PROYECTO INSTALACIN
GABINETE TECNICO 10 MEDIDORES
CATEGORA DOMSTICA
EDIFICIO SOLIZ
Propietario: EDIFICIO SOLIZ Tel. 2750420-60178788
Direccin: C/J. MANUEL CACERES N/911
Departamento: LA PAZ
Provincia: MURILLO
Zona: TEMBLADERANI
INDICE
Pag.
1 GENERALIDADES............................................................................................................ 3
2 REQUERIMIENTO ............................................................................................................ 3
3 DESCRIPCIN DEL PROYECTO .................................................................................... 4
3.1 CONSIDERACIONES PRELIMINARES....................................................................... 4
3.1.1 UBICACIN DE MEDIDORES Y UN REGULADOR. ............................................. 4
3.1.2 UBICACIN DE APARATOS A GAS........................................................................ 4
3.1.3 ALIMENTACIN DE AIRE........................................................................................ 5
3.1.4 EVACUACIN DE PRODUCTOS DE COMBUSTIN............................................ 5
3.1.5 AIREACIN COCINA................................................................................................. 5
3.2 CLCULOS ..................................................................................................................... 5
3.2.1 DETERMINACIN DE POTENCIAS DE APARATOS A GAS. .............................. 5
3.2.2 DETERMINACIN DE POTENCIA INSTALADA................................................... 7
3.2.3 CALCULO DE CAUDAL POR SIMULTANEIDAD DEL EDIFICIO. ..................... 7
3.2.4 CALCULO DEL MEDIDOR........................................................................................ 9
4 DETERMINACIN DEL DIMETRO DE LAS TUBERAS. ........................................ 9
5 INDICACIONES PARA COLOCACIN DE TUBERAS. ............................................ 10
5.1 MATERIAL DE TUBERA........................................................................................... 10
5.2 ACCESORIOS. .............................................................................................................. 10
5.3 TUBERA ENTERRADA Y EMPOTRADA................................................................ 10
5.4 ENSAMBLADURA....................................................................................................... 10
6 ALIMENTACIN EN GAS NATURAL. ........................................................................ 10
1 GENERALIDADES
El proyecto est destinado a la dotacin de Gas Natural al inmueble que se encuentra
ubicado en la zona: Tembladerani, C/J. Manuel Caceres N/911 Esq. Landaeta EDIFICIO
SOLIZ. La especificacin de los departamentos:
PLANTA BAJA
PRIMER PISO
SEGUNDO PISO
TERCER PISO
CUARTO PISO
QUINTO PISO
DEPARTAMENTO PB
DEPARTAMENTOS 1A y 1B
DEPARTAMENTOS 2A y 2B
DEPARTAMENTOS 3A y 3B
DEPARTAMENTOS 4A y 4B
DEPARTAMENTO 5B
Proyecto Instalacin
Proyecto Instalacin
Proyecto Instalacin
Proyecto Instalacin
Proyecto Instalacin
Proyecto Instalacin
gratuita 39K
gratuita 39K
gratuita 39K
gratuita 39K
gratuita 39K
gratuita 39K
AMBIENTE
