Abstract
This paper introduces the cantilever formwork system in san-xi highway construction, in which the composition and advantages
have been briefly illustrated, and the main components including tripod body, pre-buried bolt, concrete, compression member of
the cantilever formwork system have been analyzed on the aspects of strength, stiffness and stability, to ensure the safety of the
formwork system in high pier construction. Then the summary of the overall process of high pier construction has been made and
according to the formwork installation of high pier construction and concrete construction, an available description on the
assemble, cantilever template mold, reinforcement, respectively, was given in the second section construction and other segmental
construction.
Keywords: Cantilever Formwork; High Pier; Structure Calculation; Construction Technology

1 2
1. 230601
2. 230601

80 Km/h
24.5m 12.5m-I
1 630540630 T 5
- 61 http://www.ivypub.org/cet

568. 5 U
55.3m~60.1m

2.1

2.2
1
2
3 600mm
4
5
6 30
7
8
9

3.1
3 KN/m
1.5 KN/m 3.0
9KN 4.0 6 KN
6.5KN 2.5KN/m2 2.53=7.5KN/m
15KN
- 62 http://www.ivypub.org/cet

3.2
10
(12)
9

(11)
11

(10)
(13)
8
(9)
1 2
(1) (2) 3

(6)

(3)

4 (4)

(7)

(5)

(8)

MPa

1
25
6
7
8
912
13

111.5
191.4
71.8
45.9
59.2
125.4
76.9

[(/125)2+ (/215)2]1/2
MPa
15.6
0.533<1
24.2
0.911<1
0
0.334<1
0
0.213<1
0
0.275<1
5.5
0.584<1
0
0.358<1

3.3

3.4
3.4.1

(M30) Ae=560.6 mm2 V / Ae 85.6N / mm2 540N / mm2


540N / mm2 40Cr

3.4.2

(M30) 65 mm A t 20.5cm2

N / Ae 4.88N / mm2 540N / mm2 540N / mm2 40Cr


3.4.3

- 63 http://www.ivypub.org/cet

(D15, L=175mm)
la 1.1 d f y / f t la 54mm
175mm

3.4.4

(D15) 60 mm At=265.5mm2
335 N/mm2
F 335 152 / 4 60KN F / At 226N / mm2 335N / mm2

3.5

3.5.1

F 0.2 fc (2.3h2 bh)


F 0.2 14.3 (2.3 3702 80 370) 985.18KN

3.5.2

F u h [
]
F uh [ ] 80 365 2.1 192.64KN

F=192.64KN F=192.64KN>N=100KN

3.6

3.6.1

m M
N

f
A W1 0.8 N c
NE

2
3
4
5

3.6.2

NE

m M
N
MPa

A W1 0.8 N
NE

130.1
130.4
142.2
142.5

149.7<215
148.2<215
158.9<215
144.0<215

m M

N
MPa
A

W1 0.8

19.6
17.8
16.7
1.5

MPa

'

t M
f
W b

1
2
3
4
10

'A

MPa
13.1
19.7
18.1
16.8
19.2

t M
MPa
W b
104.7
95.6
95.6
104.8
150.2

'A

t M
MPa
W b

117.8<215
115.3<215
113.7<215
121.6<215
169.4<215

- 64 http://www.ivypub.org/cet

3.7

4.1
4.5m 4.6m

4.2
4.2.1

4.2.2

M30
1.5cm
10cm10cm 10
D20

4.2.3

4.3

4.3.1

6MPa 10MPa

- 65 http://www.ivypub.org/cet

4.3.2

300 mm*2500 mm
90 2mm
2mm 10
U 5cm

4.3.3

4.65m 10cm
5cm

4.4

1 48
2

1mm
3
4

REFERENCES
[1]

Cui Buyun. Application of DP-180 Cantilever Template in Variable Hollow Thin-walled High Pier Construction: Journal of
- 66 http://www.ivypub.org/cet

Kunming Metallurgy College, 64-67, Vol. 24, No. 5, September, 2008


[2]

Li Desheng. Design and Construction of High Pier Cantilever Template: Highway Traffic Science and Technology (Technology
Edition), 97-98, Vol. 9, September, 2007

[3]

Shao Xudong. Bridge Engineering, China Communications Press, Beijing, 2004

[4]

Tao Xianyong. Application of Cantilever Formwork System with Wood I-Beams to Construction of Thin-Wall and High-Rise
Piers, World Bridges, 33-35, February, 2004

[5]

Wu Oiu-liang, Liu Zongjian. The Cantilever Climbing Form Construction Technology of Variable Section Hollow Thin-walled
Pier, Chongqing Architecture, 22-24, Vol. 7, 2009

[6]

Xing Jun, Luo Weicheng. Design and Application of Pier Cantilever Large Steel Formwork for Hydropower Station, Water
Resources & Hydropower of Northeast China, 5-7, March, 2010

[7]

Xia Long. Construction Technology of Cantilever Formwork for High Concrete Pier: Construction Technology, 324-327, Vol.
40, June, 2011

[8]

Zhou Shuixing, He Zhaoyi, Zhou Yisong. The Luqiao Handbook of Construction Calculation, China Communications Press,
Beijing, 2001

1981-

2 1963-

1982.9~

2000.9~2004.7

1989.7

2011.9~

Email: ldh2006a@163.com

Email: wgahui@163.com

- 67 http://www.ivypub.org/cet

You might also like