Professional Documents
Culture Documents
Open 30% Open 25% Open 50% Open 50% Open 15% Open 25% Open 50% Open 50% Open 15% Close Close Close Close Close Close Close
Open 20% Open 20% Open 20% Open 50% Open 15% Open 20% Open 20% Open 50% Open 15% Close Close Close Close Close Open 50% Close
Open 20% Open 20% Open 20% Open 50% Open 15% Open 20% Open 20% Open 50% Open 15% Close Close Close Close Close Open 50% Close
- Before Start BCP Level Drum : 200mm - BCP A Start - BCP B Start ( When Level Drum : 0 mm)
3.
Start Up Air & Gas System with the sequence as follows; a. Start RAPH A & B b. Start IDF A c. Start FDF A d. Start IDF B e. Start FDF B f. Start TV Camera / Flame Detector Cooling fan g. Adjusting Total air flow > 30%
4. 5. 6. 7. 8. 9. 10.
FURNACE PURGING FUEL OIL LEAK TEST START PRIMARY AIR SYS START 1ST PAIR OIL BURNER LIGHT OFF 2ND PAIR OIL BURNER LIGHT OFF OIL BURNER LOAD PROGRAM AUTO AUX STEAM START
Time to Furnace Purging is 300 s Time to Furnace Purging is 150 s Confirm that PAF A & B Start Confirm that Oil Burner CD 1 & 3 Start Confirm that Oil Burner CD 2 & 4 Start
Wait Until Main Steam Pressure reach 20 barg after that aux. steam PCV and CV will open until header pressure aux steam reached 14 barg and temperature 270 C
3.
CV WARMING START
- CV Warming is complete until temperature CV Outlet Metal reach to 180 C or get warming for 1 hour so can continue to next step.
TURBINE START
1. TURBINE START - Confirm that turbine speed Increase to 400 RPMwith accelerating rate 100 rpm/min (for Warm : 150rpm/min, Hot and Very Hot : 200rpm/min ) and confirm that turning gear stop & engage when turbine speed increase 2 rpm. - Warming 1st Pulv. After Turbine speed >100 RPM -Check : a. Abs. Lmst Feed Sys start b. Lmst Feed Tank Start c. ME Wash Pump Start d.ME Wash Sys. Start e.Abs. Lvl Cntrl Start (SP : 6620mm) f.Oxi. Air Blower Start g. Abs. Recirc. Pump A/B/C Start 4. 5. FLY ASH SYS START RUB CHECK - Rub Check turbine from local by local operator turbine when speed turbine reach to 400 rpm - Check parameter turbine : vibration, temperature, eccentricity, expansion turbine - Make sure the state of oil sight of each bearing is normal condition - After get confirmation from local, that the condition turbine during rub check is safe, increase turbine speed to 700 rpm 6. 7. 8. TBN SPEED UP TO 700rpm START OIL BURNER AB 1-3 AND 2-4 LOW SPEED HEAT SOAK - Start Oil Burner when Turbine Speed 700 rpm - Time for low speed heat soak is 0 or 30 min after turbine speed reach 700 rpm (depend on miss match temperature) (for Warm, Hot, and Very Hot start up no Low Speed Heat Soak)
2. 3.
9. 10. 11.
TBN SPEED UP TO 3000rpm START OIL BURNER EF 1-3 HIGH SPEED HEAT SOAK
- Check parameter turbine : vibration, temperature, eccentricity, expansion turbine. - Start Oil Burner when Turbine Speed 3000 rpm - Time for high speed heat soak is 40 min after turbine speed reach to 3000 rpm (for Warm : 30min, Hot : 10 or 30 min, and Very Hot : 0min)
UNIT LOAD UP 2
1. UNIT LOAD UP TO 50%LOAD - For Load up to 50 %, Load Rate is 3.48 MW/min (for Warm : 6.96 MW/min, Hot : 6.96 MW/min, Very Hot : 6.96 MW/min)
2. 3. 4. 5.
4TH PULV. WARMING START 4TH COAL BURNER START 2ND TBFP UNIT LOAD UP TO 75% LOAD
At Load > 190MW - 4th Coal Burner Start when load > 300 MW - 2nd TBFP inservice when load reach 50 % - For Load up to 75%, Load Rate is 6.96 MW/min (for Warm : 10.44 MW/min, Hot : 13.92 MW/min, Very Hot : 13.92 MW/min)
6. 7. 8.
5TH PULV. WARMING START 5TH COAL BURNER UNIT LOAD UP TO 100% LOAD
At Load >350MW - 5th Coal Burner Start when load >450 MW - For Load up to 100%, Load Rate is 6.96 MW/min (for Warm : 10.44 MW/min, Hot : 13.92 MW/min, Very Hot : 13.92 MW/min)
9. 10.