PROGRESS OF PROJECT ADB LOAN NO.2289 (US$226.

000 MILLION)
FOR POWER TRANSMISSION ENHANCEMENT PROGRAMME
UNDER C.E.(EHV-I) NTDC ORGANIZATION

(TRANCHE-I)
STATUS AS ON 15-04-2010
Sr.
No.
1.

2.

3.

Name of Project

Ext. at 500 KV Lahore


(Sheikhupura) Substation
(Lot-I)

Present Status

Energized and commissioned on No


Load on 07.07.2009 and on Load on
08.07.2009.

Extension at 500 KV Sheikh


Muhammadi Substation

Transformer foundation completed.


220KV equipment foundation in
progress.
Transformer reached at site. Chinese
erectors awaited.
Overall Progress of completion 72%.
Balance material yet to be allocated.
Protection drawings yet to be issued.

Ext. at 500 KV Gatti


(Faisalabad)Sub Station
(Lot-II)

4.

5.

Energized and Commissioned on No Load


on 14.02.2009 and on load on 21.02.2009.

Extension of 500 KV Tarbela


Power House Switch Yard

Transformer shifted to site. Chinese


erectors visited site and due to some
discrepancies of pipes and Gaskits
they have returned to China and will be
back in April.
Foundations work completed.
Overall Progress of completion 72%.
Balance material yet to be allocated.
Protection drawings yet to be issued.

Extension of 220 KV Mangla


Power House Switch Yard

Transformer installed, assembled and


dehydration completed.
Wiring & Testing under progress.
Overall Progress of completion 94%.

Expected
Date of
Completion
Completed

Completed

June, 2010
subject to Law &
Order
improvement

June, 2010

May, 2010

(2)
6.

Ext. of 220 KV Bannu Sub


Station

Contract signed with M/s Potential.


Foundation work 80% completed.
Transformer shifting delayed due to
security reasons.
Overall Progress 30%.
Balance material yet to be allocated.
Protection drawings yet to be issued.

December, 2010
Subject to Law &
Order
Improvement

August 23, 2009


(Completed)

7.

Extension
Ludewala.

KV

Transformer commissioned On Load


on 23.08.2009.

8.

Augmentation of 220 KV GIS


Islamabad University

Transformer commissioned On Load


on 19.12.2009 at 13:39 hrs.

9.

of

220

Upgradation of existing 132


KV to New 220 KV GIS at
WAPDA Town Lahore Sub
Station

10

11.

Tender No.ADB-16R-2008

(Lot-I).
Looping In/Out at Ghazi
Barotha Shahi Bagh at
Mardan Sub Station

Tender No.ADB-16R-2008
.
(Lot-II).

220 KV D/C T/Line Feed for


WAPDA Town Substation

Civil works Progress:


a)
AIS Portion = 100%
b)
GIS Portion = 100%
GIS Hall completed.
Erection of 03 Nos. 220/132kV
Transformers
completed
and
dehydration completed.
Erection
of
GIS
equipments
completed. Testing in progress.
Wiring in progress.
Overall Progress of completion 84%

EPA has issued NOC/ Environ- mental


approval in favour of NTDC
Length of T/Line = 27 KM.
Total Location = 86.
Concreted = 67 Nos.
Overall Progress 40%
R.O.W problem at Mardan end is
being resolved
Severe Right of Way Problem which is
being resolved.
Length of T/Line = 06 KM
Total Locations = 37 Nos.
Concreted = 27 Nos.
Overall Progress = 40%

19.12.2009
13:39 hrs

June 2010

June 2010

June 2010

(3)
12.

13

14

15

Tender No.ADB-16-2007
(Lot-III).
For 220KV D/C T/Line for In &
Out of one Circuit of GattiKala Shah Kaku T/Line at
220KV Bandala Substation.

Installation of SVCs at 220 KV


NKLP Lahore

Upgradation of 220 KV Bandala


Grid Station and Allied 220kV
T/Line feed for 220kV Bandala
G/Station.

Length of Line = 6.33 KM


Total Location = 22 Nos.
Concreted
= 22 Nos.
Erection
= 19 Nos.
Back Fillling = 22 Nos
Overall Progress = 8%

June 2010

Turnkey tenders for Installation of


SVCs at 220kV NKLP opened on
13.02.2010 and evaluation report
received from C.E Design is under
process.
Possession of land already taken.
Work for boundary wall in progress.
Contract agreement signed on
23-01-2010.

