Steps to create new project. 1 Open blank Microsoft office project file.

2 Create new calendar according to the given data.:TOOLS-CHANGE WORKING TIME 3 Specify the start date of the project and calendar.PROJECT MENU- PROJECT INFORMATION 4 Assign the calendar in GANTT area. 5 Add activities.(Copy activities from given excel sheet). 6 Assign the WBS.Your WBS code & given WBS code should match. 7 Link activities.

NFORMATION

4 Prepare the WBS as given below only.The WBS code should match with given WBS code. i.e.A37 to A143 5 Please do not edit the given data.
Outline Code 1 1.1 1.2 1.2.1 1.2.2 1.3 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8 1.3.9 1.3.10 1.3.11 1.3.12 1.3.13 1.3.14 1.3.15 W.B.S 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.2 1.2.1 1.2.1.1. 1.2.1.2 1.2.1.3 1.2.1.4 1.2.1.5 1.2.1.6 1.2.2 1.2.2.1 1.2.2.2 1.2.2.3 1.2.2.4 1.2.2.5 1.3 1.3.1 1.3.1.1 1.3.1.2

W.B.S. NAME

Level Of WBS 1 2 2 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
DURATIONS (day)

Project "ABC"
General works Substructure Foundations Basement RCC Superstructure Ground Floor RCC First Floor RCC Second floor RCC Brickworks, door frames Internal Plaster External Plaster Concealed Conduiting & Waterproofing Aluminum Windows & grills Fixing Toilet Dado TILING Flooring & Kitchen Dado Fixing doors shutters Internal Painting External Painting Sanitory Wares & Electrical Fittings Building Services TASK NAMES

1.Project "ABC"

1.1 General

1.2 Substructure

1.3 Superstructur e

PROJECT "ABC"
General works Obtain building permits Install temporary power Install temporary water service Set up site office Prepare site - lay down yard and temporary fencing Clear the site Lineout Substructure Foundations Excavations of foundations Excavations of elevator pit P.C.C. for all footings Reinforcement works for footings and columns Formwork for footings Prepare and pour concrete for basement floor Basement (RCC) Casting of Columns Casting of Lift wall Casting of Staircase Shuttering work for slab Slab casting Superstructure Ground Floor (RCC) Casting of Columns Casting of Lift wall 4 2 2 2 2 3 2 3 3 3 6SS 7SS+1 day 8FS-1 day,4,5,6,7

7 1 2 7 3 3 12 5 7 7 1

9 9 13 14SS+2 days 15SS+6 days,12,14 16FS+1 day 18SS+2 days 18SS+2 days 18SS+6 days 21,18,19,20

12 5

22 25SS+2 days 25SS+2 days

1.3.1.3 1.3.1.4 1.3.1.5 1.3.2 1.3.2.1 1.3.2.2 1.3.2.3 1.3.2.4 1.3.2.5 1.3.3 1.3.3.1 1.3.3.2 1.3.3.3 1.3.3.4 1.3.3.5 1.3.4 1.3.4.1 1.3.4.2 1.3.4.3 1.3.4.4

Casting of Staircase Shuttering work for slab Slab casting First Floor (RCC) Casting of Columns Casting of Lift wall Casting of Staircase Shuttering work for slab Slab casting Second floor (RCC) Casting of Columns Casting of Lift wall Casting of Staircase Shuttering work for slab Slab casting Brickworks, fixing of door frames Basement Ground First Second

7 7 1 12 5 7 7 1 12 5 7 7 1 10 10 10 10

27SS+2 days 25,28,26,27 29 31SS+2 days 31SS+2 days 33SS+2 days 31,34,32,33 35 37SS+2 days 37SS+2 days 39SS+2 days 37,40,38,39 22FS+15 days 29FS+15 days 35FS+15 days 41FS+15 days

1.3.5 1.3.5.1 1.3.5.2 1.3.5.3 1.3.5.4 1.3.6 1.3.6.1 1.3.6.2 1.3.6.3 1.3.6.4 1.3.7 1.3.7.1 1.3.7.2 1.3.7.3 1.3.7.4

Internal Plastering Basement Ground First Second External Plastering Backside surface Left side surface Front side surface Right side surface External Painter Backside surface Left side surface Front side surface Right side surface Concealed Conduiting (Plumbing) & Waterproofing for toilets and bathrooms Basement Ground First Second Aluminum Windows & grills Fixing Basement Ground First Second Toilet Dado Basement Ground First Second TILING Flooring & Kitchen Dado Basement Ground First Second FIXING DOOR SHUTTERS Basement Ground First Second Internal Painting Basement Ground First Second Sanitory Wares & Electrical Fittings Basement Ground First Second Building Services Procurement of lift Lift Installation work Procurement of DG Procurement of Transformor Installation of DG Installation of Transformor

