Landslide damaged headrace tunnel of Pucara hydroelectric power plant in Ecuador. A concrete-lined bypass tunnel (519 m, = 2. M) with a 380 m long access tunnel was selected as best solution. Studies were carried out to minimize economic losses caused by the plant's closure and by possible reservoir water spillage.
Landslide damaged headrace tunnel of Pucara hydroelectric power plant in Ecuador. A concrete-lined bypass tunnel (519 m, = 2. M) with a 380 m long access tunnel was selected as best solution. Studies were carried out to minimize economic losses caused by the plant's closure and by possible reservoir water spillage.
Landslide damaged headrace tunnel of Pucara hydroelectric power plant in Ecuador. A concrete-lined bypass tunnel (519 m, = 2. M) with a 380 m long access tunnel was selected as best solution. Studies were carried out to minimize economic losses caused by the plant's closure and by possible reservoir water spillage.