December, 2011

December, 2011

Extension / Augmentation of
existing 500 & 220 KV Grid
Staions of NTDC System
i)
ii)
iii)
iv)

Extension of 220 KV
Burhan Sub Station
Extension of 500 KV
Sheikh Muhammadi
Sub Station
Argumentation
of
220 KV Murdan Sub
Station
Augmentation
of
New Rewat Sub
Station

Bidding Documents are prepared


by

Chief

Engineer

(Design)

NTDC

Tender

will

10-05-2010

be

opened

on

December -2010

NTDC RUNNING PROJECTS TO BE COMPLETED UPTO 30.06.2010


UNDER C.E.(EHV-I) NTDC ORGANIZATION
Sr.
No.
1.

Name of Project

Present Status

Extension at 500 KV Sheikh


Muhammadi Substation

2.

3.

4.

Extension of 500 KV Tarbela


Power House Switch Yard

Transformer foundation completed.


220KV equipment foundation in
progress.
Transformer reached at site. Chinese
erectors awaited.
Overall Progress of completion 72%.
Balance material yet to be allocated.
Protection drawings yet to be issued.

Transformer shifted to site. Chinese


erectors visited site and due to some
discrepancies of pipes and Gaskits
they have returned to China and will be
back in April.
Foundations work completed.
Overall Progress of completion 72%.
Balance material yet to be allocated.
Protection drawings yet to be issued.

Extension of 220 KV Mangla


Power House Switch Yard

Transformer installed, assembled and


dehydration completed.
Wiring & Testing under progress.
Overall Progress of completion 94%.

Ext. of 220 KV Bannu Sub


Station

Contract signed with M/s Potential.


Foundation work 80% completed.
Transformer shifting delayed due to
security reasons.
Overall Progress 30%.
Balance material yet to be allocated.
Protection drawings yet to be issued.

Expected
Date of
Completion

June, 2010
subject to Law &
Order
improvement

June, 2010

March, 2010

December, 2010
Subject to Law &
Order
Improvement

(2)

Sr.
No.
5.

Name of Project

Present Status

Upgradation of existing 132


KV to New 220 KV GIS at
WAPDA Town Lahore Sub
Station

Civil works Progress:


c)
AIS Portion = 100%
d)
GIS Portion = 100%
GIS Hall completed.
Erection of 03 Nos. 220/132kV
Transformers
completed
and
dehydration completed.
Erection of GIS equipments completed.
Testing in progress.
Wiring in progress.
Overall Progress of completion 84%

Tender No.ADB-16R-2008

(Lot-I).
Looping In/Out at Ghazi
Barotha Shahi Bagh at
Mardan Sub Station

EPA has issued NOC/ Environ- mental


approval in favour of NTDC
Length of T/Line = 27 KM.
Total Location = 86.
Concreted = 67 Nos.
Overall Progress 40%

Tender No.ADB-16R-2008
.
(Lot-II).

220 KV D/C T/Line Feed for


WAPDA Town Substation

Severe Right of Way Problem which is


being resolved.
Length of T/Line = 06 KM
Total Locations = 37 Nos.
Concreted = 27 Nos.
Overall Progress = 40%

7.

8.

Tender No.ADB-16-2007
(Lot-III).
For 220KV D/C T/Line for In &
Out of one Circuit of GattiKala Shah Kaku T/Line at
220KV Bandala Substation.

Length of Line = 6.33 KM


Total Location = 22 Nos.
Concreted
= 22 Nos.
Erection
= 19 Nos.
Back Fillling = 22 Nos
Overall Progress = 8%

Expected
Date of
Completion

March 2010

June 2010

June 2010

June 2010

NTDC NEXT YEAR PLAN (JULY 2010 TO JUNE 2011)


UNDER C.E.(EHV-I) NTDC ORGANIZATION
Sr.
No.

Name of Project

Present Status

Installation of SVCs at 220 KV


NKLP Lahore

Upgradation of 220 KV Bandala


Grid Station and Allied 220kV
T/Line feed for 220kV Bandala
G/Station.

Expected
Date of
Completion

Turnkey tenders for Installation of


SVCs at 220kV NKLP opened on
13.02.2010 and sent to CE (Design)
NTDC for evaluation.
Possession of land already taken.
Work for boundary wall in progress.
Contract
agreement
signed
on
23.01.2010.

December, 2011
December, 2011

Extension / Augmentation of
existing 500 & 220 KV Grid
Staions of NTDC System
i)
ii)
iii)
iv)

Extension of 220 KV
Burhan Sub Station
Extension of 500 KV
Sheikh Muhammadi Sub
Station
Argumentation of 220 KV
Murdan Sub Station
Augmentation of New
Rewat Sub Station

Bidding Documents are prepared


by Chief Engineer (Design) NTDC

Tender

will

10.05.2010

be

opened

on

December -2010