9 9 9 9 10 7 10 7 9 7 9 7

43 44,48 45,49 46 43,44,45,46 53 54 55 53 54,58 55,59 56,60

1.3.8 1.3.8.1 1.3.8.2 1.3.8.3 1.3.8.4 1.3.9 1.3.9.1 1.3.9.2 1.3.9.3 1.3.9.4 1.3.10 1.3.10.1 1.3.10.2 1.3.10.3 1.3.10.4 1.3.11 1.3.11.1 1.3.11.2 1.3.11.3 1.3.11.4 1.3.12 1.3.12.1 1.3.12.2 1.3.12.3 1.3.12.4 1.3.13 1.3.13.1 1.3.13.2 1.3.13.3 1.3.13.4 1.3.14 1.3.14.1 1.3.14.2 1.3.14.3 1.3.14.4 1.3.15 1.3.15.1 1.3.15.2 1.3.15.3 1.3.15.4 1.3.15.5 1.3.15.6

7 7 7 7 10 10 10 10 10 10 10 10 7 7 7 7 8 8 8 8 15 15 15 15 7 7 7 7 60 15 15 15 15 15

43,61 44,63 45,64 46 48,88 49,89,68 50,90,69 51,91,70 63 64,73 65,74 66,75 48 49,78 50,79 51 48 49,83 50,84 51,85 78 79,88 80,89 81,90 48 49,93 50,94 51,95 16 56FS+7 days 18SS+2 days,99 18SS+2 days 28 28 61SS+4 days

1.3.15.7 1.3.15.8 1.3.15.9

HT & LT Cabling work Fire fighting system Building Finishing

15 15 3

66SS+5 days

Tips. 1) Select any activity and decide which activity will be predecessors and successors for the current activity. 2) If possible, link activities in parallel 3) Except first and last activity, remaining all activities should not be open ended 4) Try to reduce the total project durations. 5) All relationships between activities shouls be realistic Q.N.1 Find the total durations of the above project.

Strictly follow the following steps to assign the resources 1 Change the existing currency and specify new indian currency INR, sym 2 Copy following resources in the resource sheet

Assumption: To execute all works, it is alloted to sub co materials.


1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOURCE NAME R.C.C. 100 mm Thk. Wall 150 mm Thk . Wall 200 mm Thk wall FW door Qty Door frames Internal Plaster celling Plaster Toilet s water Proofing Aluminium powder coated sliding windows Cermic- Glazed Tiles Virtified Tiles Flooring Virtified Tiles Skirting Cermic Tiles Flooring Cermic Tiles Skirting Anti-Skid Ceramic Tiles Black Granite platform in kitchen D1 D2 D3 D4 Internal Painting Sanitary Wares & Electrical Fittings External plastering External painting Excavation P.C.C. Female coolie Male coolie Material label CUM Sqm Sqm Sqm Sqm Rm Sqm Sqm Sqm Sqm Sqm Sqm Rm Sqm Rm Sqm Rm Sqm Sqm Sqm Sqm Sqm Sqm sqm sqm cum cum

Before assigning any resources please follow next steps 1) Select all activities 2) Right click, task information,select advanced,select task type as fixed durations
W.B.S TASK NAMES DURATION (day)

1
1.1

Project "ABC"
General works Obtain building permits 4

1.2 1.2.1

Install temporary power Install temporary water service Set up site office Prepare site - lay down yard and temporary fencing Clear the site Lineout Substructure Foundations

2 2 2 2 3 2

1.2.2

1.3 1.3.1

1.3.2

1.3.3

Excavations of foundations 7 Excavations of elevator pit 1 P.C.C. for all footings 3 Reinforcement works for footings and columns uptp basement floor 7 Prepare and pour concrete for basement floor 7 Basement (RCC) Casting of Columns 12 Casting of Lift wall 5 Casting of Staircase 7 Shuttering work for slab 7 Slab casting 1 Superstructure Ground Floor (RCC) Casting of Columns 12 Casting of Lift wall 5 Casting of Staircase 7 Shuttering work for slab 7 Slab casting 1 First Floor (RCC) Casting of Columns 12 Casting of Lift wall 5 Casting of Staircase 7 Shuttering work for slab 7 Slab casting 1 Second floor (RCC) Casting of Columns 12 Casting of Lift wall 5 Casting of Staircase 7 Shuttering work for slab 7 Slab casting 1 Brickworks, fixing of door frames

