Actual Production (MCM) 2960.948

%age achieve-ment 90.6

Surplus(+) Shortfall(-) Vis-vistarget(%age) -9.4

Surplus(+) Shortfall(-) over lastyear(%age) -13.6

October,2013*

April- October, 2013* April2012 October,

22308.807

20787.129

93.2

-6.8

-16.1

24787.663

MCM:MillionCubicMetres.*:Provisional.

B.COMPANY-WISEACHIEVEMENT Company/State PlannedTarget (MCM) ONGCGujarat 1983.560

ActualProduction (MCM) 1962.871

%ageachievement

Surplus(+)Shortfall(-)(%age)

99.0

-1.0

Rajasthan

119.550

129.839

108.6

AndhraPradesh

1.270

1.352

106.5

TamilNaduAssa

88.710

94.429

106.4

100.690

115.176

114.4

39.310

38.136

97.0

Tripura

69.960

80.425

115.0

Mumbai Offshore OIL

High

1564.070

1503.514

96.1

236.950

225.213

95.0

-5.0

Assam

213.970

206.428

96.5

ArunachalPradesh

1.230

1.671

135.9

Rajasthan PRIVATE/JVC

21.750 1048.994

17.114 772.864

78.7 73.7 -26.3

Onshore$

105.522

89.943

85.2

Offshore TOTAL

943.472 3269.504

682.921 2960.948

72.4 90.6 -9.4

$:IncludingCoal2012-13isatAnnexure-II.BedMethaneproduction.

Company/State ONGC(Offshore) ONGC(Assam) OIL(Rajasthan) OIL(Assam)

Reasonsforshortfall DelayincommissioningofB-193&SB-14processplatformaffectedproduction.DelayinexecutionofG-1 developmentproject. Lackofconsumers. LessthanthecommittedwithdrawalofRajasthanRajyaVidyutUtpadanNigamLimited(RRVUNL). LowwithdrawalbyBrahmaputraValleyFertilizerCorporationLimited(BVFCL).

Pvt./JVCs(Arunachal Productionislessdue tounderperformanceofnewdevelopmentofwellsandsand/wateringressissuesin Pradesh) olderwellsetc. Pvt./JVCs(Gujarat) Lessoilproductionduetointermittentflow.WellAsjol#7closedduetononrevivalafterwork-overjob.Oil wellhaveceasedinBhandut.UnderperformanceofproducingwellsinCamby&CB-OS/2.High watercutin producingwellsinCB-ON/7.Naturaldecline.Wateringressissuesinwellbores.No gasproductionfromthe field aswellshaveceasedduetowaterloading inBoala.Gasproductionwasceasedw.e.f.10.11.2012as perGOIdirectivespriortofieldabandonmentinCB-ONN-2000/2. Pvt./JVCs Gasproductionislessduetounderperformanceofwells. (Rajasthan) Pvt./JVCs (Jharkhand) IncidentallyproducedCBMisbeingsoldinsmallquantities.

Pvt./JVCs(Off-shore) TaptigasproductionislessthanbudgetduetonondeliveryofexpectedvolumesfrominfillwellsandMTA# 3earlywaterbreakthroughfollowedbyloading.Atotalof9wellsinD1,D3 and2wellsinMAhaveceasedto flowduetowater/sandingressinKG-SWN-98/3field.Loadingofwells,delayedwellservicesactivities, delayeddeliveryofPJandPLinfillwellsandclosureofMAwellsdue toleakobservedintheMAriser.Natural AstatementshowingnaturalgasproductionduringOctober,2013andcumulativelyfortheperiodApril-October,2013vis--vis DeclineintheCB-OS/2&Ravvafield.