COCINA
COCINA
COC-HOR
CAL-BAO
SUB TOTAL
COCINA
COC-HOR
SALA COMEDOR CAL-BAO
SALA
RAD
SUB TOTAL
COCINA
COC-HOR
LAVANDERIA CAL-BAO
SUB TOTAL
COCINA
COC-HOR
SALA COMEDOR CAL-BAO
SALA
RAD
SUB TOTAL
COCINA
1 COC-HOR
LAVANDERIA CAL-AGUA
SUB TOTAL
10
23
33
10
23
4,4
37,4
10
23
33
10
23
3,7
36,7
10
23
33
0,9259
2,1296
3,0556
0,9259
2,1296
0,4074
3,4630
0,9259
2,1296
3,0556
0,9259
2,1296
0,3426
3,3981
0,9259
2,1296
3,0556
NUMERO DE PISOS O
DEPARTAMENTO
AMBIENTE
COCINA
COC-HOR
SALA COMEDOR CAL-BAO
SALA
RAD
SUB TOTAL
COCINA
COC-HOR
LAVANDERIA CAL-BAO
SALA
RAD
SUB TOTAL
COCINA
COC-HOR
SALA COMEDOR CAL-BAO
SALA
RAD
SUB TOTAL
COCINA
COC-HOR
LAVANDERIA CAL-BAO
SALA
RAD
SUB TOTAL
COCINA
COC-HOR
TERRAZA
CAL-BAO
SALA
RAD
SUB TOTAL
TOTAL
10
23
3,7
36,7
10
23
2,3
35,3
10
23
3,7
36,7
10
23
2,3
35,3
10
23
3,5
36,5
353,6
0,9259
2,1296
0,3426
3,3981
0,9259
2,1296
0,2130
3,2685
0,9259
2,1296
0,3426
3,3981
0,9259
2,1296
0,2130
3,2685
0,9259
2,1296
0,3241
3,3796
32,7407
COC HOR
RAD
CAL BAO
PB
1A
1B
2A
2B
3A
3B
4A
4B
5B
En cocina
En cocina
En cocina
En cocina
En cocina
En cocina
En cocina
En cocina
En cocina
En cocina
Sala
Sala
Sala
Sala
Sala
Sala
Sala
Cocina
Sala comedor
Lavandera
Sala comedor
Lavandera
Sala comedor
Lavandera
Sala comedor
Lavandera
Terraza
PUNTOS
DE USO
CAUDAL
[l/min]
CAUDAL
CRITICO
[l/min]
TIEMPO DE USO
mnimo
N USOS
VOLUMEN
DISEO [l]
Cocina 1
Fregadero
50
48
Bao 1
Lavamanos
40
12
Ducha
10
40
80
LITROS/MINUTO
Caudal Critico
Pu =
Donde:
q * T
14.33
T = Salto Trmico
Pu = Potencia til [Kw]
El calefn apropiado y existente en el mercado es de 10 lt/min, entonces se calcular:
Pu =
Pu = 17.446[Kw]
Rendimiento
n = 95%
n=
Pu
P
; Pabs = u
n
Pabs
Pabs =
17.446
= 18.3[Kw]
0.95
PLP =
18.3[Kw]
= 23.1[Kw]
0,79
El adoptado 23 [Kw].
Calefaccin (para calefaccin de sala)
DETERMINACIN DE LA POTENCIA DE CALEFACCIN
PARA CALEFACCIN DIVIDIDA DP. 1A
N
CLASIFICACIN
DE ZONA
AMBIENTE
H1
SALA
AISLAMIENTO
ESQUEMA
DEL LOCAL
3pi, 1pe,
Techo y piso
aislado
1pv
AREA
[m2]
VOLUMEN
[m3]
CLASE
LOCAL
P abs
[Kw]
P abs
[Kca/h]
32,90
80,61
4,17
3586
AREA
[m2]
VOLUMEN
[m3]
CLASE
LOCAL
P abs
[Kw]
P abs
[Kca/h]
29,50
72,28
3,82
3285
AREA
[m2]
VOLUMEN
[m3]
CLASE
LOCAL
P abs
[Kw]
P abs
[Kca/h]
29,50
72,28
3,82
3285
AREA
[m2]
VOLUMEN
[m3]
CLASE
LOCAL
P abs
[Kw]
P abs
[Kca/h]
13,50
33,08
2,17
1869
AREA
[m2]
VOLUMEN
[m3]
CLASE
LOCAL
P abs
[Kw]
P abs
[Kca/h]
21,00
51,45
3,54
3046
P abs [Kcal/h]
Adoptado
3800 [Kcal/h]
4,4 Kw
MARCA
MODELO
P abs [Kcal/h]
Adoptado
3200 [Kcal/h]
3,7 Kw
MARCA
MODELO
VOLCAN
CLASIFICACIN
DE ZONA
AMBIENTE
H1
SALA
AISLAMIENTO
ESQUEMA
DEL LOCAL
Techo y piso
3pi, 1pe,
aislado
1pv
LONGVIE
CLASIFICACIN
DE ZONA
AMBIENTE
H1
SALA
AISLAMIENTO
ESQUEMA
DEL LOCAL
Techo y piso
3pi, 1pe,
aislado
1pv
P abs [Kcal/h]
Adoptado
3200 [Kcal/h]
3,7 Kw
MARCA
MODELO
LONGVIE
CLASIFICACIN
DE ZONA
AMBIENTE
H1
SALA
AISLAMIENTO
ESQUEMA
DEL LOCAL
Techo y piso
3pi, 1pe,
aislado
1pv
P abs [Kcal/h]
Adoptado
2000 [Kcal/h]
2,3 Kw
MARCA
MODELO
LONGVIE
CLASIFICACIN
DE ZONA
AMBIENTE
10
H1
SALA
AISLAMIENTO
ESQUEMA
DEL LOCAL
Techo y piso
2pi, 2pe,
aislado
2pv
P abs [Kcal/h]
Adoptado
3000 [Kcal/h]
3,5 Kw
MARCA
MODELO
LONGVIE
0.736
]+ Q
cal .
