You are on page 1of 5

NEFT SERVIS

NEFT-SERVIS ACTIVITIES It is over a decade since Neft-Service LLC has started supplying equipment for major oil and gas industry of Russia and other CIS countries .

MAIN PRODUCTS and DEVELOPMENTS:

GRANIT HYDRAULIC TUBING TONG : manufacture, delivery, warranty.

SPARE PARTS FOR HYDRAULIC POWER TONGS AND SPIDERS : manufacture and supply of complete package of certified hydraulic tongs and spiders.

UNIQUE DESIGN SOLUTIONS: Special Design Bureau owing to its high skilled design team develops unique products which are often second to none on the Russian market.

RUBIN-146 and RUBIN-168 DOWNHOLE SAFETY VALVE SYSTEM consisting of a packer, automatic down hole safety valve, quick-lock joint with chevron seal and a coupling.

KVARTS-102 and KVARTS-126 SAND JET PERFORATORS are designed for production enhancement of operated wells by means of abrasive jet perforation and thus channeling and fracturing uncased intervals or holes cased with dia. 102 mm to 114 mm pipes (for KVARTS-102) and dia. over 126 mm pipes (for KVARTS-126). CUSTOM-MADE EQUIPMENT

2009 was the year for Neft-Servis LLC to start production of the GRANIT hydraulic tubing tong. We have created our hydraulic power tongs on the background of our best experience accumulated throughout the last 10 years of cooperation with the oil and gas industry of Russia and owing to profound knowledge of our engineering team.

2009 was the year for Neft-Servis to start manufacture of GRANIT spiders. We have created our hydraulic power tongs on the background of our best experience accumulated throughout the last 10 years of cooperation with the oil and gas industry of Russia and owing to profound knowledge of our engineering team.

KVARTS PERFORATOR Perforators specifications KVARTS-102 KVARTS-126 Weight, kg Casing string diameter, mm Perforator length, mm 21 82 760 31 100 814 40 200 126 and more

Max. internal fluid overpressure, MPa 40 Max. operating temperature, Production string diameter, mm 200 102, 114

Description and Application KVARTS-102 and KVARTS-126 sand jet perforators are designed for increasing reservoir recovery of operated wells by means of abrasive jet perforation and thus channeling and fracturing uncased hole intervals or holes cased with pipes of dia. 102 mm, 114mm, 126 mm and more. Perforator makes holes in casing string and cement sheath by means of fluid jet containing sand or other abrasive mix directed by the device nozzles towards the wellbore wall. Advantages - Threaded nozzle seats are properly protected from accidental damage by a reflected jet. - Endures extremely high pressure; used at hydraulic fracturing of formation. - KVARTS-102 perforator has no native analogues. Service and warranty During warranty period Neft-Servis specialists look after the equipment operation and fulfill required maintenance works. Our priorities are the top quality of the products we manufacture and unparalleled customer service.

RUBIN DOWNHOLE SAFETY VALVE SYSTEM System specifications Casing string diameter, mm 146, 168

Adjustable pressure drop sensible by the valve, MPa 1135 Max. operating pressure, Valve inner diameter, mm Outer diameter, mm Weight, kg Length, mm 288 60 139,8161,7 85 1860

System designation RUBIN downhole safety valve system allows closing off bottom-hole formation zones and makes it possible to repair a well without killing thus avoiding deleterious effect of plugging fluid on bottom-hole formation zones and oilbearing formations.

Sphere of application Well types: - Category I gas, oil and water inflow and open flowing susceptible wells; - Wells with abnormally high water-intake capacity; - Wells with more than one productive strata, one of which might be an intake formation; - Wells with abnormal formation pressure; - Wells of low production intervals reservoir properties; - Sidetracked holes. Advantages - Easy assemblage and expedite roundtrip operations in all well types, including crooked ones; - Decrease of a well nonproductive time; - Elimination of pump change operation negative impact on a well deliverability; - Safe operations without killing a well for a period of well pump change and valve repair; - Enhancement of operations ecological level; - Possibility to install the valve in any casing interval and to remove it in case of necessity;

You might also like