III.A.REFINERYPRODUCTION

(INTERMSOFCRUDETHROUGHPUT)

Month / Period

October, 2013* AprilOctober , 2013* AprilOctober , 2012

Planne d Target (TMT) 19024.000

Actual Productio n (TMT) 18374.949

%ageachievement

Surplus(+)Shortfall(-) vis target(in%age)

Vis--

96.6 100.2

-3.4 0.2

129906.000 130210.014

Surplus(+ ) Shortfall( )over-4.8 last year(in %age) 3.7

125565.593

*:Provisional. Note:RIL(SEZ)productionfiguresforAugust 2013arerevisedfrom3187TMT to3207TMT&Sept'2013proratedfiguresrevisedfrom3085TMT to 3089andOctober2013figuresareonproratedbasis. ThecrudethroughputinIOC(Guwahati,Digboi,Barauni&Bongaigaon),BPCL(Mumbai,Kochi),HPCL(Mumbai),NRL(Numaligarh),MRPL (Mangalore),ONGC(Tatipaka),HMEL(Bhatinda),RIL(SEZ)&Essarrefinerieshaveexceededtheirplannedtarget. Thecrudethroughputin IOC(Gujarat,Haldia,Mathura&Panipat),HPCL(Visakh),CPCL(Manali&Narimanam),BORL(Bina),&RIL (Jamnagar)refinerieswaslessthantheirplannedtarget.

Company/State

Reasonsforshortfall

IOCL,Gujarat IOCL,Haldia IOCL,Panipat

Throughput islowerduetohighBlackOilinventoryonaccountoflowerBitumen demand. ThroughputisinlinewithlowerHSD&Blackoildemandduringmonsoon. ThroughputisrestrictedduetohigherBlackOilinventory,&probleminDHDTunit. ThroughputislowerbecauseofshiftingofplannedshutdownfromSep'13toOct'13.

IOCL,Mathura LowcrudethroughputduetodetermentofRef1shutdown(MoUshutdownperiod: 16-Sep'13to15-Oct'13,Actual:27Sep'13to01Non'13).CDUII&CDUIIIthruputwaslowerduetoOHCUshutdown(10d LowcrudethroughputforISD(VGO)management. aysinOct'13)forcatalystscooping. LowthruputduetoLSHSupliftmentproblem. CPCL,CBR BORL,Bina Refineryshutdownwastakenfor12daysforreplacementofreformercatalystin Hydrogenunit.

CPCL,Manali

HPCL,Visakh

Astatementshowingrefinery-wiseproductionduringthemonthofOctober,2013andcumulativelyfortheperiodApril-October,2013 vis--vis201213isatAnnexure-III.

III.REFINERYCAPACITYUTILISATION

Month October,2013*

Utilisation(%) 102.2

Perio d April-October,2013

Utilisation(%) 103.5

October,2012

106.6

April-October,2012

100.5

Therefinery-wise detailsofthecapacityutilisationduringOctober,2013andcumulativelyfor theperiodApril-October,2013vis-a-vis 2012-13aregiveninAnnexure-IV. ClickheretoseeAnnexure-I ClickheretoseeAnnexure-II ClickheretoseeAnnexure-III ClickheretoseeAnnexure-IV

RCJ

PressInformationBureau GovernmentofIndia MinistryofPetroleum&NaturalGas


23-December-201315:55IST

ProductionPerformanceofOil&NaturalGassectorforthemonthofNovember, 2013

I. Month/Period

A.CRUDEOILPRODUCTION PERFORMANCE Planned Actual Target(TMT) Production(TMT)

%age achievement

Surplus(+)Shortf all(-)Vis- vistarget (%age)

Surplus(+) Shortfall(-) overlastyear (%age)

November,2013* April-November,2013* April-November,2012 B.COMPANY-WISEACHIEVEMENT Company/State

3323.000 25936.000

3141.427 25159.510 25390.449 PlannedTarget(TMT)

94.5 97.0

-5.5 -3.0

1.1 -0.9

ONGC Gujarat AndhraPradesh TamilNaduAssam Offshore OIL Assam ArunachalPradesh PRIVATE/JVC TOTAL C.REASONSFORSHORTFALL Company/State ONGC(Offshore)

2058.000 410.000 21.000 18.000 103.000 1506.000 321.000 320.000 1.000 944.000 3323.000

Actual Production (TMT) 1805.320 399.068 24.043 18.220 102.743 1261.246 295.700 293.600 2.100 1040.407 3141.427

%age achievement 87.7 97.3 114.5 101.2 99.8 83.7 92.1 91.8 210.0 110.2 94.5

Surplus(+)Shortfall(-) (%age) -12.3

-7.9

10.2 -5.5

ONGC(Gujarat)