1.3.4

Basement

10

Ground

10

First

10

1.3.5

1.3.6

1.3.7

1.3.8

1.3.9

1.3.10

Second Internal Plastering Basement Ground First Second External Plastering Backside surface Left side surface Front side surface Right side surface External Painter Backside surface Left side surface Front side surface Right side surface Concealed Conduiting (Plumbing) & Waterproofing for toilets and bathrooms Basement Ground First Second Aluminum Windows & grills Fixing Basement Ground First Second Toilet Dado Basement Ground First Second TILING Flooring & Kitchen Dado

10 9 9 9 9 10 7 10 7 9 7 9 7

7 7 7 7 10 10 10 10 10 10 10 10

1.3.11

Basement

Ground

First

1.3.12

1.3.13

1.3.14

1.3.15

Second FIXING DOOR SHUTTERS Basement Ground First Second Internal Painting Basement Ground First Second Sanitory Wares & Electrical Fittings Basement Ground First Second Building Services Procurement of lift Lift Installation work Procurement of DG Procurement of Transformor Installation of DG Installation of Transformor HT & LT Cabling work Fire fighting system Building Finishing

7 8 8 8 8 15 15 15 15 7 7 7 7 15 15 15 15 15 15 15 15 3

Find the total cost of the project.

ssign the resources ify new indian currency INR, symbol is Rs.

rks, it is alloted to sub contractor with materials.


RATES 6000 550 550 550 2600 450 250 100 650 2400 100 900 90 700 70 700 5000 2500 1350 1350 1350 50 50 275 75 100 1500 150/d 200/d

select task type as fixed durations


BUDGETED RESOURCES

All works will be executed by the sub-contractor only.


Rs. 15,000

Rs. 25,000 Rs. 10,000 Rs. 25,000 Rs. 15,000 Rs. 5,000 Rs. 35,000

Excavation (125 cum) Excavation (50 cum) P.C.C.(15 cum) Rcc (20 cum) Rcc (35 cum) Rcc (30cum) Rcc (2cum) Rcc (1.5cum) Rcc (90 cum)

Rcc (30cum) Rcc (2cum) Rcc (1.5cum) Rcc (90 cum) Rcc (30cum) Rcc (2cum) Rcc (1.5cum) Rcc (90 cum) Rcc (30cum) Rcc (2cum) Rcc (1.5cum) Rcc (90 cum)

100 mm Thk.wall(280 sqm),150mm thk.wall(480 sqm),200mm thk.wall(240 sqm),FW door Qty(50 sqm),Door frames(sal wood)(210 Rm) 100 mm Thk.wall(280 sqm),150mm thk.wall(480 sqm),200mm thk.wall(240 sqm),FW door Qty(50 sqm),Door frames(sal wood)(210 Rm)

100 mm Thk.wall(280 sqm),150mm thk.wall(480 sqm),200mm thk.wall(240 sqm),FW door Qty(50 sqm),Door frames(sal wood)(210 Rm) 100 mm Thk.wall(280 sqm),150mm thk.wall(480 sqm),200mm thk.wall(240 sqm),FW door Qty(50 sqm),Door frames(sal wood)(210 Rm) Internal Plaster (2849 SQM),celling plaster (964 sqm) Internal Plaster (2849 SQM),celling plaster (964 sqm) Internal Plaster (2849 SQM),celling plaster (964 sqm) Internal Plaster (2849 SQM),celling plaster (964 sqm) External Plaster (500 SQM) External Plaster (500 SQM) External Plaster (500 SQM) External Plaster (500 SQM) External Plaster (500 SQM) External Painting (500 External Painting (500 External Painting (500 External Painting (500 SQM) SQM) SQM) SQM)

Toilet s water Proofing (77 sqm) Toilet s water Proofing (77 sqm) Toilet s water Proofing (77 sqm) Toilet s water Proofing (77 sqm) Aluminium powder coated sliding windows(80 sqm) Aluminium powder coated sliding windows(80 sqm) Aluminium powder coated sliding windows(80 sqm) Aluminium powder coated sliding windows(80 sqm) Cermic- Glazed Tiles (340 sqm) Cermic- Glazed Tiles (340 sqm) Cermic- Glazed Tiles (340 sqm) Cermic- Glazed Tiles (340 sqm)