DONDE:
A = 5 A=5
n1= 10 N de cocinas
n2= 0 N de Cal-Agua
n3= 0 N lavavajillas o maquina de lavar cocinilla
n4= 0 N de Cal-Bao (14 Kw)
n5= 10 N de Cal-Bao (22,4 - 26,6 Kw)
Q = Q1 + Q2
A. Clculo de caudal de calefaccin.
Partimos de la ecuacin:
Q2 =
Donde:
0.9 * S TOTAL
100
Q2 =
m3
0.9 * 35
= 0.315
100
h
0
1
1
2
2
3
3
4
4
5
TOTAL Q2 [m3/h] =
35
35
35
35
35
35
35
35
35
35
0,315
0,315
0,315
0,315
0,315
0,315
0,315
0,315
0,315
0,315
3,150
[
]
= 0.48 * [5 + (10 + 2 *10) ]
0.736
0.736
Q1'
Q1' = 8.2668 m 3 / h
Q = Q1' + Q2
(n)
[
]
= 0.48 * [5 + (9 + 2 * 9 ) ]
0.736
0.736
(n)
[
]
= 0.48 * [5 + (6 + 2 * 6) ]
0.736
Q1'
Q1' = 6.4283 m 3 / h
Q = Q1' + Q2
0.736
(n)
0.736
Q1' = 0.48 * 5 + (3 + 2 * 3)
(n)
Q1' = 4.8186 m 3 / h
Q = Q1' + Q2
0.736
[
]
= 0.48 * [5 + (2 + 2 * 2 ) ]
0.736
0.736
Q1' = 4.1946 m 3 / h
(n)
Q = Q1' + Q2
]
]
0.736
Q = 0.48 * 5 + (1 + 2 *1)
Q = 3.4775 m 3 / h (n)
Q = Q1' + Q2
0.736
Aparatos Potencias
Cocina
10 Kw
Calefn
23 Kw
Calefactor
4,4 Kw
Total
37.4 Kw
1
2
( P ) = 23 + 10 + 12 (4.4) = 35.2[Kw]
n
Q=
Q=
Pt [Kw]
PCS Kwh / m 3
35.2[Kw]
= 3.259 m 3 / h
10.8
Por simultaneidad:
4 bar
19 mbar
353.6 kw
37.4 kw
B20
G2.5
Fabricacin Nacional
32.7407 m3/h
3.0556 m3/h
3.259 m3/h
MADAS
Y.P.F.B.
N DE
MEDIDORES
10
9
8
7
6
5
A
5
5
5
5
5
5
n1
10
9
8
7
6
5
n2
0
0
0
0
0
0
n3
0
0
0
0
0
0
n4
0
0
0
0
0
0
n5
10
9
8
7
6
5
AREA EN
Q2[m3/h]
3,15
2,835
2,52
2,205
1,89
1,575
Q[m3/h]
11,4168
10,6641
9,8983
9,1173
8,3183
7,4974
5
4
4
3
3
2
[m2]
35
35
35
35
35
35
4 5 4 0 0 0 4
5,3889
1,26
6,6489
35
3 5 3 0 0 0 3
2 5 2 0 0 0 2
4,8186
4,1946
0,945
0,63
5,7636
4,8246
1
1
35
35
1 5 1 0 0 0 1
3,4775
0,315
3,7925
35
A.G.
0.10m
0.10m
0.35m
1 A.G.
0.10m
A.G.
A.G.
A.G.
0.10m
0.10m
0.35m
0.35m
2.90m
0.10m
1 A.G.
1 A.G.
1 A.G.
Q PROM.
[m3/h]
Long.
Real [m]
Lequiv.
