Steps on Operating the Sanity Check Program

Background
System

Loss Segregation is totally dependent on the integrity of the data. To ensure the correctness of data to be used, it should first be run into the program Sanity Check 1.0

Background
Sanity

Check verifies the following characteristics of EC System Data:


CONNECTIVITY PHASING RADIALITY

Sanity Check Procedure


Open the Excel Data of the Electric Cooperative to be

sanitized.

Sanity Check Procedure


We will first prepare the input data for the Sanity Check. In the

excel file, find the sheet for the Primary Distribution Lines.

Sanity Check Procedure


Select the data in the fields for From Bus, To Bus and

Phasing. Copy it.

Sanity Check Procedure


Open a new notepad file then paste the data there. It should

look like this:

Sanity Check Procedure


Save this file inside the Sanity Check folder located in this

address: C:\Program Files\Sanity Check Name the file using the following format: ECName_pri.txt

Sanity Check Procedure


Do the same steps for Distribution Transformers, Secondary

Lines and Service Drops.

Sanity Check Procedure


NOTE:

In naming the input text files, I suggest the following format:


For DTs: ECName_dt.txt For Sec. Lines: ECName_sec.txt For Svc. Drops: ECName_svc.txt

Sanity Check Procedure


After preparing the input data, we are now ready to do the

process. Open the program by clicking on the icon in the desktop for Sanity Check Program.

Sanity Check Procedure


The program interface should look like this:

Sanity Check Procedure


Click on the Browse buttons and search for the specified file.

Sanity Check Procedure


Once youve selected the files to be used in the simulation,

click the RUN button.

Sanity Check Procedure


To view the output, click the View Output button.

Interpretation of Results

Interpretation of Results
From Bus ID To Bus ID Terminal Branch Tree Number Phasing of To_Bus Branch Type of To_Bus Branch Type of From_Bus Radiality Check 2 Radiality Check 1 Phasing Layer Phasing of From_Bus Phasing Check Branch Type Check

A PL_Bus0001 PL_Bus0001 PL_Bus0007 PL_Bus0009 PL_Bus0009 PL_Bus0009 PL_Bus0010

B PL_Bus0002 PL_Bus0007 PL_Bus0009 PL_Bus0010 PL_Bus0019 PL_Bus0030 PL_Bus0011

C BN BACN BACN BACN CABN BACN BACN

D 1 0 0 0 0 0 1

E 1 1 2 3 3 3 4

F 1 1 1 1 1 1 1

G 0 0 2134 2134 2134 2134 2134

H 24 2134 2134 2134 3124 2134 2134

I 1 1 1 1 1 1 1

J 0 0 1 1 1 1 1

K 1 1 1 1 1 1 1

L 0 0 0 0 0 0 0

M 1 1 1 1 1 1 1

N 0 0 0 0 0 0 0

END

Interpretation of Results

BACK

Interpretation of Results

BACK

Interpretation of Results

BACK

Interpretation of Results

BACK

BACK

Interpretation of Results

BACK

Interpretation of Results

BACK

Interpretation of Results

BACK

Interpretation of Results

BACK

Interpretation of Results

BACK

END