Reasonsforshortfall ClosureofwellstomaintainliftGaspressureduetoenginereplacementandoverhaulingofProcessGasCompressor (PGC)atHeera,increasedwatercutinwellB-173A#2YH affected production. Lessthananticipated oilgainfrom new developmentwellsofD1field, delayincommissioningofB-193processplatformaffectedproduction.Delay inexecution ofG1developmentproject.Lessthananticipatedoilgainfrommarginalfieldsdevelopmentwells&sidetrackwells. Less than anticipated oil gain from workoverand new developmentwells affected production. Frequent GEBpower shutdown,ageingoffieldsresultingdeclineinreservoirpressure&increasedwatercutaffectedproduction. Consequentialeffectofbandhsandblockades. Production fromKSG#46 ceasedduetosuddenincreaseinwatercut.Furtherproduction from wells KSG#29,34,57, 11,29,58,65and66hasdeclinedduetosandingressandincreaseinwatercut. NoOilproductions asthewellsareceasedinDholasan&Bhandutfield. BreakdownofpumpatONGCunloadngfacility. HighwatercutinproducingwellsinCB-ON/7. Naturaldecline. Wateringressissuesinwellbores.

OIL(Assam) Pvt./JVCs (ArunachalPradesh) Pvt./JVCs(Gujarat)

AstatementshowingCrudeOilProductionduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis--vis2012-13isat Annexure-I.

II.A. NATURALGASPRODUCTION Month/Period

PlannedTarget(MCM)

November,2013* April-November,2013* April-November,2012 MCM:MillionCubicMetres.

3243.060 25551.867

Actual Production (MCM) 2893.282 23680.411 28048.105

%age achieve-ment 89.2 92.7

Surplus(+) Shortfall()Vis--vis target (%age) -10.8 -7.3

Surplus(+) Shortfall(-)over lastyear (%age) -11.3 -15.6

B. COMPANY-WISEACHIEVEMENT Company/State

PlannedTarget (MCM) 1990.050

ActualProduction(MCM)

%ageachievement

Surplus(+)Shortfall(-) (%age) -3.7

ONGC

1916.136

96.3

Gujarat

113.820

126.508

111.1

http://pib.nic.in/newsite/PrintRelease.aspx

1/4

Rajasthan

1.230

1.479

120.2

AndhraPradesh

83.870

96.708

115.3

TamilNaduAssam

97.560

108.617

111.3

Tripura

38.240

37.461

98.0

MumbaiHighOffshore

72.520

61.913

85.4

1582.810

1483.450

93.7

OIL

224.820

226.402

100.7

0.7

Assam

202.580

205.262

101.3

ArunachalPradesh

1.200

1.518

126.5

Rajasthan

21.040

19.622

93.3

PRIVATE/JVC

1028.190

750.744

73.0

-27.0

Onshore$

113.103

102.293

90.4

Offshore

915.087

648.451

70.9

TOTAL

3243.060

2893.282

89.2

-10.8

$:IncludingCoalBedMethaneproduction.

C. REASONSFORSHORTFALL

Company/State

Reasonsforshortfall

ONGC(Offshore)

DelayincommissioningofB-193&SB-14processplatform affectedproduction. Delayinexecution ofG-1 developmentproject. Lackofconsumers.

ONGC(Assam)

ONGC(Tripura)

Lessofftakebyconsumers.

OIL(Rajasthan)

LessthanthecommittedwithdrawalofRajasthanRajyaVidyutUtpadanNigamLimited(RRVUNL).

Pvt./JVCs (WestBengal)
CBMproducedinsamllquantitiesarebeinginternallyusedandflaredasnomarketinnearvicinity. LessoilproductionduetobreakdownofpumpatONGCunloadngfacility. Highwatercutinproducingwellsin CB-ON/7. Naturaldecline. Wateringressissuesinwellbores.Nogasproductionfromthefieldaswellshave ceasedduetowaterloadinginBoala. Gas productionwasceasedw.e.f.10.11.2012 asperGOIdirectives priortofieldabandonmentinCB-ONN-2000/2. IncidentallyproducedCBMisbeingsoldinsmallquantities.