[m]
Calculado
[mm]
p1-p2 por
tra [mbar]
Tramo
p1-p2 total
[mbar]
O-A
A-G
10
1
11,4168
3,7925
4,90
3,15
5,88
3,78
20,01
12,04
2,90
0,25
2,2490
0,3016
O-A
O-G
2,2490
2,5506
A-B
B-H
H-J
J-L
H-N
J-Q
9
3
2
1
1
1
8,3183
5,7636
4,8246
3,7925
3,7925
3,7925
4,90
4,20
4,20
4,20
3,50
3,85
5,88
5,04
5,04
5,04
4,20
4,62
17,76
14,97
14,00
12,78
12,31
12,56
0,35
0,15
0,35
0,45
0,10
0,10
0,2714
0,1357
0,3167
0,4071
0,1086
0,0987
O-B
O-H
O-J
O-L
O-N
O-Q
2,5204
2,6561
2,9728
3,3799
2,7647
3,0715
B-C
C-I
I-K
K-M
I-P
K-R
6
3
2
1
1
1
8,3183
5,7636
4,8246
3,7925
3,7925
3,7925
4,90
4,55
4,55
4,55
3,85
4,20
5,88
5,46
5,46
5,46
4,62
5,04
17,76
15,22
14,24
13,00
12,56
12,78
0,35
0,15
0,35
0,45
0,10
0,10
0,2714
0,1253
0,2923
0,3758
0,0987
0,0905
O-C
O-I
O-K
O-M
O-P
O-R
2,7918
2,9171
3,2094
3,5852
3,0158
3,2999
C-D
D-E
E-F
D-Q
E-T
3
2
1
1
1
5,7636
4,8246
3,7925
3,7925
3,7925
4,90
4,90
4,90
4,20
4,55
5,88
5,88
5,88
5,04
5,46
15,46
14,46
13,20
12,78
13,00
0,50
0,35
0,45
0,10
0,10
0,3878
0,2714
0,3490
0,0905
0,0835
O-D
O-E
O-F
O-Q
O-T
3,1796
3,4510
3,8000
3,2701
3,5345
TRAMO
Q PROM.
[m3/h]
Long.
Real [m]
Lequiv.
[m]
Diam. Adop.
[mm]
"
p1-p2 por
tra [mbar]
Tramo
p1-p2 total
[mbar]
O-A
A-G
10
1
11,4168162
3,79246329
2,90
0,25
3,48
0,30
35,08
26,64
11/4"
1"
0,1503
0,0066
O-A
O-G
0,1503
0,1569
A-B
B-H
H-J
J-L
H-N
J-Q
9
3
2
1
1
1
8,31829995
5,76359819
4,82457064
3,79246329
3,79246329
3,79246329
0,35
0,15
0,35
0,45
0,10
0,10
0,42
0,18
0,42
0,54
0,12
0,12
35,08
26,64
26,64
26,64
20,96
20,96
11/4"
1"
1"
1"
3/4"
3/4"
0,0102
0,0084
0,0143
0,0118
0,0083
0,0083
O-B
O-B
O-J
O-L
O-N
O-Q
0,1605
0,1690
0,1832
0,1950
0,1773
0,1916
B-C
C-I
I-K
K-M
I-P
K-R
6
3
2
1
1
1
8,31829995
5,76359819
4,82457064
3,79246329
3,79246329
3,79246329
0,35
0,15
0,35
0,45
0,10
0,10
0,42
0,18
0,42
0,54
0,12
0,12
35,08
26,64
26,64
26,64
20,96
20,96
11/4"
1"
1"
1"
3/4"
3/4"
0,0102
0,0084
0,0143
0,0118
0,0083
0,0083
O-C
O-I
O-K
O-M
O-P
O-R
0,1707
0,1792
0,1934
0,2052
0,1875
0,2018
C-D
D-E
E-F
D-Q
E-T
3
2
1
1
1
5,76359819
4,82457064
3,79246329
3,79246329
3,79246329
0,50
0,35
0,45
0,10
0,10
0,60
0,42
0,54
0,12
0,12
35,08
26,64
26,64
20,96
20,96
11/4"
1"
1"
3/4"
3/4"
0,0075
0,0143
0,0118
0,0083
0,0083
O-D
O-E
O-F
O-Q
O-T
0,1782
0,1924
0,2043
0,1865
0,2008
TRAMO