Professional Documents
Culture Documents
Dairy plant
Chilling Centre
Through trucks
Tata 407 = 44 cans Mahindra max = 40 cans Minidor = 20 cans Rickshaw = 8 cans * each can of 40 lit capacity.
Volumes change : Summer and Winter Medium sized union 800 source points, 4-6 Chilling
centers/Dairy plants
Our objective
Minimise transportation cost Validating current routes Scope of improvement Quicker planning
Business constraints
Time Vehicle Capacity Time windows Transportation rate
Methodology
Dairy plant Vehicle type, Capacity, Max Order count, Max travelling Distance
Existing Routes
Optimised Routes
Route Name 1 2 3 4 5 6 7 8 9 10 11 12 13
Vehical type
TATA 407 MAX 207 TATA 407 TATA 407 TATA 407 TATA 407 TATA 407 RIKSHAW Max Mah TATA 407 TATA 207 Max Mah MINI DOR TOTAL
Trip cost
657 521 596 874 645 835 847 112 574 612 588 862 358 8080
Results
EXISTING ROUTES:
No of Routes : 13 Total length : 1445 km / Shift
OPTIMISED ROUTES:
No of Routes : 11 Total length: 1350 km/shift
Conclusion
GIS Technology for Farmers organisation Initial hand holding and training required Better road network Better optimisation