Pvt./JVCs (Gujarat)

Pvt./JVCs (Jharkhand)

Pvt./JVCs (Off-shore)

TaptigasproductionislessthanbudgetduetonondeliveryofexpectedvolumesfrominfillwellsandMTA#3 earlywaterbreakthroughfollowedbyloading.Atotalof9wellsinD1,D3and2wellsinMAhaveceasedtoflow

http://pib.nic.in/newsite/PrintRelease.aspx

2/4

duetowater/sandingressinKG-SWN-98/3 field. Loadingofwells,delayedwellservicesactivities,delayed deliveryofPJandPLinfillwellsandclosureofMAwellsduetoleakobservedintheMAriser. AstatementshowingnaturalgasproductionduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis--vis2012-13is atAnnexure-II.

III.A.REFINERYPRODUCTION

(INTERMSOFCRUDETHROUGHPUT)

Month/Period

PlannedTarget(TMT)

ActualProduction (TMT)

%age achievement

November,2013*

17818.000

17802.709

99.9

Surplus(+) Shortfall(-) Vis--vis target (in%age) -0.1

Surplus(+) Shortfall(-) overlast year (in %age) -5.0

April-November,2013*

147724.000

147968.305

100.2

0.2

2.5

April-November,2012

144303.636

Note:RIL(SEZ)productionfiguresfor Sept'2013arerevisedfrom3089 TMTto3045TMT&Oct'2013proratedfiguresrevisedfrom3151TMTto 3192andNov'2013figuresareonproratedbasis.

The crude throughput in IOC (Guwahati, Haldia,Digboi, BarauniPanipat&Bongaigaon), BPCL (Mumbai, Kochi), HPCL (Mumbai), NRL (Numaligarh),ONGC(Tatipaka),BORL(Bina),HMEL(Bhatinda)&RIL(SEZ) refinerieshaveexceededtheirplannedtarget. ThecrudethroughputinIOC(Gujarat&Mathura),HPCL(Visakh),CPCL(Manali&Narimanam), MRPL(Mangalore,) RIL(Jamnagar)&Essarrefinerieswaslessthantheirplannedtarget.

Company/State

Reasonsforshortfall

Throughput isrestrictedduetoproblem inCrudeUnitfurnace &HighBlackOilinventoryonaccountoflowerBitumen demand.

IOCL,Gujarat IOCL,Mathura

ThroughputislowerbecauseofshiftingofplannedshutdownfromAug-Sep'13toOct-Nov'13.

http://pib.nic.in/newsite/PrintRelease.aspx

3/4

HPCL,Visakh

LowcrudethroughputforISD(VGO)management.

CPCL,Manali

LowcrudethroughputduetoRef-Ishutdownbasedoneconomics.

CPCL,CBR

LowthruputduetomaintainLSHSproductioninlinewithplannedofftakeandcrudemix.

MRPL,Mangalore

UnitswereundershutdownduetoRefineryblackout.

Astatementshowingrefinery-wiseproductionduringthemonthofNovember,2013andcumulativelyfortheperiodApril-November,2013vis-- vis2012-13isatAnnexure-III.

III.REFINERYCAPACITYUTILISATION

Month

Utilisation(%)

Period

Utilisation(% )

November,2013*

100.7

April-November,2013

102.9

November,2012

107.0

April-November,2012

101.3

Therefinery-wisedetailsofthecapacityutilisationduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis-a- vis201213aregiveninAnnexure-IV.

ClickheretoseeAnnexure

RCJ

http://pib.nic.in/newsite/PrintRelease.aspx

4/4

PressInformationBureau GovernmentofIndia MinistryofPetroleum&NaturalGas

24-January-2014 16:04IST

Production PerformanceofOil&NaturalGassectorforthemonthofDecember,2013

I. Month/Period

A.CRUDEOILPRODUCTION PERFORMANCE Planned Actual %ageachievement Production Target(TMT) (TMT)

Surplus(+)Shortfall()Vis--vistarget (%age)

Surplus(+)Shortfall(-)over lastyear (%age)

December,2013*

3435.000

3256.368

94.8

-5.2

1.6

April-December,2013*

29371.000

28411.237

96.7

-3.3

-0.6

April-December,2012

28595.392

TMT:Thousand Metric Tonnes. . *:Provisional

Note: OilIndia LtdproductionfiguresforNov 2013figuresrevisedfrom3141.427TMTto3136.786. B. COMPANY-WISE ACHIEVEMET Company/State

