Professional Documents
Culture Documents
,,'R(j{SERfES. ~ -.' Pro Jam (PJ) and Collegiate Jam (CJ) Models
~
'.-.-,
."
...,-..,
-" ,--
-.
+-
",
~-
.:
Lower Yoke P/CJ106 , ~ Breakaway Rim P/CJ 109
r--------
"':::~
~i
""'~~..f111111-
5ide View
-1.
ltlust, #1
_
Complete Assembly
You will need the following Tools & Supplies (not included)
1 - Brick; 7 1/2" x 3 1/2" x 2 1/2" 1 - Set Post Hole Diggers 1 - 5' Steel Bar 2 - 5 Gallon Buckets 1 - 3' Level 5-7 Bags of 80 lb. Quikrete 1 - Tape Measure 1 - Drill with attachment (to secure backboard pad) 1/2" Ratchet 1/2" Open-end Wrench 9/16" Ratchet 9/16" Open-end Wrench 3/4" Ratchet 3/4" Open-end Wrench
Dig hole approximately 20/lx 20/1wide x 44/1deep. Once hele is completed, place the 5' Steel Bar into the backside of the hole. This is so Post can easily slide down it into the hole. Lift Post (with Crank Flanqe facing the backside of hole) up and into hole. Center Post in hole and place Brick in front side of hole 4-6/1below plate to brace Pole from moving forward. (Illustration #2) Place-Post Hole Digger in hole on backside to brace Post against Brick. Vertically level Post in both directions. Pour one bag of concrete in hole, then add water and mix with Steel Bar. Continue adding concrete (one bag at a time) & water until hole is filled to Plate level. Remove Post Hole Digger after hole is 1/2 2/3 full of concrete.
Crank Flange
Front Side
5' Steel Bar
<;
.. IMPORTANT! ..
Remember while pouring concrete to continue to check level of the Post in both directions.
Attach Adjusting Crank to back of Post using 3 sets: 1/1x 5/16/1Bolt D with 3/8/1Flat SteeJ Washer m, 5/16" Split-lock Washer m and 5/16/1 Hex Nut !J . (Illustration #3) l'
Attach Upper Yoke Arm to Post using 2 sets: 2 1/2" x 1/2" Bolt Pl, three 1/2" Nylon Washers 6, two 9/16" Flat Steel WasherS m and 1/2" Hex Lock Nut m. (Illustration #4)
~'
Attach Lower Yoke Arm to Post using 2 sets: 31/2" x 1/2/1Bolt m, two 9/16" Flat.Steel Washers three 1/2" Nylon Washers 6, andf!2/1 Hex LockNut m. (Illustration #4)
m,
. IMPORTANT! .
Nylon Washers are used as a bushing between all
steel-to-steel parts.
6
(-tlilllli
lIIust. #4
Yoke Assembly
Strap to
Lower Yoke
-B
Attach top part of Vertical Straps to Lower Yoke Arm with 2 sets: 3 1/2" x 1/2" Bolt fil, four 9/16" Flat Steel Washers m, six 1/2" Nylon Washers 6, and 1/2" Hex Lock Nut fa. (Upper Illustration #5)
1111I.1
J'~.
6
,8
\
9
IMP.oRTANT! ..
0
Vertical Strap flange straight si9"s are to be positioned inward facing each other. The offset sides are to face outward. Attach bottom part <;>f Vertical Straps to Crank Flange with: 8" x 1/2" Bolt mJ, two 9;:t6'bFlat Steel Washers m, six 1/2" Nylon Washers 6, 1/2" Hex Lock Nut fa ,and two black Steel Spacers 1m. (Lower Illustration #5)
.. IMPORTANT! ..
Tighten all bolts snug. Do not over tighten nuts.
lIIust. #5
43
Lower Yoke Arms to lowest position. Attach Backboard to Upper Yoke Arms with 2 sets: 2 1/2" x 1/2" Bolt la, 9/16" Flat Steel Washer m, three 1/2" Nylon Washers 6,9/16" Split-lock Washer lEI, and 1/2" Hex Nut m1 (Illustration #6). Attach Backboard to Lower Yoke Arms with 2 sets: 4" x 1/2" Bolt m, two 9/16" Flat Steel Washers m, four or more 1/2" Nylon Washers 6, and 1/2" Hex Lock Nut (Illustration #6).
U-Shaped -----Backboard Frame PJ107 CJ107 Lower Yoke Arm P/CJ106 ~===~~
.. IMPORTANT! ..
Ira_Ira I --ro -r
I I
'----0(;
Qo---J
CJ107\
I
Place four 1" x 9/16" gray plastic Rim Spacers Ira into Backboard mounting holes (Illustration #7), and then follow Rim Installation Instructions found in the Rim Hardware box.
Backside of Backboard
View
lIIust. #7
Rim Spacers
Apply Calibration Decal to Post (Illustration #8) unless optional Pole Pad is being installed in which case consult end user.
ADDITIONAL INSTRUCTIONS
Calibration Decal
P/CJ110
Backboard Pads
U-shaped black urethane pads for bottom portion of backboard. Instructions found inside pad box. Upper Post
P/CJ 101
P/CJ111
"IMPORTANT!
After installation is complete, this instruction sheet should be given to the end user for future reference, warranty and replacement parts.
Qty. Req.
3 3 3 3 4 22 40 9 4 1 2 2 2
>
Description
2
4 1 1
1
2 1 1 1 1 1 1 1 1 1
PJ PJ PJ
PJ
1" x 5/16" -18 Hex Head Bolt 3/8" Flat Steel Washer 5/16" Slit-lock Washer 5/16" - 18 Hex Head Nut 21/2" X 1/2" -13 Hex Head Bolt 9/16" Flat Steel Washers 1/2" Nylon Washers 1/2" -13 Hex Lock Nut 31/2" X 1/2" -13 Hex Head Bolt 8" x 1/2" -13 Hex Head Bolt 4" x 1/2" -13 Hex Head Bolt 1/2" Solit-Lock Washer 1/2" -13 Hex Head Nut Tubular Steel Spacers 2" x 1" (Black) Tubular Plastic Spacers 1" x 9/16" (Gray) Vertical Post - 6" x 6" X 13'4" Anchor Sleeve - 6" x 6" X 44" w/ Hardware Adiustable Crank Vertical Straps - Tubular Steel 1 1/2" x 1" X 80" Upper Yoke (Tubular Steel) PJ: 2" x 1"/72 112" wide CJ: 1 1/2" x 1"/60 1/2" wide Lower Yoke (Tubular Steel) 3" x 2"/53 112" wide Backboard Frame (Tubular Steel) PJ: 70" x 40 1/2" wide CJ: 58" x 381/2" wide Acrylic Backboard wi Aluminum Frame PJ: 72"x42"x1/2" wide CJ: 60"x40"x1/2" Rim - Heaw Duty Breakaway Calibration Decal White Vinvl Strio Backboard Pads (Optional) Pole Pad (Optional)