Complete Streets Great Streets Living Streets Green Streets

Dale Avenue
CH2MHILL

Process to Date
Reviewed Previous Studies & Public Engagement Interviewed Staff Defined Goals & Evaluation Measures Developed Options for Nodes & Segments Engaged Public Evaluated Input to Narrow to Two Options Developed Two Concepts
Dale Avenue
CH2MHILL

Public Input Findings


Green Space, Trees & Gathering Places Retain Front Yards Safety for All Users Enhance Existing Pedestrian Realm Parking Enhanced Street Character Enhance Business Redevelopment Potential
Dale Avenue
CH2MHILL

Evaluation Measures
Compatibility with Future Land-Uses Compatibility with Existing Land-Use Pedestrian Accessibility Bicycle Accommodation Transit Operations Safety (Conflict Points) Parking Interaction Between Modes of Travel Operations and Maintenance Costs Capital Costs Storm Water Quality Aesthetics
Dale Avenue
CH2MHILL

Nodes
Hanley Laclede Station Rd Bredell

Big Bend

Hawthorne

Bellevue

Node

Dale Avenue

CH2MHILL

HANLEY

BANNEKER

* What is shown in these concepts is phase 1 construction *


HANLEY BANNEKER

City Limits Bicycle Lane Bicycle Sharrow Proposed Sidewalk Edge of Existing Sidewalk

Existing Tree

Land Outside Limits of Construction Land Inside Limits of Construction Rain Garden/Bioswale

Commercial Land Use Institutional Land Use Single Family Land Use Multi-Family Land Use

LACLEDE STATION

HANLEY

LACLEDE STATION

HANLEY

CH2MHILL

Dale Avenue

Dale Avenue

Proposed Tree

Multi-purpose Path

CH2MHILL

* What is shown in these concepts is phase 1 construction *

City Limits Bicycle Lane Bicycle Sharrow Proposed Sidewalk Edge of Existing Sidewalk

Existing Tree

Land Outside Limits of Construction Land Inside Limits of Construction Rain Garden/Bioswale

Commercial Land Use Institutional Land Use Single Family Land Use Multi-Family Land Use

CH2MHILL

Dale Avenue

Dale Avenue

Proposed Tree

Multi-purpose Path

CH2MHILL

* What is shown in these concepts is phase 1 construction *

City Limits Bicycle Lane Bicycle Sharrow Proposed Sidewalk Edge of Existing Sidewalk

Existing Tree

Land Outside Limits of Construction Land Inside Limits of Construction Rain Garden/Bioswale

Commercial Land Use Institutional Land Use Single Family Land Use Multi-Family Land Use

CH2MHILL

Dale Avenue

Dale Avenue

Proposed Tree

Multi-purpose Path

CH2MHILL

* What is shown in these concepts is phase 1 construction *

City Limits Bicycle Lane Bicycle Sharrow Proposed Sidewalk Edge of Existing Sidewalk

Existing Tree

Land Outside Limits of Construction Land Inside Limits of Construction Rain Garden/Bioswale

Commercial Land Use Institutional Land Use Single Family Land Use Multi-Family Land Use

CH2MHILL

Dale Avenue

Dale Avenue

Proposed Tree

Multi-purpose Path

CH2MHILL

Hanley/Dale Intersection
Option- Multi-Use Trail (Concept B)

Option- Bike Lane on Street (Concept A)

* Option on Top scored higher in the evaluation *

Dale Avenue

CH2MHILL

Laclede Sta./Dale Intersection

OptionRoundabout (Concept A)

Option- Chicane (Concept B)

* Option on Top scored higher in the evaluation *

Dale Avenue

CH2MHILL

Bredell/Dale Intersection

OptionRoundabout (Concept A)

Option- Chicane w/ North Plaza (Concept B)

* Option on Top scored higher in the evaluation *

Dale Avenue

CH2MHILL

Big Bend/Dale Intersection

OptionReserved Right Turn (Concept A)

OptionGathering Space (Concept B)

* Option on Top scored higher in the evaluation *

Dale Avenue

CH2MHILL

Hawthorne/Dale Intersection

OptionParallel Parking/Two Way (Concept A)

Option45 Degree Parking/One Way (Concept B)

* Option on Top scored higher in the evaluation *

Dale Avenue

CH2MHILL

Bellevue/Dale Intersection

OptionRoundabout (Concept B)

OptionConventional Intersection (Concept A)

* Option on Top scored higher in the evaluation *

Dale Avenue

CH2MHILL

Segments
Hanley Laclede Station Rd Bredell

Big Bend

Hawthorne

Bellevue

100 ROW 60 ROW

Dale Avenue

CH2MHILL

Dale 100 Segments West of Big Bend

Option-Bulbouts for existing trees (Both Concepts) Dale Avenue


CH2MHILL

Dale 60 Segments East of Big Bend

Option- Bioswale with Vehicles Separated from Bike Lane (Concept B)

Option-Bike Lanes w/ Bulbouts between Parking (Concept A)

* Option Left scored higher in the evaluation *

Dale Avenue

CH2MHILL

What do we want from you?


Review the two concepts. Comment on the options based on three perspectives:
your personal use of the street how the street will relate to your neighborhood how the street will relate to the City as a whole

Note: please be specific about what you like or do not like about each concept or node.
Dale Avenue
CH2MHILL

Next Steps
Open House to engage residents and businesses Evaluate Public Input from tonight Develop Final Concept with Cost Estimate Help in Writing Grant Application