PlannedTarget (TMT) 2127.000

ActualProduction(TMT)

%age achievement 88.5

Surplus(+)Shortfall(-)(%age)

ONGC

1881.420

-11.5

Gujarat

422.000

411.985

97.6

AndhraPradesh TamilNadu

22.000 19.000

25.112 20.105

114.1 105.8

AssamOffsho

107.000

107.752

100.7

re

1557.000

1316.466

84.6

OIL

335.000

290.860

86.8

-13.2

Assam

334.000

288.816

86.5

http://pib.nic.in/newsite/PrintRelease.aspx

1/5

ArunachalPradesh

1.000

2.044

204.4

PRIVATE/JVC

973.000

1084.088

111.4

11.4

TOTAL

3435.000

3256.368

94.8

-5.2

C.REASONSFORSHORTFALL Company/State

Reasonsforshortfall

ONGC(Offshore)

Closureofwellsforsafetyreasons&maintaininggas liftpressureduringstoppageof ProcessGasCompressor(PGC) formaintenanceatHeera&lessthananticipatedgain from developmentandsidetrackwells ofNeelamfield,increasedwatercutinwellB173A#2YHaffectedproduction.Lessthananticipatedoilgainfromnewdevelopmentwells ofD-1field,delay incommissioningofB-193processplatformaffectedproduction.Delay inexecutionofG1developmentproject. FrequentGEBpowershutdown,ageingoffieldsresultingdeclineinreservoirpressure& increasedwatercutaffectedproduction.

ONGC(Gujarat)

OIL(Assam) Consequentialeffectofbandhsandblockades. Wateringressissuesinwellbores.

Pvt./JVCs (ArunachalPradesh)

Pvt./JVCs (Gujarat)

NoOilproductionsasthewellsareceasedinDholasan&Bhandutfield. Workoverjobin3 wellsdidnotreasultintheprojectedincreaseinproductionandproductionfromCambay77Hyettocommenceduetodelayindrilling.Naturaldeclineandincreasingwatercutin wells.

AstatementshowingCrudeOilProductionduringDecember,2013andcumulativelyfortheperiodApril-December,2013vis--vis201213isatAnnexure-I.

II.

A.NATURALGASPRODUCTION Month/Period Planned Target (MCM) 3351.732

Actual Production (MCM) 3001.676

%age achieve-ment 89.6

Surplus(+)Shortfall(-)Vis- vistarget (%age) -10.4

Surplus(+)Shortfall(-) over last year (%age) -9.9

December,2013*

April-December,2013*

28903.599

26682.087

92.3

-7.7

-15.0

April-December,2012

31379.915

MCM:MillionCubic Metres.*:Provisional.

B. COMPANY-WISEACHIEVEMENT Company/State PlannedTarget(MCM)

ActualProduction(MCM)

%ageachievement

Surplus(+)Shortfall(-)(%age)

ONGCGujarat

2068.620

1999.013

96.6

-3.4

Rajasthan

116.330

119.547

102.8

AndhraPradesh

1.270

1.399

110.2

TamilNadu

84.860

98.740

116.4

102.100

116.199

113.8

http://pib.nic.in/newsite/PrintRelease.aspx

2/5

Assam

39.860

38.952

97.7

Tripura

75.060

68.152

90.8

MumbaiHigh Offshore OILAssa

1649.140

1556.024

94.4

227.690

227.897

100.1

0.1

204.700

206.821

101.0

ArunachalPradesh

1.240

1.609

129.8

Rajasthan PRIVATE/JVC

21.750

19.467

89.5

1055.422

774.766

73.4

-26.6

Onshore$

120.665

102.698

85.1

Offshore

934.757

672.068

71.9

TOTAL

3351.732

3001.676

89.6

-10.4

$:IncludingCoalBedMethaneproduction.

C. REASONSFORSHORTFALL Company/State

Reasonsforshortfall

ONGC(Offshore)

DelayincommissioningofB-193&SB-14processplatformaffectedproduction. Delay inexecutionofG-1 developmentproject.

ONGC(Assam)

Lackofconsumers.