Virtified Tiles Flooring (495 sqm),Vetrified tiles skirting(566 Rm),Cermic flooring(143 sqm),Cermic tiles skirting(199 Rm),Anti-skid ceramic tiles (165 sqm),black granit platform in kitchen(21 RM) Virtified Tiles Flooring (495 sqm),Vetrified tiles skirting(566 Rm),Cermic flooring(143 sqm),Cermic tiles skirting(199 Rm),Anti-skid ceramic tiles (165 sqm),black granit platform in kitchen(21 RM)

Virtified Tiles Flooring (495 sqm),Vetrified tiles skirting(566 Rm),Cermic flooring(143 sqm),Cermic tiles skirting(199 Rm),Anti-skid ceramic tiles (165 sqm),black granit platform in kitchen(21 RM) Virtified Tiles Flooring (495 sqm),Vetrified tiles skirting(566 Rm),Cermic flooring(143 sqm),Cermic tiles skirting(199 Rm),Anti-skid ceramic tiles (165 sqm),black granit platform in kitchen(21 RM) D1(15 SQM),D2(37 SQM),D3(11 SQM),D4(41 SQM) D1(15 SQM),D2(37 SQM),D3(11 SQM),D4(41 SQM) D1(15 SQM),D2(37 SQM),D3(11 SQM),D4(41 SQM) D1(15 SQM),D2(37 SQM),D3(11 SQM),D4(41 SQM) Internal Painting Internal Painting Internal Painting Internal Painting (2850 sqm) (2850 sqm) (2850 sqm) (2850 sqm)

Sanitary Wares & Electrical Fittings (10156 sqm) Sanitary Wares & Electrical Fittings (10156 sqm) Sanitary Wares & Electrical Fittings (10156 sqm) Sanitary Wares & Electrical Fittings (10156 sqm) Fixed cost Rs.400000 Fixed cost Rs.25000 Fixed cost Rs.300000 Fixed cost Rs.100000 Fixed cost Rs.15000 Fixed cost Rs.300000 Fixed cost Rs.50000 Fixed cost Rs.15000 Total male coolie -15,Total female coolie -15

BALCONY UTILITY

TOILET BEDROOM

LIVING

KITCHEN C. BEDROOM

DINING TOILET BALCONY M. BEDROOM

TOILET

UTILITY

KITCHEN

UTILITY

TOILET BEDROOM

LIVING

KITCHEN C. BEDROOM

DINING TOILET BALCONY M. BEDROOM

TOILET

UTILITY

KITCHEN

LOBBY

C. BEDROOM

TOILET

LIVING

TOILET KITCHEN TOILET DINING KITCHEN

M. BEDROOM BALCONY

BEDROOM BALCONY

UTILITY

UTILITY

TYPICAL

BALCONY UTILITY BALCONY BALCONY UTILITY UTILITY BALCONY

BEDROOM BEDROOM LIVING DINING BALCONY BALCONY DINING DINING BEDROOM

M. BEDROOM

OILET BEDROOM

TOILET KITCHEN KITCHEN KITCHEN TOILET M. BEDROOM DINING TOILET LIVING TOILET TOILET TOILET M. BEDROOM TOILET LIVING LIVING TOILET C. BEDROOM

UTILITY

KITCHEN

UTILITY

BALCONY

BALCONY

UTILITY

UTILITY

BALCONY

BEDROOM BEDROOM LIVING DINING BALCONY BALCONY DINING DINING BEDROOM

M. BEDROOM

OILET BEDROOM

TOILET KITCHEN KITCHEN KITCHEN TOILET M. BEDROOM DINING TOILET LIVING TOILET TOILET TOILET M. BEDROOM TOILET LIVING LIVING TOILET C. BEDROOM

UTILITY

KITCHEN

LIFT

LIFT
LOBBY

LOBBY

HOSP.LIFT

HOSP.LIFT

TOILET LIVING LIVING TOILET M. BEDROOM

TOILET LIVING TOILET M. BEDROOM TOILET LIVING TOILET C. BEDROOM

TOILET KITCHEN DINING KITCHEN KITCHEN KITCHEN DINING

DINING

DINING

TOILET

BALCONY BEDROOM

BALCONY BEDROOM BEDROOM BALCONY BALCONY M. BEDROOM

OM BALCONY BALCONY

UTILITY

UTILITY

UTILITY

UTILITY

TYPICAL FLOOR PLAN

BALCONY BALCONY BEDROOM M. BEDROOM

DINING TOILET

TOILET

LIVING

TOILET

C. BEDROOM

BALCONY BALCONY BEDROOM M. BEDROOM

DINING TOILET

TOILET

LIVING

TOILET

C. BEDROOM

LIVING

TOILET

C. BEDROOM

TOILET

DINING

TOILET

BEDROOM BALCONY

M. BEDROOM BALCONY