ONGC(Tripura)

Lessofftakebyconsumers.

OIL(Rajasthan)

Lessthanthecommitted withdrawalofRajasthanRajyaVidyutUtpadanNigamLimited(RRVUNL).

Pvt./JVCs (WestBengal) IncidentallyproducedCBMisbeingsoldinsmallquantitiesasthefield iscurrentlyunderdecvelopment. Onlyonewellisproducingandothertwowellsareceasedduetowaterloading.NaturaldeclineinHazirafield.Nogasproductionfr omthefieldaswellshaveceasedduetowaterloadinginBoala. Gasproduction wasceasedw.e.f.10.11.2012asperGOIdirectivesprior tofieldabandonmentinCB-ONN-2000/2. IncidentallyproducedCBMisbeingsoldinsmallquantities.

Pvt./JVCs (Gujarat)

Pvt./JVCs (Jharkhand)

Pvt./JVCs (Off-shore)

KG-OSN-2001/3fieldisunderdevelopment&yettocommencecommercialproductonofgas.Well MercuryisclosedduetowaterloadinginPY-1field.Taptigasproductionislessthanbudgetduetonondeliveryof expectedvolumesfrominfillwellsandMTA#3earlywaterbreakthroughfollowedbyloading.Atotalof9 wellsinD1,D3and2wellsinMAhaveceasedtoflow duetowater/sandingressinKG-SWN-98/3field.

AstatementshowingnaturalgasproductionduringDecember,2013andcumulativelyfortheperiodApril-December,2013vis--vis 2012-13isatAnnexure-II.

http://pib.nic.in/newsite/PrintRelease.aspx

3/5

2/26/2014

PrintRelease

III.A.REFINERYPRODUCTION

(INTERMSOFCRUDETHROUGHPUT) Month/Period PlannedTarget(TMT)

ActualProduction(TMT)

% ageachievement

December,2013*

18232.000

18631.188

102.2

Surplus(+) Shortfall(-) Vis-vistarget (in%age) 2.2

Surplus(+)Shortfall()over lastyear (in%age)

-1.7

April2013*

December,

165956.000

166616.968

100.4

0.4

2.1

April-December,2012

163256.153

Note:RIL(SEZ)productionfiguresforOct132013arerevisedfrom3191.582TMTto 3206TMT&Nov'2013proratedfiguresrevisedfrom 3081.476TMTto3084.533andDec'2013figuresareonproratedbasis. ThecrudethroughputinIOC(Haldia,BarauniPanipat&Bongaigaon),BPCL(Mumbai),HPCL(Mumbai&Visakh),NRL(Numaligarh), MRPL(Mangalore),ONGC(Tatipaka),BORL(Bina),HMEL(Bhatinda), Essar(Vadinar)&RIL(SEZ) refineries haveexceededtheir plannedtarget. Thecrudethroughputin IOC(Guwahati,Gujarat,Digboi&Mathura),BPCL(Kochi),CPCL(Manali&Narimanam)&RIL(Jamnagar) refinerieswaslessthantheir plannedtarget. Company/State Reasonsforshortfall

ThroughputislowerbecauseofoutageinHydroCracjerUnitforhighpressuredrop. IOCL,Mathura Throughputislowerduetohigherbuildupofintermediatesthantheplanwhich willbedepletedinthesubsequentmonths.

BPCLKochi

CPCL,Manali

LowcrudethroughputduetoRef-Ishutdownbasedoneconomics.

CPCL,CBR

LowthruputduetoreducedCrudeavailability.

Astatementshowingrefinery-wiseproductionduringthemonth ofDecember,2013 andcumulativelyfortheperiodApril-December,2013 vis--vis201213isatAnnexure-III.

III.REFINERYCAPACITYUTILISATION Month

Utilisation(%)

Period

Utilisation(%)

December,2013*

102.0

April-December,2013

102.8

December,2012

104.7

April-December,2012

101.7

Therefinery-wisedetailsofthecapacityutilisation duringDecember,2013 andcumulativelyfortheperiodApril-December,2013vis-a-vis 2012-13aregiveninAnnexure-IV.

2/26/2014

PrintRelease

http://pib.nic.in/newsite/PrintRelease.aspx

5/5